Loading...
HomeMy WebLinkAboutBID - 7543 NEW OFFICE BUILDING AT NIX FARM NATURAL AREAS FACILITY (3)Addendum 3 - 7543 New Office Building at Nix Farm Natural Areas Facility Page 1 of 2 ADDENDUM NO. 3 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of BID 7543: New Office Building at Nix Farm Natural Areas Facility OPENING DATE: 3:00 PM (Our Clock) August 30, 2013 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: Exhibit 1 –Revised Bid Schedule Please contact John Stephen, CPPO, LEED AP, Senior Buyer at (970) 221-6777 with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing Addendum 3 - 7543 New Office Building at Nix Farm Natural Areas Facility Page 2 of 2 EXHIBIT 1 – REVISED BID SCHEDULE 8. BID SCHEDULE (Base Bid) LUMP SUM BASE BID $ IN WORDS: ALTERNATE SCHEDULE 1. Install owner provided PV panels on the existing maintenance building, (per drawings): $_________ Lump Sum 2. Mobilization cost to drill a Geothermal test hole to be used for testing before the system is installed: $_________ Lump Sum 3. Bore 250 L.F. of 4” Telecom from the existing maintenance shop to the west end of the new building, (per drawings): $_________ L.F. 4. Pergola, (per sheet LS503): $_________ Lump Sum 5. Geothermal vertical well, grout and piping: $_________ L.F. 6. Portland cement concrete pavement, 6” thick: $_________ S.F. 7. Asphaltic concrete pavement, 3” thick: $_________ S.F. 8. Install Decorative Plastic Glazing (Section 08840) at interior door type B: $_________ Lump Sum