Loading...
HomeMy WebLinkAboutPrebid - RFP - 7525 ARTHUR DITCH BRIDGE REPLACEMENT DESIGN SERVICES1 Welcome to the Pre-Proposal Meeting for: Arthur Ditch Box Replacement Design (Bid # 7525) June 28th, 2013 2 RFP Evaluation Committee • John Stephen, Senior Buyer – Purchasing • Jin Wang, Capital Projects Engineer • Mark Kempton, Floodplain Engineer • Tracy Dyer, Project Manager • Ken Mannon, Operations Services Director 3 Key Dates and Facts • Proposals Due – July 10, 2013 at 3:00 pm (Purchasing Department clock) • Arthur Ditch / City of Fort Collins ownership • Preliminary and Final Engineering with Design Support during Construction • Contract will be “Hourly Rate Not to Exceed” 4 Proposal Clarifications • Eight (8) Copies – Written or Electronic o City can Receive up to Twenty (20) MB Files • Twenty-Five (25) Page Maximum o Page Count Exclusive of Covers / Dividers o 11x17 Sheets Count as One (1) Page o Cover Letter is not Considered in Page Count 5 Project Location  Oak / Whitcomb  Olive / Loomis  Canyon b/w Mulberry and Magnolia (Mulberry Pool Parking Lot) 6 Project Goals • Design for replacement of 3 separate structurally deficient box structure segments o Fit replacement structures into Floodplain “no-rise” conditions / model • Box design alternatives • Improve pedestrian mobility, vehicular ride quality • Project phasing / scheduling • Site restoration details / conditions 7 General Project Schedule • Preliminary Engineering November 2013 • Floodplain Modeling Nov-May 2014 • Final Engineering June -July 2014 • Advertise for Construction August 2014 • Proposals must contain detailed Project Schedules meeting the August, 2014 Advertisement Date for Construction in the Fall of 2014 8 What’s Involved? • Preliminary and Final Engineering Design o Data Collection and Data Analysis o Property Owner Coordination o Utility Coordination o Plans & Specifications o Cost Estimates o Construction Support o Creative Solutions! 9 Design Coordination • Flood Plain Modeling / Design Coordination • Road Profile adaption to existing infrastructure • Existing Utilities and Potholing o Included in Your Proposal o City will Collect Locations / provide data 10 Oak / Whitcomb • Constrained limits – tree’s / private property features o Existing storm infrastructure o Potential tree mitigation 11 Loomis / Olive • Combination sidewalk, gutter system • Proximity to private structures • Tree protection / removal 12 Canyon b/w Mulberry and Magnolia • Storm water delivery • Floodplain / roadway profile design challenges • Restoration requirements 13 Design Opportunities • Box cross section tie – ins, changing dimensions o Fit to existing box with new cross section • Curb / Gutter / Sidewalk systems • ADA compliant pedestrian access ramp design • Road profile design / ride quality review 14 Quality Assurance / Quality Control • The Consultant Team is Fully Responsible for the QA / QC of the Plans, Specifications, Cost Estimates and Constructability of the Design • Please Include the Following in Your Proposal: o QA / QC Processes o Methods for Design o Support During Construction o Accountability 15 Environmental • The Consultant Team will address all applicable environmental regulations (City) associated with the project: o City Floodplain o Soils / Groundwater Investigations o Structure Demolition o Noise mitigation / management 16 Questions? • Please address questions through e-mail to: John Stephen jstephen@fcgov.com - and - Tracy Dyer tdyer@fcgov.com • RFP Download Available @ www.fcgov.com/eprocurement