Bryan Avenue Bridge Replacement at
Larimer #2
Federal Aid Project No. BRO M455-092
PRE-BID CONFERENCE
October 24, 2013
10:00 AM
215 N. Mason Street
Training Room 2E
City of Fort Collins
Engineering Dept.
Capital Improvements Program
22
INTRODUCTIONS
• Engineering:
• Capital Projects Program:
• Dean Klingner - Program Manager 221-6511
• Randy Maizland – Project Manager 218-5658
• Joe Crabill - Construction Inspector 222-1134
• Purchasing:
• John Stephen - Purchasing Agent 221-6777
• Traffic:
• Syl Mireles - Traffic Eng. Tech 221-6815
• Consultant Engineer:
• KDG Engineering, LLC
• Stan Kobayashi, PE 720-420-9069
2
33
ATTENDANCE
• Please be sure to register
• BID OPENING
• When: November 12, 2013 @ 3:00 P.M.
• Where: 215 North Mason Street (2nd
Floor)
44
Vicinity Map
3
55
IMPORTANT CONTRACT DATES:
• AWARD CONTRACT
• Approximately November 18, 2013
• PRE-CONSTRUCTION MEETING
• Mandatory Meeting Prior to Start of Construction
• Date to be determined after contract is awarded
• CONSTRUCTION START DATE
• Approximately mid December 2013
• FULL ROAD CLOSURE LIMITATIONS
• The roadway closure of Bryan Avenue for installation of the precast split-box bridge
shall be completed within 21 calendar days as shown in the Construction Documents.
• SUBTANTIAL COMPLETION
• 120 calendar days
• FINAL COMPLETION
• 30 Calendar days after Substantial
66
CDOT Local Agency Project
UDBE goal for this project is 9%
Bid proposal must include:
– CDOT 606 Anti-Collusion Affidavit
– CDOT 714 UDBE Assurance
Bids will not be accepted if they do not have these forms
Fuel Cost Adjustment option
Low bidder to receive:
Form 605, Form 621, Form 715, and Form 718
These forms must be returned by 4:30 pm the following day (Nov 13)
Monthly payments will not be processed until all documentation
required by CDOT for federally funded projects has been
submitted to the City.
4
77
SUMMARY OF WORK
Bryan Avenue Bridge Replacement:
• 1. Construction Traffic Control
• 2. Clearing and Grubbing
•3. Removals
• 4. Erosion Control
• 5. Concrete 3-Sided Box Culvert and Top Slab (Precast) Bridge Design and
Plan Submittals
• 6. Coordination with the Larimer County Canal No. 2
• 7. Structure Excavation and Backfill
• 8. Concrete 3-Sided Box Culvert and Top Slab (Precast) Bridge Installation
• 9. Joint Wrap
88
SUMMARY OF WORK
• 10. Temporary Paving with Cold Asphalt Pavement (Recycle)
• 11. Cast-in-place Concrete Box Culvert
• 12. Concrete
• 13. Sidewalk
• 14. Hot Mix Asphalt
• 15. Lighting and Electrical Wiring
• 16. Urban Design – Stone Installation
• 17. Cleanup and punch list
• 18. Seeding
5
99
Bryan Avenue Bridge Replacement
1010
PROJECT OVERVIEW
• PHASING
• Once contract is awarded, contractor should immediately order
pre-cast structures and light standards to determine lead times and
delivery dates and make shop drawing submittals.
• Full road closure limited to 21 days for demolition of existing
structure, setting of new pre-cast structure and re-opening road to
one lane northbound into City Park.
• Temporary paving with recycled asphalt to protect bridge deck
during the winter.
• Complete all outside edge improvements, sidewalks, walls,
electrical, urban design etc… maintaining one lane of traffic.
• Pave road with HMA
6
1111
PROJECT OVERVIEW
• Coordination with other utilities
– Gas, water, electric and City fiber optic will be relocated or
abandoned prior to start of construction.
– Contractor will need to coordinate with Century Link and
Comcast to reroute services to Club Tico building.
• Contractor responsible to acquire all appropriate permits and submit
required documentation
• Erosion Control
• Dewatering Permit
• CDOT Form 205 for each subcontractor
• TCS Diaries, Payrolls etc…
1212
HIGHLIGHTS FROM GENERAL CONDITIONS AND
GENERAL REQ’S:
• PROJECT MEETINGS:
• Once a week. Location and time to be determined.
• Agree to weekly quantities
• PROGRESS AND SCHEDULE REVISIONS:
• Prior to construction, initial schedule must be submitted and
approved
• Schedules shall be updated weekly
• The Contractor may be required to submit additional schedules
depending on the progress of the project.
• Record Drawings Plan Set
• Contractor will be required to keep record drawings
• Will be submitted to the City at the end of the project
7
1313
Highlights from Specifications
1414
Section 202 Removals
202-00400 Removal of Existing
Bridge
• Missing from bid schedule. Will
issue addendum
Other Removals
• Trees
• Inlet and pipe
• Sidewalk, curb & gutter
• Concrete and asphalt pavement
• Light standard
• Fence
8
1515
206-00000 Structure Excavation – 491 CY
o Established, plan quantity. Payment will be plan quantity. Any
removals beyond plan limits by contractor will not be paid by
the City
203Muck Ex – 173 CY
-Paid on measured quantity
EARTHWORK
1616
SECTION 208 – Erosion Control
Less than an acre of disturbance. No SWMP plan required by the State
however, the contractor is responsible for installation of erosion
control BMP’s as described on the Storm Water Management Plan
sheets.
Pay Items
– Erosion control logs
– Gravel bags
– Concrete washout
– Tracking pad
– Sweeping
– Erosion control supervisor
9
1717
SECTION 601 – NEW BOX STRUCTURE
• 3 Sided precast
box
• Precast deck
• Cast-in-place
riparian walls
• Wing walls
• Parapet walls
1818
HMA AND CONCRETE PAVING
• 403-32721 Hot Mix Asphalt (Grading SG) (75) (PG 58-28) – 40
Tons
• 403-33721 Hot Mix Asphalt (Grading S)(75)(PG58-28) – 42 Tons
• 304-06000 Class 6 Aggregate Base Course – 72 Tons
• 412-00800 Concrete Pavement (8 Inch) - 100 SY
• 608-00006 Concrete Sidewalk (6 Inch) – 207 SY
BID ALTERNATE - 403-33851 Hot Mix Asphalt (Grading
S)(100)(PG64-28) Leveling Course – 500 Tons
10
1919
URBAN DESIGN ITEMS
Moss Rock Faced Parapet
Walls and Columns
2020
URBAN DESIGN ITEMS
Pedestrian Timber Railing
58 LF
11
2121
URBAN DESIGN ITEMS
Pedestrian Steel Railing
38 LF
2222
URBAN DESIGN ITEMS
Metal Light Standard (4)
LED Luminaires (4)
Contractor should order light standards and
luminaires at contract award. Long lead
time.
12
2323
Traffic Control
• Full road closure – 21
days maximum
• Re-open one travel
lane northbound
• Pedestrian detour and
signage
• Portable message
signs
2424
Thanks For Attending!
• Any Questions or concerns can be addressed to:
• Randy Maizland
• Phone: (970) 218-5658
• Email: rmaizland@fcgov.com
THANK YOU!