Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
524939 DOUGLASS COLONY GROUP INC - PURCHASE ORDER - 9135293 (2)
t/ . nS rchasirl SPECIFICATIONS AND Financial Services Purchasing Division 215 N. Mason St. 20' Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 jcgor.con✓purchasing CONTRACT DOCUMENTS FOR ROOF REPLACEMENT AT DRAKE WASTEWATER TREATMENT PLANT BID NO. 7529 PURCHASING DIVISION 215 NORTH MASON STREET, 2ND FLOOR, FORT COLLINS • AUGUST 7, 2013 - 3:00 P.M. (OUR CLOCK) ability of the bidder to provide future maintenance and service for the use of the • subject of the contract, and (9) any other circumstances which will affect the bidder's performance of the contract. 3.3. Each Bidder may be required to show that he has handled former Work so that no just claims are pending against such Work. No Bid will be accepted from a Bidder who is engaged on any other Work which would impair his ability to perform or finance this Work. 3.4 No Bidder shall be in default on the performance of any other contract with the City or in the payment of any taxes, licenses or other monies due to the City. 4.0 EXAMINATION OF CONTRACT DOCUMENTS AND SITE 4.1. It is the responsibility of each Bidder, before submitting a Bid, to (a) examine the Contract Documents thoroughly, (b) visit the site to familiarize himself with local conditions that may in any manner affect cost, progress or performance of the Work, (c) familiarize himself with federal, state and local laws, ordinances, rules and regulations that may in any manner affect cost, progress or performance of the Work, (d) study and carefully correlate Bidder's observations with the Contract Documents, and (e) notify Engineer of all conflicts, errors or discrepancies in the Contract Documents. 4.2. Reference is made to the Supplementary Conditions for identification of: Subsurface and Physical Conditions SC-4.2. • 4.3. The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Contract Documents and such means, methods, techniques, sequences or procedures of construction as may be indicated in or required by the Contract Documents, and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. 5.0 INTERPRETATIONS AND ADDENDA. 5.1. All questions about the meaning or intent of the Bidding Documents are to be submitted in writing to the Engineer and the OWNER. Interpretation or clarifications considered necessary in response to such questions will be issued only by Addenda. Questions received less than seven days prior to the date for opening of the Bids may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. 5.2. All questions concerning the scope of this project should be directed to the Engineer. Questions regarding submittal of bids should be directed to the City of Fort Collins' Purchasing Division. 5.3. Addenda may also be issued to modify the Bidding Documents as deemed advisable by OWNER or Engineer. 40 r ja or . C.x m i "Fut ,Article's I Uan 12.*' --OWAERUqyStipfhe IImV. q.h., Corie6tion Pehod.- .' I , ." . - - � 13 M. [n special 6ricumstzirt6es ,where a l5artitolar item 'Off'.eqw.pm—ent. is p'.Iac�d in-, cor.imi* Uqqs' isCrvli'", :before: - Stibstuntiiil, Cbruiplefiom.of all the. Work the: 66rrqcti(MpeiiDd ror that ifiiid,rdiy'-stHiT to'r'un'fr6m an earlier -'date ir so prmded'in ' he pVu cations.or w6tim-Am—c-nd-ment- Wo* (sio c6t�age,'6- other A. - 1. w/ LI IT OF FORT 60ticl �S _'I bi)IF16='�4i(m-WOUG3 ed, reTnuvo or.mplaced ur#.r this pirajuijph, 13: 11 Z':4hc correction, 0(�rjqd,'I�ufidcr With respect to.suffi Work- will.be extends l fur an ad livanal d ofena jeer; Plum A , ccepmnce.eifpiJFcfivw•W6 OFINER.njqj;, i-onvel befect4,eIVork.-. I 0 I* 0 0 0 0 includedamages. will u not e 0 of repsI X others da�'14'1�26 4, Ir k2e'n o 'removal, o cc: ,e, e tioiL, 'moval,_or repla er 4)f, 'CONTRACT CO :a (AV OR in6vb-e�, 11 �rd a, cxt, en cause "in'OrT Wort W tab rum', u m' selby }rigjtts and ARTICLE CbINTRACT6k AND t6b1pmlolq, 14.-L, 'The 'sm Muk 6. valutis'ektablishcd as'-&bicled inl �ptnagaph 1_9 wql '_*.r�ca-:sthe ba'b,iufor prcgreS-s vpay i'n entI s ;andpil,beIneci ratedinto ntionn ofiApplication for- Payment ' Yfflept PqNPt965,to rxGINRER:: P�dj;r� �aym5nts911 account of LInt PrcPw6rk will he hhised 66'the*rufief of vnws comp COATA4 &Offa Wffmfily Of Tide.- 114:3 XADINTRACTOR',W-acnint-s! Find that tide •1_ !,�mMtee� , any 11 w N --'ed'b ,to a k or - Tat�ria. and eq'tupment cover y any ;Appli`61i&i fiar Payment, whether' incor - - d ' th tp�c. -1 1 - 1 1. . qvrqu _tn ' � of ject or not, Ail1'pa!-;k'1p,ONVNER ridIatef thanilk firric �aymerif frm and alilir of , all Liens., 14A. ENGINEER will. witHin ten daysafter receipt of pep6h AOOicakion' far Paygt ant eitheF indicate ' i i a' _— -, - ON71�*- - CON6m'ONS-1910_969`90 14.S; of any.,jm,6iizrit JC4ucsfcJ,ifi.an ApOipiiliri for Payment will oonsti!utc;a "In ton' by hNGINEHR to OWNER based. on ba6- , - - "' f he MaGiNEFR's on site R - Kallq!)cA. eucvtcd Work :FNG1,N1HER's.,review Oif.the'A- I t on for Pa�cfit,aricl NAlle, Inp ng 6ta-mid'EZZ6. that to,dr'b6t or G !cco r 415*1 tha- Wciik hgs pfpgT'eskq. tm .h6 lipifit indicated,'_ 14.53. the, cortdiii6ns Iirecqdent id CONTRACTORS -beifig entitled] to) vah. pavinefit pl=ur to lmve, been 'Orlud Aiour as "'it its :E!v'GIN UR!s i;:s rk'. ponsi li�',to C& 14;7; r N 6 1 NE F R� r�c iii k-. t 6 re =-' m &ua t kwh 6 1 c or any of any payment ifinE3�401NEER!sIcpinion. it *o-uld � -Incprre t . I he, t 'niak ,�t re pprese n ptauo Is _o 0 "r U" '�gra '0" t" n I any payment' or_ of, r, ev or tl�e • results or subs rq I�ye , e� Ed ry any �prevtously ;recommended: to stick cttent `as' .may -';be' 6 F-R librit loss because- 1.4.7*!- or C&MO144t�yor 14.72. theLrd —t Price has 'been reduced ,by wren,nmen,c,.(hartec Order,MvNp41. 6s been required to cprrecv &Jctzve Wark in 'pan-- ' phITI4.' _.ccaor -nce M., gru ..-or 14.7.4. ENGINEER has iiauai knowlawi''or' 'the: occ irF6nac of ;any of, nuip'e'rntedins 0 21 UEJiJ52Winclusive. CATER ma "reffisc to mhk-c paj,mdnt,ofthe ill arrid6ht. 1475 claims have Ixenmade against rn� ao�u'� of of the Wm{� 'I 43A Eierij hi%;u I;cch -filed in con6iection,4iihihe- Work e�cep 6t,whe rc'CON*C RA crCIR: rwRi-d�llvyereds sp L!' Bond s'ki's6k_t6r- R: to, &zfic�-A�'thc yA&�CW�, satiiftiotion and discharge of suchicra, 14.73.• there are Aerttems entitling O'WNT_FRt.6 asa- ,offagai5st the amount re6Rffiqda or 11478 'OWINM'hms,actual "k.rioM.edge ."of -Oic cccurr�m-c of an),ofthe' eyerTs enumerated in au 1 %1"4 lnclywe� tut OVAYER - must , give CONTRACTOR immediate ivifittm n66ci'(wJth a 66j)y.to FINGINEFR) staring. the pity CONTRACTOR to y IRCAen Im "CONTRACTOR; •�rh'_ CONTRACTOR a5rtects to OWNER" mitmFactian the Sd6'4dfid&. CO . I I �releft . ml: V/aj_fojf6kT OOL UNSMOMPIC ATIONS (TIXI V -1 /2 OUO) 1 4.9., 0 VINIM shall have: the 6g)tto 4mlude CONTRACTOR' front Lh&' ' W64, after =ilc' date' .iif sut6tarai�al Completion. OWNER _shall allow to"66ntojete 4tei4.tin 1the t6ii6tivc list 0 0 I* pqa� qn of pal of the'Woii. W 111, be aibvoffipl ished pribr q6 6btifipfiyi-Rec ,5eqiijreme Is' -M h'5 15 -F ..m prpa Vnp ; in rcspecto fyroi3crt)v insurance. "i -a afk jn .`d lereoI' , is ompleic, i-W "or in ag-r-ced - entire ,pcirljo- '" cI ENIGRNZER,�QlJuakp -,'Cfiiiil itis-Ncti&n - wIth blMi� =I&_GQNTR_,A_(;TOR' and will . 'n6lifv - �CONFI'RA I CTOR it v .Writing of,nlh(m*rti6ulIirs in which, th-is iasriacfiqn' re I v&Is:, unmcdiat,� take such measures as are necessary c Rnal Applicarion.fir Pikvwent., 0 i9iii-8 (1999 , 6 611 . in . q461, IT QYI';OPILT CDLLIM'MODIFICAinIO* NS'Y'ifiV 4 i-NO). E lo' , fiifiiish such' n r !recelpt, 'in, fun. CtOw—T-RAt:TOnizmaY ,or th N i, , a 0 er. Mons satka,6 "te", 'to iRif', , OWNER-60imif, _Y eIe-- v 0 lieos-iifAaXtriwm U Ahe 7surctvto! fidR16x be---s-ubrfiittcd: on to the. formht-or the OWNER'S standard ,lbfmibQumJ in theTibiecIrrmhuaL 17u!idp#AjenIzmdA . ccep tan , re. 1416: * The nm&g and .accTfsnvvcf'GI3iI paynipj . i I will - cbNTRActow t:xt*,- claims. -grising, tunsett defeq�,e work, appearmg.after ,1aiofitmmhieaile Mply= t� ih, term-S bf.,iny• special. gil2iaiit&-S;ape ci fied .thqrea - 6i From CONTRA(MD-, Wi eontinu .Ing lipobtions,,under 14i's w6i%4i, ll:, di6s' by. CONTRACTOR' against OWNER other than thbsc previously made in. tooting andstillunsettled. .'ARTICLE AS;-SUSPFINSION -Or NWQRK I I . '01VNMAJ Suspendl+ rk; . kv I 'P ,6WN[,'R,d,Iqy , 7erqLhWeI: 15:2,'. 'Upon, the occtiri�hce of -any one or more of the following&cnts' if,,CONtIZ/AC7Okr.enistentl)-fails tolpeif perform the Wolk-'In accordance witfi,ific- ccor t4 ( cl aim- �b in - u �,- utnot limited to, failure to sttpiplyel t skilled wprkersor suitably' materials eient ot fiiilureto-a eriito'the progrss ' le-C lish6d under p62 as'- _ a dj ed 'l!V6m, dime totime pursuant p 6- if -CONTRACTOR disregaidk ,Laws 'or -Reitflatkins,of arypublic body haimgI f 512'J. 4,CbNTRkTOk d. a . e -Altile kahority. of IS' .j- . if.'CONTRACTOR 'athervise violatesjn: any- substantiAl wayany, pro%'IsLoni" of - the t3dritra-cl- Dociimeng, . . Ej6bCrjE�ikAJ:C0NDiTi0iIIS 614M (090'EdAiw), 32 V- — of:F6ifC0LLi1s1sMi J Gi�kTIONSMEN"IdOUG)d LIT .06ti CONt'_ CTOR"but %ifich die s;*d,e-. lJ_;ewhire_. 'd fi n j�,) Mcuk as OWNERmay'decroexpediie" ,In Z ;vase. CONTRACTOk,sh6H'mt4b;i 6ititleid to receive or)- �fuhhe'r 'pay';rwnih until the -Work' is ' finished. If flie'uriaid balance of ifi,daruct Price exceeds an Vai "i costs, ried b-;,'OWNF'R "mg,-o6t of ,or resultinglom completing the Work sack excest will be .pdidifo CONTRACTOR. If such ebinfs;:custs; losses and ' damages exceed. such-unpaid.,balance, CONTRACTOR 6k ihallj " — to OWNER1,-�h claws costs, "Pay c qFa.,� ., Id by, - Such and jaffidamagesi�&aiicOWN M- will be reviowed �by' ';EYZGINFER-as to their, "so approv-ed'by pro�ided'_-Oiat wh-eh exer6sirj any I right s'. or remedies .under this, paragraph OWN( 'Ri qhall 'not he required to ;olvtairc Ole IdiWest. pri&6&t Oc W6rklerformid.r 15.1 Wh efe hi'v.6 hc&;Is terd miiat by. iny . n I g fiLq ,or rcmqcfic-s, qP 'OWNRR agatn.q" CONTRACTORalien ,existma"or whi&miy thaafterr or" gay"m!�'C of 'nvin�_)� -due' 6 NViIl R will nilt� refe I MA liability, (jpon�.1.1sevem dayv', written notice to* C701\9 'RA(,-rM and' FNdINHER, 'OWNblIt' may, without cause mW without d, other righi-;r ,preju te any renledy, of OW N&R,elect 't i It die, cemcnt in such X: se, cbim'R'Xlr11"'be jziid - kvithout, cluplicaticin orpny,items. 15.4.1. kii cbmpletid and acceptable Work executed 155ciirnents- " " prior to tbe.effcctiw dme,of termination' including raii.and r&Lwtiabli. suitis r6r overhead' and prilfit,ori S;6jl Wok, 1S.A2. Coi.e p K ses sus9ained prii r to the _ - �eff ecuve &-iff or termination in 'perforrung. servi&s.and f �urI. -nisJunglbor i. nulteriA s;or e - ' _quipment asje4i by. the 426nirget, bocumciats'*a 7,cormection with uncohipleze-4 -Work, plus fWtr andrdisdniibkjvj , ms.for -&Yerh6d and proflCM such c1q'c'T`cs incurred ifi' Set tlekkfit QflerffiihatM contracts .lvfth Subvc;nIT-,60_M. S6P'P',j idfs UMI O"the m aod- lor4eisohabk pjtenses diiecflv, attributable to termin ktioii CONMRACT.Mshall, not be� paid�on accbLint! of loss"of 10�i� I I ' 6 1 1 11 " I , hi �. loss 'pa Ed I is or reVenUe or ot r-ecuncirmc orCUIST9 out 6, riwi,ti'n',,'from.'sLfchte'rmumUom C0t,TA,lcT0-R- Mqj"Slop' UYvrkor.Terifiifialk, �.5. it; dirodg)l no act or'fauit of CblIiTkAdfOk the A`Iurkisl,suspto.ded for a p . eriod - of mane than ninety days bft OWNER ,6r'undLi an'order ,bf1catirt or'odverpu'ic a",f -fNd , li Y 4P"FR' 11 --submirte&qr within Thirty days �9 after it �Ls aymen, O%V,NFR.Ailsfihi thirty days any 0 0 PCLIE 1(r M.SRJTE RMOMMION E :ARTICLE 17—iVIISCELtiANE0U5 'qmflgIvmcie-.* A7:1. Wheneva.. tiny"Proxisich of the, Comma :Dodtm-'�ntg 11--. th ' i i — 17 i — m nOfiec,'iiklll be: deemed lo1rtve be6vvdIidlv giYedif &I]Mere�d'm td tli- IVI U91 b, indi 'd - &-of thefium or to -'an or �or,ko 9 mqrn 0. iffie.corporution fdr,whbm;it -1.5 intended. unirdelavered at' ,szni by registered dr�berihfied m-ail,-p'm:'tagc prepaid;-to-the gq.businme&addrcss k-auwn to ft4i fibli 17;2.1: Mienanpperipd of time is mrcrrcU'ta in the ,Cordiict bcx;%tfiimts be comcd tb� and, irijudc, the �Iait' flay of�Siiqh, Peri6a If the diiv Wlany 'sueh kn'W rills,on,ii, Sittura - - S day or,, I on a by such day.w if be bmifteii "-'tfii.com Ptltflrion: ibe 6& kum 11 A, 61indiir d6j,'tit 6ou'rs- mcit" idd riod idthl�tot In pm he next,midniWit -%6u,c6nstkute.n Pi*fpi vimI`Pe& anji--'�vuh Include&. 14. S YW ecfeiehc�a -js ninde to -66 iifik costs� -a 16�i A(f6mag6"-, it "Ifiiklu& ine"t'ch 'aageAul' not "Ind cj?h4i�of elig sl archtit is attorneys ind �Yffiei pr6kicnals and all.-court,'or, 17A Thejaivs,of the'State of C lomdo . lftKA-this AmcrnenL Refer rkt6.tivri'ner6fieni,Cc)16rndo mattiles Z follows 17.*6-.2*. -I'f,a claim -ii filed &WNlEkis mqu ied by ,19%v'(CRS38-2(-107).to.widih6ld &Cifi all pdi-Mchl§ to CONTRACTOR- sufficient fumls to ixisure-the t%'iymcnt of aft ilatms r labor--, materials :tcamAtim torovenbr- otha7klies .,used: or 7. conainied' bNi (X)NI'17RA('�TOR , �nr !h '33- EjCL)c(jE-6AL,Cowf ,34 wAU I I- - Y OF.FoKT.MUU NiSMODIFICATIONS W-Y4 OOG) 0 • 0 010-9 09906�dm') I.CA,TION- ' . s (iifi .1)11,'_y4 qouu) �11 35. 36 O,IT Oi+,O,RT,-ODLLI NS MODIFjCXnONS kXLY 41- 000) 0 E Is 0 i.EX%IIBIT CC-Afo General Canditiops+ of the Cnnstruetion C'ihttdct Bett%•cetl, QWNER�and CONTRACTOR D1S1? I'm RES0LITHON a6REEbiENT' .ow,\Tm urLa'CbNTR/\CT.oR hereby'e�ree that' t\rticic il6-of the Gencrul'Conditi6ru;1of dhe, Corv;tviction' 'Gonvact :hetwazn _C, WNE'R and-t;(jgrg,A 'F(iR.. is. n ii2ndttl,ty nclude lhefollnµing' igezinent of thepurties:- IG9 ��rt as biovidzil ut parti ph_ 165,b6k ii, np,arbiiration aristral-out of or, ralaing,to a Contract Documents shaltinclude by corso11dation.1joirrcier or in any clover manner, any Olhdr 'person' or entity (rnclUcling' ISICrlNF�RF ETTGMEER's CoripOiant and the .ofl cera directors agettts Jetnploye or consultants of eny.of them) w (;!6 not alpaity to this coN ctunless 'Ifi�.4 I the uiclusron of such other, person or entily'is, necessary if cnmplelc "relief rs lo'be'afforded among t Rase who :ve ulreacly parties tcj_the_arbi6 iugtt;und 16.4' such other person or entity�is substantially involved in'A question of lae or fact which is cbminon Co those whq nre airendy emits whichwdh i -tthned rda:iirhitretiontnnd' 1K4 i the• written fconseiih of tl c p her ppeerrson 'or entity soughlt .to be ncludLd i nil of OWNER and CONl RAMbR-has bccn`ohlaincd for such inchrsion; wliiih` wns i t; shalt mukr's*ific i:el'erena to this fapgraph: huh ne such consent shall coasii a consent tnarhuratioit oFarry tllslititc not specLGcally ducriticd. n: such consent %or to. arharatlon -witl .any ' party! not. spccitically'identified in Ruch consent. 16.G. .The award ren iered ky the arbitrators wi11 be final, judgment may be enured upon It in r iy court having }unstliction tltzreof and' ;it will not be subject .to 'm&l�c:hdaiior uppc rl. (3(J-A 1'. • 5.4. Addenda will be mailed or delivered to all parties recorded by the OWNER as having received the Bidding documents. 6.0 BID SECURITY 6.1. Each Bid must be accompanied by Bid Security made payable to OWNER in the amount stated in the Invitation to Bid. The required security must be in the form of a certified or bank cashier's check payable to OWNER or a Bid Bond on the form enclosed herewith. The Bid Bond must be executed by a surety meeting the requirements of the General Conditions for surety bonds. 6.2. The Bid Security of the successful Bidder will be retained until such Bidder has executed the Agreement and furnished the required contract security, whereupon Bid Security will be returned. If the successful Bidder fails to execute and deliver the Agreement and furnish the required contract security within 15 days of the Notice of Award, OWNER may annul the Notice of Award and the Bid Security of that Bidder will be forfeited. The Bid Security of other Bidders whom OWNER believes to have reasonable chance receiving the award may be retained by OWNER until the earlier of the seventh day after the effective date of the Agreement or the thirty-first day after the Bid Opening, whereupon Bid Security furnished by such Bidders will be returned. Bid Security with Bids which are not competitive will be returned within seven days after the Bid opening. 7.0 CONTRACT TIME. The number of days within which, or the date by which the Work is to be substantially complete and also completed and ready for Final Payment (the Contract Times) are set forth in the Agreement. 8.0 LIQUIDATED DAMAGES. Provisions for liquidated damages are set forth in the Agreement. 9.0 SUBSTITUTE ("OR EQUAL") MATERIAL AND EQUIPMENT The Contract, if awarded, will be on the basis of material and equipment described on the Drawings or specified in the Specifications without consideration of possible substitute or "or equal" items. Whenever it is indicated on the Drawings or specified in the Specifications that a substitute or "or equal" item of material or equipment may be furnished or used by CONTRACTOR if acceptable to Engineer, application for such acceptance will not be considered by Engineer until after the "effective date of the Agreement". The procedure for submittal of any such application by CONTRACTOR and consideration by Engineer is set forth in the General Conditions which may be supplemented in the General Requirements. 10.0 SUBCONTRACTORS, SUPPLIERS AND OTHERS 10.1. Each Bidder shall submit at the Bid opening to OWNER a list of principal subcontractors he proposes to use in the Work. Refer to Section 00430 contained within these Documents. 10.2. If OWNER or Engineer after due investigation has reasonable objection to any proposed Subcontractor, either may, before the Notice of Award is given, request • the apparent successful Bidder to submit an acceptable substitute without an 6C-Al Uf' MODTRCATIU;O (kFV 9114)' 0 0 1-1 • • SECTION 00800 SUPPLEMENTARY CONDITIONS SECTION 00800 SUPPLEMENTARY CONDITIONS Conditions of the Contract These Supplementary Conditions amend or supplement the General Conditions of the Construction Contract (EJCDC General Conditions 1910-8, 1990 edition with City of Fort Collins modifications) and other provisions of the Contract Documents as indicated below. SC-4.2 Subsurface and Physical Conditions: A. Add the following language to paragraph 4.2.1 of the General Conditions. 4.2.1.1.1 The following report(s) of exploration and tests of subsurface conditions at the site of the Work: n/a Contractor may rely upon the accuracy of the technical data contained in the geotechnical documents, but not upon nontechnical data, interpretations or opinions contained therein or upon the completeness of any information in the report. • B. 4.2.1.2.1 No drawing of physical conditions in or relating to existing surface or subsurface structures (except Underground Facilities referred to in Paragraph • 4.3) which are at or contiguous to the site have been utilized by the Engineer in preparation of the Contract Documents, except the following: n/a SC-5.4.8 Limits of Liability A. Add the following language at the end of paragraph 5.4.8. The limits of liability for the insurance required by the paragraph numbers of the General Conditions listed below are as follows: 5.4.1 and 5.4.2 Coverage A - Statutory Limits Coverage B - $100,000/$100,000/$500,000 5.4.3 and 5.4.5 Commercial General Liability policy will have limits of $1,000,000 combined single limits (CSL). This policy will include coverage for Explosion, Collapse, and Underground coverage unless waived by the Owner. 5.4.6 The Comprehensive Automobile Liability Insurance policy will have limits of $1,000,000 combined single limits (CSL). 5.4.9 This policy will include completed operations coverage/product liability coverage with limits of $1,000,000 combined single limits (CSL). • • SC-12.3 Add the following language to the end of paragraph 12.3. Contractor will include in the project schedule zero 0 days lost due to abnormal weather conditions. 0 SECTION 00900 ADDENDA, MODIFICATIONS AND PAYMENT 00950 Contract Change Order 00960 Application for Payment n U • 0 • 0 SECTION 00950 CHANGE ORDER NO. PROJECT TITLE: Roof Replacement at Drake Wastewater Treatment Plant CONTRACTOR: Douglass Colony Group Inc PROJECT NUMBER: 7529 DESCRIPTION: 1. Reason for change: 2. Description of Change: _ 3. Change in Contract Cost: 4. Change in Contract Time: ORIGINAL CONTRACT COST $ .00 TOTAL APPROVED CHANGE ORDER .00 TOTAL PENDING CHANGE ORDER .00 TOTAL THIS CHANGE ORDER .00 TOTAL % OF THIS CHANGE ORDER TOTAL C.O.% OF ORIGNINAL CONTRACT ADJUSTED CONTRACT COST $ .00 (Assuming all change orders approved) ACCEPTED BY: DATE: Contractor's Representative ACCEPTED BY: Project Manager REVIEWED BY: Title: APPROVED BY: Title: APPROVED BY: Purchasing Agent over $30,000 cc: City Clerk Contractor Engineer Project File Architect Purchasing DATE: DATE: 9• For., \ \ \ § § § LL o ® m ® 3 j §§kk§ 20Z0co zz®z= zoomz zPW/e� °)/»2M \ka-§� - �/ 2$y $ } \ ) k © { \ \ w - ) )M & . co m® 0 � 3 \� z \ / e S k \ ) g 6 co t§ k0m � _ 2 ( : \«)} $ ± § \/ \{±% a! ) § \ & ).. j ) `° 27�_ w §} 5 $. e 2& gee7 = e_ » _ k §J _ \) )E> m / }S \ \§ cl /\ «o§\� j 2\ ) \ g� \ _� msmpm ow 7 „ 6) U/£<a 2 - / » () ~ \ } \\ \ ® & & > & \ \ \ \ o _ -E co _ CO f 7 2 } 'a} < » # \ G 0 { co / / / LL 7 a o ! / . q < / 2 2 § § p ( D \ \ w 0 < » E 3§ ) z z o! f cc \ § \ j c\ k an E )}{ \ { { { / \) ]\§ a / / / kM(f ( k / ]/ k ]a /z 0 � 0 0 • 0 a � LL U O O m N W O 0000000000000000000000000000000 Q 0w0000000000000000000000000000000 a o`66666660000000000000000000000000 F e»u4E»vie»sve»f»v>F»6cktoU3F»eacflE»f»c»Fa6c EU) »V)UYU) 6flF»6e3d9,E13, a� L O O O N �O W � W 75 C O O CD CD CD CD CD CD O O O O CD O O O O O O O O O CD O CD O O O CD O CD N B CDO O CD O O O O O O O O O O CD CD CD CD CD CD O O O O CD CD CD CD CD O O +- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 >O Q Q K! E!T fA (fi EA d9 EA d9 EA EA &a va ER 6f> Ki to fH fA d9 6, EH EA 6c 6 1), 6 of to ER d9 EA E U o m T ~ in a a0 �0000000000000000000000000000000 00000000000000000000000000000000 O i o o �V>�V)�Y>���61��6S�ta�V)�V>����eaVaUa����VaVa O O_ > L Q z `)� OWE o H� UQ Ua w O J a a O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 00000000000000000000000000000000 Q a)00000000000000000000000000000000 a)Q Ef3 ER b9 ER EA EA EA E9 u* ffi ER b9 eg, ER Efl 6 u)i t 6 d4 6 6 b9 6 6 6 e% ER e% to fA >Y E O O U T 0 �0000000000000000000000000000000 00000000000000000000000000000000 E000000000000000000000000000000 Q E»uqc»e»E»c»E»e»E»E»u3v3via es<»e»c»cn6»F»dsE»et�c»c»6e»6»e»e6»» �n z O co a m O U o U z a J O 0 U 0 O o ~ L a� m E — o z O � U � 1 LL L �_ p d co )w -a (D N O O O O O O O O O O O O O O O Cl O O o 0 0 0 Cl 0 0 0 0 0 0 0 0 0 0 0 Q �, C O+ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O OH @ O O O O O O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O F EA U) U). U) U) U) U) U) U) U) U) U) U) U) U) U) U} U) U) U) U) U) U) U U) ) UU) ) U) U) U) U) U) LL N O N " Cp 'a U) L U1 O w O d C O O O O O O O O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O D 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O a) -SC O E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U) U) U) U) U) U) U) b9 Efl U) U) U) U) U) EA U) U) U) U) U) U) U) U) U - U) U) U) U) CO U) O U) O U) Z O OL cG O N UF-Cc Q 0 Ci d LL � p C 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CD O a O O O O O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O Z o U)UUU UUUU6 )) U) U) 'O O O a-Q > Q O d U U J 0 d Q C 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N E O O O O O O O O O O O O O O O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 U) U) U) U) U) U) U) U) U) U} U) U) U) U) U) U) U) U) U) U) U) U) U) U) U) U) U) U) U) U) O U) O U) Q Q >O > O UJ U H 0Ci �0O000O0000O00000000O0000O0000O CD CD 000O00000000O000000000000000000 00 E000000000000000000000000000000 U) U) U) U) U) U) U) U) U) w U) U) U) U) U) U) U) U) U) U) U) U) U) U) to U) w U) U) U) 00 w U) Q w U C .` � d U) w w c Q = � Uwp OJ -j U F- w o F U C7- O w Z ~ O = U a) d � N E m :? Z A n LJ • v LL 0-0 o 0 C: 0000000000000000000000000000000 0 `*M.U)@ o000000000000000000000000000000 0 W= L C ~ U)U3 6-3 6T696)6q6!T6->6-1U)616-361U>U3,U1 U, U) U) U3 U) U, U) 6-3 U) U) U) U) fA U) CL a� a 0 0 m o m � H �c 70 >�n0 0 w -r- O aL)i~� 61) J O Q O c U _ 7 :- O co 0 co w C U U3 ��O�QCL 0 W Z) f O CL O Y L U N N 0 N C/) O Q �Z O H N N E w O Z increase in Bid price. If the apparent successful Bidder declines to make any , substitution, OWNER may award the contract to the next lowest responsive and responsible Bidder that proposes to use acceptable subcontractors. Subcontractors, suppliers, other persons or organization listed and to whom OWNER or Engineer does not make written objection prior to the giving of the Notice of Award will be deemed acceptable to OWNER and ENGINEER subject to revocation of such acceptance after the effective date of the Agreement as provided in the General Conditions. 10.3. CONTRACTOR shall not be required to employ any subcontractor, supplier or other persons or organizations against whom he has reasonable objection. The use of subcontractors. listed by the Bidder and accepted by OWNER prior to the Notice of Award will be required in the performance of the Work. 11.0 BID FORM. 11.1..A copy of the Bid Form is bound in the Contract Documents which may be retained by.the Bidder. -A separate unbound copy is enclosed for submission with the Bid. 11.2. Bid Forms must be complete in ink or typed. All lump sum prices on the form must be stated in.words and numerals; in case of conflict, words will take precedence. Unit prices shall govern over extensions of sums. 1.1.3.• Bids by corporations must be executed in the corporate name by the president or a vice-president (or. other appropriate officer accompanied by evidence of authority to sign) and the corporate seal shall be affixed and attested by the secretary or an . assistant secretary. The corporate address and state of incorporation shall be shown below the corporate name. 11:4. Bids by.partnerships must be executed in the partnership name and signed by a partner, his title must appear under his signature and the official address of the partnership must be shown below the signature. 11.5. Bids by joint venture shall be signed by each participant in the joint venture or by an authorized agent of each participant. The full name of each person or company interested in the Bid shall be listed on the Bid Form. 11.6. The Bid shall contain an acknowledgement of receipt of all Addenda (the numbers of which must be filled in on the Bid Form). 11.7. No alterations in Bids, or in the printed forms therefore, by erasures, interpolations, or otherwise will be acceptable unless each such alteration is signed or initialed by the Bidder; if initialed, OWNER may require the Bidder to identify any alteration so initialed. 11.8. The address and telephone number for communications regarding the Bid shall be shown. 12.0 BID PRICING. Bids must be priced as set forth in the Bid Schedule or Schedules. 40 Table of Contents Drake Waste Water Treatment Plant -Roof Replacement August 2013 Technical Specifications Summary of Existing Conditions Summary of Work Section 01 30 00 Contract Considerations Section 01 30 30 Alternatives Section 01 30 39 Coordination of Meetings Section 01 3300 Submittals Section 01 3310 Construction Progress Schedule Section 01 4000 Quality Control Section 01 5000 Construction Facilities and Temporary Controls Section 01 6000 Material and Equipment Section 01 6025 Protection of Work and Property Section 01 7010 Cleaning Section 02 70 00 ACRM Removal Section 06 10 00 Rough Carpentry Section 07 53 03 Single Ply Roofing -Fully Adhered —TPO Reinforced 60 mil -Reinforced Section 07 62 00 Sheet Metal Flashing and Trim Section 07 90 00 Joint Sealers Section 22 40 00 Installation of New Roof Drain Inserts Drawings RP1 Roof Plan Al Wall Flashing Detail A2 North Parapet Wall Detail —Anaerobic Digester Facility A3 Roof Hatch Detail A4 Roof Drain Detail, Typical A5 Pipe Penetration Detail, Typical A6 Skylight Detail A7 Expansion Joint Detail A8 Pipe Support Detail, Typical A9 Guy Wire Stand Detail A10 Solar Tube Detail — Dewatering Building All Expansion Joint Detail Al2 Parapet Wall Detail -Typical A13 Curb Flashing Detail — Typical A14 Edge Detail —Anaerobic Digester Facility 0 14". CITY ,of IFDRT;POLLINS- DRAKE WVVTP '3616ENViR6MENTAL- DR IVE FORiddLUNS, COLORADO - .1 1 ." ' kg*7ROOFIWFIVE'BUl ' WINGS. BUILDING i26 bEWAtEAINd BUILDING BUILDING #21 - CENTRIFUGEL BUILDING 'BUILDING 47- NORTH PLANT' LIFfBUiLDl NG .bUILDING#41 SOUTH END OF TUNNEL BUILDING buiLbikd; kiANAER66(C'61_GtSTtR FACILITY SUMMARY OF EXISTING CONDITIONS BUILDiNG_#26 DEWATERING,BU I ILDING: Mstal.Deckj 3." Isocyindrate (Iol'o-O lild),, 3" Foam Glass (loose laid), EPDM, 1.5" Ballast. 'BUILDING #21. CENTRIFUGE -BUILDING,- Metal Deck, 5" Foam Glass- - (macn.Iily'a*ched),fill:PerIite,4-FjjL Built -Up Roof iACRMfilts and 6"e,flashn' -ca Gravel Surf -ace. BbIL6lNr;,#7'NORTA PLANT LIFT BUILDING: Concrete Da6k,51! Foam Glass (mopped),. I/ " F�erilte, 41�1 Built -Up RRM'felts a a a val'surfice, 2 y Built Roof (AC pd,b se.fl shing), Grp BUILDING #41'SOLT(H'E-N'D OF TU , NNEL BUILDING' C6ncraisbeck, 5" Foam Glass,, 1/2 4- i Oerlite, Ply Built -Up, - Roof, (Ackmiafti and ba.se:fla-shing),' Gravel Surface. BUILDING #23 ANAEROBIC� DIGESTER FACILITY: Concrete Dock. 3".Foarfi'Glass (loose 1 1 aid P , I V EDM, ! Bi , 1.14 , L NOTES 0 SUMMARY OF WORK (DEWATERING BUILDING, CENTRIFUGE BUILDING) . Remove the existing roofing and insulation down to the metal deck and haul away the debris THE ACRM BUILT-UP ROOF MATERIAL MUST BE REMOVED PER THE GUIDELINES ATTACHED WITH THE SUMMARY OF WORK. All debris must be removed from the flutes of the metal deck before the new roofing can be installed. Install one layer of 2" isocyanurate insulation mechanically attached with screws and plates. The attachment pattern shall be per 1-90 wind uplift requirements. Install'/4" per foot tapered isocyanurate insulation per the roof plan drawings. The tapered insulation shall be set in two-part urethane adhesive. The pattern of the installation shall be 6" on center throughout the field of the roof. Install one layer of %" Dens -Deck Prime set in two-part urethane adhesive. The attachment pattern shall be the same as the tapered isocyanurate. Install a 60 mil FleeceBack TPO Roof System set in two-part urethane adhesive. The attachment pattern shall be 4" on center throughout the entire roof area. The membrane shall be 115 mil total thickness with FleeceBack). Approved manufacturers: Carlisle, Firestone, GAF, Manville Flash all walls and curbs with 60 mil FleeoeBack TPO set in urethane adhesive. Install a_termination bar at the top of the flashing at all wall locations. Install 24 gauge Stainless Steel Counter flashing over the top of the termination bar. All curbs.shall be flashed with 24 gauge Stainless Steel Slip Flashing. .Provide and install two new solar tubes (see attached cut sheet) set on 20"X20"X12" curbs. This is for the Dewatering Building Only. Provide and install new 24 gauge Stainless Steel vent stacks. Supply and install 2,000 square feet of walk way pads. Locations to be determined by the owner Provide and install new cast iron drain screens at all roof drain locations. Provide 2'X2' sumps at all roof drain locations. Upon completion of the project, provide a TWO-YEAR contractors warranty covering labor and materials. Upon completion of the project provide a manufactures TWENTY-YEAR FULL SYSTEMS • WARRANTY. Include all building permit fees (City of Fort Collins) in your base bid price. The testing during the ACRM removal will be the responsibility of the roofing contractor. Asbestos Monitor MDR Corporation Marvin OFFICE: 303457-0502 CELL: 720-581-4641 SUMMARY of WORK (NORTH PLANT LIFT BUILDING, SOUTH END OF TUNNEL BUILDING, ANAEROBIC DIGESTER FACILITY) . Tear off the existing roof and insulation board down to the concrete deck and remove the debris. . THE ACRM BUILT-UP ROOF MATERIAL MUST BE REMOVED PER THE GUIDELINES ATTACHED WITH THE SUMMARY OF WORK. NO ACRM ON ADF BUILDING. • Install one layer of 2" isocyanurate insulation board set in two-part urethane adhesive. The attachment pattern for the adhesive shall be 4" on center in the comers and perimeter (12'X12') and 8" on center throughout the field of the roof. . Install Y," per foot full tapered isocyanurate set in two-part urethane adhesive. The attachment The attachment pattern for the adhesive shall be the same as the 2" isocyanurate. • . Install one layer of %a" Dens -Deck Prime set in two-part urethane adhesive. The attachment pattern shall be the same as above. Install a 60 mil thick TPO Roofing System set in two-part urethane adhesive. The application rate of the adhesive shall be 4" on center throughout the entire roof area. The membrane shall be 115 mil total thickness with the FleeceBack. Flash all walls and curbs with 60 mil FleeceBack TPO set in two-part urethane adhesive. Install a termination bar at the top of the flashing at all wall locations. . Provide and install new 24 gauge Stainless Steel Counter flashing over the top of the termination bar. . All curbs shall be flashed with 24 gauge Stainless Steel Slip Flashing. . Provide and install new 24 gauge Stainless Steel vent stacks. • Supply and install 1,500 square feet of walk way pads. Locations to be determined toward the 9 end of the project ANEROBIC DIGESTER FACILITY: A NEW ROOF DRAIN WITH ASSOCIATED PIPING WILL BE PROVIDED AND INSTALLED BY PATRICK PLUMBING. THE COST OF THE MATERIALS AND INSTALLATION WILL BE INCLUDED IN THE PRICE OF THE RE -ROOF. . Provide and install new cast iron drain screens at all roof drain locations. . Provide 2'X2' sumps at all roof drain locations. . Upon completion of the project, provide a TWO-YEAR contractors warranty covering labor and materials. . Upon completion of the project, provide a manufactures TWENTY-YEAR FULL SYSTEMS WARRANTY. . Include all building permit fees (City of Fort Collins) in your bid price. . The testing of the ACRM removal will be the responsibility of the roofing contractor. Asbestos Monitor MDR Corporation Marvin OFFICE: 303-457-0502 CELL: 720-581-4641 0 0 • MISCELLANEOUS ITEMS The following items will be installed during the reroof process. DeWatering Building: Two new solar tubes 20"X 20" curbs. Anaerobic Digester Facility: New roof drain and associated plumbing. Centrifuge Building: one new 3' X 3' curb. These items will be contracted out separately and should not be included in your bid. . ALL NEW ROOFING MEMBRANE MUST BE COVERED WITH TARPS BEFORE TEAR OFF CAN PROCEED FOR THE DAY. . THE ROOFERS MUST CHANGE IN TO A CLEAN PAIR OF SHOES BEFORE THE INSTALLATION OF THE NEW MEMBRANE. . ALL OSHA REQUIREMENTS WILL BE STRICTLY ADHERED TO WHILE ON SITE. . Any penetrations that will be removed will be covered with %" steel plating that will be bolted to the substrate. Approved Manufactures: Carlisle, Firestone, Johns/Manville, GAF. SUPPLY AND INSTALL NEW CAST IRON DRAIN SCREENS AT ALL ROOF DRAIN AND OVERFLOW DRAIN LOCATIONS. . IF ALL OF THE ROOFING AREAS ARE AWARDED, IT WILL BE A REQUIEMENT TO HAVE TWO MINIMUM 7 MEN CREWS WORKING ON THIS PROJECT. THIS WILL BE ® NECCESESARY TO EXPEDITE THE PROJECT. . DUE TO TIME CONSTRAINTS, IT WILL BE A REQUIREMENT TO HAVE TWO 7-8 MAN CREWS ON THE SITE. 01 3000 Contract Consideration PART1 GENERAL 1.1 SECTION INCLUDES A. Contingency allowance. B. Schedule of values. C. Application for payment. D. Change procedures. E. Measurement and payment - unit prices 1.2 APPLICATIONS FOR PAYMENT A. Submit three copies of each application on AIA Form G702 -Application and Certificate for Payment and AIA G703 - Continuation Sheet. Contractor's electronic media driven form, if similar to these forms may be utilized. - B. Content and Format: Utilize Schedule of Values for listing items in Application for Payment. C. Payment Period: Monthly. D. Waiver of Lien required. E. Include an updated construction progress schedule. F. Payment Request: Include all labor and maintenance in place at the time of application, less retainage. Payment request for stored off -site materials must be accompanied with affidavits and insurance certificates on value of material with owner named as additional insured. 1.3 CHANGE PROCEDURES A. The Consultant will advise of minor changes in the Work not involving an adjustment to Contract Sum/Price or Contract Time by issuing supplemental instructions in written form. B. The Consultant may issue a Proposal Request which includes a detailed description of a proposed change with supplementary or revised Drawings and specifications, a change in Contract Time for executing the change with a stipulation of any overtime work required. Contractor will prepare and submit an estimate within 3 days. TechniScan, Inc. Drake WWTP TSI Project # 8062 Page 1 of 3 • • • 01 3000 Contract Consideration C. Unit Price Change Order: For contract unit prices and quantities, the Change Order will be executed on a fixed unit price basis. For unit costs or quantities of units of work which are not pre -determined, execute Work under a Construction Change Directive. Changes in Contract Sum/Price or Contract Time will be computed as specified for Time and Material Change Order. D. Time and Material Change Order: Submit itemized account and supporting data after completion of change, within time limits indicated in the Conditions of the Contract. Consultant will determine the change allowable in Contract Sum/Price and Contract Time as provided in the Contract Documents. E. Maintain detailed records of work done on a Unit Price or Time and Material basis. Provide full information required for evaluation of proposed changes, and to substantiate costs for changes in the Work. Owner/Owner's representative must have documented evidence prior to approval of such change orders. The Contractor must notify Owner/Owner's representative when a change order condition is encountered so this condition can be easily and readily documented not being approved at the Contractor's expense. F. Change Order Forms: AIA G701 Change Order G. Execution of Change Orders: Owner will issue Contract Amendments. 1.4 DEFECT ASSESSMENT A. Replace the Work, or portions of the Work, not conforming to specified requirements. B. If, in the opinion.of the Consultant, it is not practical to remove and replace the Work, the Consultant will direct an appropriate remedy or adjust payment. 1.5 MEASUREMENT AND PAYMENT -UNIT PRICES A. Authority: Measurement methods are delineated in the individual specification sections. B. Take measurements and compute quantities. The Consultant will verify measurements and quantities. C. Unit Quantities: Quantities and measurements indicated in the Bid Form are for contract purposes only. Quantities and measurements supplied or placed in the Work shall determine payment. D. Payment Includes: Full compensation for required labor, Products, tools, equipment, plant and facilities, transportation, services and incidentals; erection, application or installation of an item of the Work; overhead and profit. PART PRODUCTS Not Used. TechniScan, Inc. Drake WWTP TSI Project # 8062 Page 2 of 3 01 3000 Contract Consideration PART 3 EXECUTION Not Used. • TechniScan, Inc. • Drake WWTP TSI Project # 8062 Page 3 of 3 • 01 3030 Alternatives PART1GENERAL 1.1 SECTION INCLUDES A. Alternative submission procedures. B. Documentation of changes to Contract Sum/Price and Contract Time. 1.2 RELATED SECTIONS A. Document 00 52 14 - Agreement - AIA: Incorporating monetary value of accepted Alternatives. B. Document 00 21 14 - Instructions To Bidders, Document 00 41 13 - Bid Form - Stipulated Price, Document 00 43 00 - Supplements to Bid Forms and Appendices: Requirements for Alternatives. C. Section 01 33 00 - Submittals; Section 01 33 10 Construction Progress Schedule: Work schedule affected by Alternatives. D. Section 01 60 00 - Material and Equipment: Product options and substitutions. 1.3 SUBMISSION REQUIREMENTS • A. Submit alternatives identifying the effect on adjacent or related components. B. Alternatives quoted on Bid Forms will be reviewed and accepted or rejected at the Owner's option. Accepted alternatives will be identified in the Owner -Contractor Agreement. C. Coordinated related work and modify surrounding work to integrate the work of each alternative. D. Submit alternates 10 days before bid date. PART 2 PRODUCTS Not Used. PART 3 EXECUTION Not Used. • TechniScan, Inc. Drake WWTP TSI Project # 8062 Page 1 of 1 0 is 13.0 SUBMISSION OF BIDS. 13.1. Bids shall be submitted at the time and place indicated in the Invitation to Bid and shall be enclosed in an opaque sealed envelope marked with the Project title, Bid No., and name and address of the Bidder and accompanied by the Bid Security, Bid Form, Bid Bond, Statement of Bidders Qualifications, and Schedule of Subcontractors as required in Section 00430. If the Bid is sent through the mail or other delivery system, the sealed envelope shall be enclosed in a separate envelope with the notation 'BID ENCLOSED" on the face of it. 13.2. Bids shall be deposited at the designated location prior to the time and date for receipt of Bids indicated in the Invitation to Bid, or any extension thereof made by addendum. Bids received after the time and date for receipt of Bids will be returned unopened. Bidder shall assume full responsibility for timely delivery at the location designated for receipt of Bids. 13.3. Oral, telephonic, telegraphic, or facsimile Bids are invalid and will not receive consideration. 13.4. No Bidder may submit more than one Bid. Multiple Bids under different names will not be accepted from one firm or association. 14.0 MODIFICATION AND WITHDRAWAL OF BIDS. 14.1. Bids may be modified or withdrawn by an appropriate document duly executed (in a manner that a Bid must be executed) and delivered to the place where Bids are to be submitted at any time prior to the opening of Bids. 14.2. Bids may also be modified or withdrawn in person by the Bidder or an authorized representative provided he can prove his identity and authority at any time prior to the opening of Bids. 14.3. Withdrawn Bids may be resubmitted up to the time designated for the receipt of Bids provided that they are then fully in conformance with these Instructions to Bidders. 15.0 OPENINGS OF BIDS. Bids will be opened and (unless obviously non -responsive) read aloud publicly as indicated in the Invitation to Bid. An abstract of the amounts of the Base Bids and major alternates (if any) will be made available after the opening of Bids. _ 16.0 BIDS TO REMAIN OPEN SUBJECT TO ACCEPTANCE. All Bids shall remain open for forty-five (45) days after the day of the Bid Opening, but OWNER may, in his sole discretion, release any Bid and return the Bid Security prior to that date. 17.0 AWARD OF CONTRACT. 17.1. OWNER reserves the right to reject any and all Bids, to waive any and all informalities not involving price, time or changes in the Work, to negotiate contract terms with the Successful Bidder, and the right to disregard all nonconforming, nonresponsive, unbalanced or conditional Bids. Also, OWNER reserves the right to reject the Bid of any Bidder if OWNER believes that it would not be in the best 01 3039 Coordination of Meetings PART1 GENERAL 1.1 SECTION INCLUDES A. Coordination and project conditions. B. Preconstruction meeting. C. Project Coordination Meeting. 1.2 RELATED SECTIONS A. Section 01 33 10 - Construction Progress Schedules. 1.3 COORDINATION AND PROJECT CONDITIONS A. Coordinate scheduling, submittals, and Work of the various sections of the Project Manual to ensure efficient and orderly sequence of installation of interdependent construction elements, with provisions for accommodating items installed later. B. Verify utility requirements and characteristics of operating equipment are compatible with building utilities. Coordinate work of various sections having interdependent responsibilities for installing, connecting to, and placing in service, such equipment. C. Coordinate completion and clean-up of Work of separate sections in preparation for Substantial Completion. D. Coordinate access to site for correction of defective Work and Work not in accordance with Contract Documents, to minimize disruption of Owner's activities. 1.4 PRECONSTRUCTION MEETING A. Owner and Consultant will schedule a meeting after Notice of Award. B. Attendance Required: Owner, Consultant, and Contractor. C. Agenda: 1. Execution of Owner -Contractor Agreement. 2. Submission of executed bonds and insurance certificates. 3. Distribution of Contract Documents. 4. Submission of list of Subcontractors, list of Products, schedule of values, and progress schedule. 5. Designation of personnel representing the parties in Contract, and the Consultant. TechniScan, Inc. Drake WWTP TSI Project # 8062 Page 1 of 3 • A • 0 0 01 3039 Coordination of Meetings 6. Procedures and processing of field decisions, submittals, substitutions, applications for payments, proposal request, Change Orders, and Contract closeout procedures. 7. Scheduling. D. Record minutes and distribute copies within three (3) days after meeting to participants, with copies to Consultant, Project Manager, Owner, participants, and those affected by decisions made. 1.5 PROGRESS MEETINGS A. Weekly progress meetings (if necessary) may be scheduled by Consultant or Owner/Owner's representative and will be mandatory attendance by contractor's designated project manager. B. Consultant will make arrangements for meetings, prepare agenda with copies for participants, preside at meetings. C. Attendance Required: Project Manager, job foreman, major Subcontractors, Owner/Owner's representative, and Consultant, as appropriate to agenda topics for each meeting. D. Agenda: Review minutes of previous meetings. 2. Review of Work progress. 3. Field observations, problems, and decisions. 4. Identification of problems which impede planned progress. 5. Review of submittals schedule and status of submittals. 6. Review of off -site fabrication and delivery schedules. 7. Maintenance of progress schedule. 8. Corrective measures to regain projected schedules. 9. Planned progress during succeeding work period. 10. Coordination of projected progress. 11. Maintenance of quality and work standards. 12. Effect of proposed changes on progress schedule and coordination. TechniScan, Inc. Drake WWTP TSI Project # 8062 Page 2 of 3 01 30 39 . Coordination of Meetings 13. Other business relating to Work. E. Record minutes and distribute copies within two days after meeting to participants, with copies to Consultant, Project Manager, Owner/Owner's representative, participants, and those affected by decisions made. 1.6 PROJECT COORDINATION MEETING A. Communicate daily with building tenant's representative as to the proposed daily activity and identify possible problem areas and general concerns. B. Communicate with consultant any alterations, deviations, or changes to the specification/drawings as encountered. Communicate potential change order requests to consultant for verification and documentation. PART PRODUCTS Not used. PART 3 EXECUTION Not used. TechniScan, Inc. Drake WWTP TSI Project # 8062 Page 3 of 3 . SECTION 01 33 00 SUBMITTALS PART1 GENERAL 1.1 SECTION INCLUDES A. Submittal procedures. B. Construction progress schedules. C. Proposed Products list. D. Product Data. E. Shop Drawings. F. Samples G. Design data. H. Certificates. I. Manufacturer's. instructions. J. Manufacturer's field reports. 1.2 RELATED SECTIONS A. Section 01 40 00 - Quality Control: Manufacturers' field services and reports. B. Section 01 70 00 - Contract Closeout: Contract warranties, manufacturers' certificates, and closeout submittals. 1.3 SUBMITTAL PROCEDURES A. Transmit each submittal with transmittal accurately identifying all items requiring review B. Sequentially number the transmittal form. Revise submittals with original number and a sequential alphabetic suffix. C. Identify Contractor, Subcontractor or manufacturer; pertinent drawing and detail number, and specification section number, as appropriate. D. Prior to each submittal, carefully review and coordinate all aspects of each item being submitted and verify that each item, and the submittal for it, conform to the requirements of the contract documents. By affixing contractor's signature to each submittal, certify that this coordination has been performed. TechniScan,Inc. Drake W WTP 01 3300 TSI Project #8062 1 Submittals 1.4 1.5 E. Schedule submittals to expedite the Project, and deliver to Consultant at business address. Coordinate submission of related items. F. For each submittal for review, allow 5 days excluding delivery time to and from the contractor. G. Identify variations from Contract Documents and Product or system limitations which may be detrimental to successful performance of the completed Work. H. Provide space for Consultant review stamps. I. When revised for resubmission, identify all changes made since previous submission. J. Distribute copies of reviewed submittals as appropriate. Instruct parties to promptly report any inability to comply with requirements. K. Submittals not requested will not be recognized or processed. CONSTRUCTION PROGRESS SCHEDULES A. Submit initial schedule in duplicate within 5 days after date established in Notice to Proceed. B. Revise and resubmit as required. C. Submit revised schedules with each Application for Payment, identifying changes since previous version. D. Submit a horizontal bar chart with separate line for each major portion of Work or operation, identifying first work day of each week. PROPOSED PRODUCTS LIST A. Within 5 days after date of Notice to Proceed, submit list of major products proposed for use, with name of manufacturer, product name and reference standard for each item clearly identified. B. For products specified only by reference standards, give manufacturer, trade name, model or catalog designation, and reference standards. 1.6 PRODUCT DATA A. Product Data For Review: Submitted to Consultant for review for the limited purpose of checking for conformance with information given and the design concept expressed in the contract documents. TechniScan, Inc. Drake WWTP 01 3300 TSI Project #8062 2 Submittals 0 9 • 0 • 2. After review, provide copies and distribute in accordance with SUBMITTAL PROCEDURES article above and for record documents purposes described in Section 01700 - CONTRACT CLOSEOUT. B. Product Data For Information: Submitted for the Consultant's knowledge as contract administrator or for the Owner. C. Product Data For Project Close-out: 1. Submitted for the Owner's benefit during and after project completion. D. Submit the number of copies which the Contractor requires, plus two copies which will be retained by the Owner and Consultant. E. Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information specific to this Project. F. After review distribute in accordance with the Submittal Procedures article above and provide copies for record documents described in Section 01700 - CONTRACT CLOSEOUT. 1.7 SHOP DRAWINGS A. Shop Drawings For Review: Submitted to Consultant for review for the limited purpose of checking for conformance with information given and the design concept expressed in the contract documents. 2. After review, produce copies and distribute in accordance with SUBMITTAL PROCEDURES article above and for record documents purposes described in Section 01 70 00 - CONTRACT CLOSEOUT. B. Shop Drawings For Information: Submitted for the Consultant's knowledge as contract administrator or for the Owner. C. Submit the number of opaque reproductions which Contractor requires, plus two copies which will be retained by the Consultant and Owner. 1.8 SAMPLES A. Samples For Selection: Submitted to Consultant for aesthetic, color, or finish selection. TechniScan, Inc. Drake WWTP TSI Project #8062 3 01 3300 Submittals 2. Submit samples of finishes from the full range of manufacturers' standard colors, in custom colors selected, textures, and patterns for Consultant selection. 3. After review, produce duplicates and distribute in accordance with SUBMITTAL PROCEDURES article above and for record documents purposes described in Section 01 70 00 - CONTRACT CLOSEOUT. B. Submit samples to illustrate functional and aesthetic characteristics of the Product, with integral parts and attachment devices. Coordinate sample submittals for interfacing work. C. Include identification on each sample, with full Project information. D. Submit the number of samples specified in individual specification sections; one of which will be retained by Consultant. E. Reviewed samples which may be used in the Work are indicated in individual specification sections. F. Samples will not be used for testing purposes unless specifically stated in the specification section. 1.9 DESIGN DATA A. Submit for the Consultant's knowledge as contract administrator or for the Owner. B. Submit for information for the limited purpose of assessing conformance with • information given and the design concept expressed in the contract documents. 1.10 CERTIFICATES A. When specified in individual specification sections, submit certification by the manufacturer, installation/application subcontractor, or the Contractor to Consultant, in quantities specified for Product Data. B. Indicate material or Product conforms to or exceeds specified requirements. Submit supporting reference data, affidavits, and certifications as appropriate. C. Certificates may be recent or previous test results on material or Product, but must be acceptable to Consultant. 1.11 MANUFACTURER'S INSTRUCTIONS A. When specified in individual specification sections, submit printed instructions for delivery, storage, assembly, installation and adjusting to Consultant for delivery to owner in quantities specified for Product Data. B. Indicate special procedures, perimeter conditions requiring special attention, and special environmental criteria required for application or installation. TechniScan, Inc. Drake W WTP 01 3300 TSI Project #8062 4 Submittals i C. Refer to Section 01 40 00 - Quality Control, Manufacturers' Field Services article. 1.12 MANUFACTURER'S FIELD REPORTS A. Submit reports for the Consultant's benefit as contract administrator or for the Owner. B. Submit report in duplicate within 10 days of observation to Consultant for information. C. Submit for information for the limited purpose of assessing conformance with information given and the design concept expressed in the contract documents. PART PRODUCTS Not Used. PART 3 EXECUTION Not Used. TechniScan,Inc. Drake WWTP TSI Project #8062 END OF SECTION 5 01 3300 Submittals 01 3310 Construction Progress Schedule PART1 GENERAL 1.1 SECTION INCLUDES A. Format. B. Content. C. Revisions to schedules. D. Submittals. 1.2 RELATED SECTIONS A. Section 01 10 00 - Summary of Work: B. Section 01 30 00 - Contract Consideration: Application for payment. C. Section 01 33 00 - Submittals: Shop drawings, product data, and samples and schedule of values. 1.3 REFERENCES A. AGC (Associated General Contractors of America) publication 'The Use of CPM in • Construction - A Manual for General Contractors and the Construction Industry". 1.4 REVISIONS TO SCHEDULES A. Work will be conducted Monday through Friday, from 7:00 a.m. until the roof is completely dried in. 1.7 SUBMITTALS A. Submit initial schedules within 5 days after date established in Notice to Proceed. After review, resubmit required revised data within 5 days. 1.8 DISTRIBUTION A. Distribute copies of reviewed schedules to Project site file, Subcontractors, suppliers, and other concerned parties. B. Instruct recipients to promptly report, in writing, problems anticipated by projections indicated in schedules. TechniScan, Inc. Drake WWTP TSI Project # 8062 Page 1 of 2 0 • PART PRODUCTS • Not Used. PART 3 EXECUTION Not Used. TechniScan, Inc. Drake WWTP TSI Project # 8062 Page 2 of 2 interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by OWNER. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. 17.2. In evaluating Bids, OWNER will consider the qualifications of the Bidders, whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award. 17.3. OWNER may consider the qualification and experience of Subcontractors, Suppliers, and other persons and organizations proposed for those portions of the Work as to which the identity of Subcontractors, Suppliers, and other persons and organizations is submitted as requested by OWNER. OWNER also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Award. 17.4. OWNER may conduct such investigations as OWNER deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications and financial ability of the Bidder's proposed Subcontractors, Suppliers and other persons and organizations to do the Work in accordance with the Contract Documents to OWNER's satisfaction within the prescribed time. 17.5. If the Contract is to be awarded, it will be awarded to the lowest responsive and responsible Bidder whose evaluation by OWNER indicates to OWNER that the award will be in the best interest of the OWNER. Award shall be made on the evaluated lowest base bid excluding alternates. The basis for award shall be the lowest Bid total for the Schedule or, in the case of more than one schedule, for sum of all schedules. Only one contract will be awarded. 17.6. If the Contract is to be awarded, OWNER will give the Successful Bidder a Notice of Award within forty-five (45) days after the date of the Bid opening. 17.0 CONTRACT SECURITY. The General Conditions and the Supplementary Conditions set forth OWNER's requirements as to performance and other Bonds. When the Successful Bidder delivers the executed Agreement to the OWNER, it shall be accompanied by the required Contract Security. 18.0 SIGNING OF AGREEMENT. When OWNER gives a Notice of Award to the Successful Bidder, it will be accompanied by the required number of unsigned counterparts of the Agreement with all other written Contract Documents attached. Within fifteen (15) days thereafter, CONTRACTOR shall sign and deliver the required number of counterparts of the Agreement and attached documents to OWNER with the required Bonds. Within ten (10) days thereafter, OWNER hall deliver one fully signed counterpart to CONTRACTOR. Each counterpart is to be accompanied by a complete set of the Drawings with appropriate identification. U 01 4000 Quality Control PART GENERAL 1.1 SECTION INCLUDES A. Quality assurance - control of installation. B. Tolerances C. References and standards. D. Inspecting and testing laboratory services. E. Manufacturers' field services. 1.2 RELATED SECTIONS A. Section 01 33 00 - Submittals: Submission of manufacturers' instructions and certificates. B. Section 01 60 00 - Material and Equipment: Requirements for material handling, storage, protection and product substitution. 1.3 QUALITY ASSURANCE -CONTROL OF INSTALLATION A. Monitor quality control over suppliers, manufacturers, subcontractors, Products, • services, site conditions, and workmanship, to produce Work of specified quality. B. A set of project documents shall be distributed by contractor to all major subcontractors. One copy of the project specifications shall be maintained on site at all times. The Contractor shall review with his field personnel and subcontractors the specification requirements and details so they have a clear understanding of the project requirements. C. Comply with manufacturers' instructions, including each step in sequence. D. Should manufacturers' instructions conflict with Contract Documents, request clarification from Consultant before proceeding. E. Comply with specified standards as minimum quality for the Work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship. F. Perform Work by persons qualified to produce required and specified quality. G. Verify that field measurements are as indicated on shop drawings or as instructed by the manufacturer. H. Secure Products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, or disfigurement. TechniScan, Inc. Drake WWTP TSI Project # 8062 Page 1 of 3 • 07 4000 Quality Control I. Communicate daily with building tenants and owner's representative as to the proposed daily activities and identify possible problem areas and general concerns. 1.4 TOLERANCES A. Monitor fabrication and installation tolerance control of Products to produce acceptable Work. Do not permit tolerances to accumulate. B. Comply with man ufacturers'tolerances. Should manufacturers' tolerances conflict with Contract Documents, request clarification from Consultant before proceeding. C. Adjust Products to appropriate dimensions; position before securing Products in place. 1.5 REFERENCES AND STANDARDS A. For Products or workmanship specified by association, trade, or other consensus standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes. B. Conform to reference standard by date of issue current on date of Contract Documents, except where a specific date is established by code. C. Obtain copies of standards where required by product specification sections. D. Neither the contractual relationships, duties, or responsibilities of the parties in Contract nor those of the Consultant shall be altered from the Contract Documents by mention or inference otherwise in any reference document. 1.6 INSPECTION SERVICES A. Owner will appoint, employ, and pay for specified services of an independent firm to perform quality assurance monitoring. B. Inspecting does not relieve Contractor to perform Work to contract requirements. 1.7 MANUFACTURERS' FIELD SERVICES A. When specified in individual specification sections, and as required for specified guaranty requirements, require material or Product suppliers or manufacturers to provide qualified staff personnel to observe site conditions, conditions of surfaces and installation, quality of workmanship, as applicable, and to initiate instructions when necessary. B. Report observations and site decisions or instructions given to applicators or installers that are supplemental or contrary to manufacturers' written instructions. C. Refer to Section 01 33 00 - SUBMITTALS, MANUFACTURERS' FIELD REPORTS article. TechniScan, Inc. Drake WWTP TSI Project # 8062 Page 2 of 3 01 40 00 Quality Control PART PRODUCTS Not Used. PART 3 EXECUTION 3.1 EXAMINATION A. Verify that existing site conditions and substrate surfaces are acceptable for subsequent Work. Beginning new Work means acceptance of existing conditions. B. Verify.that existing substrate is capable of structural support or attachment of new Work being applied or attached. C. Examine and verify specific conditions described in individual specification sections. D. Verify that utility services are available, of the correct characteristics, and in the correct locations. 3.2 PREPARATION A. Clean substrate surfaces prior to applying next material or substance. B. Seal cracks or openings of substrate prior to applying next material or substance. C. Apply manufacturer required or recommended substrate primer, sealer, or conditioner prior to applying any new material or substance in contact or bond. TechniScan, Inc. Drake WWTP TSI Project # 8062 Page 3 of 3 • SECTION 01 50 00 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS PART1 GENERAL 1.1 SECTION INCLUDES A. Temporary Utilities: Electricity, lighting, heat, ventilation, telephone service, water, and sanitary facilities. B. Temporary Controls: Barriers, enclosures and fencing, and protection of the Work C. Construction Facilities: Access roads, parking, progress cleaning, project signage, and temporary buildings. 1.2 RELATED SECTIONS A. Section 01700 - Contract Closeout: Final cleaning. 1.3 TEMPORARY ELECTRICITY A. Cost: By Contractor; provide and pay for power service required from utility source. B. Contractor can connect to owner's existing power only with the owner's approval at agreed terms and conditions. In no case, shall the contractor disrupt the owner's use of • service. 1.4 TEMPORARY SANITARY FACILITIES A. Provide and maintain required facilities and enclosures. Existing facility use is not permitted. Provide at time of project mobilization. 1.5 BARRIERS A. Provide barriers to prevent unauthorized entry to construction areas and to protect existing facilities and adjacent properties from damage from construction operations and demolition. Provide minimum 6 foot high chain link fence barrier around staging area and any materials stored on site on the ground. Regularly monitor site and remove any hazards to the public. B. Provide barricades and covered walkways required by governing authorities for public rights -of -way and for public access to existing building. C. Provide protection for landscaping designated to remain. Replace damaged landscaping as a result of this contract. D. Protect non -owned vehicular traffic, stored materials, site, and structures from damage. TechniScan, Inc. Drake WWTP 01 5000 TSI Project #8062 1 Construction Facilities and Temporary Controls E. For exterior ladder access, ladders shall be taken down at the completion of each day's • work and secured to prevent access to the roof. 1.6 PROTECTION OF INSTALLED WORK A. Protect installed Work and provide special protection where specified in individual specification sections. B. Provide temporary and removable protection for installed Products. Control activity in .immediate work area to prevent damage. C. Provide protective coverings at walls, projections, jambs, sills, and soffits of openings. D. Protect sidewalks, stairs, and other surfaces from traffic, dirt, wear, damage, or movement of heavy objects, by protecting with durable sheet materials. E. Prohibit traffic or storage upon waterproofed or roofed surfaces. If traffic or activity is necessary, obtain recommendations for protection from waterproofing or roofing material manufacturer. F. Prohibit traffic from landscaped areas. G. Coordinate with building tenants daily areas of work overhead. 1.7 PARKING A. Arrange for temporary paved surface parking areas to accommodate construction personnel. B. When site space is not adequate, provide additional off -site parking for personnel. 1.8 PROGRESS CLEANING AND WASTE REMOVAL A. Maintain areas free of waste materials, debris, and rubbish. Maintain site in a clean and orderly condition. B. Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces, and other closed or remote spaces, prior to enclosing the space. C. Collect and remove waste materials, debris, and rubbish from site daily and dispose off - site. D. Open free -fall chutes are not permitted. Terminate closed chutes into appropriate container trucks. TechniScan, Inc. Drake W WTP 01 5000 TSI Project #8062 2 Construction Facilities and Temporary Controls A L 0 1.9 REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS A. Remove temporary utilities, equipment, facilities, materials, prior to Substantial Completion inspection. B. Clean and repair damage caused by installation or use of temporary work. C. Restore existing and permanent facilities to original condition. PART 2 PRODUCTS Not Used. PART 3 EXECUTION Not Used. TechniScan, Inc. Drake WWTP TSI Project #8062 END OF SECTION 01 5000 3 Construction Facilities and Temporary Controls 01 6000 • Material and Equipment PART1 GENERAL 1.1 SECTION INCLUDES A. Products. B. Transportation and handling. C. Storage and protection. D. Product options. E. Substitutions. 1.2 RELATED SECTIONS A. Document 00 21 14 - Instructions to Bidders: Product options and substitution procedures. B. Section 01 40 00 - Quality Control: Product quality monitoring. 1.3 PRODUCTS A. Do not use materials and equipment removed from existing premises, except as specifically permitted by the Contract Documents. • B. I Provide interchangeable components of the same manufacture for components being replaced. 1.4 TRANSPORTATION AND HANDLING A. Transport and handle Products in accordance with manufacturer's instructions. B. Promptly inspect shipments to ensure that Products comply with requirements, quantities are correct, and Products are undamaged. C. Provide equipment and personnel to handle Products by methods to prevent soiling, disfigurement, or damage. 1.5 STORAGE AND PROTECTION A. Store and protect Products in accordance with manufacturers' instructions. B. Store with seals and labels intact and legible. C. Store sensitive Products in weather tight, climate controlled, enclosures in an environment favorable to Product. TechniScan, Inc. Drake WWTP TSI Project # 8062 Page 1 of 2 01 6000 Material and Equipment D. For exterior storage of fabricated Products, place on sloped supports above ground. E. Provide bonded off -site storage and protection when site does not permit on -site storage or protection. F. Cover Products subject to deterioration with impervious sheet (tarpaulins) covering. (Manufacturer's packaging wrappers alone not acceptable.) Provide ventilation to prevent condensation and degradation of Products. G. Provide equipment and personnel to store Products by methods to prevent soiling, disfigurement, or damage. H. I Arrange storage of Products to permit access for inspection. Periodically inspect to verify Products are undamaged and are maintained in acceptable condition. 1.6 PRODUCT OPTIONS A. Products Specified by Naming One or More Manufacturers: Products of manufacturers named and meeting specifications, no options or substitutions allowed. U TechniScan, Inc. Drake WWTP • TSI Project # 8062 Page 2 of 2 01 6025 Protection of Work and Property PART 1 GENERAL 1.1 WORK INCLUDED A. The Contractor shall provide all materials, equipment and labor necessary to protect the Owner's property from damage due to construction activities. Newly constructed work, unincorporated products and materials, and existing structures shall all be afforded suitable protection. 1.2 PROTECTION A. All portions of the site and existing structures or landscaping are intended to remain undisturbed unless otherwise indicated. B. The Contractor shall protect all curbs and gutters and streets adjacent to the property. C. All buried utilities including lawn sprinkler systems shall be preserved during the progress of the work unless otherwise indicated. PART 2 PRODUCTS Not used. PART 3 EXECUTION 3.1 EXECUTION A. The Contractor shall identify existing substandard conditions in writing prior to beginning the work, or assume responsibility for the correction of such conditions under the terms of this section. 3.2 PROTECTION OF WORK AND PROPERTY A. Demolition, construction, and other operations performed in the course of the work shall not cause deterioration or damage to other adjacent property or utilities, public or private, the building or its contents, directly or indirectly. B. Construction operations shall be performed so as to minimize and control dust, dirt, and noise within reasonable limits. C. Construction not specifically required to be modified or removed for work under this contract and construction labeled "to remain" shall remain undisturbed throughout the execution of the work. The Contractor shall provide all appropriate means of protection necessary for accomplishment of this objective. Provide protection from natural elements as required. TechniScan, Inc Drake WWTP TSI Project # 8062 Page 1 of 2 E 01 6025 Protection of Work and Property D. The Contractor shall provide, install, and maintain all shoring, bracing, and other temporary construction necessary for the protection of existing construction to remain undisturbed and as required for the safety of personnel and public. E. The Contractor shall be fully responsible for the replacement, restoration, repair, or cleaning of any damage or loss incurred as a result of faulty compliance with the requirements of this section. At the discretion of the Owner, an equitable settlement value may be established in lieu of correction of damage or loss. This amount shall be deducted from the contract amount by Change Order. F. Mechanical and electrical equipment required to be removed and reinstalled to accommodate work in the Contract shall be handled with the greatest of care and restored to full operation and function. G. The Contractor shall comply with verbal and written instructions of Loss Control Agents of the Owner's Insurer to minimize potentially hazardous procedures and conditions. H. The Contractor shall take precautions to protect existing concrete and asphalt pavement from damage due to vehicle loads, parking, and storage. I. Schedule loading to take advantage of pavement material consolidation during cooler • temperatures. Minimize loading paved areas during hot weather. Employ plywood to distribute wheel loads to the greatest extent possible. J. The Contractor shall distribute materials stored on the roof so as not to overload or create concentrated loading of the roof structure. The Contractor shall also provide protection of the existing roof and shall store all material up off the roof surface. Damage to the roof system shall be immediately repaired to a weathertight condition. K. The Contractor shall give written notice to the Owner and the Consultant prior to mobilization over the existing underground sprinkler systems. At the Owner's option, inspections and/or tests of the existing system shall be conducted prior and subsequent to mobilization in order to establish performance criteria for the installed system. Except as waived in writing by the Consultant, the performance of the installed system shall be returned to the existing condition, within reasonable limits. 3.3 SCHEDULES A. The Contractor shall coordinate work between the various trades and with the Owner and shall provide a schedule of Utility interruptions needed to the Owner. The Owner will review such schedule and direct such modifications as may be needed for the continued operation of the facility. B. The Contractor shall notify the Owner whenever lawn sprinkling systems must be deactivated and for what duration of time the system must remain shut off. • TechniScan, Inc Drake WWTP TSI Project # 8062 Page 2 of 2 • 19.0 TAXES OWNER is exempt from Colorado State Sales and Use Taxes on materials and equipment to be incorporated in the Work. Said taxes shall not be included in the Contract Price. Reference is made to the General and Supplementary Conditions. 20.0 RETAINAGE. Provisions concerning retainage are set forth in the Agreement. 21.0 PURCHASING RESTRICTIONS. Purchasing restrictions: The Bidder's authorized signature of this Bid assures the Bidder's compliance with the City's purchasing restrictions. A copy of the resolutions is available for review in the Purchasing and Risk Management Division or the City Clerk's office. A. Cement Restrictions: City of Fort Collins Resolution 91-121 requires that suppliers and producers of cement or products containing cement to certify that the cement was not made in cement kilns that burn hazardous waste as a fuel. 22.0 COLLUSIVE OR SHAM BIDS Any Bid deemed by the City in its sole discretion to be a collusive or sham Bid will be rejected and reported to authorities as such. Your authorized signature of this Bid assures that such Bid is genuine and is not a collusive or sham Bid. 0 23.0 BID RESULTS. For information regarding results for individual Bids send a self-addressed, self -stamped envelope and a Bid tally will be mailed to you. Bid results will be posted in the Purchasing office seven (7) days after the Bid Opening. END OF SECTION L] 01 7010 Cleaning PART1 GENERAL 1.1 DESCRIPTION A. Work Included 1. Throughout the construction period, maintain the buildings and site in a standard of cleanliness as described in this section. B. Related Work Described Elsewhere 1. In addition to standards described in this Section, complywith all requirements for cleaning as described in various other Sections of these specifications. 1.2 QUALITY ASSURANCE A. Conduct daily inspection, and more often if necessary, to verify that requirements of cleanliness are being met. PART 2 MATERIALS 2.1 CLEANING MATERIALS AND EQUIPMENT A. Provide all required personnel, equipment and materials needed to maintain the specified standard of cleanliness. 2.2 COMPATIBILITY A. Use only the cleaning materials and equipment which are compatible with the surface being cleaned, as recommended by the manufacturer of the material or as approved by the Consultant. PART 3 EXECUTION 3.1 PROGRESS CLEANING A. Material Storage 1. Retain all stored items in an orderly arrangement allowing maximum access, not impeding drainage or traffic, and providing the protection required to maintain the materials in an undamaged condition. B. General 1. Do not allow the accumulation of scrap, debris, waste material, and other it not required for construction of this work. TechniScan, Inc. Drake WWTP 01 7010 TSI Project #8062 1 Cleaning • • �I i 2. At least once each week and more often if necessary, completely remove all scrap, debris, and waste material from the job site. 3. Provide adequate storage for all items awaiting removal from the job site, observing all requirements for fire protection and protection of the surrounding site. C. Site Daily, and more often if necessary, inspect the site (including building interior) and pick up all scrap, debris and waste material. Remove all such items to the place designated for their storage. 2. Weekly, and more often if necessary, inspect all arrangements of materials stored on the site, restack, tidy or otherwise service all arrangements to meet the requirements specified herein. 3. Maintain the site in a neat and orderly condition at all times. 4. Provide adequate protection of existing curtain wall during construction to prevent staining and or damage as a result of operations performed under this contract. As a minimum, provide sheathing protection extended from the roof perimeter edge down over the curtain wall in the areas of work. 3.2 FINAL CLEANING A. Definition Except as otherwise specifically provided, "clean" (for the purpose of this article) shall be interpreted as meaning the level of cleanliness generally provided by skilled cleaners using commercial quality building maintenance equipment and materials. B. General Prior to completion of work, remove from the job site all tools, surplus materials, equipment, scrap, debris and waste. Conduct final progress cleaning as described in Article 3.1 above. C. Site 1. Unless otherwise specifically directed by the Consultant, clean all adjacent areas on the site. Completely remove all resultant debris. D. Building Interior Where Owner has allowed Contractor access through the building interior, visually inspect all access routes and remove all traces of soil, smudges, and other foreign matter. Any materials damaged as a result of this project shall be repaired to the satisfaction of the owner or replaced at no additional cost to the • TechniScan, Inc. Drake WWTP 01 7010 TSI Project #8062 2 Cleaning owner. E. Building Exterior Visually inspect all exterior surfaces and remove all traces of soil, waste material, smudges and other foreign matter. Remove all traces of splashed materials from adjacent surfaces. If necessary to achieve a uniform degree of exterior cleanliness, hose down the exterior of the structure. In the event of stubborn stains not removable with water, the Consultant may require other cleaning or painting at no additional cost to the Owner. END OF SECTION TechniScan, Inc. Drake WWTP 01 70 10 TSI Project #8062 3 Cleaning Q 0 0 • 027000ACRM Removal PART1 GENERAL 1.1 DESCRIPTION A. Provide all labor, material, equipment, and tools as required to prepare the existing roofing system for reroofing as specified in this section. B. Provide for the proper disposal of all existing materials designated to be removed. Use approved trash receptacles in areas designated by the Owner's representative. C. Coordinate the roof preparation work with the new roofing work in such a manner as to keep the new insulation and roofing materials, building, and building interior absolutely clean, dry and watertight. D. Provide and document the safe removal and disposal of Asbestos Containing Roofing Materials (ACM) in accordance with NESHAP and City requirements. 1.2 SUBMISSION REQUIREMENTS A. Documentation that workers have received training according to 29 CFR 1926.1101 OSHA standards for removal of asphalt impregnated asbestos containing roofing and asbestos containing roofing materials. • B. Documentation that a Competent Person, as defined by OSHA and having received the appropriate training will be on -site and available to the workers during all times of operations. C. Documentation that Contractor has a respiratory protection program, including a written respiratory policy, written medical surveillance and fit testing. D. A site specific safety plan. PART 2 MATERIALS 2.1 No products required in this Section. PART 3 EXECUTION 3.1 PRE -WORK ACTIVITIES A. Coordinate with Plant Staff to shut off and lock out HVAC and electrical systems where applicable. B. Coordinate with Plant Staff to secure ground -level work area to minimize disruption to plant operations. C. Seal over any windows, HVAC units, air intakes or other openings that could allow TechniScan, Inc • Drake WWTP TSI Project # 8062 Page 1 of 3 027000ACRM Removal fibers from the work area into the building. Do not seal over any plumbing vents in the work area. 3.2 PROTECTION OF SURFACES A. Contractor shall take all necessary precautions during roof preparation to protect the building and adjacent surfaces from being soiled or damaged. B. When weather threatens, cease work under this section and return roof to a watertight condition. Note: Provide temporary protective sheets of 45 mil EPDM, large enough to cover the day's work area. Visqueen will not be allowed for a temporary covering. C. Contractor shall restore to original condition any damages caused during work performed in this section. 3.3 ACM REMOVAL A. Removal method of ACM shall ensure that the material remains non -friable. B. Use of water or amended water is acceptable, but shall be coordinated with plant staff to minimize damage to surrounding equipment. C. Water used during demolition shall be disposed of with the ACM or filtered to five microns prior to discharge to sanitary sewer. 3.4 DISPOSAL A. Properly dispose of all debris from roof preparation on a daily basis. B. Do not store excessive amounts of debris (as determined by Owner/Owner's Representative) on roof. Contractor shall take care not to over stress roof deck and provide protection to new and existing roof from damage by stored debris. D. ACM material shall be disposed of separately from other roof waste. E. ACM waste dumpster will be lined with polyethylene sheeting. Lining will be sealed across the top of the dumpster prior to transport. F. Waste manifest required by landfill and city documentation for disposal shall be completed by the competent person. G. Dispose of all nails or mechanical fasteners removed as ACM. Place into polyethylene waste bags and lower into the dumpster. TechniScan, Inc Drake WWTP TSI Project # 8062 Page 2 of 3 40 027000 ACRM Removal 3.5 CLEAN UP A. Prior to the completion of the work remove from the job site all tools, equipment, debris and waste. B. Conduct final cleaning as per Section 01 70 00. • TechniScan, Inc • Drake WWTP TSI Project # 8062 Page 3 of 3 06 10 00 Rough Carpentry PART1 GENERAL 1.1 DESCRIPTION A. Work Included 1. Install all wood nailers and plywood indicated on the drawings and as required by the specifications. B. Related Work Described Elsewhere 1. Section 02 70 00 - Roof Demolition 2. Section 07 30 03 — Single Ply Roofing — Fully Adhered — TPO Reinforced 60 MIL. 1.2 QUALITY ASSURANCE A. Qualifications of Workmen 1. Provide sufficient workmen and supervisors who shall be present at all times during execution of this portion of the work and who shall be thoroughly familiar with the type of construction involved and the materials and techniques specified. B. Rejections 1. In the acceptance or rejection of rough carpentry, the owner will make no allowance for lack of skill on the part of workmen. C. All work shall conform to pertinent standards of Factory Mutual testing. 1.3 PRODUCT HANDLING A. Protection 1. Store all materials up, off of the roof deck or ground, and covered with a weatherproof covering anchored sufficiently so as to resist wind blow -off. 2. Keep all materials clearly identified with all grade marks legible. Keep all damaged material clearly identified as damaged and stored separately to prevent its inadvertent use. 3. Do not allow installation of damaged or otherwise non -complying material. TechniScan, Inc. Drake WWTP TSI Project # 8062 Page 1 of 3 L� 0 0 00 • are ry Rough Carpentry B. Replacement 1. In the event of damage, immediately make all necessary repairs and replacements to the approval of the owner and at no additional cost to the owner. 2.2 PLYWOOD AND ORIENTED STRAND BOARD (OSB) A. All plywood and OSB shall be minimum 1/2" or to match existing plywood, exterior type, C-C plugged grade, and a minimum of five (5) plies (plywood). 2.3 FASTENERS A. All fasteners must have corrosion -resistant coating. 1. Masonry/Concrete Fasteners A) Threaded Masonry/Concrete Fasteners 1) Corrosion -resistant, threaded fastener with a low profile head. 2) Screw fastener to be Factory Mutual approved. 3) Approved Products A] Confas by Construction Fasteners B] Tapcon Flat Head Phillips by Buildex C] Confixx by Fabco D] TPO Fasteners listed by Manufacturer B) Other Masonry/Concrete Fasteners 1) The following fasteners may also be used. A] Metal Hit Anchor by Hilti B] Rawl -Drives by Rawl Cl Zamac Nailin by Rawl D] Gripcon by Fastenrite TechniScan, Inc. Drake WWTP TSI Project # 8062 Page 2 of 3 0 06 10 00 Rough Carpentry 40 B. Threaded Steel/Wood Fasteners 1. Corrosion -resistant, self -tapping, self -drilling screw with low profile head. 2. Screw type fastener to be Factory Mutual approved. 3. Approved Products A) Dekfast by Construction Fasteners B) Roof Grip by Buildex C) Insul Fixx by Fabco C. Wood to Wood Fasteners 1. Nails A) Number 10, hot -dipped, galvanized steel or 304 stainless steel ring shank. B) Minimum embedment to be 1-1/2". 2. Screws A) Number 10, 300 series stainless steel wood screw or #14 Phillips Pan 300 series stainless steel sheet metal screws. B) Minimum embedment to be 1-1/4". PART 3 EXECUTION 3.3 CLEANUP A. Premises shall be kept in a neat and orderly condition. B. After installation of all rough carpentry, contractor shall remove all construction debris and equipment from job site. TechniScan, Inc. Drake WWTP TSI Project # 8062 Page 3 of 3 • 07 53 03 Single Ply Roofing -Fully Adhered TPO 60 mil Reinforced GENERAL 0.1 SECTION INCLUDES A. Install 1/4" per foot full tapered insocyanurate in manufactures approved insulation adhesive. B. Dens -Deck Prime —1 /2 inch installed with manufactures approved adhesive per 1-120 wind uplift requirements. C. Insulation — 1/2 inch per foot tapered insulation to be used for crickets. D. Membrane roofing and base flashings fully adhered to the 1/2 inch thick DensDeck Prime. 0.2 RELATED SECTIONS A. Section 06 00 00 - Rough Carpentry B. Section 07 62 00 - Flashing and Sheet Metal. C. Section 07 90 00 - Joint Sealers 0.3 REFERENCES • A. ASTM C208 - Insulating Board B. ASTM 4637 - TPO Scrim Reinforced Fleeceback single ply membrane. C. NRCA (National Roofing Contractors Association) - Roofing and Waterproofing Manual. D. SPRI - Wind Design Guide for Fully Adhered Single Ply Roofing Systems. E. UL 790 - Fire Hazard Classifications. 0.4 SYSTEM DESCRIPTION A. TPO 60 mil Scrim Reinforced Fleeceback Membrane Conventional Roofing System: One ply membrane system with insulation, membrane finish, fully adhered with manufactures approved low rise adhesive. 0.5 SUBMITTALS FOR REVIEW A. Section 01 33 00 - Submittals: Procedures for submittals. B. Product Data: Provide characteristics on membrane materials, flashing materials, and insulation. Provide manufacturer's recommended instructions for installation of materials. C. Manufacturer's certification that Contractor is an approved applicator to install the • TechniScan, Inc. Drake WWTP TSI Project # 8062 Page 1 of 8 SECTION 00300 BID FORM • i 07 53 03 Single Ply Roofing -Fully Adhered TPO 60 mil Reinforced manufacturer's guaranteed roof system (labor and material). D. Shop Drawings: Indicate joint or termination detail conditions, conditions of interface with other materials, and tapered insulation cricket layout. E. Submit letter from membrane manufacturer that insulation to be supplied is an acceptable substrate for their guaranteed roof systems. F. Submit detail for proposed Night Seals. G. Samples: Not required. 0.6 SUBMITTALS FOR INFORMATION A. Section 01 33 00 - Submittals: Procedures for submittals. B. Manufacturer's Installation. Instructions: Indicate special precautions required for heat welding the seams of the membrane. C. Manufacturer's Certificate: Certify that products meet or exceed specified requirements. 0.7 QUALITY ASSURANCE A. Manufacturer: Company specializing in manufacturing the products specified in this section with ten years' experience. B. Applicator: Company specializing in performing the work of this section with five years experience and approved by system manufacturer. C. Perform Work in accordance with manufacturer's instructions. 0.8 REGULATORY REQUIREMENTS A. Conform to applicable code for roof assembly fire hazard requirements. B. UL 790: Class A Fire Hazard Classification. 0.9 PRE -INSTALLATION MEETING A. Coordination and Meetings: Pre -installation meeting to take place one week before starting work of this section. 0.10 DELIVERY, STORAGE, AND PROTECTION A. Section 01 60 00 - Material and Equipment: Transport, handle, store, and protect products. TechniScan, Inc. Drake WWTP TSI Project # 8062 Page 2 of 8 u11 07 53 03 Single Ply Roofing -Fully Adhered TPO 60 mil Reinforced B. Store products in weather protected environment, clear of ground and moisture. C. The material stored on the roof surface shall be scattered over the roof deck to avoid damage to the structural roof system. Concentrated loads of high magnitude will not be permitted on the roof. D. The Contractor shall use extreme care in transporting materials across the existing roof surface. The Contractor may have to make repairs to damaged areas of the existing roof membrane, insulation and/or decking, where workmen have damaged the existing surface in transporting materials. E. The Contractor shall furnish all required storage enclosures and safeguards. 0.11 ENVIRONMENTAL REQUIREMENTS A. Section 01 60 00 - Material and Equipment: Environmental conditions affecting products on site. B. Do not apply roofing membrane during inclement weather and follow manufacturer's written instruction on acceptable ambient temperature range suitable for installation of their product. C. Do not apply roofing membrane to damp or frozen deck surface. D. Do not expose materials vulnerable to water or sun damage in quantities greater than can be weatherproofed during same day. E. TPO membrane roofing, flashings, insulation, and adhesives shall not be applied when the surrounding air and surface temperature, relative humidity, or wind velocity is notwithin the range acceptable under the manufacturer's recommendations. F. Due to solvent flash off, condensation may form on freshly applied solvent based materials when ambient temperature is near the dew point. Due to possible surface curing, the application of solvent based material should be discontinued under these conditions. If condensation develops, discontinue the application of the solvent based materials and allow the surface to dry. When conditions allow for continuing the operation, apply a freshener coat of solvent based material to the previously coated materials. G. Installation during Windy Conditions Dynamic forces caused by winds of 20 mph or greater may disturb the installation of the TPO membrane during the adhesion of the membrane to the DensDeck Prime A) Areas of greater impact during windy conditions are normally along the perimeter area of the building which is 0.4 times the building height or 0.1 times the lesser building dimension, whichever is smaller. TechniScan, Inc. Drake WWTP TSI Project # 8062 Page 3 of 8 07 53 03 Single Ply Roofing -Fully Adhered TPO 60 mil 10 Reinforced 0.12 COORDINATION A. Coordinate the work with the installation of associated metal flashings, as the work of this section proceeds. 0.13 WARRANTY A. Section 01 70 00 - Contract Closeout. B. At the owner's option, provide a 20-year labor and material warranty. Price for warranty to be included in base bid but indicated separately on Bid Form. C. Correct defective Work within a two (2) year period after Substantial Completion for any. work that fails to prevent penetration of water into the building or within a 2-year period under the manufacturer's 20-year warranty option. Provide warranty indicating such coverage. PART PRODUCTS 1.1 MANUFACTURERS - MEMBRANE MATERIAL A. TPO 60 mil scrim reinforced Fleeceback membrane. B. Section 01 60 00 - Materials and Equipment: As specified. 1.2 MEMBRANE AND ASSOCIATED MATERIALS A. Membrane: TPO 60 mil scrim reinforced Fleeceback single ply membrane. B. Accessories: Bonding adhesives, splice cements, lap caulk, primers, and water cut-off mastics are to be supplied by the membrane manufacturer and are to be compatible with materials to which they are to be applied. 1.3 INSULATION A. Full tapered 1 /4" per foot tapered isocyanurate. B. Cover board insulation: 1/2 inch thick DensDeck Prime, shall be adhered to the existing isocyanurate insulation. The Dens -Deck Prime shall be 1/2 inch thick by 4 ft X 4 ft. D. Adhered Insulation — for 1/2 inch thick DensDeck Prime. General approvals for the attachment of the insulation layer(s) using adhesives in adhered roofing system are restricted to non -steel deck projects. 1. Adhesive shall be applied only to properly prepared and pre -approved substrates, free of any debris, dirt, grease, oil or moisture. TechniScan, Inc. Drake WWTP TSI Project # 8062 Page 4 of 8 • 07 53 03 Single Ply Roofing -Fully Adhered TPO 60 mil Reinforced 2. The minimum product temperature at time of application shall be 70 degrees F. 3. Adhesives are not recommended for applications when surface or ambient temperatures are below 40 degrees F. or above 110 degrees F. 4. Insulation shall be fully bonded to the substrate with a maximum board size of 4 feet X 4 feet. 5. Insulation shall be set into a continuous .5 inch bead of adhesive at a minimum rate of one linear foot of adhesive for every one square foot of insulation board per 1-110 wind uplift requirements. Install low rise adhesive at a rate of 4" on center, all layers of tapered insulation. 6. Place the boards onto the adhesive beads and walk on the boards, spreading the adhesive for maximum contact. 7. A second walking will be required after ten (10) minutes to ensure maximum contact and bond strength. 2.4 FLASHINGS A. Flexible Flashings: Same material as membrane; but unsupported FiberTite flashing • material. B. Counter flashings: As specified in Section 07 62 00. C. Sealants: As recommended by membrane manufacturer. D. Strip Reglet Devices: Galvanized steel; maximum possible lengths per location, with attachment flanges. E. Stack Boots: Flexible boot and collar with clamps for pipe stacks through membrane. PART 2 EXECUTION 2.1 EXAMINATION A. Verify that surfaces and site conditions are ready to receive work. B. Verify deck surfaces are dry and free of snow or ice. Confirm dry deck by moisture meter with 12 percent moisture maximum. C. Verify roof openings, curbs, pipes, sleeves, ducts, and vents through roof are solidly set. TechniScan, Inc. Drake WWTP TSI Project # 8062 Page 5 of 8 07 53 03 Single Ply Roofing -Fully Adhered TPO 60 mil Reinforced 3.2 INSULATION APPLICATION A. Install 2" isocyanurate per Summary of Work. B. 1/4" per foot full tapered isocyanurate and 1/2" Dens -Deck Prime, set in manufactures approved insulation adhesive. 4" on center .5 inch bead. C. Lay boards with edges in moderate contact without forcing. Cut insulation to fit neatly to perimeter blocking and around penetrations through roof. D. Apply no more insulation than can be covered with membrane in same day. 3.3 INSTALLATION OF TPO MEMBRANE A. TPO Fleeceback 60 mil Roofing System (115 mil total thickness). 1. TPO Fleeceback 60 mil membrane (115 mil total thickness). a. Position the TPO Membrane and fold the sheet to allow a workable exposure to the underside of the sheet. b. Apply a 4" on center bead of low rise adhesive to the Dens -Deck Substrate. c. Apply low rise adhesive 4" on center throughout the entire field of the roof 3.4 TPO SCRIM REINFORCED FLEECEBACK 60 MIL MEMBRANE A. Apply flexible flashings or field fabricated flashings to seal membrane to vertical elements B. Fully adhere membrane to penetration and use continuous pieces where feasible and practical. C. Overlap splices a minimum of 3 inches and extend flashing a minimum of 4 inches onto new roof surface. Heat weld all seams. D. Coordinate installation of through -wall scuppers and related flashings E. Where sheet metal flashings are detailed, secure field membrane to wood nailers, set sheet metal flashing in a full bed of water cut-off mastic and nail in place. Strip in sheet metal flashing with membrane to be fully adhered using appropriate adhesives and cements. Provide sealant at base of sheet metal jack and around edge of membrane flashing seam to field membrane. Flash ings are to be totally bonded and free offish mouths or wrinkles. (refer to diagram section) TechniScan, Inc. Drake WWTP TSI Project # 8062 Page 6 of 8 u • 0 07 53 03 Single Ply Roofing -Fully Adhered TPO 60 mil Reinforced 3.5 NIGHT SEALS A. Temporary night seals are to be constructed at the end of each working day to protect the insulation, roofing and building components from damage due to wind and moisture. B. Temporary night seals are to be as detailed by the Contractor and approved by the manufacturer and Owner/Owner's representative. 3.6 FIELD QUALITY CONTROL A. Section 01 40 00 - Quality Assurance: Field inspection and testing. B. Correct identified defects or irregularities. 3.7 MECHANICAL A. Mechanical and HVAC equipment shall remain operational at all times unless shutdown is required, and then coordinated in advance with Owner/Owner's representative. B. When required, the contractor shall carefully disconnect, remove, re -install and re -connect exhaust units, vents and HVAC equipment, as necessary, for completion of the roof work. The roofing contractor shall note that all the mechanical equipment is in working order prior • to disconnecting any units and will caution his workmen not to damage any of the existing equipment and service lines. C. Roofing work around HVAC equipment must proceed with extreme care to prevent damage to gas/refrigerant lines, electrical lines and condensate drain lines. Damage to the service lines or drain lines will be the sole responsibility of the roofing contractor and all repairs will be accomplished by appropriately trained personnel (plumbers, electricians, HVAC mechanics) at the roofing contractor's expense. Repairs will include system purging, system charging and system start up if required. All mechanical equipment shall be demonstrated to be in proper working order upon completion of the project. 3.8 ELECTRICAL A. All damage to electrical components shall be replaced by a licensed electrician at the roofing contractor's expense. B. All associated electrical work shall be performed by a licensed electrician and is the responsibility of the contractor. 3.10 CLEANING A. Section 01 70 00 - Contract Closeout: Cleaning installed work. TechniScan, Inc. Drake WWTP TSI Project # 8062 Page 7 of 8 07 53 03 Single Ply Roofing -Fully Adhered TPO 60 mil Reinforced B. In areas where finished surfaces are soiled by Work of this section, consult manufacturer of surfaces for cleaning advice and conform to their instructions. C. Repair or replace defaced or disfigured finishes caused by Work of this section. 3.11 PROTECTION OF FINISHED WORK A. Section 01 70 00 - Contract Closeout: Protecting installed work. B. Protect building surfaces against damage from roofing work. C. Where traffic must continue over finished roof membrane, protect surfaces. All new membrane areas must be covered with tarps before tear -off can begin. • TechniScan, Inc. Drake WWTP TSI Project # 8062 Page 8 of 8 • 07 62 00 Sheet Metal Flashing and Trim PART1 GENERAL 1.1 SECTION INCLUDES A. Counterf lashings at roof curb mounted equipment. 24 ga. stainless steel. B. Rain collars and caps. C. Penetration flashings. Provide and install new stainless steel vent jacks. 1.2 RELATED SECTIONS A. Section 07 53 03 - Single Ply Roofing. B. Section 07 90 00 - Joint Sealers. 1.3 REFERENCES A. ASTM A176 - Specification for stainless and heat -resisting chromium -nickel steet plate, sheet, and strip. B. ASTM B32 - Solder Metal. C. Water Mastic - provided by membrane roofing manufacturer. (Section 07 53 03) D. FS O-F-506 - Flux, Soldering, Paste and Liquid. E. NRCA (National Roofing Contractors Association) - Roofing Manual. F. SMACNA - Architectural Sheet Metal Manual. 1.4 QUALITY ASSURANCE A. Perform work in accordance with SMACNA and NRCA standard details and requirements. B. Maintain one copy of the specifications and approved shop drawings on site. 1.5 QUALIFICATIONS A. Fabricator and Installer: Company specializing in sheet metal flashing work with 5 years documented experience. TechniScan, Inc. Drake WWTP TSI Project #8062 Page 1 of 4 076200 • Sheet Metal Flashing and Trim 1.6 DELIVERY, STORAGE, AND HANDLING A. Deliver, store, protect and handle products to site under provisions of Section 01 60 00. B. Stack preformed material to prevent twisting, bending, or abrasion, and to provide ventilation. Slope metal sheets to ensure drainage. Secure to prevent damage to metal and to roof during inclement weather. C. Prevent contact with materials which may cause discoloration or staining. 1.7 COORDINATION A. Coordinate work under provisions of Section 01 30 39. B. Coordinate with the work of Section 07 53 03 for installation of the new roof system and maintaining it weathertight on a daily basis: PART2 PRODUCTS . 2.1 SHEET MATERIALS A. Stainless Steel: ASTM A176 specification for stainless steel and heat -resisting chromium -nickel steel plate and strip 24 gage core steel. To be used for roof top unit curb flashings,.counterflashings and pipe flashings. • B. Stainless Steel Sheet: ASTM 176. 2.2 ACCESSORIES A. Fasteners: Galvanized steel with soft neoprene washers. B. Primer: Zinc chromate type. C. Protective Backing Paint: Bituminous or approved equal. D. Sealant: Polyurethane type, specified in Section 07900. E. Plastic Cement: ASTM D4586, Type I. F. Solder: ASTM B32; 50/50 type. G. Flux: FS O-F-506. 2.3 FABRICATION A. Fabricate counterflashings to allow toe to extend 3 inches over roofing base flashing. TechniScan, Inc. Drake WWTP TSI Project # 8062 Page 2 of 4 0 0 0 07 62 00 Sheet Metal Flashing and Trim B. Counterflashing shall be formed in not more than 10-foot lengths. Lap ends 3 inches and caulk all loose lock joints. Cut and miter all inside and outside corner joints. C. All sheet metal penetration (lashings (i.e., roof jacks, pitch pans, etc.,) and through wall scuppers to have all seams soldered weathertight. 2.5 FINISH A. Back paint concealed metal surfaces with protective backing paint to a minimum dryfilm thickness of 15 mil. PART 3 EXECUTION 3.1 EXAMINATION A. Verify roof openings, curbs, pipes, sleeves, ducts, or vents through roof are solidly set, reglets in place, and nailing strips located. B. Verify roofing termination and base flashings are in place, sealed, and secure. C. Verify sheet membrane waterproofing has been installed at top of perimeter parapet wall prior to installation of sheet metal cap flashing. . 3.2 INSTALLATION A. Conform to drawing details included in the specification manual and to conform to SMACNA and NRCA details. B. Secure flashings in place using concealed fasteners. [Use exposed fasteners only where permitted.] C. Apply a TPO recommended sealant compound between metal flashings and membrane flashings and between lap joints in perimeter edge flashings. D. Fit flashings tight in place. Make corners square, surfaces true and straight in planes, and lines accurate to profiles. E. Seal metal joints watertight. F. Finish all sheet metal weather tight. G. Where lap seams do not have a joint cover, lap according to pitch but in no case less than 3 inches. H. Make all lap seams in the direction of water flow. TechniScan, Inc. Drake WWTP TSI Project #8062 Page 3 of 4 • 0 SECTION 00300 BID FORM PROJECT: 7529 Roof Replacement at Drake Wastewater Treatment Plant Place: Ft Collins Date: 8/12/13 1. In compliance with your Invitation to Bid dated 7/16 , 20 13 and subject to all conditions thereof, the undersigned a (Corporation, Limited Liability Company, Partnership, Joint Venture, or Sole Proprietor) authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of see bid bond f$ . ) in accordance with the Invitation To Bid and Instructions to Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment Bonds is as follows: Western Surety Company, 333 S. Wabash Ave, Chicago, Ib. 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No. 1 through 2 8. BID SCHEDULE (Base Bid) BUILDING #26 DEWATAERING BUILDING: $ 94,373.39 BUILDING #21 CENTRIFUGE BUILDING: $ 39,135.73 076200 • Sheet Metal Flashing and Trim Provide suitable watertight expansion joint as required for proper installation. J. Caulking of sheet metal where required shall be neatly and thoroughly performed for a watertight seal. K. For all sheet metal penetration flashings (roof jacks, pitch pans, etc.,) provide rain collars/hoods installed over top of these flashings. 3.4 FASTENING A. Secure metal as per detailed drawings. B. For fastening into concrete, use masonry/concrete anchors with neoprene washers with steel backing. Use all metal anchors only, no plastic anchors allowed. C. For exposed fastening into wood, use screws with neoprene washers. D. All fasteners to be corrosion resistant coated. 3.5 SOLDERING A. Thoroughly clean and tin all joint materials prior to soldering. B. Use heavy soldering copper of a blunt design, properly tinned for use. C. Perform all soldering slowly with well -heated soldering copper in order to heat seams thoroughly and to completely fill them in. D. Make all exposed soldering of finished surfaces neat, full -flowing, and smooth. E. After soldering, thoroughly wash and flux with a soda solution. 3.6 FIELD QUALITY CONTROL A. Field inspection will be performed under provisions of Section 01 40 00. B. Inspection will involve surveillance of work during installation to ascertain compliance with specified requirements. C. All roof surfaces to be adequately protected to prevent damage. Keep all scrap metal off roof surface at all times. If damage to roof does occur; visibly mark area and report immediately to roof contractor and/or Owner/Owner's representative. 0 TechniScan, Inc. Drake WWTP TSI Project # 8062 Page 4 of 4 is • 07 90 00 Joint Sealers PART1 GENERAL 1.1 SECTION INCLUDES A. Preparing substrate surfaces. B. Sealant and joint backing. 1.2 RELATED SECTIONS A. Section 07 53 03 - Single Ply Roofing: Sealants required in conjunction with roofing. B. Section 07 60 00 - Sheet.Metal Flashing and Trim: Sealants required in conjunction with metal flashings. 1.3 REFERENCES A. ASTM C920 - Elastomeric Joint Sealants. B. ASTM D1056 - Flexible Cellular Materials - Sponge or Expanded Rubber. C. SWRI (Sealant, Waterproofing and Restoration Institute) Sealant and Caulking Guide _. Specification. 1.4 SUBMITTALS A. Submit under provisions of Section 01 33 00. B. Product Data: Provide data indicating sealant chemical characteristics, performance criteria, substrate preparation, limitations, and color availability. C. Manufacturer's Installation Instructions: Indicate special procedures, surface preparation, perimeter conditions requiring special attention, and manufacturer's general installation requirements. 1.5 QUALITY ASSURANCE A. Perform work in accordance with sealant manufacturer's requirements for preparation of surfaces and material installation instructions. 1.6 QUALIFICATIONS A. Manufacturer: Company specializing in manufacturing the Products specified in this section with minimum three years experience. TechniScan, Inc. Drake WWTP • TSI Project #8062 Page 1 of 3 07 90 00 Joint Sealers 40 B. Applicator: Company specializing in performing the work of this section with minimum three years experience. 1.7 ENVIRONMENTAL REQUIREMENTS A. Maintain temperature and humidity recommended by the sealant manufacturer during and after installation. 1.8 COORDINATION A. Coordinate work under provisions of Section 01 30 39. B. Coordinate the work with all sections referencing this section. 1.9 WARRANTY A. Provide two year warranty under provisions of Section 01700. B. Warranty: Include coverage for installed sealants and accessories which fail to achieve water tight seal and exhibit loss of adhesion or cohesion, or do not cure. PART2 PRODUCTS 2.1 SEALANTS— RECOMMENDED BY TPO Manufacturer A. Polyurethane Sealant: ASTM C920, Grade NS, Class 25, single component, chemical curing, non -staining, non -bleeding, capable of continuous water immersion, non -sagging type; clear color; as manufactured by Sika or Sonneborn. 1. Elongation Capability 25 percent 2. Service Temperature Range -40 to 180 degrees F 3. Shore A Hardness Range 20 to 35 2.2 ACCESSORIES A. Primer: Non -staining type, recommended by sealant manufacturer to suit application. B. Bond Breaker: Pressure sensitive tape recommended by sealant manufacturer to suit application. PART 3 EXECUTION 3.1 EXAMINATION A. Verify that substrate surfaces and joint openings are ready to receive work. TechniScan, Inc. Drake WWTP TSI Project #8062 Page 2 of 3 07 90 00 Joint Sealers B. Verify that joint backing and release tapes are compatible with sealant. 3.2 PREPARATION A. Remove loose materials and foreign matter which might impair adhesion of sealant. B. Clean joints in accordance with manufacturer's instructions. C. Perform preparation in accordance with manufacturer's instructions. D. Protect elements surrounding the work of this section from damage or disfiguration. 3.3 INSTALLATION A. Install sealant in accordance with manufacturer's instructions. B. Install sealant free of air pockets, foreign embedded matter, ridges, and sags. C. Apply sealant within recommended application temperature ranges. Consult manufacturer when sealant cannot be applied within these temperature ranges. 3.4 CLEANING A. Clean work under provisions of 01 70 10. B. Clean adjacent soiled surfaces. 3.5 PROTECTION OF FINISHED WORK A. Protect finished installation under provisions of Section 01 50 00. B. Protect sealants until cured. TechniScan, Inc. Drake WWTP TSI Project #8062 Page 3 of 3 22 40 00 Installation of New Roof Drain Inserts PART1 GENERAL 1.01 SECTION INCLUDES A. Provide and install all necessary hardware and appurtenances, supports, insulation, tools, labor, and equipment for the repair of existing drains. B. Furnish new clamping rings, domes, and bolts for existing roof drains where existing drain components are missing, broken, deteriorated or otherwise unusable. C. All drains to receive new cast iron domes. D. Provide and install all necessary hardware and appurtenances, supports, insulation, tools, labor and equipment for.new roof drains and overflow scuppers as indicated on Roof Plan. 1.02 RELATED SECTIONS A. Section 02 70 00 - Roof Demolition. B. Section 07 53 03 - Single Ply Fully Adhered 1.03 SUBMITTALS A. Submit under provisions of Section 01 30 00. B. Product Data. 1. Roof Drain. 2. Piping and Accessories. 3. Pipe Insulation. C. Manufacturer's Installation Instructions. 1.04 ' QUALITY ASSURANCE A. Qualification of Manufacturer: Products used in this work shall be produced by manufacturers regularly engaged in the manufacture of similar items and with a history of successful production acceptable to the consultant. B. In acceptance or rejection of the work of this section, the consultant will make no allowance for lack of skill on the part of the workmen. 1.05 REGULATORY REQUIREMENTS A. New drain installation to comply with all governing codes and authorities. 1.06 PRODUCT HANDLING A. Use all means to protect the materials of this section before, during, and after installation, and to protect the work and materials of all other trades. TechniScan, Inc. Drake WWTP TSI Project # 8062 Page 1 of 4 22 40 00 Installation of New Roof Drain Inserts iB. Deliver only new materials to the job site in original, unopened containers. Materials to be stored in such a manner as to be protected from rain, snow, or inclement weather. When storing materials on the roof, do not over stress the deck. C. In the event of damage, immediately make all repairs and replacements to the approval of the consultant and at no additional cost to the owner. 1.07 SEQUENCING AND SCHEDULING A. Coordinate schedule with owner's representative and building tenants to minimize disruption of current building activities. B. Coordinate inspection and repair of existing roof deck and roof system with roofing contractor to ensure complete weather tightness at the conclusion of the working day. C. Contractor to completely cover building contents in areas working overhead daily. Work closely and daily communicate with building personnel in case access is required into any of these areas. 1.08 GUARANTEE A. All new materials and workmanship covering work provided under this section of the specifications shall be guaranteed in writing by the contractor to maintain all plumbing in a watertight condition without cost to the owner fora period of two (2) years after date of final payment. • PART 2 PRODUCTS 2.01 ROOF DRAINS A. Remove existing drain bowls. B. All drains to receive new Hercules drain inserts. C. Installation of new roof drain inserts. PART 3 EXECUTION 3.01 COORDINATION A. Roofing contractor will be responsible for drain bowl removal. B. When installing new drain inserts, and new drain hardware, carefully coordinate the work with the consultant's field representative and roofing contractor. C. Coordinate and schedule all work with owner's representative and building tenants to gain access from within the building. Properly rope off areas and ensure safety of all employees and patrons of the building. Upon completion, assist tenant in re -conforming the work area. D. Completely cover building contents in areas working overhead daily to insure no damage to • TechniScan, Inc. Drake WWTP TSI Project # 8062 Page 2 of 4 22 40 00 Installation of New Roof Drain Inserts building contents. E. Restore all surfaces damaged by the operations of this section to like -new condition, at no additional cost to the owner. 3.02 QUALITY CONTROL A. The building is to remain absolutely watertight during repair of existing drains. The deck and new membrane is not to be cut if any ponded water exists on roof surface. B. Be careful not to damage any interior or exterior finishes, including floors, ceilings, and walls. Provide adequate protection for interior contents in areas of work on a daily basis. C. All roof drain(s) are to be watertested upon completion of repairs to verify water tightness. 3.03 PRE -CONSTRUCTION INSPECTION A. Examine site and determine satisfactory conditions for deck. B. Notify owner's representative of any conditions or defects which may adversely influence performance or completion of work. Absence of written notice to owner's representative will constitute the contractor s acceptance of site. C. Verify Deck support, attachment and integrity. 0 2. Deck weight limits before loading or installing materials. 3. Existence and locations of fire sprinkler systems, above and below deck conduit tubing, and any ceiling suspension systems. 3.04 INSTALLATION A. Provide new drain inserts at six locations determined by the consultant's field representative. B. Sump existing roof drain inserts as necessary to ensure top of drain is set below top of new insulation surface. * To be accomplished when total tear -off and re -roof is scheduled for main roof area. 3.05 VERIFICATION A. Upon completion of the installation of each drain insert, visually inspect and verify that all components are complete and properly installed. Verify that all drains and piping are in working order, and are absolutely watertight. 3.06 CLEANUP A. At completion of all plumbing work, remove all construction debris and equipment from job site. Contractor is to ensure that all building components (ceilings, lights, etc.) are TechniScan, Inc. Drake WWTP TSI Project # 8062 Page 3 of 4 22 40 00 Installation of New Roof Drain Inserts iundamaged and properly in place. 0 TechniScan, Inc. 10 Drake WWTP TSI Project # 8062 Page 4 of 4 0 C- r (7 Z _ 0Ig2' q i s O I M • .� r C7 /N ¢¢ J O 71 e� cm C) a T O < ® ®off &`' � M) 0 3 \I/ I /I\ 0 1 aD _eia1}If4 9y n a '' City of Fort Collins - Drake WWTP m� f V 3036 Environmental Drive Fan CONns. Colorado rf! 9 • 60 MIL FLEECEBACK TPO SET IN LOW RISE ADHESIVE 112" DENS -DECK PRIME SET— IN LOW RISE ADHESIVE • TechniScan, Inc. job no date IB)35. Be S'reeLSuie1W0 �, oer�r caaraao mm C • Remodro� Rev¢ions ] 3_n.p5J$� 1 ] 37I.2740 Fm 1 fmlY+ L111 3 u o� • �nb� Yb�4m mreN l IVJ� M ml b Or{6tl' Y � t neIDY1 s e1NM� u! J�1 tly S Mh �Illn aynl �L ietii6u� Yc &162 CAUL TERMINATION BAR NEW STAINLESS - STEEL FLASHING ETAL DECK NEW 2" ISOCYANURATE %4" /FT. FULL TAPERED ISOCYANURATE SET IN LOW RISE ADHESIVE WALL FLASHING DETAIL NOT TO SCALE City of Fort Collins - Drake WWTP 3036 Environmental Drive Fort Collins, Colorado dwg. name Wall Flashing Detail tlwg. no. Al Ell BUILDING 0 NORTH PLANT LFta(ADINb:' P7;w7.05-- BUILDING ,04i. SOUTH LMIJ biF-tUNN'El- BUILDING BUILDING #23 ANAEROBiO;DIGESTER rAcILT.Y: 88;006.50 TOTAL OF ALL au(L:b]N 306,088M Threehund�thou§and,eldht�lt-Ilaes & ej h certs;INWOFDs-ftft&, PRICES Th6'foF'ego-ijOgpr'1b'es-shall indlud&all,16bor, materials, transportation, §hbri I ng, reniovial, d-ew6terihg,,over�eod',,prbfi'ti',Irisur6nde, 61:6, 116cover thb complete Work In Place of the several kinids.cilled f6r, Bidder , ackhomileddes that ,the-6WNER4has therightto del6te lterns in the Bid or change quantities at his sole discr6tion without affecting ,the ,Agreement,,orprices,df any item so 166g'as,the. dbletion or change does not,exceed°twohiy-fi'veperceiit- (26%)'(of the totaill Ag reement Price. RESPECTFULLY License Number (If-Apollbable) Addrld§$ 60 MIL FLEECEBACK TPO SET IN LOW RISE ADHESIVE 1/2" DENS -DECK PRIME IN LOW RISE ADHESIVE CAULKING TERMINATION BAR NEW STAINLESS - STEEL FLASHING NEW 2' PLYWOOD CONCRETE DECK NEW 2" ISOCYANURATE Y4" /FT. FULL TAPERED ISOCYANURATE SET IN LOW RISE ADHESIVE ANAEROBIC DIGESTER FACILITY NORTH PARAPET WALL DETAIL NOT TO SCALE CAULKING NEW COVER PLATE 9 1] TechniScan, Inc. job no. 8062 City of Fort Collins - Drake WWTP 3036 Environmental Drive Fort Collins, Colorado dwg. none Parapet wall Detail dwg.no. A2 date 3/6/12 1873 5. Be ie Sneer Sure I oerrve� cdaoco arra 303.3?905J5 Phone XZ3M7,0F. drawn by jk, Revisions � 2 =_ M 4w� t 2 bMm6n qy�y MJ���iM MNmY �1 na®Y1 s etiv�Y �1 �ATsil b gtlh �Iltn m�nl OG i�ln6u� be S • • 0 pq:dSJ }uauaa6eueVq Isid pue 6uiseyaand }o ao}oaala lned- tija� J ' l a urg -nog( y}Inn 6uNionn o} paeAuo; Nool pue uol}e}uasaid lesodoid moA-Buuedajd ui popuadxe noA auag au} alepaidde aM *suol}el}o6au }oei}uoo o} }oafgns }oefoid sly} JOI Japinoid aovuas leuolssajad ay} se pa}oalas uoaq sey uajl} jnok '£60Z seomjoS 6ugoo,�j jjo;suejL.O£9L lesodoJd uo uol}e}uasaad jnoA jol nog( gluey} o} e� q pinonn uolsin14 6ui'seyoand su11100 IJOJ 10 AID NL :yolnaue}S -JN aeaa £ [0Z saowaS 6ul}OO�I }JO;suell 0£9L :3�1 09908 00 'sulilo0 ]JOA 0 }lufl 'anlJa s}ua8 96bt7 yolnaue}s yoez :u}}y yoaL 6UIJOO�j paouenpy £ 60Z '6Z }sn6ny 6u.isel-LOLuoa-no6o} 6uisey0md xe}-LOL9'lZZ'OL6 9LL9' VZ'OL6 ZZ40900.59xO su!11oo 14jo� Od 085 xo9 Od JooIj p,ZUG •3$ uo eW uoIsinIp 6uiseyand uise ind �O �� �� saainJag leiaueuid 0 9 Fj 0 pq :dSJ }uauwa6euen �siH pue 6ulsegoand JO a010aAa Ivlo ,ajnlnl agj ul ss000ns gonw wjij anon( gsim pue sjoefoid ,sulllo0 hod jo A}l0 ul lsaaalul anon( anul}uoo nog( adoq aM -uol}e;uasaid anon( 6uuedaid ul papuadxa nog( awil eq} aleloaidde am `}oafoid slq} ao; pa}oalas jou wam nog( g6noglly -salbolougoa I 6u1100�j paOuenpy sl suol}ellobau joeiluoo o} joefgns }oafoid slq} jol pa}oalas wjij agl saOlNas 6ullOOd }Po;sueJl ML dJd uo uol}e}uasaid mop( jol nog( � ueq} of mill pinom uOISInIa '6ulsegoand su11100 }POd ;o 40 aql 6uiseyojnd1woo ,no6oL xe; -LOL9' LZZ'OL6 • 9LL9'LZZ'OL6 ZZ909 oO 'Su,uoo uoi 099 xo8 Od J001d p Z'IS uOSeW •N GLZ uolslnlp 6ulsey0md saalnJOS leloueulj :Izuad 'SW aeaa £ 60Z saOwaS 6u1jo0�j :Po}sueJl 0£SL :A?j 5Z508 00 `sullloo hod }1no0 }uowaso�j t{,69 lzuad euu}e}l :u};y 6uljoo�j yeueu £60Z `6Z jsn6ny buisepind suilloz) ljo� IO AI!:) E s • pq '.dSJ juawobeueW �si�j pue 6uisepind 10 a0109JIG oyAAjja),, -aanln; eqj ui ssaoons gonw wjij inoA gsiM pue s}oofad ,sugloo :po j jo Al!o ui Isaaa}ui jnoA anui}uoo noA adoq aM -uoge}uesaid anon( 6uuedaid • ui papuadxa noA awi} ay} almaidde am 'joafad sigl aol pa;oalas }ou ajam nog( gBnoy;ly •sai6ojougoa I 6ulJoo�j paouenpy Sl suoi;eilo6au }oeiluoo o} }oafgns joafad sqj jol pa}oalas Wi4 aql '£ 60Z saoinUaS 6u400�J }PoJsueJl 0£5L dJ2J uo uoileluesaid anon( jo; nog( Nuegj o; @N!l pinonn uolslnla 6uisepind suipoo }jod jo Aji3 aqi 6wseymnd1woo'no6o{ M -LOL9' LZZ'OL6 9LL9' VZ'OL6 ZZ909 00 'sulnoo IJod 099 Xo8 od J001d w Z 7S uoseW •N W uolslnla 6ulseyand s03lnJ8S leloueuld :uozoj -JW jeaa £60Z saouuaS 6ui;ood:po;suejl 0£5L :�I2j 8£508 00 'puejanoj any paayJ001 t7g8g uozol Aeijjep :ujjy swelsAS 6uiJood N-UJ £ 0Z '6Z;snbny buisepind suillo:) 14jo� • a 0 ROOF HATCH TO REMAIN 60 MIL FLEECEBACK TPO SET IN LOW RISE ADHESIVE --\ NEW 2" ISOCYANURATE ROOF HATCH DETAIL NOT TO SCALE NEW STAINLESS STEEL SLIP FLASHING 1/2" DENS -DECK PRIME SET IN LOW RISE ADHESIVE METAL DECK Y4" /FT. FULL TAPERED ISOCYANURATE SET IN LOW RISE ADHESIVE TechniScan, Inc. I873 S. Bebie Wo-et-SateI ce C�oae emn ® 3N.31.0535 PFone 30J3"274F.. C'=2 Ir�ln M M b Off' 11 i! t =74 mMM v e1ti�Y raJ1 a MR Mlles mr�1 at itln�my Yq job no. 8062 City of Fort Collins - Drake WWTP 3036 Environmental Drive Fort Collins, Colorado dwg. name Roof Hatch Detail date 3/6/I2 drawn by jM Revisions I P dwg. no. A3 3 5 60 MIL FLEECEBACK 1/2" DENS -DECK TPO SET IN LOW RISE PRIME SET IN ADHESIVE LOW RISE ADHESIVE METAL DECK NEW 2" ISOCYANURATE Y4" /FT. FULL TAPERED ISOCYANURATE SET IN LOW RISE ADHESIVE ROOF DRAIN DETAIL, TYP. NOT TO SCALE • 0 TechniScan, Inc. job no. 8062 City of Fort Collins - Drake WWTP 3036 Environmental Drive Fort Collins, Colorado dwg. nome Roof Drain Detail • dwg. no. A4 dote 3/6/12 18735. gdona street -SoleI `° .do Wm 3Q3.3].W35 Pnone 3 37727N fm drown by IV^ Remons I 2 �=° N pvw t 2 YMmlln gyeM mMM etlrM��V � y1h �61n mrrt a! i.tln�� Fa 5 3 5 0 60 MIL FLEECEBACK TPO SET IN LOW RISE ADHESIVE ---\ TechniScan, Inc. I8I35. Be colcuael-soiteM censer cdo�mo BdY12 X3.329 0535 Pnone M3.37I274 Wx WS t=2 M bay � MIM Yb.mIM qp�q M1Y�11 M M M JgkYtY 6[b6 TMM O e1M�le W] �MN M NEW 2" ISOCYANURATE %4" /FT. FULL TAPERED ISOCYANURATE SET IN LOW RISE ADHESIVE PIPE PENETRATION DETAI NOT TO SCALE job no. 8062 date 3/6/12 drawn by jM Revisions 1 2 3 TYP. City of Fort Collins - Drake WWTP 3036 Environmental Drive Fort Collins, Colorado METAL DECK TPO FLEXIBLE BOOT FLASHING 1/2" DENS -DECK PRIME SET IN LOW RISE ADHESIVE dwg. name Pipe Detail dwg. no. A5 • • SECTION 00400 SUPPLEMENTS TO BID FORMS 00410 Bid Bond 00420 Statement of Bidder's Qualifications 00430 Schedule of Subcontractors 60 MIL FLEECEBACK TPO SET IN LOW RISE ADHESIVE --\ Q 0 NEW STAINLESS STEEL SLIP FLASHING SKYLIGHT TO REMAIN 1/2" DENS -DECK PRIME SET IN LOW RISE ADHESIVE s e b ° � • °. DECK NEW ISOCYANURATE SET IN LOW RISE ADHESIVE %all /FT. FULL TAPERED ISOCYANURATE SET IN LOW RISE ADHESIVE TechniScan, Inc. IBIS. Be re SRe l - Suite I cervcr C kxr .. B n W3.329.0.5]SPhone 3OS.3I).2)4 Fox =2 M Gv�r � �Nw FM�MYn QyvYq mYYO sW�M� ��iltl�wl Gv gtlR �IX� aMi eE iWn6m�Fe SKYLIGHT DETAIL NOT TO SCALE job do 806 °be32 dwg. name City of Fort Collins - Drake WWTP Skylight drown by �kn ReVmions 3036 Environmental Drive Detail I 2 Fort Collins, Colorado dwg. no. A6d 0 60 MIL STANDARD TPO 60 MIL FLEECEBACK TPO SET IN LOW RISE ADHESIVE 1/2" DENS -DECK — PRIME SET IN LOW RISE ADHESIVE • NEW STAINLESS STEEL CAP 60 MIL EP CONCRETE DECK — NEW 2" ISOCYANURATE Ya" /FT. FULL TAPERED ISOCYANURATE SET IN LOW RISE ADHESIVE NEW 2X12 NAILERS /a 4 .. � e d NEW NAILERS ANAEROBIC DIGESTER FACILITY EXPANSION JOINT DETAIL NOT TO SCALE TechniScan, Inc. 1873 s. MMM S1281-Sdte l oa g am" W 2 Xm3,z7ann. .,sw n.Mntl cam .n tw e t « lob no. 8062 City of Fort Collins - Drake WWTP 3036 Environmental Drive Fort Collins, Colorado dvg. name Expansion Joint Detail dole 6/26/13 dmW by 1M Remom dwq. no. A7 5 60 MIL FLEECEBACK TPO IN LOW RISE ADHESIVE 1/2" DENS -DECK PRIME IN LOW RISE ADHESIVE TechniScan, Inc. 1873 S.8e re Sveet - Sate IKo Denv r Ctl w &YIR 311.3?9A5]$PnOne 3ns�n nn F. 4V1W =2 u oi.., � �erw semaea� awM erg ws m r w+aea sa�m s.me .ve.� mar a Tw k TPO FIELD FABRICATED FLASHING WITH CLAMPING RING NEW 2" ISOCYANURATE %4" /FT. FULL TAPERED ISOCYANURATE SET IN LOW RISE ADHESIVE PIPE SUPPORT STAND DETAIL, TYP. job no. 8062 date 316112 drown by jvn Remons t S 6 NOT TO SCALE City of Fort Collins - Drake WWTP 3036 Environmental Drive Fort Collins, Colorado METAL DECK dwg. non Pipe Support Detail dwg. no. A8 0 • 0 E NOTE: SUPPLY AND INSTALL TWO GUY WIRE STANDS ON THE ANAEROBIC DIGESTER FACILITY 60 MIL FLEECEBACK TPO SET IN LOW RISE ADHESIVE 1/2" DENS -DECK PRIME SET— IN LOW RISE ADHESIVE d d.. .. .d' d e e a a NEW 2" ISOCYANURATE %4' /FT. FULL TAPERED ISOCYANURATE SET IN LOW RISE ADHESIVE ANAEROBIC DIGESTER FACILITY GUY WIRE STAND DETAIL, TYP. NOT TO SCALE CONCRETE DECK TechniScan, Inc. . 1873S 3eA MS3h et-SnI I O oen"e. cowoao eo222 303.32905 Phone 3 327.22eafax pea on noi�de <udiwlNmElatlnM.q etllc nillm emenl at w e lttnnScm, Nc pbno. 6062 City of FColliDrake WWTP FortCollins- 3036 Environmental Drive Fort Collins, Colorado dwg. name Guy Wire Stand Detail dale 3/6/12 dmo by ;im Revisions 2 dwg. no. A9 3 e 3 60 MIL FLEECEBACK TPO SET IN LOW RISE ADHESIVE 1/2" DENS -DECK PRIME IN LOW RISE ADHESIVE TechniScan, Inc. 1823 S. BeGare Street -SjOe is Denver Cdwado B 2 303.329.0535 more 3manva Pa. M13 ni a.... a w 1- i,.dim5- cwmiA9 rc ..m..�.da,..a0m.aue�:d...a. NEW 2" ISOCYANURATE %4' /FT. FULL TAPERED ISOCYANURATE SET IN LOW RISE ADHESIVE job no. 8062 date 3/6/12 drawn by jBn Revisions 1 2 NOTE: SUPPLY AND INSTALL TWO NEW SOLAR TUBES ON NEW 2"X12"X20" CURBS - BY OTHER CONTRACTOR, DO NOT INCLUDE IN BID DEWATERING BUILDING SOLAR TUBE DETAIL NOT TO SCALE City of Fort Collins - Drake WWTP 3036 Environmental Drive Fort Collins, Colorado METAL DECK dwg. name Solar Tube Detail dwg. no. A10 P E NEW STAINLESS STEEL FLASHING NEW EXPANSION JOINT 60 MIL FLEECEBACK TPO SET IN LOW RISE ADHESIVE 1/2" DENS -DECK PRIME IN LOW RISE ADHESIVE METAL DECK NEW 2" ISOCYANURATE %4q /FT. FULL TAPERED ISOCYANURATE SET IN LOW RISE ADHESIVE DEWATERING BUILDING EXPANSION JOINT DETAIL NOT TO SCALE NOTE: 20 LINEAL FEET TOTAL 60 MIL EPDM NEW 2"X12" TechniScan, Inc. 3735 B EColcxoei-s qe m Dame, cao,aaa m222 ]03329.0M5 Phone 3m3n.274Fox Cipypnt 10�1 41 On�n 6 MI tm Inlmmvtim m,ing en q oo na^ Ga EuglwtMUaiaCUM. mrc nn�en emv�� or a � lob no. a062 City of Fort Collins - Drake WWTP 3036 Environmental Drive Fort Collins, Colorado tlwg. name Expansion Joint Detail 316m12 date by ReNvons 2 dwg.no. A l 1 3 x 5 CAULKING TERMINATION BAR NEW STAINLESS — STEEL FLASHING 60 MIL FLEECEBACK TPO SET IN LOW RISE ADHESIVE 1/2" DENS -DECK PRIME IN LOW RISE ADHESIVE TechniScan, Inc. 1823 S. BeSche S'rent - Sole la00 Denver Coacdo eazn 303.M0535 Phone X2327 274) FcR U,, .2 M Owe 1 MIM YbmeLLn gyvPq M M b W{BYtl. ml 1 ptlh �I[In mr�l N job no. 8062 date 3/6/12 drawn by Ilm Revisions 1 2 TYPE VARIES NEW 2" ISOCYANURATE /y" /FT. FULL TAPERED ISOCYANURATE SET IN LOW RISE ADHESIVE PARAPET WALL DETAIL, TYP. NOT TO SCALE City of Fort Collins - Drake WWTP 3036 Environmental Drive Fort Collins, Colorado • dwg. name Parapet Wall Detail is dwg. no. Al2 T� k 0 60 MIL FLEECEBACK TPO SET IN LOW RISE ADHESIVE 1/2" DENS -DECK PRIME IN LOW RISE ADHESIVE TechniScan, Inc. .,, , BeAVFei' d. Bute W2 Denver cdmoco ee2n 'lAl.3"_'9.0515 Plane 3033II nn Fax c p =2 N Pw� t Mlin bMmIM ryaFp I�.F M M W 0[htl.6 YlaLL nndr�t s etlr.l� r! JY�wI q. p!h �11ln mil e[ i.dSmx r NEW 2" ISOCYANURATE %4" /FT. FULL TAPERED ISOCYANURATE SET IN LOW RISE ADHESIVE job no. 8062 date 3/6/12 drown by Ilm Revi,bn, 2 3 5 EXISTING CURB CAP FLASHING TO REMAIN TYPE VARIES CURB FLASHING DETAIL, TYP. NOT TO SCALE City of Fort Collins - Drake WWTP 3036 Environmental Drive Fort Collins, Colorado dwg. name Curb Flashing Detail dwg. no. A13 60 MIL FLEECEBACK TPO SET IN LOW RISE ADHESIVE 1/2" DENS -DECK — NEW STAINLESS PRIME SET LOW STEEL GUTTER AND RISE ADHESIVE OPEN FACE DOWNSPOT °a 8 d 4 ° NEW NAILERS CONCRETE DECK NEW 2" ISOCYANURATE Y4' /FT. FULL TAPERED ISOCYANURATE SET IN LOW RISE ADHESIVE ANAEROBIC DIGESTER FACILITY EDGE DETAIL NOT TO SCALE u r TechniScan, Inc. job no. 8062 City of Fort Collins - Drake WWTP 3036 Environmental Drive Fort Collins, Colorado dwg. name Edge g Detail dwg. no. A14 date 6/26/13 1023s. a emresveer-Sarteum oenV r c .do eom 3 329 O5 Rhone 3(23n.2MFox drovm by jVn Revisions I 2 n.�op.rs,3 e. mm e�a�a�mNmm« . 1 .emu- .a^.ni�or. a 3 S city of Fort Collins Purchasing ADDENDUM NO. 2 SPECIFICATIONS AND CONTRACT DOCUMENTS Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov. conVpurchasing Description of BID 7529: Roof Replacement at Drake Wastewater Treatment Plan OPENING DATE: 3:00 PM (Our Clock) August 12, 2013 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed as follows: 1. The Opening Date has been changed to August 12, 2013 at 3:00 pm (our clock). 2. Specification addition: An 1-90 uplift requirement is acceptable on the metal deck. Please contact John Stephen, CPPO, LEED AP, Senior Buyer at (970) 221-6777 with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST STATEMENT ENCLOSED WITH THE ADDENDUM HAS BEEN RECEIVED. BE ACKNOWLEDGED BY A WRITTEN BID/QUOTE STATING THAT THIS Addendum 1 — 7529 Roof Replacement at Drake Wastewater Treatment Plant Page 1 of 1 • • • • SECTION 00410 BID BOND KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned Douglass Colony Group- Inc. as Principal and as Surety, are hereby held and firmly bound unto the City of Fort Collins, TWestern Surety Company Colorado, as OWNER, in the sum of "or the payment of which, well and truly to be made, we *Five Percent of Amou t Bid (5%) hereby jointly and severally bind ourselves, successors, an assigns. Signed, this 7th day of August, 2013 THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof to enter into a Construction Agreement for the construction of Fort Collins Project, Roof Replacement at Drake Wastewater Replacement Plant, Bid No. 7529 NOW THEREFORE, (a) If said Bid shall be rejected, or (b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed In accordance with said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall remain in force and effect, it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to transact business In the State of Colorado and be accepted by the OWNER. 0 IN „WITNESS WHEREOF. the I?Mclpal and'Ihe Suraiy Ni h6V&hereuht6set their , hands and teals this day of ..August7' 2013, and such of them as are corporations have caused their'carporates,eals.tbbp.hee.6toaftixe,d66d'thebepe.6sdntsi6-bEis,lgnedby'thoirproper officers, lhe,day and year firit'setforth a,bowi. PRINCIPAL . NaP6: .Douglass Colony Group, Inc. ,SURETY Addr*e*s*s'.-59b1 E. 58th;Avenue 333 S. Wabash Ave. tSFIAP 'WsternretyQmany POWER Of A7 TORNEY'APPOINTING INDIVIDUAL, ATTORNEYANTAC r • Know Ali Me6By'f66ePrestfits;1lialWBSTLRN'SURisIYCDYII'ANY,•4,uitti )iik6tac`9ijidr4[i having uti pn!n ipal 'Iricc`in'the Ci1y of-Srous Falls; and Stite'of Snµih 17akota -indltliat it &es by "virlue ma la cdnstinlie anduppnini' Nuglas.0 Baesle'r,xr tin [:<Qau' 47 Cory Cla6SS,Mal ry.E Hanks, Intdividually of D nv^r CO; its Iruc arid lawful Atlaraeyls) ur`ract iiitli full rib -- tnd'aulir fic'!Oy, conf reed jg sign; seal and crex ale fur aad do itv behnlf tad ids ='undertaAmki tiiid nther dtliiaiocy instruments of similar nuture - -- - In Unliiiited Amounts mid to hind it thereby as'fnlly and lodiie satnee."ttanr 3 if,sueli,ltiFimments were sijned,liy.n duly auili<liind ©ff cer ofihe corpohdlo uh i ll the acw nrsoid Attornty pursuant m ihe`auihonty hctiby gtvpn arc li rebyxaiitied and c6AG ',red This Power of Aliuntiel is made_ and csecutcri'.pursupnl to and by auttrprity of The By-Law,printed on the revarse Ircrrbf;. duly udupted,;as trxli ated by- the.5 l elders of thceruj oration. In 1Y1ine5's tither[KrF; }V TERI1'SURE'fY COS7PAN]"Fias'cau5bd these ptcaiiitfi to b`c 'sigii,:.d by itb'V ce ['resideul'and us.c«paste seal lii ble' hc;etd afrbCed;on this l&Ih ddy of lunc, 20i3 , .yverr� WESTE.R`N SU°RET:'- CQM`PAhI.Y avo��s� �.°.°.°` aµlT Braflal Vlcelrrestitctit State df SOuih WON 1 s5, County of Llinnehahn - - On lhis,'I Sth day uGlune 2013;"tiefon,'me Perdona[ly came-!'aul7.. Brullat, iv inc known kho: barng tiy. uie duly s>*pm; did depasc and s.1J..ifcit tie F area dos rn 1he C:it} ut"Srnux Falls, State. iif Stwth Utrko+u, that 1v`e is Ilia Vice Pia -Adenl of'ATST&RN .9URE7Y COMI �NY,dcsmbed m;L ail yhicfF cxe utcd the "ubope i i tYlin u1t7 that l6 knota3•thc wltt of tniri curpvration; ihat the iz d iffzed ldAthe soid,ink`nilnenl is siloh dyrpbiil seu1; Ihat it vita 5b uff`ma d pursuant to :authority given by the Board of Dimctgfs of said eorpomtion and that he -sighed hi6 numc Ilieretd,pursuant to flit e5uthvr Iy and ac{ nowlc ges same to bc'thlc act and deed pf 'said caspµrgttoti., - My:ltrnrinl$bl Vie FFpIrCS ��'� yT J �70Nft June23 24I5 mmOTvueuc SOUTH vAKOTA�; tY-�y ✓ J.-Mohr; Notary Pnhlic CERTIFICATE I [.Nets>n, Assi {o { S aretaeyof 1031STEAN SURETY COMPANY.do hcrWyccrnfy'Ili:t the Power of Atwrncy hi:i4nabovect forth iO Mail it truce and further emfp that thl 6y fng of the corpomttnn print* do the reverse 6mbf is still rn`,ti}tm hr testimony whereof I hi ve her@unto sM!5 cribed my nlrniandffi auxl the `seal of thesaid.cdtpuratl6ii Iltis 7.. day;of ., � r W.E'S T`ER'N S'V,R E `P j G C M -A N Y `4f A +� Ze , d _ !< NFlsoh.'hc;ivant Seerotnry, • SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: Douglass Colony Group Inc. 2. Permanent main office address: 5901 E 58th Ave. Commerce City, CO 80022 3. When organized: 1 /1 /1947 4. If a corporation, where incorporated: Colorado 5. How many years have you been engaged in the contracting business under your present firm or trade name? 4 years 7 months,prior to 2009 DCG was two entities. 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) DCG has 325 open contracts, please see attached listing projects in progress. 7. General character of Work performed by your company: Roofing, Metals, Solar, waterproofing. 8. Have you ever failed to complete any Work awarded to you? NO If so, where and why? NA 9. Have you ever defaulted on a contract? NO 10. If so, where and why? NA • Are you debarred by any government agency? NO If yes list agency name. NA 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. Please see attached notable projects. 12. List your major equipment available for this contract. DCG has all major equipment to perform the work, some equipment is rented. 13. Experience in construction Work similar in importance to this project: Please see attached WWTP 14. Background and experience of the principal members of your organization, including officers: Robert Bechtholdt -President CEO 38 years • Patrick Wolack- Executive Vice President COO -new construction, 31 years, Gary Degenhart Executive Vice President-reroof 30 years, Steve Bechtholdt,Exe VP Metals 17 years 15. Credit available: $25000,000.00 16. Bank Reference: US Bank 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? Yes 18. Are you licensed as a General Contractor? Subcontractor for Roofing and Metals If yes, in what city, county and state? 80 plus current licenses nationwide. What class, license and numbers? Roofing, waterproofing, solar 19. Do you anticipate subcontracting Work under this Contract? NO If yes, what percent of total contract? Zero And to whom? NA 20. Are any lawsuits pending against you or your firm at this time? NO IF yes, DETAIL NA 21. What are the limits of your public liability? DETAIL General-1 M What company? National. Fire Ins. of Hartford. 22. What are your company's bonding limitations? 25M 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. • Dated, at 10:45 this 22 day of July , 2013, C6 p Douglass Col ny Grottp Inc. By. Printed:Tamara MUSCh Title-, A&ninistrativ , Assis ant State of Colorado county of Adams Tamara MUSCh being duly sworn deposes and says that he. i$ Tamara Musch of Douglass Colony Group Inc. (dam®) ,(Organization) and that the answers to the foregoing guestlons and all sietements therein contained are true and correct. Subscribed and sworn to before me this day ofJ* 2073 DANIAIMM NotPublic _ N4TARY PUS STATE Of G4LbftAD0 Natery ID 2408A0A384z W commisslon expires:; t t�1y Gommission_Enpiras 10f2611014 , • I DOU%ASSj.tOLONY- 'Statement of Qualifications: ,We are an Award Winning 'Rdofihg,&:SpLcicia,l,ty Contractor: Headcluattorz. 5461 i. 50ih Ave., Commerce city, C0.'80022 P30 3.280-263S F 303-28&kd2 �5rielej, 110141h'Ave. GYWeY. . .. " CQ 80631 P970-352-2040 F 9704524378 Glvriviiccl JXScwevreldftoiid 'GanwoodSprings, C0,111601 0 910.947�0305 'Colorado Spripgs� CO 80507 P 719-611-622 2 Cr 7 19.C,311-6199, -Douglass Roofing was founded ih.1 941 iri'Greeley Cb & has.sinde helopd.pioneer the,ro6fing'industry over the Past.66 years, In.- - 2009.bouglass Roofing merged W,ith, QolonyVetal and formed The Douglass ouglass Colony Group. Today wp'f6cus on Commercial, Industrial &'MOltitamily",roofing tolnlcludei Flat,Metal 9 Steep applications for New Construction &,Re-Rpofs.- In additio'n to, traditional rodfing we f6atur,04-solar &Vision,c pIrriposi.te,mellal panel division, in-house sheet metal shbp, Iibht:gabgesteeI'trussbs Water=pjroofing, and serviceancl'majnteriarioe divisions. Safety &,Quality coritecil. Total Recordable, Lo9t W6kkd2y Case Inbident Rate I , noldent Rate hMghffl, Wig UYy i1o, "I �Z!11 V, 1 �;41 RePortgd Averag& ��19 i at `F� Png 2010 .68 4K958; 10060 4.83 3.76 M5 12i30 ';4.36i Cki 201 —666,8-57, 12.30 2:13 4.30 2aO 173 IkIR 399, Recent Awards: 2013 ABC C6itikation. flbr,"an'oAccredfted Quality Cofi4actor" 201,12 AGG AGE Award Winner's for Best Building. Projects. • Gold "-bestbyiIdihg-pr0jed,t-s • E)rbnze—bbstbuilding projec 2012.ABC Safety Platinum,lLevell Ste subcontr6ct.ors. With r qver-500, 2012.ABC Award of Merit for Denver 2012 ABC Award of Excellence 'for C .o Category: Specialty Construic 2012 ABC Free Enterprise Award for c East;Tdwer. 2012 Ranked 0 in ToIJ100 Rbofihg Rpofing f Metals I 5dar IWmterpmfinq • Projects in Progress 2013 January 7, 2013 1. 3100 Pearl Street 50-010-1748 start Date;5-23-2012 Contract Amount Roofing$540,515.00 Metal $ 74750.00GC; Reylenn Properties, Geff Myers Phone;303.435.2612 Roofing, Sjeetmetal, Gutters, Flashing, Podium Deck Water Proofing 2. Cabelas Lone Tree 50-010-1899 start date 2-4-131-25 and Ridgegate PRKY Lone Tree, CO Contract Amount; Roofing $568,368.00 sheet Metal $249,678.00 GC; Gerald Phipps, Phone 303.571.5377 3.Castle Rock Adventist 50-010-1704 start Date 3-15-12 2354 Meadows BLVD Castle Rock, CO 80109 Contract Amount Roofing $674,329.00 Metal $189,920.00 Metal Panels $1,293,178.00GC; Ge Johnson Contact; Ron Doolittle 720.833.3755Architcect; Hunton Brady Architects 4.CCD SLEB 50-010-1770 Start Date; 6-29-12 700 Curtis Denver, CO 80202 Contract Amount; Roofing $823,824.00 Metal $328,258.00GC; Gerald Phipps, Contact Bernie, Phone 303.571.5377 Archotect; OZ Architecture 5. CU Kittridge Central 50-010-1689 start Date;2-16-12 2400 Kitterdge Loop Boulder, CO 80305 Contract Amount Roofing $873,981.00 GC; Metal $158,850.00Kiewit Scope; Dry on Roof, Ludowici Pan and Cover Tile Contact; Saul Abrahams 303.930.9000 6.Denver Capitol Dome 50-050-1891 start date; 11-12-12 200 E. Colfax Denver, CO 80203 Contract Amount; Metal $ 1,062,340.00 GC Gerald Phipps,Contact; Jamie Rodriguez Architect; Martin/Martin Inc. 7. Fed Center Building 50-010-1831 start Date; 4-1-13 Building 85 Lakewood, CO 80225 Contract Amount; Roofing $ 608,275.00 Metal $21,750.00 GC; Skyblue Phone 303.220.0339 8.SACWTP PV 50-080-1742 start Date; 1-01-13 8495 Quebec St. Commerce City, CO 80022 Contract Amount; Solar $529,033.00 9.JEFFCO -Courts & Admin 50-010-1808 start Date; 08-2-12 100 Jefferson PRKWY Golden, CO Contract Amount; Roofing $1062045.00 Metal $30,055.00 GC City of Jeffco Phone 303.271.8590 10. Kuni Lexus 50-010-1728 start Date 5-06-2012 5150 South Quebec St, Greenwood Village, CO 80111 Contract Amount; Roofing $692,365.00 Metal $82,061.00 Contact John Brunetti Phone 303.394.4892 Architect; MNA 13. VA Damproofing 50-010-1819 start Date 9-14-12 13611 East Colfax Aurora, CO 80045 Contract Amount; Roofing $1,472,641.00 GC Kiewet Turner Contact; Mike Kieth 303.930.9000 14. WSC Field House 50-030-1777 600N. Adams St Gonnison, CO 81230 Contract Amount; Roofing $1,299,689.00 Metal $265,850.00 GC JE Dunn Contact TO Brickell 719.471.0217 DouglasslColony Group Inc 5901 E. 58th Avenue Commerce City, CO 80022 • Notable Projects Colorado Convention Center 10-100-5671 303-951-7905 700 14th Street Denver, CO 80202 Contract total Roofing $2,401,223.05 Metals $127,299.00 Contact;City of Denver, Elizbeth Hamilton Job Size 427,900 SF Start Date 04-07-2008 Completion 6-27-2008 DJC Courthouse 10-100-5807 490 W. Colfax Denver, CO 80204 Contact; Dwight Runkles Hensel Phelps 303-951-7905 Cotract Amount $ Roofing 2,110,172.47 Metal $1,178,706.00 50,188 Sf start Date 09-23-2008 Completion Date 3-29-ma2010 Consultant; Fentress Architects Alex Thome 303.722.500.0 Leprino Foods Phase II 50-020-1550 1500 1 st Avenue, Greeley, CO 80631 296,878 SF SQ Contact Lafe Herrick Layton Construction 970-352-1911 Contract amount Roofing $2,757,177.36 Metals $625,430.7 Start Date 8-28-2011 Completion ; TBD Manor Vail Lodge 10-600-5531 595 E Vail Drive Vail, CO 81657 64,700 Sf Contact; Todd Raper, GE Johonson 970-470-9368 Contract amount, Roofing $ 2,039,621.14 Metals $299,908.00 Start 7-25-07 Completion 4-1-2008 Architect; Zeheren and Associates Solaris 10-600-5670 141 East Meadow Drive Vail, CO 81657 64,200 SF Contact Phil Perry, Weitz Construction 970-476-0201 $5,228,639.10 $3,254.800.46 Start Date 11-21-2008 Completion Date;10-8-2009 St.Marys The Century Project 10-100-5614 2339 N. 7th Street Grand Junction CO 81501 96,000 SQ Contact; Jim Mohlnar, FCI McCarthy 970-263-8866 Contract amount; Roofing $6,304,312.00 Metals $4,805,734.77 Start Date; 3-31-2008 Completion; 1-1-2009 State Farm 10-200-5801 1555 Promontory Circle Greeley, CO 80638 157,770 SF,SQ Contact; Holder Construction Tracy Turner 303.592.7777 Contract amount Roofing $ 2,475,973.05 Metals $134,941.01 start Date 6-30-2008 Completion 2-18-2009 Architect; EB Architects . DouglasslColony Group Inc 5901 E. 58th Avenue Commerce City, CO 80022 -City of • 16rtColhns 'Purchasing ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS Financial Services Purchasing Division 215 N. Mason St. 2n4 Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 lcgov. com/purchasing Description of BID 7529: Roof Replacement at Drake Wastewater Treatment Plan OPENING DATE: 3:00 PM (Our Clock) August 7, 2013 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed as follows: 1. Clarifications 1) Under the Summary of work (dewatering building) We talk about installing two solar tubes .... but under miscellaneous items we indicate for them not to include them in the bid • 2) Under the Summ.ary.of work (anaerobic digester facility), we talk about the contractor paying for the plumbing work by Patrick Plumbing, but under the miscellaneous items (again) we indicate for them not to include in the bid. 3) Contractor will be responsible for following all applicable laws and regulations for asbestos containment. Please contact John Stephen, CPPO, LEED AP, Senior Buyer at (970) 221-6777 with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST STATEMENT ENCLOSED WITH THE ADDENDUM HAS BEEN RECEIVED. BE ACKNOWLEDGED BY A WRITTEN BID/QUOTE STATING THAT THIS Addendum 1 — 7529 Roof Replacement at Drake Wastewater Treatment Plant Page 1 of 1 • Waste Water treatment plant December 14, 2012 1.Torringtron WWT 10-200-5691 40-100-6343 7076 County Road 55F Torrington, WY82240 Contract Amount Total $103995.00 GC Molcon Start Date; 6-30-2008 Complete 8-23-2009 2. Thornton Water Treatment Plant 9520 Ellens Court Thornton, CO Paul Spaceses GC CITHO Contract amount Total $ 189,100 Start Date; 8-10-12 Completed; 12-09-12 3. Sheridan WWT 10-200-5574 6 Soldier Creek Road Sheridan, WY 82801 GC Molcon Contract amount Total $40,525.00 start date 12-13-07 complete 3-13-2008 4. Pinery WVVFP 10-100-5416 5242 Old School House Road Parker, CO 80134 GC Stanco Contract total $105,894.36 start Date 3-13-07 Complete 2-22-09 5 Hudson WWTP 50-060-1468 21507 Highway 52 Hudson, CO 80642 GC REYINC scope steel trusses only Contract total $18745.00 start 9-27-09 Completed 11-24-09 6. Edwards WWTP Ar EAGRIV 3101 Lake Creek Village DR Edwards, CO 81632 Contract Total $443018.00 start Date 10-31-08 Complete 8-14-2009 7.Avon WWTP Millie S Ln Avon, CO 81620 AR EAGGRIF Contract Total $570,046.58 start Date 10-31-2008 Complete 11-10-2009 DouglasslColony Group Inc 5901 E. 58th Avenue Commerce City, CO 80022 . SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 15% of the contract. ITEM 0 SUBCONTRACTOR SECTION 00500 AGREEMENTFORMS 00510 Notice of Award 00520 Agreement 00530 Notice to Proceed LIJ Is • C� SECTION 00510 NOTICE OF AWARD DATE: August 29, 2013 TO: Douglass Colony Group Inc PROJECT: 7529 Roof Replacement at Drake Wastewater Treatment Plant OWNER: CITY OF FORT COLLINS (hereinafter referred to as "the OWNER") You are hereby notified that your Bid dated August 12, 2013 for the above project has been considered. You are the apparent successful Bidder and have been awarded an Agreement for 7529 Roof Replacement at Drake Wastewater Treatment Plant. The Price of your Agreement is Three Hundred Six Thousand Eighty -Eight Dollars and Eighty Cents ($306,088.80). Three (3) copies of each of the proposed Contract Documents (except Drawings) accompany this Notice of Award. Three (3) sets of the Drawings will be delivered separately or otherwise made available to you immediately. You must comply with the following conditions precedent within fifteen (15) days of the date of this Notice of Award, that is by September 13, 2013. 1. You must deliver to the OWNER three (3) fully executed counterparts of the Agreement including all the Contract Documents. Each of the Contract Documents must bear your signature on the cover of the page. 2. You must deliver with the executed Agreement the Contract Security (Bonds) as specified in the Instructions to Bidders, General Conditions (Article 5.1) and Supplementary Conditions. Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid abandoned, to annul this Notice of Award and to declare your Bid Security forfeited. Within ten (10) days after you comply with those conditions, OWNER will return to you one (1) fully -signed counterpart of the Agreement with the Contract Docum ents attached. Cityof Fo ollins OWNE By: G rry S. Paul Director of Purchasing & Risk Management SECTION 00520 AGREEMENT THIS AGREEMENT is dated as of the 29th day of August in the year of 2013 and shall be effective on the date this AGREEMENT is signed by the City. The City of Fort Collins (hereinafter called OWNER) and Douglass Colony Group Inc. (hereinafter called CONTRACTOR) OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1. WORK CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Project for which the Work under the Contract Documents may be the whole or only a part is defined as the construction of the 7529 Roof Replacement at Drake Wastewater Treatment Plant and is generally described in Section 01010. ARTICLE 2. ENGINEER The Project has been designed by the City of Fort Collins who is hereinafter called ENGINEER and who will assume all duties and responsibilities and will have the rights and authority assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. ARTICLE 3. CONTRACT TIMES odt6f' 3.1 The Work shall be Substantially Complete no later than .Sopt . 6ep 2;Z 2013, after the date when the Contract Times commence to run as provided in the General Conditions and completed and ready for Final Payment and Acceptance in accordance with the General Conditions within ten (10) calendar days after the date when the Contract Times commence to run. 3.2. Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3.1. above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expenses and difficulties involved in proving in a legal preceding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as Liquidated damages for delay (but not as penalty) CONTRACTOR shall pay OWNER the amounts set forth hereafter. 1) Substantial Completion: • 0 E--Ij &4vb-r 31 Five Hundred Dollars ($500.00) for each calendar day or fraction 4t thereof that expires after the �, 2013 for Substantial Completion of the Work until the Work is Substantially Complet 2) Final Acceptance: After Substantial Completion, Two Hundred Dollars ($200.00) for each calendar day or fraction thereof that expires after the ten (10) calendar day period for Final Payment and Acceptance until the Work is ready for Final Payment and Acceptance. ARTICLE 4. CONTRACT PRICE 4.1 OWNER shall pay CONTRACTOR for performance of the Work in accordance with the Contract Documents in current funds as follows: Three Hundred Six Thousand Eiohty-Eioht Dollars and Eiahtv Cents ($306,088.80), in accordance with Section 00300, attached and incorporated herein by this reference. ARTICLE 5. PAYMENT PROCEDURES CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions. 5.1. PROGRESS PAYMENTS. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Application for Payment as recommended by ENGINEER, once each month during construction as provided below. All progress payments will be on the basis of the progress of the Work measured by the schedule of values established in paragraph 2.6 of the General Conditions and in the case of Unit Price Work based on the number of units completed, and in accordance with the General Requirements concerning Unit Price Work. 5.1.1. Prior to Substantial Completion, Owner will be entitled to withhold as contract retainage five percent (5%) of each progress payment, but, in each case, less the aggregate of payments previously made and less such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with paragraph 14.7 of the General Conditions. If, in the sole discretion of Owner, on recommendation of Engineer, Owner determines that the character and progress of the Work have been satisfactory to OWNER and ENGINEER, OWNER may determine that as long as the character and progress of the Work remain satisfactory to them, there will be no additional retainage on account of Work completed in which case the remaining progress payments prior to Substantial Completion will be in an amount equal to 100% of the Work completed. 95% of materials and equipment not incorporated in the Work (but delivered, suitably stored and accompanied by documentation satisfactory to OWNER as provided in paragraph 14.2 of the General Conditions) may be included in the application Section 00520 Page 3 for payment. 5.1.2. Upon Substantial Completion payment will be made in an amount sufficient, if necessary, to increase total payments to CONTRACTOR to • 95% of the Contract Price, less such amounts as ENGINEER shall •. determine or OWNER may withhold in accordance with paragraph 14.7 of the General Conditions or as provided by law. 5.2. FINAL PAYMENT. Upon Final Completion and Acceptance of the Work in accordance with paragraph 14.13 of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraph 14.13. ARTICLE 6. CONTRACTOR'S REPRESENTATION In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following representations: 6.1. CONTRACTOR has familiarized himself with the nature and extent of the Contract Documents, Work, site, locality, and with all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing of the Work. 6.2. CONTRACTOR has studied carefully all reports of explorations and tests of subsurface conditions and drawings of physical conditions which are identified in the Supplementary Conditions as provided in paragraph 4.2 of the General Conditions. 6.3. CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests, reports, and studies (in addition to or to supplement those referred to in paragraph 6.2 above) which pertain to the subsurface or physical condition at or contiguous to the site or otherwise may affect the cost, progress, performance or furnishing of the Work as CONTRACTOR considers necessary for the performance or furnishing of the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents, including specifically the provisions of paragraph 4.2 of the General Conditions; and no additional examinations, investigations, explorations, tests, reports, studies or similar information or data are or will be required by CONTRACTOR for such purposes. 6.4. CONTRACTOR has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilities at or contiguous to the site and assumes responsibility for the accurate location of said Underground Facilities. No additional examinations, investigations, explorations, tests, reports, studies or similar information or data in respect of said Underground Facilities are or will be required by CONTRACTOR in order to perform and furnish the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents, including specifically the provision of paragraph 4.3. of the General Conditions. 6.5. CONTRACTOR has correlated the results of all such observations, examinations, investigations, tests, reports and data with the terms and conditions of the Contract Documents. is i 0 6.6. CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies that he has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR. ARTICLE 7. CONTRACT DOCUMENTS 7.1 The Contract Documents which comprise the entire Agreement between OWNER and CONTRACTOR concerning the Work consist of the General Conditions, Supplementary Conditions, those items included in the definition of "Contract Documents" in Article 1.10 of the General Conditions, and such other items as are referenced in this Article 7, all of which are incorporated herein by this reference. 7.2 Forms for use by CONTRACTOR in performing the Work and related actions in carrying out the terms of this Agreement are deemed Contract Documents and incorporated herein by this reference, and include, but are not limited to, the following: 7.2.1 Certificate of Substantial Completion 7.2.2 Certificate of Final Acceptance 7.2.3 Lien Waiver Releases 7.2.4 Consent of Surety 7.2.5 Application for Exemption Certificate 7.2.6 Application for Payment 7.3 Drawings, consisting of a cover sheet and sheets numbered as follows: RP1 ROOF PLAN Al WALL FLASHING DETAIL A2 NORTH PARAPET WALL DETAIL - ANAEROBIC DIGESTER FACILITY A3 ROOF HATCH DETAIL A4 ROOF DRAIN DETAIL, TYPICAL A5 PIPE PENETRATION DETAIL, TYPICAL A6 SKYLIGHT DETAIL A7 EXPANSION JOINT DETAIL A8 PIPE SUPPORT DETAIL, TYPICAL A9 GUY WIRE STAND DETAIL A10 SOLAR TUBE DETAIL - DEWATERING BUILDING All EXPANSION JOINT DETAIL Al2 PARAPET WALL DETAIL -TYPICAL A13 CURB FLASHING DETAIL -TYPICAL A14 EDGE DETAIL -ANAEROBIC DIGESTER FACILITY The Contract Drawings shall be stamped "Final for Construction" and dated. Any revisions made shall be clearly identified and dated. 7.4. Addenda Numbers 1 to 2, inclusive. 7.5. The Contract Documents also include all written amendments and other documents amending, modifying, or supplementing the Contract Documents pursuant to paragraphs 3.5 and 3.6 of the General Conditions. 7.6. There are no Contract Documents other than those listed or incorporated by reference in this Article 7. The Contract Documents may only be amended, modified or supplemented as provided in paragraphs 3.5 and 3.6 of the General Conditions. ARTICLE 8. MISCELLANEOUS 8.1. Terms used in this Agreement which are defined in Article I of the General Conditions shall have the meanings indicated in the General Conditions. 8.2. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but not without limitations, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge that assignor from any duty or responsibility under the Contract Document. 8.3. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect to all covenants, Agreement and obligations contained in the Contract Document. 0 E 0 • OWNER: CITY OF FORT COLLINS By: 9 GERRY S. PAUL DIRECTOR OF PURCHASING AND RISK MANAGEMENT Title: Py-Xw- (kactsw; • 461,- ) Date Attes Addr, P. O. Box 580 Fort Collins, CO 80522 Appr�ed as to orm Assis nt City Attorney j/ ��� �✓ PRINTED "t:yi(COR'�®�� SEAL Attest: AddressTM'aivina notices: myt, I I,. s m CONTRACT DOCUMENTS TABLE OF CONTENTS • Section Pages BID INFORMATION 00020 Notice Inviting Bids 00020-1 - 00020-2 00100 Instruction to Bidders 00100-1 - 00100-9 00300 Bid Form 00300-1 - 00300-3 00400 Supplements to Bid Forms 00400-1 00410 Bid Bond 00410-1 - 00410-2 00420 Statements of Bidders Qualifications 00420-1 - 00420-3 00430 Schedule of Major Subcontractors 00430-1 CONTRACT DOCUMENTS 00500 Agreement Forms 00500-1 00510 Notice of Award 00510-0 00520 Agreement 00520-1 - 00520-6 00530 Notice to Proceed 00530-1 00600 Bonds and Certificates 00600-1 00610 Performance Bond 00610-1 - 00610-2 00615 Payment Bond 00615-1 - 00615-2 00630 Certificate of Insurance 00630-1 00635 Certificate of Substantial Completion 00635-1 00640 Certificate of Final Acceptance 00640-1 00650 Lien Waiver Release (Contractor) 00650-1 - 00650-2 • 00660 Consent of Surety 00660-1 00670 Application for Exemption Certificate 00670-1 - 00670-2 CONDITIONS OF THE CONTRACT 00700 General Conditions 00700-1 - 00700-34 Exhibit GC -A GC -Al - GC-A2 00800 Supplementary Conditions 00800-1 - 00800-2 00900 Addenda, Modifications, and Payment 00900-1 00950 Contract Change Order 00950-1 - 00950-2 00960 Application for Payment 00960-1 - 00960-4 SPECIFICATIONS 0 SECTION 00530 • NOTICE TO PROCEED Description of Work: 7529 Roof Replacement at Drake Wastewater Treatment Plant To: Douglass Colony Group Inc. ? This notice is to advise you: That the contract covering the above described Work has been fully executed by the CONTRACTOR and the OWNER. That the required CONTRACTOR's Performance Bond and Payment Bond have been received by the OWNER. That the OWNER has approved the said Contract Documents. F Therefore, as the CONTRACTOR for the above described Work, you are hereby authorized and directed to proceed within calendar days from receipt of this notice as required by the Agreement. Dated this day of , 20_ The dates for Substantial Completion and Final Acceptance shall be 20_and _ 20_, respectively. City. of Fort Collins • OWNER By: Title: ACKNOWLEDGMENT OF NOTICE Receipt of the above Notice to Proceed is hereby acknowledged this _day of 20_ CONTRACTOR: Douglas Colony Group Inc. By: Title: 0 E 0 SECTION 00600 BONDS AND CERTIFICATES 00610 Performance Bond 00615 Payment Bond 00630 Certificate of Insurance 00635 Certificate of Substantial Completion 00640 Certificate of Final Acceptance 00650 Lien Waiver Release (CONTRACTOR) 00660 Consent of Surety 00670 Application for Exemption Certificate SECTION 0061:0 PERFORMANCE BOND Bond No. 929579566 KNOW ALL MEN BY THESE PRESENTS: that Douglass.Colony Group Inc 5901 E 581' Ave., Commerce City,, CO 80022 (an tndividual),.(a Partnership), (a Corporation), here1.inafter-referred.to_ as -the "Princ1.ipal!` and (Firm) Western Surety Company (Address) 5901 E. 58th Avenue, Commerce City CO 80022 hereinafter referred to as "the Surety", are held 'and'firmlybound unto City of Fort Collins. 300 Laporte Ave. Fort Collins. Colorado 80522 a (Municipal Corporation) hereinafter referred to as the "OWNER", in the penal sum of Three Hundred Six Thousand Eighty -Eight Dollars and Eighty Cents ($306.088.80) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Agreement with the OWNER, dated the 29th.day of.August, 2013, a copy of which is • hereto; attached and made a part hereof for the ;performance of The City of Fort Collins, Project, 7529 Roof Replacement at Drake Wastewater Treatment Plant.. NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the undertakings, covenants, terms, conditions and agreements of said Agreement during the original term thereof, and any extensions thereof which may be granted by the OWNER, with or without Notice to the Surety and during the life of the guaranty period, and if the Principal, shall satisfy all claims and demands incurred under such Agreement, and shall fully indemnify and save harmless the OWNER from all cost.and damages which it may suffer by reason of failure to do:so,'and shall reimburse;and repay the OWNER all outlay and expense which the OWNER may incur in making good any default then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, FURTHER, that the said Surety; for value received, hereby stipulates and.agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. is • IN WITNESS WHEREOF, this instrument is.executed ,in three (3) counterparts, each one of which shall be deemedan original, this 5th_ day of September. 2013. • Principal Bechtholdt - president (Address) Other Partners Surety Western Surety Company Mary E. Hanks, By: Attorney -in -Fact 333 S. Wabash Ave.. Chicago, IL 60604 (Address) (Surety Seal) NOTE: DateofBond must not be prior to date of Agreement. If CONTRACTOR.is Partnership, all partners should execute Bond. LJ SECTION 00615, PAYMENT BOND Bond No. 929579566 KNOW ALL MEN BY'THESE PRESENTS: that Douglass Colony Group Inc. 5901 E 58t" Ave., Commerce City, CO 80022 (an Individual), (a Partnershig), (a Corporation), ,hereinafter'referred.to, as the !'PrincipaP` and (Firm) Western Surety Company (Address)5901 E. 58th Avenue, Commerce City, CO 80022 hereinafter referred to as "the Surety", are held..and firmly bound unto the City of Fort Collins. 800 Laporte Ave: Fort Collins Colorado 80522 a (Municipal Corporation) hereinafter referred to as "the OWNER", in the penal sum of Three Hundred Six Thousand Eighty -Eight Dollars and Eighty Cents (5306,088.80) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered intoa certain Agreementwith the OWNER, dated the29th day of August, 2013, a copy of which is • hereto attached and made a part hereof for the performance of The City of Fort Collins Project, 7529 Roof Replacement at Drake Wastewater Treatment Plant. NOW, THEREFORE, if the Principal shall make payment to all persons, firms, subcontractors, and corporations furnishing materials for or performing labor in the prosecution of the Work provided for in such Agreement and any authorized extension or modification thereof, including all amounts due for materials; lubricants; repairs on machinery, equipment and tools; consumed, rented or used in connection with the construction of such Work, and all insurance premiums`on said Work, and for all labor, performed in such Work whether by subcontractor or otherwise, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, FURTHER, that the°said Surety, for value received, hereby stipulates and agrees that no change, extension of time,, alteration or addition to the terms of the Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER'and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. 0 iN WITNESS WHEREOF; 4his instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this 5th . day of September , 2013. MO (Surety Seal) Principal 5901 E. 58th Avenue, Commerce City, CO 80022 (Address) Other Partners M Surety Western Surety Company Mary E. Hanks, By: Attorne -in-Fad 333 S. Wallash Ave.. Chicago IL 60604 (Address) NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is Partnership, all partners should execute Bond. 0 Western Surety Company POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY-tN-FACT Know All Men By These Presents, That WESTERN SURETY COMPANY, a South Dakota corporation, is a duly organized and existing corporation having its principal office in the City of Sioux Falls, and State of South Dakota, and that it does by virtue of the signature and seal herein affixed hereby make, constitute and appoint Douglas C Baesler, Kristin L Salazar, Cory Clauss, Mary E Hanks, Individually of Denver, CO, its true and lawful Atiorney(s)-in-Fact with full power and authority hereby conferred to sign, seal and execute for and on its behalf bonds, undertakings and other obligatory instruments of similar nature - In Unlimited Amounts - and to hind it thereby as fully and to the same extent as if such instruments were signed by a duly authorized officer of the corporation and all the acts of said Attorney, pursuant to the authority hereby given, are hereby ratified and confirmed. This Power of Attorney is made and executed pursuant to and by authority of the By -Law printed on the reverse hereof, duly adopted, as indicated, by the shareholders of the corporation. In Witness Whereof. WESTERN SURETY COMPANY has caused these presents to be signed by its Vice President and its corporate seal to he hereto affixed on this 181h day of Juno, 2013. ,✓.,ti0.ETy WESTERN SURETY COMPANY o3�y CA ��✓'M OPw�Px aul T. Bmflat, Vice President Stale of South Dakota County o(Minnchaha On this 181h day of June. 2013. before me personally came Paul T. Brullat, to me known, who, being by me duly swom, did depose and say: that he resides in the City of Sioux Falls, State of South Dakota: that he is the Vice President of WESTERN SURETY COMPANY described in and which executed the above instrument: that he knows the seal of said corporation: that the seal affixed to the said instrument is such corporate seal: that it was so affixed pursuant to authority given by the Board of Directors of said corporation and that he signed his name thereto pursuant to like authority, and acknowledges same to be the act and deed of said corporation. My commission expires""""'^^"""^^'""""^""`{ J. MOHR f ^NOTARY PUBLIC June 23, 2015 r sEAc sEeE r SOUTH DAKOTA J. Mohr, Notary Public CERTIFICATE 1, L. Nelson, Assistant Secretary of WESTERN SURETY COMPANY do hereby certify that the Power of Attorney hereinabove set forth is still in force, and further certify that the By -Law of the corporation printed on the reverse hereof is still in force. In testimony whereof I have hereunto subscribed my name and affixed the seal of the said corporation this s'k day of Sea KTri �l ?d 3 . WESTERN SURETY COMPANY Is� L. Nelson, Assistant Secretary Form 1`4280-7-2012 E SECTION 00630 CERTIFICATE OF INSURANCE CONTRACTOR shall insert his own standard form for Certificate of Insurance. A� o® CERTIFICATE OF LIABILITY INSURANCE TE DA09/17/2013YY) 09/17/2013 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER MCGRIFF, SEIBELS & WILLIAMS, INC. P.O. Box 10265 CONTACT Ton aJohnson Y NAME:FAX P pZ.E. Exit 800-476-2211 INC, No EWAIL ADDRESS:tohnson1 @9come riff.m Birmingham, AL 35202 INSURER(S) AFFORDING COVERAGE NAIC IN INSURER A :Continental Casualty, A CNA Company INSURED Douglass Colony Group Inc. INSURER B:National Fire Ins. Co. of Hartford INSURER C :American Casualty Company of Reading, PA 5901 E. 58th Avenue Commerce City, CO 80022 INSURER D: INSURER E INSURER F: COVERAGES CERTIFICATE NUMBER:4S9S76A4 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAYBE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPE OF INSURANCE ADDLSUBR IN WV POLICY NUMBER POLICY EFF MMIDDIYYYY POLICY EXP MMIODIYYYY LIMITS B GENERAL LIABILITY 4029341196 05/01/2013 05/01/2014 EACH OCCURRENCE $ 1,000,000 X COMMERCIAL GENERAL LIABILITY DAMA T RENTED PREMISES Es occurrence $ 300.000 CLAIMS -MADE 1XI OCCUR MED EXP (Any one person) $ 10,000 PERSONAL B AOV INJURY S 1,000,000 GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIESPER: PRODUCTS - COMPIOP AGO $ 2,000,000 POLICY X PRO1EC- LOC $ B AUTOMOBILE LIABILITY 029341201 05/01/2013 05/01/2014 COMBINED SINGLE LIMIT Ea accident $ 1.000.000 X BODILY INJURY (Per person) $ ANY AUTO ALL OWNED SCHEDULED AUTOS AUTOS BODILY INJURY(Peracddimn $ X PROPERTY DAMAGE Par accident $ NON -OWNED HIRED AUTOS X AUTOS $ A X UMBRELLA LIAR X OCCUR 018064481 05/01/2013 05/01/2014 EACH OCCURRENCE $ 5,000,000 AGGREGATE $ 5,000.000 EXCESS LIAB CIAIMS-MADE DED I X I RETENTIONg10,000 $ C WORKERS COMPENSATION AND EMPLOYERS' LIABILITY ANY PROPRIETORIPARTNER)EXECUTIVE YIN 4029341537 05/01/2013 05/01/2014 X WC STATU- OTH- TORV LIMITS ER E.L. EACH ACCIDENT S 1.000,000 OFFICERIMEMBER EXCLUDED? (Mandatory In NH) ❑ NIA E.L. DISEASE - EA EMPLOYEE S 1,000,000 If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE -POLICY LIMIT $ 1,000,000 8 8 $ DESCRIPTION OF OPERATIONS I LOCATIONS /VEHICLES (Attach ACORD 101, Additional Remarks Schedule, if more space is required) RE: Roof Replacement at Drake Wastewater Treatment Plant, Project Number: 7529 Certificate Holder and any and all parties are Additional Insureds with respects to General Liability and Automobile Liability as required by written contract. General Liability coverage is primary and noncontributory as required by written contract. Policy limits limited to that which are requested in the written contract. Waiver of Subrogation applies when required by written contract. CERTIFICATE HOLDER City of Fort Collins 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE ACORD 25 (2010105) Page 1 of 1 ©1988-2010 ACORD The ACORD name and logo are registered marks of ACORD • 0 SECTION 00635 CERTIFICATE OF SUBSTANTIAL COMPLETION TO: CITY OF FORT COLLINS (OWNER) DATE OF SUBSTANTIAL COMPLETION: PROJECT OR SPECIFIED PART SHALL INCLUDE: PROJECT TITLE: 7529 Roof Replacement at Drake Wastewater Treatment Plant LOCATION: Fort Collins, Colorado OWNER: City of Fort Collins CONTRACTOR: Douglass Colony Group Inc CONTRACT DATE: August 29, 2013 The Work performed under this contract has been inspected by authorized representatives of the OWNER, CONTRACTOR, and the ENGINEER and the project or specified part of the project, as indicated above) is hereby declared to be substantially completed on the above date. A tentative list of items to be completed or corrected is appended hereto. This list may not be exhaustive, and the failure to include an item on it does not alter the responsibility of the CONTRACTOR to complete all the Work in accordance with the Contract Documents. ENGINEER AUTHORIZED REPRESENTATIVE DATE The CONTRACTOR accepts the above Certificate of Substantial Completion and agrees to complete and correct the items on the tentative list within the time indicated. CONTRACTOR. AUTHORIZED REPRESENTATIVE DATE The OWNER accepts the project or specified area of the project as substantially complete and will assume full possession of the project or specified area of the project at 12:01 a.m., on . The responsibility for heat, utilities, security, and insurance under the Contract Documents shall be as set forth under "Remarks" below. CITY OF FORT COLLINS, COLORADO By: OWNER DA REMARKS: AUTHORIZED REPRESENTATIVE u • SECTION 00020 INVITATION TO BID SECTION 00640 CERTIFICATE OF FINAL ACCEPTANCE 20 TO: Douglass Colony Group Inc. Gentlemen: You are hereby notified that on the day of 20_, the City of Fort Collins, Colorado, has accepted the Work completed by Douglas Colony Group Inc. for the City of Fort Collins project, 7529 Roof Replacement at Drake Wastewater Treatment Plant. A check is attached hereto in the amount of $ as Final Payment for all Work done, subject to the terms of the Contract Documents which are dated August 29, 2013. In conformance with the Contract Documents for this project, your obligations and guarantees will continue for the specified time from the following date: , 20_ Sincerely, OWNER: City of Fort Collins By: Title: ATTEST: Title: 0 • SECTION 00650 LIEN WAIVER RELEASE (CONTRACTOR) TO: City of Fort Collins, Colorado (OWNER) FROM: Douglass Colony Group Inc. (CONTRACTOR) PROJECT: 7529 Roof Replacement at Drake Wastewater Treatment Plant The CONTRACTOR acknowledges having received payment, except retainage from the OWNER for all work, labor, skill and material furnished, delivered and performed by the CONTRACTOR for the OWNER or for anyone in the construction, design, improvement, alteration, addition or repair of the above described project. 2. In consideration of such payment and other good and valuable consideration, the receipt and adequacy.of which are hereby acknowledged, the CONTRACTOR voluntarily waives all rights, claims and liens, including but not limited to, mechanic's liens, Miller Act claims (40 U.S.C.A.:270 a and b), stop notices, equitable liens and labor and material bond rights which the CONTRACTOR may now or may afterward have, claim or assert for all and any work, labor, skill or materials furnished, delivered or performed for the construction, design; improvement,alteration, addition or repair of the above described project, against the OWNER on its officers, agents, employees or assigns, against any fund of or in the possession or control of the OWNER, against the project or against all land and the • : buildings on and appurtenances to the land improved by the project. 3. The CONTRACTOR affirms that all work, labor and materials, furnished, delivered or performed to or. for the construction, design, improvement, alteration, addition or repair of the project were furnished; delivered or performed by the CONTRACTOR or its agents, employees, and servants, or by and through the CONTRACTOR by various Subcontractors ormaterialmen or their agents, employees and servants and further affirms the same have been paid in full and have released in full any and all existing or possible future mechanic's liens or rights or claims against the project or any funds in the OWNER'S possession or control concerning the project or against the OWNER or its officers, agents, employees or assigns arising out of the project. 4. The CONTRACTOR agrees to defend and hold harmless the OWNER, the lender, if any, and the Surety on the project against and from any claim hereinafter made by the CONTRACTOR'S Subcontractors, materialmen, employees, servants, agents or assigns against the project or against the OWNER or its officers, employees, agents or assigns arising out of the project for all loss, damage and costs, including reasonable attorneys fees, incurred as a result of such claims. 5. The parties acknowledge that the description of the project set forth above constitutes and adequate description of the property and improvements to which this Lien Waiver Release pertains. It is further acknowledged that this Lien Waiver Release is for the benefit of and may be relied upon by the OWNER, the lender, if any, and Surety on any labor and material bonds for the project. • Signed this day of 20_. CONTRACTOR: DOUGLASS COLONY GROUP INC. n Title: ATTEST: Secretary STATE OF COLORADO ) )ss. COUNTY OF LARIMER ) Subscribed and sworn to before me this day of by Witness my hand and official seal. Notary Public My Commission Expires: 20_, • is • 0 0 SECTION 00660 CONSENT OF SURETY TO: City of Fort Collins, Colorado (hereinafter referred to as the "OWNER") CONTRACTOR: Douglass Colony Group Inc. PROJECT: 7529 Roof Replacement at Drake Wastewater Treatment Plant CONTRACT DATE: August 29, 2013 In accordance with the provisions of the Contract between the OWNER and the CONTRACTOR as indicated above, for (Surety) on bond of hereby approves of the Final Payment to the CONTRACTOR, and agrees that Final Payment to the CONTRACTOR shall not relieve the Surety Company of any of its obligations to the OWNER, as set forth in the said Surety Company's Bond. IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this day of , 20 (Surety Company) ATTACH: Power of Attorney and Certificate of Authority of Attorney(s)-in-Fact. 8ECT|{}N0007O APPLICATION FOR EXEMPTION CERTIFICATE DEPARTMENT OFREVENUE � NOT WRITE IN THIS SPACE The exemption certificate for which you are 'applying must be used only f6r the purpose of purchasing construction and building enat6rials for the exe - mpt p . roject' described below. This exemption does not include or ap�'Iy to,tlie puf6hase or rental of equipment, supplies, and, ffiaterialsw hich'a-r*e-'p'ur-c'h'ased, rented, oirbonsu mied.by the--6oritfktor arid which do riot,becom 6 part of the stiucture,� highway, road. Any Vnauthorizeid Use of the exemption certificate will result in revocatio - n of you r-exemption certificate and other penalties provided by QRINFORMATTION- Mailing address (City, State,- Zip): Contact Person E-Mail address, ederal Employpr's Identif !cation Number: �Bid amount for yourcontract, Fax Number. Business uilephicin6 numbek, Colorado withholding W account number, Pa Name'of exempt organization (as shownron contract): %empt,organizatJ66's number Principal contact at exemptorganization: J:Prin�lpal, contact's telephone number.' Physical location of project site (dive actual aciclres� when ippkable andLCiti&S andlor County (ies)'where project is located) Scheduled Month Day Year Estiniated Month Day Year construction stait date: coWi�letio6 date'. ,Signature of owner. partner or corporate officer: 1 Title of c orporate officer: - DO NOT WRITE BELOWTHIS LINE E Special Notice Contractors who have completed this application in the past, please note the following changes in procedure: The Department will no longer issue individual Certificates of exemption to subcontractors. Only prime contractors will receive a Contractor's Exemption Certificate on exempt projects. Upon receipt of the Certificate, the prime contractor should make a copy for each subcontractor involved in the project and complete it by filling in the subcontractor's name and address and signing it. The original Certificate should always be retained by the prime contractor. Copies of all Certificates that the prime contractor issued to subcontractors should be kept at the prime contractor's place of business for a minimum of three years and be available for inspection in the event of an audit. Once an 89# has been assigned to you, please use the next five numbers following it for any applications submitted for future projects. This should be your permanent number. For instance, if you were assigned.89-12345-0001, every application submitted thereafter should contain 89-12345 on the application. The succeeding numbers will be issued by the Department of Revenue. DO NOT enter what you believe to be the next in sequence as this • may delay processing -of your application. 0 SECTION 00700 GENERAL CONDITIONS 0 9 GENERAL'C"ONDITIONS CONSTRUCTION .CONTRACT These,GENCRA -�d ND[TdONS have:been'`devefope l•by using the ST.ANDARD'C)sRIE--RAL C.dNDITIONS OF TH' E,COMTkUCTION CONTRACT prclinred:by t}ia Engrnccrs`:Joml Coitt_r'act Dociiiticnts'. Conimittcc FJ[ 17C'No"'191(1 8 g990 Fd tion) 'aca'tiiisc Changgta that docWneni are'shown' by, underlining,te\t t6i has,bcen added'aiid' strikingthriwgh test.thall as.becri•deleted -T.i1CDC Q} NrRAI..,CONbITIONS. 1-910'8'(19§0"EDITI6N); WITffCII Y.OF FOR'I�'COLLINSMOOIFICA!flONS.(IiEV 9%99)' . 1 Taors:or cr : coivDMioris Article or.Ysragraph Page Article nr Pa •agrrph •Page Niunbo YTitic Number Nnmb�r&Titic Nuriib& l: DLFINITIONS „s.:, :a I PRL•LLvlINARY MATTERS L I Addcnde ...................... ., ,.,,. I 2.1Delivery of Donds;; 3 ... Documents 1-3 ' A Lcaunn for Pa ant pp yin ....._ , 1 -ant of Contract 2:3 ('ommencem '1t4 .Qsbestoa........................., ,,, ;;; ;,,;1 Timis Notice to?:f'rnc..ed.;,,.; ,,, 3 15 etd 2:4 Sta"rlipg the Woilo, 3' 1:6 ........:::....................................`I Btddme Documents,,,,,__; I. 2.5--?.7 IIzfor'e Starting Construction; Ic7 IItdduig Reyuiremems:, -- l CONI jRAGTOles Responsibility ,..._ „Report Prclimmnr} S,cficdiles; 1:9 Change Chde'r •I Delivery of (eruficattcs of 1 10 .. �... Contract . ocumcnu; 1, ._. Insurance 34 1.1 I .,,-._ Contract Price .,,.._ ,.-- I .2.8 Preconstruclton Cqn&renqe :., „.. ,4' I2 ContractTntes ::I 2:9: InitiallyAcczptablzSchedulgs.:- .__::;4 1;13' CON'TRPATOR. .....:.. . l 1 14 Btfechve . ..................................., . I ?: CONTRACT DOCUI«NTS: INTENT, 1:IS ............._ ..: :::1 AMENl)ING,'RF.U.SF 4 1:16 .. Rmctive,Qatcoflhe•Agrccmenl,....,..1, 313.2 intent,; 4: 1:17` E\'GINEEI.„ 1 13 Reference to Standards and Spcc'l' IAS ENGINECRi Consultant Gcalitats octechmcal Societies: iAg Field -Ord dr- ,. 1 Rcp ortutg and Resolving Dis- L2Q Ucrnral Re, tnmcnts, ,. 9u —. 1:2t Hazardousa_..._ ,;,,_:;..;2 34 InrcntoECctTain''Coins'or .1 21a Laws:artd Rcgttlations;,law's,br - 't�djecttvcs- ... . . _,. :; Regulat ons ..,,,_ 2' 3 5 Amending Contract Documents ... L2 b Gagt111oliJa}s 2 16, Supplem;entrngCotrise} 1.�3 Liens Doc mcnts -3 .... 1.24 Milestone?.... .. .....,_ _, 2' 3.7 Reuse of Documents ?: • 1425 Notice of Award.-.::..:..:::..,;.,;,,,,;,_;_,,;2. t;2G NaLcctoPrnceed ,,,,,,,, .. . ?• 4; AVAtl IItlill ITY nE:.L4N1�5;;, 1:27 O6VN6R,,,,,, SUHSURFAC'E,XNDPHYSICALCONDITIONS 1:25 Partial Utilization 2 �RChERENCE POINTS ... 5 1°29 PCIIs 3 41 Availabdtty of Lends _5-6, 7s3.0 _ Pevoletrm ,_;. ,...., .,.. .. ., ., ,_. :2. ,, 42 Subsurface and Pb steal } ` .1:at Pipiect ...... :.......,.._. J Conditions ...._. .................,.:,.6. ..,._..... ,,... _ Radioactivc, 4.2:Re ibrts anawm Ss :.. .dnrIm-6 132h Regular Worl.tne Hours;, ,;:; ;� A.2:2 limited Reliance b} CAN 11LaC-' 1.33 ResidzntPrgject Repjesentati e .;;..: , 2; TORAuthorizad Technical 1 34 Samples Data ,,,, G ShopDravings .... ....................... 423 Notie.ofDifferingSucbsurfaci135 - 1ry..3ti - n Sieciicatios...... . ......... a` ._".....G- ._ ....... I37Sur hc 4.2.4: NGINFER'sReview G -138 Substantial 4.2,5PosiNe,GontactDouments 1.39 Supplemen_aryConditidns .......::.... Chargz ....................................... 1.40 Supplier ,,. 0 4'2.6, Possible Prue andTtmes 1:41" Underground Faethties r 3 Adjdsnnents _:- ;, _. t ,42 Unit PrtcrWors ......:.... . : ::.:..... 3' 4 3 Physical Conditions Underground 143 GVark. Facilities ,; 7, 1.4 .......................................3 tVorl Change Ihrecttvc 3` 9:3.1 Shown or Indicated J 1.45 Written _Anigntlmenl;;.,, } 4.3.2 Not Shown or Indicated, •4.4 ReferencePoints::.................. :.....:7,,. ;I, L1CUC QNhR.4L CONI)ITION5�1910-5 {19YV hUl'flOT7�; ;w/ C(TY t7F FORT C:OLLMM MdbMCATIONS,XV.IIW9i t U 0 0 VNER'5Liiibili(y, Insurance peqy Insurance �9-1 0 oval Property Article fir parajrap Nuifi her-4-l'itic Xlor*r, .45. Arstiest9s,* PCBs; fla-mrdousM Waste or � - Material , i� W Radioactive r **OSANITINSURANCE 5.), P-f"mance. thi Papient'0 er er or 5 . :5 s: 6 377, 5,9 3.14 ,5.15 .Insurance ... ....... I ........... — ...... 4..(.-fOR'S RESPC)NSIBlvi:rjFs ........,:,;....II �so "Vision arid -Su ,perintendcncq 11 p 1.2bor ateria s.an Hquipment -1 MSchedule�; .... ......... _;_12 fo ArlJ-@ t 'or t5aiajra6h Page -Num .; o, , r ,Ntini her & I it 6 ,6�' 2 5 SubiTiittAI:Pf&, idiiieS-.,CONS u):DjjQP L)iuWqjg.or.,'�HMPje rn �Subitt - a I ,6:26. Shop Drmi ing &-'Samplc,Submits RQ,onsibi fny� f0'r-A"i3rial im's r I root Contract D'6'cdrfi ents, jl,,17 ,6:28- Iie17A-tcdWork Pe-r-for-m"e'd Prior to ENGINF:}iR'ssReviewand Approval of Required 'Submittals 629 ........... IT �41.30. c 6mRAET6E' di,�c ' Warrantyand Guarantee..., 7' 631-6.33, Indiinnificatidii' 8 :644, "Surviiral ufpbi� 7, �C) IER WORk -7:10.3 Related Wbrk at ,7A Coordination notion R,: ;OWNER'S RESPONSM111ITIFS ........ Ciini nittifica tin h s to CON" TRACTOR 18 :8.2* 18, Furii Data,undPay Promptly Wheh' Dice l SA Lands an Eilsqr�,ints, Reports. and - ......... I .................... 8-19' 't5 — -:� Insurance . - .19 4.61 CON'rRACTOR's E-xp mqe:� :9.7 - tu I c t qn� t r u ot i on 'or, f3 r oce d ii`r a;,� Methods FNCrINFEWSs Hvafuot ion 12-13 6,876. 11' 'C erning Subcontractors. Sqphcmand,Oihwrs; Waiver orkits, .............. .......... 13,14 6112 6.13 Peimits ;14 aws and Rcg datuons - - - ... ....... 1.4 , :� 72,ms ..................... ...... ........... .... 14-15 '.81-1 1 welb r Poreanses 15 6.17 S ite, Clean Is 6,1 Uoadin& ................... _1 5 '9( 4E'NG] 6.11 dqN! 2F6 Sately 4od,pirniection.. 16 !9.1 ,6.21 4Ssfet--Rl� ' -en 16 Y;t cpres - Aztm-�� ........ 9�1 2-,-),- Hn7ardC'otn*mumic6tionlkcSiiini;. .)6 93 �* -r-nic,6n&n-.......... ...... ........... 16, 9. '624 brq�y,i-4p and Shop Samples; 9.515 active Material. 14 C of Finariciii N, ". , Dements .. ........ - -- ------- JIS DURING P,19, E JCW GENEK& C ON DM ONS 19�16--ii-(1990 VDI'llOMi FORT col.l.m. SECTION 00020 INVITATION TO BID Date: July 16, 2013 Sealed Bids will be received by the City of Fort Collins (hereinafter referred to as OWNER), at the office of the Purchasing Division, 3:00 P.M., our clock, on August 7, 2013, for the Roof ' Replacement at Drake Wastewater Treatment Plant; BID NO. 7529. If delivered, they are to be delivered to 215 North Mason Street, 2nd Floor, Fort Collins, Colorado, 80524. If mailed, the mailing address is P. O. Box 580, Fort Collins, CO 80522-0580. At said place and time, and promptly thereafter, all Bids that have been duly received will be publicly opened and read aloud. The Contract Documents provide for the construction of Bid 7529 Roof Replacement at Drake Wastewater Treatment Plant. The Work consists of re -roofing multiple buildings located at the Drake Waste Water Treatment Plant. 0 All Bids must be in accordance with the Contract Documents on file with the City of Fort Collins, 215 North Mason St., 2nd floor, Fort Collins, Colorado 80524. The City encourages all disadvantaged business enterprises to submit bid in response to all invitations and will not be discriminated against on the grounds of race, color, national origin. A MANDATORY prebid conference and job walk with representatives of prospective • Bidders will be held at 10:00 AM, on July 23, 2013 at the Drake Wastewater Treatment Plant, 3036 Environmental Drive, Fort Collins. Prospective Bidders are invited to present their questions relative to this Bid proposal at this meeting. The Contract Documents and Construction Drawings may be examined online at • City of Fort Collins BuySpeed: https://www.fcqov.com/eprocurement Bids will be received as set forth in the Bidding Documents. The Work is expected to be commenced within the time as required by Section 2.3 of General Conditions. Substantial Completion of the Work is required as specified in the Agreement. The successful Bidder will be required to furnish a Performance Bond and a Payment Bond guaranteeing faithful performance and the payment of all bills and obligations arising from the, performance of the Contract. No Bid may be withdrawn within a period of forty-five (45) days after the date fixed for opening Bids. The OWNER reserves the right to reject any and all Bids, and to waive any informalities and irregularities therein. Ariicic or Palrakraph � 4 -, I um6ir S.,j:itle: Number .96 Rejecting pafe61'i�e \V&k.,...... Shop brawiiigs, Change Orders I arl d ayments: . ......... 21 6.10 6ft-erryiiniiiciii,for lJnit:-Prir-'x-s�:, ' 21-22 9.11-9-12 Dec �;n-Disli6tc-s; 9N'di- 1. . . 1, - INFER as InitialInt" tec erpr YR 03- �� � , ....... Uun� itatijng�&nENd [KEE Rs ....... Authority a6d It ds'Wfisib'il it _i, 22'723 �CHANGES INT THE AVORK �3 6%6�.R;.4 6r ic .............. "7.3 10.2 Glain f6w Ad�� 5ustment_ 23 163 Work Not Required bvContract ,Docum.&i1S.._; ....... 1014 ......... Change Orders .... ...... 16.5 Niiticiiiicma Surety ---- :_,2T CHANGE OF C0111JTPA(:r:PRjb. ......... .............. 2;. ....... I. I=l j . : Contract Price-, Claim for" A4J�trnent. - Value of :ihi'Wofk .... ------ 23124 IIA (oat 6 f Lh e W'a' rk; ...... ................... ;,24,;25 , i , Cnst of . fze:........ _5 11.3 .s Co6t Reiiordi- ,^3-26 ..................... 26 11-19 Unit Piice-w6rk.; .... ....... M-%NGE OF CONTRACtTMIES; ................... ...... 1; Claim fix.Adjustm,cnt Tim c of the Essencq.• ............... 113: Delays. 4CONTRACTOR .......... 12.41 Dlay%Pkyond` OWKER'...q.and" ,C16NIfIRXCYOP's Control ........ ...... 77, TESTS AND INSPECTIONS; CORRECTION, REMOVAL (.)k._XCCEP"fAG,_.N-E-OF' bEPE(j77i,T kVOR'K" . ............... ............... : .................27' 13.-I Notice 7 13.2 Access to the Work.. -------- ls.3' Tests ihd ln*ct�icnl CONTRACTORS mCoo ration ........ '13A O\VNER!s RespanaMit=. Indepprident Testing L-pborniory, ... 7,37 115 cdNTRAcT'OR_s'_ 'Responsibilities ;13:613.7 Cording Weirk'Prior to'lnspec- ti6n, Testiffk IN; Article or. Nrigraph Number,'kTide Nunibft Uncovering 1311 Correction,or li6ffioval of 13.12 13.13 Acceptance ... S, 13.1 0; . Work 28-29 K'0ANkNts *r6 COKTRAUMAM 14.1 Sctieq*of NW4c§ ........ 14_2 App'licatiiin forProgress 14.3 CONTRACTOR'i Warranwof Title 14,414,7 R&ielv 617,Applicstions'f6r ProgressPaymefits 29-30 • 14. &14.9 Substini i glC6rn pleti 6ri ................ ;..30 1410 Pa rtial.Uti I int ion. I ...... ------ V_3031 FinalInspection,...... .................... .,3 14.12:, Final Application or;ayment..:,31 14.1314,14 'Final Pniyment and 14,15 Waiver 0, ._Ms;: 1-32, z 1�1Stl8PET.N.-)ION OF. -WORK AJ%JTD TERMMIATiON, .................. ........... ........ :32 OWNER . M , u . I ay Suspend Work:,, 32" IS.2AS OWNH R- May Tenn matc.,.., z ............. 32' Work or Terminate,, 32-33 16, DISPUTE I - RESOLU,TION- .... I ... -I....................!33 17, M I.SCE1 L A N F. () U 8 ------------- -- ---- -- .,33 17.1 ; GiV-mg Notiq_ ..... I— - 33 17 , 2 Computation of I. . ....... 33 173 Noticie of.Cluim ............................... 33 17.9 Cuinulativc Rcinedics .......... 33 13,3 Prdussional'Fecsnd,Cburt .................. 17.6 Applicable State'Laws ................. 11,3 -� 4 . Itift,b1iink 1 35 EXHIBMGC-A`. (Optional) bisp9te i6f_1ts 6 Arbitration .. ........ --,A] 16.7 :��id7Y,'kWFORT COLLIN'SMODIRCA17t)NS(RF.V9t99) 0 0 0 0 !NDT.-,.x'TO, Gr,.Nr,,RAiX(jNDiT_ToNs City 6f FiirfCol I iiis.rhodifiEnti Ion s,td the GcKefi I Conditions of tKi Cons-tr-itictio-n- C-o-ritr's-6t 'a re- not' imm'in' this index Article or Parag*nuph -Numbcr; Article or,Pai ejjraph Acceptance of- Number Elands ;and In'stirarice .............. .. ;c6#c XA'ork....... ........... 1 10*4:1, 1 15� 1113 �OWNER.respcnsl�ififdr' ................4f5 PaM'C'n-I ......... ........ - ' -_..,AS,2 ,.. .......... insqancc............. ...................................... 5,14 AU!171;0tiz'id Variations in Work 3AI5J5. 6.27; 9.5.:... other Woi�L 1�,,CONMWT y6F,L;inds ailabilit ......... I I I , .1.44, Su_bsiitutes,and "br-fyuaf` Items tlli;lk iiv,1OI IiN,N_ FR �IOJJ ?, 5 -G30 e, 34 ot i cc 1 6 'A%vard;.N f-derined .......... 'Access to the- t, ;it I dk 0 INNER andCON emissions-;-Aots`und Omissions- TRAMOR 6.9.1, 9:13-3 2 1J,133 ......................... - ... I—: & , "0_- , - �iER . . ......... --5.9 defthiticin of(ii1sosee ition-6f Sp66ificatiofis) .... !VPr 5.7 Contract Nice or Contract Times 15, 3:15,41, 4S12, 4.5i2 ..... '5i3 9A,.9_5,A 210.4 ......................... 111, 12. 14.8, 15-1 piogress .6 schcdtile,, ....::. ...... ....... t,.'.6 Alitecincrit-- Lfini'do on f . � - 1 .............. : ........ ..... . All Risk" litsuirili6c. pplicy fbrin ..... .................... Alluwaii6&s. Cash..:,. ...... ...... Aiiiend16'Coiitra6L DOcuinents;.. `3 :5 1 _en&ietii, Wriften--- in perieral, ........... Aiiiic*il. OWNE-k-6ir CONTRACTOR intent to ...........910 9.1 i.I OA16, 2, 16,5 ,final paymenk ......... 9.13:5;,14;12,14-15 ein.gein r I ........................ ...... ........ ...... 141 - I 4. 7 review of Arbitration . .16,1116"4 �c*Falinis pigs iantShcrcto-....... *_t 45.2. 4-5.3 6 o CONTRACTORauthor'i -zed t�"s Wrk 4:5�2definition o[ ........................ ........................14. Rcquiremirits!-delinitidfi.� .................................. 1.7 Q. 14:2.6.2). )6ncc of io'n'al,bdndb, ................... I 1 0; or-tiiewcirt ...... ................. . . . . . . . . . . . . . . . . . . . . . . . . . . nns,_, ... ; .... tl., .... ;...; ..................... ritial Co,ftole-Lic 6, .... 1:38. 69 i-ennicaies oi tnsuzrarice._% Change C&tiaki, Nice— ,Ush AlloNvainces, _claim Cor price Oi4striient ...... ;.41, 4-26`4 5 15 6 U49 j4 f D: 13,14; 14-7. 15,1,15.5. CONT-RACfb"R!s fee ........... ..I1:6 ............ ............................. ........... ns to.:..: ........................ .......... espng and1rispection, I— I I — Fl= GLN EM cbtibffi6t4s (f�o isdttiox� llnit.Priu.iNorl. ,,, . „1d:9. 'ONl'RA C_,,,- ... . 'Article or:Paiagraph .Article -or Puragraph TTiimliei� Numtiei Valuc'of Mort:..,:,,,,;; ;, ,,;,; , ::.,:.:I1S3 CONTRACTOR's liability,......... j 46AZ, r16, 6:31' Change m Contract times-- _ ,... Cost of tlic Woe{ I 1 a 11' S Cwm for times adjustment .,,:4.1. 4 6, 4.5, ?I5, :- Decisions on Dispute; ,, ........... 911 9,12 9:4, 9 4;9._11. 10 10,5: 14:1. Dispute Resolution ,;,, ..-. :: J6;I . 139, 13:13 13.14,147 15'I;.IS;S D�sputeResoluuon'lgczmenl •,,, :.161'16,6 Comrectpal time limits,: ENGINEER 69Imtialnntzrpretb Delayspey ndCONTI2ACTOR's Lump'S in Prtwng ,, .., r< 11 3:2 control..::. ... : :..-.:723 < Nouu nfl_ 17=3' I�elayslxyondO�VNbR'sand - OWNh'R's, : qa 9:i,9.lt t6: -11 11.9 (XWNTRACTOR'scgntrol .-12:1, 13;U 13.'13,13.14,.17:3 Notification o suictV "10.5 OWNER's liabilup Scope o(change- ................. ..........10 3 10.4• MNWER ma'y refuse to make paymeni .1a 7 _ .......... ., Change Orders— Professional Fee and Court Costs ......... AcccptaiiceofDefzetive�1'orF,.,....... .,.:13>]3 Included -. _. .......... -,Amcnding,Contract Duciunutis.,,,.„ fur formal dcctsion on ,: 9T1 Cash .411ouances 11:6 Suhstitutytltems ,,,,,, „ 4 ......... ChangeoCCahtrsct_Price',,,,,,, , ,_,,.,;,Il Time fixlanston.... ,., , ,:_„ ...... 12.1 Changeof_Conlract Times ; 12>' Tune,ragtiirements=; 9.11, 12:1 ......... C Ihanges;in the Work_, _ 10 Utiit Pace Worl _:: z ., 11 93; CONTIL4C lOks fey 11.G balue of'„ t 1 3- `Cost o(t} e,Worl ....:...: ................... :.........I1 4 11:.7 Wancr of- on Fm•il l �ymcnt c: „14 14 14:1,5 - Cost Records_. ... :.:.........:.:: .:..._., , 11:7 Wort. (.ICange Directive - • .'` d6mituip of,: - .,:.:... ... ....... - '1•9 wnucn iiottcerequired , ,:,,,; 9.1,1'.%11 2, 12"1 emergencies , , „ ................ 4 3• Clarifications and Interpretations; ,,,; 3.6.3-9 a 9;11 LT1G1N > R's resp insibilag 10.4, 1 l.*S12 1 Clf3n Stte .;.; .... ... 19 ex��ution of.; :Ill;4 Coles afTivchnical SacictyOrgam�iUon Indemnifiction ... ¢ 12 616 G 31 6 33 or Association' ..... - 33 3- ._ Commencement of(nnratTimce............ . �3lnsurancc`Bondsand . ;..,,Y54 15.21: Commuricatianstermmatc;, general :-; 6,9 �. S.l '�Phvsicni.Conditions- Ilazord Communrc-•ition Progi ¢M, _ Subsuiface and ,::;. 4 3 Completion; - Underground Facilities ........................ 4 3 Fina1 Application fur`Nymcnt;.,,, 14 t2. - ItecordOocwtcnts. _419 FinalIn'spection _ 1'4,11 _._ c pe of Change 10 3'10: Final Psyinent and Ac eplanca .,_ 14 h 14.14 ' Substitute"s:..:.......:.....:,,,, .,,,, ,. „ 6 7 3: 6.8 ?' -Partial Utilrration::...... .:... ...14.10.._ Unit Price Wart ...........................: :. .. .... 11.9 Substantial _Completion ........................1' 38, 14.8,14:9 value of Work. covcrcdlby 11 3 1Vaivcr'df CNims,:,;;, ...... I a.15 Changgs m,the World :,., :, JQ Comput,nonpf Times:,-: ..., 17 �.1 17r 2. .Notification ............... IU,S' Conccrnihi Sti cC6;itra6tors Suppliers OFVNER's aitd CONTRACTOR's, and Others ....................................., 0a-6,11 respoisibihties ..... 124 conferences-, .Rtg}it W iui.gid)ustmen[. ,; 10° initially, acceptable schedules . :.. 29 Scopc of'change .................................. ...10 340:4 preconstructior4 .....; ...........� 8 Claims ` Conflict. Error Anibiguia Discrepanty againstCONI RAErlOR.: ::• -�4,16 CONTRACTOR to Report .... , .2 ,3;3.2 &gams( ENGINEER ,,;,: , , . ,;:,;,; „ - 6.34' Ccnslrut tioR: bcCore'stertmg by _., against OWNER '632 CONTRAC rOk ... Change' -r Contract l'iic{ ... ,.......... 9 4 11.2 CokrtictionMachmery; Equipment ale 6 a Change4$ cntrniTiftcs ., 9AJ2:1 Continuing the' -Work ......,, 629, 10.4' 'CONTRACTOR'S .:.... 4 71 9. 95 911;:10.2 'ContmctD currents— 11,9, 121, 13.9, 14_s; Amending :. ::...........I........... ..IS ...:... ......."11,2: ...................... _...... .15I:.15:5:173 Eontls. •• .... "1 rt ricDc rzNIMU1. c0h-b h6i, I910-S (1946 L•U171ON) , -,wd CITY -OF FORT COt: NS MODIFICATIONS,(R N 9199j, 'Gasfi Allowi-n-c-cs 1.8 ........ . ... :. .. n, Stop Work" r"eq'wirements ....... ................... 1, _ .... '44ftnbe, Afticle�'_Pa -agraph P .9T 1, Nl'bmbq 1A, Change of ContractTimesI LIZI I '�J,h`Agcs in IfVork te........... 5 .......... ...... M: v 0, ati&iog,Obligation ........................ check and Verify, ..... T ...... ........ .5 DefecfivekWbrk ............. 3, Dui} - to Correct J ei:11ve 4 11 , bu'i�. Lo'kepoit` difaiitioii*of ......... the Work -caused Changes in c used by b4G0,fF,ER4i-mitW inteMro6f'o 9,11 FmcrScm;y, " HNOW.-Ok as 51li.NFR's reor 6n ............ Dcfcct_q,m.Woik:bfOthors . ................... :.7:3: _v... :gerieral3 .......... ffeml, c6nditioris --4.2.3 , ins ur c 53 ,. t.f 4 Discrepancy in Documents, Intent .................. ....... ....... 3:1: 34 61der-I :4, m mor variat ions in,the b%kr N' HA "s o.....F.0h'dat.ri._I _I:8.3 Ii�utpmdn^t and'M.*.._a..c'hio;C'o.st OW:WFR'g rcspqhsibiltyIOmake, ,.-. Uthe Wbrk...... ... ..inc-6.,. .,.. Pramptphympla 14414,13 .....y... Fee -Cost.i..n..i�a . -. '..... j145fiII5 .R. -r,c.s.pons..t'...... 'Td nce. .... ....JA,113, -General Warranty Guarantee _619 Referenceto Standards i*c`,�ionis.' S Indemnification 9 6A6, 631-&33- TO ti n -6 ..... .... 3 3 jh�cti I 6f the W 'k on Gr Related Work,;,;; I,ahnr Materials-and,F D 6.5 -keporting and kesialving Discrepancies,, ii•.Sj 13 Laws 'and RegulationkCbftfolinice-K:. _6.14A '3:7 Lia lifty Ifisi"if6a . ............ ......... Su ll PP................ ...... ....... ; ............ 3. 6 Notice of intent to ApOcal ,30.4, liefill'irati , on U-ENGINEETRts Employment , ......... 82' obhg�tion,to perform and complete' unit ....... ...................... the Wcik.... .i ,variattons, ................................ .2 -* .... .. Patent Fees and paid `:Ibi'by..� ....... ....... 6A2 Visits to Site,, 13NGI NEER's .... . ...... .......... 4j: `O.Cr6imftncc and Other bo,ri'. cis- ."... ................. coniia•'c't Price--"' lq .1 Permits, obtained and paid for hi-, -6.13 ......... adjustment u 5.4;L,V.k 10:3� L3 3 Pr -:2.6:�,2:&, 2 .......... Change '9,11 69 2 104 1 . -11 Decision]-'),2 _,.an �!Sput9s .... ....... Request for formal jecisidn6n disputes u dcftriitionpt................. J, .. . .............. ............. Re"s'potisibilitties-- '41; ,Cofiteact"Tiffiics_=-_ Changes ir t%V he 10:1 I .,� � � ...... ------ ------ - - adjustment ...... ..... .. . 3. 5.i 4: 1, 9.4.,,10.3.42 , C6mernirig Subcontractors . SUPPIIeTi Chanye of ..12TI4 ...... ............ . w2. ................ luid,Othicis ..... �Comraeqcqqvt .......... ....... ........ .................!�;...... ,.029. R)A detthiton of ... ....... CN"Pcnsc; ONM CTOR—. 'd CONTRAC-TOWs General Ararraniv Acceptance of Insilianc'e, 14 and Guarantee ......... !6;36 Comm unicetiens ........ ............ 2 ONTRACTORsrc6w'.prior 'to' Shop Continue ContinueW -ork: ................... •'612% 1 OA ...... ........ Drawing or Sample A.25 ng ampie '. submittal-'. i coardinaticii orNvoTk,, ....... ......... &Ul defnihonof .......... I .......... ..... ........ ............... 3 ...... ........ * ......... ...... f,.?3' '11nit6d Reliamiebri-Technical EIM4=e,:a01ti6n: Substitutes Ua4l'46hbriied ........... of"Or -Equal",items ........... IN49Y Sto ,p Work�ci . 11 T& Acts an d Omissions . , proyidc site accessio 6th,Kri. 7,2 13 2 .......... ............. e of Others ............ 6AJ602, 6,13'.- 6 6:1. `Safety and Pioiedlidh ... ........ 4,3 13; 1 OJ8 . :. I � I I fdeductible or Licdible`lanun'ls. insuranc'e o. . . ........... ........................... 6.21-6.23, 7.2, 13,2 ---- general,.,. 6 -7 '7 -3,'g:q - .... ... . ........... ...... - - 4 ,Shbp DrawingZifSample Rtview ! : :.,. j.6.22, Prlil�rto�S.U.hmitiai..-.' 0,4 ............... Indianniewation' 6' 3 126. 3 3' ......................... EJCDC GLINIRALTO-1-A)MONS 19'10,-8(iggo Luhiow LaborillvikeriikaridKquipment,-- 63y6:5 CXWTRACTORS--other-„ 7 Laus andRegulanons , ,-, ,, - -;- 6,14 Contractual Liabihty,(nsurancc .. $`4 •Itf LmbtlityInsurence,-„ ,_, S.4 Con,ruclualTtmeLtmits;, ?siicle or Paragraph Article or Psragraph- IVilinbci' Number :Niiticc of variaticin fioinYConiract �Coordina.tion-, Documents ......_..-..:..... .. ..., 637 ,. _, CONTRA( fOR'sresponsibiliiy,;........... ;...... PatentTees`siridRoyaliies-,,,,;;; G42 Copies ofIkiiiuments.,,;,, '- Permits:::: - 0 13 Currectlon Penal - 13:1'2 Piogress:Schedulc ; 6.6 Correction. Reinovol of Acceptance Rccnrd19 riEDefechie w rl.=- related Wort. peif6i-med,priorto m general, _, ,-,...11lq f ,131U-13c14 f-.. Ei`1GINEF1t's appro"veil ofrryoired'" Acciptatn e of1k, ective 1Vorl ,,;;; stlbiniitals ;-._ 6.28; Lorrectioh or Remot el oC safe structuralloading ... , , , , G,48 Drfrchi e Work ;,; 6 30, 13:14 Safety and Protection; n 20 7 2, 133 Corredian Period .... 13.12` Safety Rcprescntat vc, f 21 OWNf 12'May (brrect-Defechve Worik 13:14 Scheduling the Worl ; :: G.92 Ql}NER:May:Stop.�Vor� _ ,.:.... .....;...... 13,10 Shop Drawings and Snmplc5 :„ .;;6.24 Cost. shop Driiu7ngs iu d'Samples Review of TesLs and Inspections -.................. „•.•• b5:1NTGINEL72-:-, 6.26 Reccrdsl7.7 Site Clea cost onlithe WorL- -_„ Submittal Rocedures; , , -17 ,-,;.;G29 F3onds aqd insurance,:.additignal,, 4 9 •.:, Suhstitutc Consvuiitidn l`4cthoda Cash Discounts ... - ...-,,,:. 11 4.?- and. Procedures_.-,.. ;-- `. 6,.7:2........_1 L5 ,,,;. -----`- Substifute-s end "Or' -Equal" Items. ,,.,;.;; 6:7c1 EmployeeErpmses;,:, _-,. „,.,..;:11.4.5:4 Superir tendcnc5 ,:,,,, 6;2. Eiclusions to ,, ;,;,; ........................... II:S; Supervision ¢ll Geierall'14115 Survival of Obligations ,,, „6.31; Homc-affic. and`ovcficad cxpcnscg ...., .j LS Taxes kA5 Losses and damnges„- 11 4 5-6' .... .... _- , Tests add_lnspecnons , , , , „ -- ... ,-, , „13:5 Materialsand equipment.,,,,,, ,., _ • , ........ 11 43' To Report, „ 2:5 Minor expense...................... .... ... I 1 4'S:8 Use of Pretoixs 6 `16fi 13 (6;3� 2A1- Payroll c nts omchanges Review Prior Shop Drawing a performed by: Su fact Sample_ Submittal. :::;, ,,;6.2.5 Records117 ,:;, Right to adjustment f , changes in the Work ,1012 Rentals of eonstr etion Nuipnicrit right tp clam% 4. 7 1 9A, 9_?. 9 I 1 I1J,2i11.2. and inachincry . 11:4:5.3 11'9 16.1. l3 9 14 8 I5 I t5.5. 173 Royalty. payments, Perm its and . ,r. 3aCely and Protection....: . 6 21 7 y; 62 li, - S*e fees. , ., -11:4.5 *. Safety RepreseNauve 6:21 Site of6cz and teinp0iary facilitie3 .......I 1 4 T SFiop'ntatdirigsnnd Sam.plcs Sutitnittalg..,6 n C 3 Special Eonsultants,;GnNTR tGTOR s ;,::-:, a11;4.4' ,Special Consultants .:_-- _ -II'AA Supplemental l 14S Substitute Construction.I 7jgh ds arid procedures 63: T axes related to the Work. l,l i:4 Substitutes; and O -Equal" Items, Tests'ar dlnspeotion, „ 13.4' Expense- .. ,- .... .......... 6 7 T_ 6.7:2 Trade Discounts -,:, ,,:, 11 4.2: :Subcontractors. Suppligrs and Other; , , , 6 8 6.1:1 utilities, fuel and sanitary. facilities ...,J 14 5:7 $uperSis-on and Supumtendence G l ^ 6 2, G 21 Work after n.gular hours 11.-0 1, Tapes. Payment by :......:..............::: G.15. Covering 1Vor} 13 G 13.7 -Os\ of Prirfi 6:76-6:18 Cumulativc'Rcmedies ,;, - , --; ,.,,- _. _ :1�7 4.17.5�- „- , _. _..--.. . iVananties_and b iaraiitees -;,__; - 6 5 630, Cutting. Elting and patching ,,::::,.- tVarranty oF`fule 14:3 I�ataw to be furnished,b}^t;)WNFR,-,.,:........ .... -3' ....:..... l Irntten Notice Requirz l-- Day=defipiti in o£ ::. •........ ::... 17.2:2 CONTRACTOR slip Work or tztmtnAta ,-:-a�_� Decisions on Disputes" _ ..•.:....-:..... 9:11. 9:12 . . - Reports of Differing 5ub`stuflee _ _- defective --definition and Physical Cor diuons . 4.23 defective Wor4 Substantial Completion ...... "„ , „ , ......7 4:8 Acccptance.of. „ ........................ ••.•,.10 4 1.,13r13' LJCUC_-i.1•-.NfsTI.•1L CO2D1170N51910-3 (19911 L• M010 'WI wym FORT Comm, MODMCAT IO S,(RF.V9l99) 0 Is 0 0 'Corrc-ctidn-oi Rcfiioval of, 10.4.1, 13A 1 --- -- - ----- .................... 13:1 2 I - I - - 4)a�nients to the,C0 N1 TR . ACTOR, - 'iw neral.,,,,,. ........ ....... MAI i - . Re6cafiiiu�afidqfion of pfiyrjeqi� - J4 4; t4.13 Article or Paragriiph Article 6r,F (agriph- MiTiber Ob'scrvation by R G[NHER ............................. .. 9.2 OWNER May - Stop % Vork - .................. *..,.1310 RospbnsibiliiicsLimitations on -91,1-,9.13 ,Prompt Notitti of ....... I3:1' fReports on Differing Subsurface Physical Conditions ........... 3:9 'Shop Dra*nL gsand'Sa in p les , , review 6w finitt ............ .T ". H31bilifir-... ..... ........ . lays,.......... 4 I 6.29:12.3-12 , 4 .1 1 11 StAtus:11itiring Ccristiruction' . .. .... 2.1 tnithdiied variations to the kydrk,, ... livery" of certfficates-of- insurani3e, 23 1Clarifications Had terraihiiions for Unit Prices.,,, .......... '10 Decisidris on Disputc§ ........... I ...... 111:9.11-9.1.2. Tering Doem''in"ations,66'Unif Wk N!ofilci UL ---- ....... - ------ ENGINSER,hs Initia lntcrPrctcf.._ 1 9. 12 .... �9 I- lzNG`TN'FFR's,W I vieiY - ":: 424 ............. FNG I WEPA;sl�esli�&i -9, I Possible (cu traci Documents Change A,215 Liiaiiiiiia Possible Price aid Times Adjustments;,,, ...... ,.4.-2.6 ..... . zOWNER's Retpre's'ent-at-tv'e.,,.... • 9.1 .... .. 3J; 14;2 Project Represeatdtiv --Work 'Tuic Resoitindri-: Rejectin" befe ..... 9 .................................. J6.1-16.6 �S KtiIi',64i %Jhj-s,.Changc,Otr6r's ��rliitratji5n - , -- -, - :,, ......... .. ....... isa -1165 - . - n aym,el',Ls,, .............. 97-9,9 generali6 * Visits to S!41q,, Mediation ............. ....... ........ ...... 166 Unit"I�kc1t&m inia&ii� - ....... I ................ ..... .10 pule Resolution Agreement,;, 'Visits to , Site ........... ................... 92 ....... �Ws, Decisions b ttenconsentrequif�4.....9.1 N n..... ..... ........ ..... 1 - cuaic,nts�- - a'n'q-- - ......... 0.3-6.:S C,OAS,Of7 ......... .......................... ....... ....... ? 2 H-quipment.rentm Ccnt of ihe,lYorl .......... 1.4-53 LquiGalerit Materials an l Equipmedl;:;:„ eTi.br opomissiyps, ...... mugs --definition of,,,, 1,15 scinenis� . ............ ...... �4I' Ex�.Ioiations.ff ph�-sidal dooditidmi 4'q I . . . M� .......... iiiqhl,-:46 'eoive diw*of Agr�efiiiifion,qf ............. jA� �e�, 66147fkACTO s Pii R's-�Cost: " .................. 5 c encie 9 -------- ---:---T!- 23 11 d - G1NEER-- il�eailio'n of,.. . ....... . . . .... J-19 as initial inter' reter.on disp -9 12 :7 " -y b .. issued ENGINEER .............. ............ 3.6:L,%5 definfticn',of ........... -tithofi� ......... Final t i on'llor, P-......... ....... ititioins on a 'Lim" .%913, s In. liection - , ......... 1. 4.11 ------- - ----- - Final Nay,7,ncn`ti� Rcsiecnt cscnt-a� i-i, `R's 9.3 and A66cpiafic6 GINEE�Jil C io Prior to for lash al["6cc 1.78 GINEER's, authority and responsibility, lJmi , tathons 'General Re quimments iW the -1116rk ...... ...... --.m ..... : ........ J :20 Ohan'gi.!Drderg. 12 -1 � -- P T i n c i P a I re, f& Ac, eisto;;,;,,,, .6, 15: 4,' 6: C-6.,!,,: 6. 2 4 :.diirilft-cati6ns and intcrPretations 3:63, GmnjNa�,c ......17.1 Decisions do Disputes ........ Work7,by CON TRACTOR:,... �6.30.:,14.12 zfefeqfive Wo& hoticE 6F, ................. ....131 Hazard Conraunimiion Wogra n A... Evaluation -of Subiu"IL'U'lle"It C '673 Liability ............ ... 6.32; 932 of ..... ........ ......... 1413 .. . .. general ......... ....... 4 Olis6rvatJobs ... ............. O1VNHR's:r orisibilit..y ...... ....... 54, r EJGDCGENU(AL CONDMONS191M (1990 LU1710M 41M.Y MTORT • Indc i niFioation;... & l l 616; 631.6}33 Ir surance lnttially Acpeptable Schedules, 29, I'iccedence ",:,: 3 13 33' Inspebtton Reference to .................. 3 3'I 133.14.12 S3fet,�ndPrMect,on' y 620 Final ,.,...... ....:............ . . ,:,,; 14.1 I Subcontractors,.Suppliers endihhery „ ,,6.5 b.l'1 Article or Paragraph Article or Paragraph . .;Number Numb'oa 1 Speciallre"uve8li'ENGIN-CL'R�....:,: 9 y rr.;.,'9.6 s '.., :. ,. Tzsts.anddnspections ...... . _ Tests'afidAppro+al _,,,;, 87, 13;3-13',4' Use ofPizmises- ¢,16. ltnswana— Visitsto:Site -9.2 :...: .. Acccptancc,of,by OWNER ,...;.:.. .. .,..-:-.5.14 liability InSW`ance Addifiona'l,:rcymred by changys CnNTRACI OR s ...., .,.„... _ ... , inthe;Worl _...: 1 i 45.9; 014NhK's` 5`5 BeCorc slarting.the Nork' ,,., ,,, ,,,,-2.7� Licznsed Sureties end Insurerg , ,_, ,. ;.................. , i3 -Bbndsand,-;ingeneral, ,5 .Liens- - Cancellation Prousions;; ;, 5 8' Application for Progress Payment ....... 14.2'. ., Certificates of 7. 5, S:3 5 4 _ 11 ..4.13; CONI;RAC1'OR's' Warranty,ofiTitic „- .. -,19.3 :,:.. 5'665,5,8,5.14,9,13.4.14;12 Final Applicationfori'aym�nt;;;;- 14'12' coinpletedop rauons,..... defimtidn;o( ............. ........: ........1,23 CONTPACTORsLiability . t.413- ;i llaiveroRClaims ,. .........14:15., CON-1'FLACTOR's objectiim to coverasz 5.14 LimitationS, . CNUIN -ER's authority and ContractualLiabihty ..... _. 5,4.10 rzsponsibihues „_„.P•13 deductible amounts, CONTRACTOR's ;kimrt..d Reliance by CONTRACTOR Fespnisibiltry r9 Authaned l''2 4inal Application for Payment 14 12 Maintenance'and Operating Manuals Licensed Insurers,-,-; ,. Final Application.for-Payment Notice regwrements, mstenal.cfianges 5 8. 10.5 Manuals (ofothers)=- Option to`Repine e-......Y. ..-.,A.I Precedznce ................... ....::3.3.3:I other spccial insurances . _i 10' K�fcrcnce tam Contrai.t l)o+,umcntg _ 3.33 - 6M,T ik as c fiduiary for insureds o 12 � 13 Mntcnals an d egwpmcnt— futnishcd t (7NTIiAC TOR....... OWpik Rs Liability ..... ,. 5,5 .........6 011 NCR's Resporisib litY.:............. 8:5 iby nol incur aced u Worl ...,... ...........14?' F Partial Utilipiion Property insuran x 5 IS Materials or eywpment-aeywvalent 6 7 PirtY `:.. _,.: ; 5 G=Sad' Mediauon`(Opttonal) ............: 16.7 Receipt and Application of Insurance Milestoncs-dcfinition:of: ;, 1 24 Proceeds ...............:............ 5,12-5:13 Miscellaneous- Spemal Insurance .; Computation of limes 17:2_' --_::10 Waive,i ofRiehts -:> S.-I l Cumulative Remeilies....... lnteni oCConlract Iyocumenis 31-3.4- Giving Notice ;;;-... 17;I Inte pretauoris'and ClariCicatior s 3 63' 9,4 Notice ofClaim ...... .... 17 3' .. invespgaurnts of physical cdndihnnq..:,.;, 4 > anal FUs and Court Casts Included,,, ,,,,17 5. Labor. Materials and IAuipment._ - . -„ , -_ . 63-6.5 Multi prime. contracts::-- bands-, Not SS6%yn or indicated-; ....... 43.2 . and Easements .. SA' Notice of-- .4vedebility�of .-,;...... ...........::.. .4L.8.4 Acceptability,6fproject :_....... .1413, Reports and „_:, . 8.4' AAmrd, deGmtion of _.. 1 25 Laws and Regulations•Law�s.orRegulations Clamt ;.; .. ..J7-3 Bonds 51-5;2 Dtfects,13A irt2he Worh-:--_, . .... . ..... ...lij.4 Mffering.Subsurface nc.Ph}sical.Cncditions;. 4.?:3' - Contt`act Dociimenls .. ,: . ...:.. ..: ....... . . 3t1 Givtgg GON-fKACTORsReslionsibilmes,-,, 614 Correction Penod dejecm e Work:-,,, :13 12, Tests and Inspectidns ,, ;, ...... l3 3' Cost of the l4orL taxes:. ] 1 4;5:4` yariatiogi Shop Dmving and Sample ...... 6:_'7 definition of: 1:22' Notice to, Proceed-- .. gcncralG.lg detinitioniu( 1 2G IndemtiiFicalicvt...................... 631.6.33' giving of) ...................... .................................2 3 S. [K='GENOLAL covet nONs i4io,ps 0svo Lnino:r) - iwI 07t OF FORT COLUNS MOI)mcmmm (RF.v�9!99) • LI 0 ".(fir.Equal'; item's........ :.............. :.. .................. :...:.:..:y:7' Other t,& Otertimr.Worl:-piohtbihonof:.- ._,¢:3= Acceptancc of rkfecttt e:.\Voil 13 1: appointian fl rlNEEPs •... 8:2' as rtductaryS l2'sL1 Availab*,,ofLtmtb, -r-espoiistbthty „_„ definmon oF.....: -.1 ... :1 '7 data fivntsh , K;3. ._ Iyiuy Cornet nefective Work' May refuse ,to make pavnierii MapStop the tiYorl. ... ,_33.1f1 ,1,4>ay Stisperrd Work. Ternnneti;:,,. 88 I3 10 h I ISi4 Payment. make prompt 8:3 14.4, W.13 p6formanar bffothcr "coil :: , ..., .,.. - 7:1 permits and licenses requiriments .,_;,, C 13 'piitchaasid insiuence requiiementg 5.6 5.10 OWNEks;- AcczptanceottheWorh,._ Change Ord r,% obligation to cxerut4 .... R q, d U:4. Communications ... 81+ Coordmauon oEhc Work _._ .. 7 Disputes, request Cortdeci4ion ". ... ,, ..... Inspecuuns tests entl `approval; 8,3.13.4 Liobdtty jfisurarice 55 Notice of Defects - .�. ,:13 1 Re�+resemative--Daring Cgnsuvcuon; ENGINEER'S s and nppiactdb'..,:;.., - $.7 Ss.S erns :::..:................." ..,...:8:4 iNG[NEER ...........S:3 .,,, Sa R'orl. S;$ 13 tQ 13.1 service's ,. - .... separate repri'sentitne at site ........ ..., 9:3 0 g ependent tcs ase of the attcy '.�cu`litu ' Uad, -5. 63d24.,14:i(t -written consent or tippraval required; EJC& i:i-&S tAL CO. NDfnbN51910.8�(1990 minoW. vl dTY, OF Ft1R'f COL4Rv5 MODIFICATICYNS fjiF.V 9/Wi1: A4icle or: Paragraph , Article or.0aragraph, • Number '�ffibcr 'Nun Fkr 14M -,,vritten:tiotice reqpWd,,:.L .... __I:I .... L,T1, 9 4 "9. 1. ...... ................ 5.4 general.............. : ................ ............. ... 4.5 ,0 Fnrtial Utiliz_�aition= I'definition.or", ... ..... g6nera1630.2.4, 14;10 ...................... ............ .......... ..... 142 i66ty,of,fit1c.. 14.3 .... 14.11 ............. 4' 14-14 J_ .)�3 14 1,4_10 ........ ::.: ............... I .... :1412 I Pr. - riCi agress Paym - . . . ... ...... 14 -11.1 .1 .4 prompt payment I- ILI 11. Schcduld of Values- 14! 1 I -Waiver of Mims ............ . ............. When pavrnentsAue: ..................... 14.4, 14._13 wiihho_lding payment . ....... 14:7 ............ periormdrice 136ndi ........................................... `5. 15.2 definition of .......... ...... ....... general............... ................ ....... w�..r ... ... bWAR!s, rcsponsibility f6r,, 8.10 phyGonili lions-- �N i;;`vings OL 'or re'l6ting 19 ........................ AIL-? ENGDTFER's rnicw� ... ......4.204 ....... exi . sting- structureg . --------- 2 cnern 4.2.L2... .................... ....... ....... ................ 1 Notice 6f-Differing SuWurNeec6r ........................ 4 .2,J Poss e.contractDoctanents-Ching;e ............. 4.15 and bii%ving's., .......................... I ...... ice and .......... ........... 42 ice,, Conditi6h.1 ........ ............. it 1jaii.:Li_rniicd k6anftty - _Xuihori7ed.-....*. jTkA("rdP . . ..... ........ i_2 ...... . ......................... _w ................ Showh 'i " I'di'd d 7 4:3.2 n or n cde ... ...... 4.� Pc_ti6n oC ................... b ......... ...0. ..... -,3 . 6 _,2.0_ I a ............. .. ....... . ........... _; ...... -2 ........................... ........... ................ t................. ......... oc...... I s Status DuritfgConstruction ............ 0.3 native .Rcgldcnt-,'dctimunnnf!;, A33 ........... _ .............. 15-7 I. r, . 4 ...................... ....................... ; ....... 1,113-i responsibility for ;..: 8,10 )n�6f'P_a_ym_ c'n-,k .................. 14.4,-T4.5114,13 l . f, .1 - I - - - ures ormatntainmg .... I ........ ..... ............. ....... ...... _All 6.14 fivizWof ,at site ............... w�3.1,7'73 '............. I erfame . " p r ior, to,Sho'p Drawings P d 'kemedics,cumul�itive, ......... . _11 ....... 1-111 17.4j 17.5 --_ "I �I� C'. Rcrnovai or. orrcction,off)ejechi-e-W6ik" 13.41 rental tn agreeents.-OWNER aplabyal rcquii ....... 1,4,5,3�' - _x -_ - I I , rolucement of ENG[NEER;•byOWNER 8.2 Re ,porhpC and Reso vint, Discrepancies ........ ... :Reports --- and Drawings and 164 qWNER's Resident and ,Pr�ject Represe,ntntj,v&- :dOl-m-tioh o'f:' a ............ _6 ................. I 1.33 provision for ....... I ........ 93 UCDC GENULAL CONTH,itbN� 19io-S (1!i4o EDI-bbN) :,w,.dw,OV FORT COLLMI MO Dr FICA17CYN S (MV. 91 9Yj E • Arribic or Pe6jiziph. -Nulnheu Art¢Ie,or Pafagraph '":Nu_trilii:r ResidentSupeiiotendiiil, CONTRACTOW° .,: 6,2 sP .... _ Re;CONTtRACT4R's submittal reyuir l In en r l;:• g ;:- . ubmittal Procedures .,::;; .: 6.2 'use to,approve substitutions . . Shown or.indica[ed } 3i1 HNUINEER's in'general , ;•;,, ,, �.. ;::. 9 Site Access 7 13:? Liana nions,un ,,.;..::.. ................:�,13, ....... ,.-::.... ,;.,.:.♦ .,.. Site'.Claanhne"ss.. ......:'-: .:..:,.:........ OWNCR s m eeneral 8 ... _. _... _...... Site;.Vtsus to- .. Retamage la' by [ gGINEER, '' A 132 Rcusc gf; . NumcnLq...others..: .... , ....... ............... . _ .....133 RMcw by-CON7 R4Cil OR Shtil)Dra}wings" spedihUauses of - lots, Pali y_form and Sumples:Pr qi to Subit ittol .:. .: _......, , 6^5 insuranx;..., 5s2 :• ReviewdAppltuaiicns far deCmttionoC_ „ . „ 1,�36 Progiess,Payments ,;.„ ;,; „144-14;7 'Spcci lcatrons= Right to'an adjustment.,.,.,.--..,,..., 10 " rdefutatlow..of 1.3G I2ighis' ot`Way-_,.._,-. . _ , as _ o('1•cchnicalSa.tepes,reterencem,; -r3Sil Royalties:Patent Ms and ..,..::; ....:.::: .......¢ to :precedence:.:, .. .....:. ,... „•.,3;'3:3 Safe Strt ct rat l.osdin ... 6;18 'Stendnrds and,Specifications Safety_=- if TeeHnical,SoctedesS:........:.:..: .......,r3 and:Protetyon ._.,,, 4 3' 6 16 61R; Starling Construction ...... 6.20-6 21 7.2. 13.2 'Staging ihe'Woik ..,,, ;. ....:_ ?, 4 general ............, 6 20 6 23 Stop or suspend Work byCONfRAACTOR,, Samples--. by OWNED, deCuuuon of , ;. l ;d Slorege g(me(erials and equipment general ............ ...:. ,. ? ' :.: 6 -A 6 28' g Structural Liisain Safety ;;, 6.'18 Revtv�s 6y CONTRACTOR _.._. _. , „ 6 25 Subcc iiecctor,- Revievp FNGINk-R :.............. C 2G, G;37 Concerning„ ..: „._,,, .......... 6.4 i related work ¢ 28 6 242 defmdton of delays 1.37 :'submittal of .... ...... 123 submittal'piocedu 6k:...:........ ^ 6' $ .gills. vvarver, it n" ......................... 6:11 Schedule of progress ° 6 ? S 9 6 6; Subcuntiacttus :in general . 6 8 6.11' 629104, 1524 Subcontracts raquredpmiistons SchedulC of Shop Drawing and Sample Sulmtittals- Submittals .., ; 6 �$ ? 9 624 6 2& Applications for Papnicn .... .14-2 Schedule of Values 6, 2,8 9 1,4.,1, Matntcnamcc,and pp4 Won Manuals 14d`2 ieto ........:...:: .............. :....r.::..:..:..... J5.2 1 >..:............. :..:............ ........:...:.......::..:. if C6irwici Times ....:...:.:.:: 6-6' _. .... --, 10:4 kcceptable try......... ....... :..... ....° 6 Chansrs.. ......... .............. 10,3-10A 'onddions:........... ...:..:::.<:.._....::. .. a;2:1it gs _ . �lcs-general .... .... _ and. 9 7-'9 9 Pprov al oF,.. _ ......,........:3 W rev low. . . 9, 7' 6,^4 G 28 iel5ted WorF 6:38 w-procedures', . ,.. `?B E 14-428 0 ::. 5stons ................ ....,. .? 6; "' �8=2:9 64 _ ^ 6.28 of;; ..:1 ' 38. structton Metti`tids or Procedures ;,;6.72 I ^tjr Equal" 1•tcros ,_6.7 CTOR's Expense ,_ IR's hvaluatiim; 673 :_.... 7:1.1 Construction'.... hods ' EAMC. OIih7a& CO*ID177DNS 191 a:8 (199a L•Di-nON). %WIMTY MODW1CA7tCf.VS4AE.V, Mi.? • Bid security in the amount of not less than 5% of the total Bid must accompany each Bid in the form specified in the Instructions to Bidders. Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision - making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited. City of Fort Collins Gerry S. Paul Director of Purchasing & Risk Management 40 bS_1itutC:ltEms 6.7.V-2 ........ .......... 42A ........ :42, SifturthLe or .......... 1, ...... .... TeciiAicai Data ,... ...... _..; ......................... a ...... A2.2 Sumvis I ion— , . -1 - �CONTRACTOR's r4onsibility ....... .qWNhMa all riot supervise........... .................... - FNC,MFk-sh,-,Ilnot super'v"-15 'U913.2 'Superintendence;.: ................ Supplemental Costs.............................................. I 14?5 Iof... m ........... ..................... : ......... 1.39 ' Cie r' rences to I ilb, i1,8; 2,2'1`2`,9. ...... „5. Is, 1; 6,8, 6.13. 7.4: 8: 11, 9.-3;. 9 10 definition ............. ........... ....... 1.-;J!*i �., , ... pilnviOM rereren&-SO 7-6.5, . 6X6.) 1; 6:20. 624,9:13. 14A2 waiver consent tofinal payment .* ...... .............. ...14:1 . 2, 14:14 ENdNFhR-I;-�s no .. ' 0 ...... ................... ......... t . . 4oiifica'ion'o -.*. .. 10.1 IQ, - 15.2 4t , ialificati6n'ofj ......... 1.0 ............ ........... Survival of (? e iqri.............. *.. ............. _St4Q,Work,,OWNER May ....................... _1110, 15'1 susiiension or,'Ahor'k and Termination ------- ......... 15 .......... ays ndkVcyrk .......... ay Terminate;,...... 15,4 t,by R-A 0 ........................ '15 7 lance by CONTRACTOR' ............... I �4.2.2 — . —, — Times ce and Times Adjustments------- I - 1 1 : ...... 4:2.6 Jiffering Subsurface and 171(%mlitiodis- .................................... 4.13 41 Article or Pariiiniolt KT6 m lttr* ,by CONrl-RACI-OR '15.5 by- 6 X,%- E, R, .... .......... ........... :of ENGII�HER:'i"e 'mp ovin'ent: , * ............ ......... 111'� I - Suspension of Work.'-in,gcoeral ....... :.,., ................. 35 Terms A - T Z��!ions A�cc tOthcAVmk;bY6theFs. _1 ........ COTWIRACTOWs 5 cost of 13.4 covering Work prior tQ.,, _.13.6 ' -117 L%vs Notice of.b4ects ............ ......................... ......... 13,1 q*F. 9 M�j Stip\Vork: .................. ......... 1310 iDIVNER's indpen-dent tOi4 ....... is 61n�[, required i�r� G, NEFR.—: I r, c icq aiIrij ..... ................ - :13-4 Uncovering the Work; at ENGRM- ERs Change of C.66t,rnct ---- .......... �. ..;...12* mpututlian o Con tract Tim e -d rmit on of ......... ........... 12 daY. ................... .............. ........... L-1 7.2.2- Milestinfes. ................. .......... 2 Rtiplccmms nts— 9 10 161 ............ I clArifications, ,C6mmencement,qf Contrnct.-Time*,,.,,. 2.3 c YrC u tidh' cap str ConFerc.nqq,_,. ' ' " .......................... ........ 5.6, 5,9 6.6 . 'Starting he , woo k.- , 2A' 143 Lincovc rin - g Work....... UndergroundFRcihties, Physical .Cmidhtions- 14m,Shown or lndiiiat&i, ------ 4.3 1 . 2 .icitca,ion of ........ .............................. 4,3_6.20 `Shown of"In'dicatcd ...41 ............... Unit price Work —,claims - ............. ........ ....... Unit fi !or. ... lk:13, 6,20,,17.1 7.3; 13:2 C......... ..........-....I...... I ..................... 0 0 0 • ',Variations!in Work= -Minor. Atuhanrcd .,,,;6:2� 627;9.5 Article or-Peiegraph -:Niimbei. Vtslts(oSitc by ENGINEER....,1. 9.3 Waiver of Claims"on Final l'ayTr cnt ll 14J5 Waiver ofRrg6tsibyin'suredparties 5116.11, Warranty and Civarahice, vcneral by. -'GOi4T%ACTOR........ :................... :........ :........... b,30 Warranty of Title, CONTRACTOR's 14:3` Work=_ Access In - 13.3, .... ..., . - by rnF crs ...... ..... 7, ,Changesm the.::: Cpritinumg the.... _ ¢.?9 CONTRACTOR'Iofay.Stop Work or Term tnate_::........:...:...:.:..:,......._.,....:......::15: 'Coordinatiomof'.,, 7.1 Cost of the ......::. .. ..:...: .......:. 11 A-11!5 fdefimition of;;;,,;,,,.••;. 1A3 n, glected;by C,ONTTRACTOR ...:.....:......:... _:...... :1.3:14 - other'Worl. _ _... 7 •,OINVER Wy, Stop 1S`orl ,, ,... ...... ....13 l U OWNER May Suspend Work ............. .... ::13.1 O 15,1 Related R'prk.nt Stte . 7.1=7r3 ,Starting the, ::::::::::::.:..:..::::.:.::.:.::::::.:.::::::i.4 istc*ng by CONTRACTOR',. .__ :0.5 'Stopping W OWNER I5 1-15.4 Varia ion and deviation auihorized,'niinot". ...,,3'.G. Work.Cfiangc Dirzotive- claims pursuant to .. ]0;2 defiriiuon of . I'44 principal references to 3 5i3 IO 1 102 Written Amenilmeni - definition of ., piincipal references to -:,•...,: 1 10, 3:5, 0 10,15,1 ...................... § 2,6:8:2r6,1%101,10.4,' Ml 121,13,172 143,.2 Written Clarifications'and. Interpretations._.... ....: .........3.6:3_i:9.4; 9.11 Written Notice Required- by 9. I n-9.11, 10-4, 11.2, 12.1 by,01vNHR Q,10-9:Yl,10A, lI 2,;13_I4. iy_ 0 E.ICOC G4StiER CONDMONS I910•8(1990;EDITIOM C1 �w/,TY OF:FORTCOLUN''S MOMRCAMQNS tRF.V 9199) Pai I ii-aluy) page let lilh:nk intentic NJ, LUMCGENOUL CONDMONS 191043,(190 EDIIION) 0 0 E 9 0 GENERAL CONDITIONS. ,ARTICLE i=DE7TNITIO\S Wherever i szd in diese Gener'tl Cortdi[ibris or'ih the other. ;Contract Documents the Collowuc tegns:,. ve Ihe= ,meanaigs ;utdicatedJwhich are= applicuble'io bvih;itl e' aingular enrlplotal thereof_ I.A. Al kk d, Wriiten.or grspRic insttuiiteiits is5ioeil. .prior to thc•-ropcnuig-of:Bids which cla i6 :.corrcc4`,or, chair ge 'rhi • Bidding Requirevdi nCq or .doer I Doamcr is 1-.2 4grYenrznr °I'Ifc' siincn,cimvact hcnveen;'Ull!NER: :and CONTKAC I UR wVcit o t} e WorL' tti br.p tr fan ed ` ,other contract Documents arc attachii'a to the'Agrecnient and math a part thereof as.piv idol t} ere n. i':3 •t 'lkdhon for.•.Yd}mmnt 7V lirm accepted try'• HNt, IA.4hich is to be used by CUN I RAM'OR ;in, requesting progress or,, final paymenfs-and n{iich.is to;bi; accornpani, .by ton as is ;[equircd,tiyrt}ie,C'ontract )ix.•ununrs: l.! Ashealdr Arty-metertalt}at;cottatnsntnre'thnnone ,puccnt as6��stos trot tc-friahie a is releasing atilicslos filx:'ts. t-aito the nirlabove currint.action'-levels Aiiblishiid,hry,thi' MUM � Staics Oa a --' iw ': Safety and, '+Health 'tldntiriistration: laic_ Bid The nffer_or;proposal of tlt� tiiddrsubmiacd pre on the pre�cr htd•fir t'se(ting'foRh the cis"for tfje Work• to be pufor neil. 1 6. Bidrliir 1Cl/171.O1tJ T} e_ _ ad4hiselncnt _or trip inviml to..Bid, instructions to bidders, tl - Bid form grail tlie:proposed Contrnct Docunteitts,(itcluditg at1 Addin'di 'issued pnot to iuCUI of 6i4.).; l'Z .RrddGrg Reojmmenut=The iac6rtiscmcrit or iitctaiti ui'to'Iiid: instructions to bidders, and the Ri i`form l'.&: BorfiZt=PerConnai_t biand;Payment bonds;u iQ ot}ieT mSlrumenLs n`fsecurify - 19. Chan ge Ordzr='A document:orecommended by LNGINEEI ;,'which W sigm' biy,COh'TRAt MR and (yWNI l ari l nottwrtzrS an addit on deletitm,or;revision in, i}e Work•.or`an adjustmznt m,t}e";Gontta& Prici of tke Cuntmct Tithes �ssuecl �m or 9fter,the`EllectiYc befe•oC,the Agreement I:10 .Catihvc! DoeiiiwenLs—Tha' e grcemeri[ tlldenila (which pertem tu:. :the Contract Do&ujn-") iCON1RAC1;O12s But! (mclutkrig cloctunentatiop scc:ompatnvina, the Bid _and any piist",Bid dociuneiitgdcn submitted prig{ to the Notice of AW d) when ettachccl`iis an'cxhibt to the 4grarienS the.;Notic� to t?viced the' Bouts. these' •General Conditions:;: the SupPlementury 'Goridilioiu,thl' Specifications and the• Urewings,".os: the{, :F:ICUC.OF2J&ItAI: CGM71T[ONS lL1U-k lrW 661irtii; 9, ' wl DP' OP EORT COLL1 t•S \f0Un1CAAON3tA&V •',TU(jU). 111. C61rrac4 TR.4�TOitT1'0ce'The ;moneys payable -by 'OWNER to COiir contpleUon'of thn LVorl in accortlance With, the Contract Uoraiinents as, Gated in the Agreement ,,(aubjici to, the p"'ioiisions of jzrragreph I 1 9 I fn the case of Unit puce Wort,), • 1 1?: Conmucf Trines ncc"mSmbers of clays or AZ datcs,statcd m thc' agreerniint: z(i) to achieve Substantial Completion and (ii),to 6ornplctc thc,iVorl..'so that'it'is reads ,'f r fioah'pay cnt as. evidenced by • 1-.N6jNkF,R'i svntte6-iecorniriefi&ti6ii of-fln;A pavntenl in: accordance withparagreph14:13:, 1 13:, COMIR 10,TO i -The Jerson fum •or,avporation tviivwhcnn OWN 1* has enlered•intathe Agreement' t 15: Draeiorg =The druwinp which show the scope:, a�tegt:and characidr of thi Work tc U fiiiirii h d'and p.rtornicd by VCORNT CTOR -and whl& Imve, been preparre, or'apprined• by JiNdWEER and are'refer`red tq m .the;Contract Documents,. :'Shop,driWirF are `not Drawings as so dzfuieti 116. IFffeclive Data of lkr lgyreirThe ;date mihcatrd in the A�entent on which'it becoxie�enl—,elfecii -- Wf if'no such date N indicated'ii.nieans,thi'date on,tvhi h tha'ia Bement is siEried md,ilelivrreil byahc List 6f the two paities to si�riinl dzhver, , ; 117, FNGINGER-The persiix firm tir ctirpittiitian named as such rn the Agree irrnt. I21$1 ENGrhYWa x ConavllaiN--A'., person. tirifi, or tcorporation havuig'a contractwiih GNGINGhit to Cutnisti sen•ii:es- as GNV11vTSRs. rndepeiuleet 'proCesslonsl. associate or vdmultiim with respect to the.Proj&t ur'ed.w}io is identified as stich in tti ,Suppleme'taryCot &bons: 1.19. •.,Field Qrrlcr A wriiten order-:. issued: by INGWEERwinchtirtlersmy r`}angesin,theWorklii aecarilanix with poragrap�il�i9 5't on which cingi not involve' a clringe in the Contract. or the Cor imet Tomes ;the Specificreiiorri.. IJI. kwrilofu Widte=The term Ila-zardbus W , aste'.quill 16V�C the'-mm-n-u-Ig "Nlic`Solidl 4wqstel mv8siivAcN2 USC,'Seaimf 69035`a_s An4fided, 6um dine io, time.. L_ig:16kr anti &jijlgri Lh ?rl ?egaIati6ns----Any .and ,all applicable WWSnile��'rcgulu.t_ibfts,oidMnces. ,&&S'Am uff"%andAL'94bbdies., havinglunsd cfton, 1.22.6. L&jdI 1161idcA-:sWl 13e-Jthose 146lid6y.% ubserVcd bv -the'Citv of Fort Coiliriv Lien's—Lidts, churgTs -security, "crests, or. ,,ni Cos upon real pro -rty gr percA=, pmlxrty. 'lii d the, 1.-24- Milesic?)m—A rincipal event sTvp ic in . ta�dni'in6gnc i-' ' ' - -1 1 'w _t Id ale com ' p t;ho_ !o u : 2 no. omp efi - b;Contract Documents rclbt nu I _me pnor M M of n1l',the L23: Mofice of-Aipanl-:A written nonce b}_ -the'n'PrIlrent it�cbesaful•hid&*siEtin 16tjup_'Q n com p I mrice ,y the h* by 'fent suc6cssful bidda Withthec6nditions jr, I CDCd I � the � an 6 CIA cm.tincrut ;6tNn I eciried., ` gnatiddeliver, thcA �OWN?OWNERwill.i s' — grei:meht. 1_ 26. Notice iTce 16 I'nrce&4�.A written. notice, given h}- <O%WER tL)`CbNRA&OR (With ft 66ff t6'EWit NGIR) fixiij - 0 ii date . I I on . whi . ch the •&ntraci` T'imes, will loomMenleeLto ftm a6d w6whichC(iNTRA;L-TOR shall s6r-t to perform CONTRACT(jR'S oblijpticns ,under ' the. Contrqcvpocumtnts 1.27. OIVVIFJZ—The ixiblib• - body authority, ,core gtion; oissocifitittn: firfh` or person With whom' 'CONTRACTOR has entered into the Agreemcitit and'foi I-Sto 6e; - -`id& proy. .1.2 S. Partial Uffliiationuse by 0_A,VN_TMZ,. of n the IVork for,thepuipose for ikhicfi it 'is; intended s(or a related rior. to .Substa:nIia'l`Cdrn'pjetIMb'f all the Work, I?qo, Pin-olemw-Petroleunt. uicluoing,crudc,!oil,or-mw ' ' r' Which is liqLiid atstandard66ndiliMs 6f temperature emperature- and pi;ssure ,(661,degrees Fahrenheit and ,14.7pounds per sq'itare inch',ahstilute) "such' as oil, :��ojcom, Fuel oil,-ZH glAc�.oil iiftise.�i6lineAcro-s'enc. 'oil mi eil4iih other-iron-Ila:qirdodsi kVastes un&&rudez ,1.31. Arojecj__thc total c6psuucjibn-oi Which theVork, qd be provided uh&-t,t}i,C6n7aitt'DL;cumijits.inty. be the' R Whole, or a'0?4 as indicat.ed elsewl*re'in "the Conimct. ,DPcun_iqn(s, 32 Ra&6ucfiiw Af&erid—S6urce. special nwe�ar. defined 6ythvkmnic W I ct TY of FORT 0 OL L INS MOD6qCAII6m;atEv 4/14=l (41USGS666h -201-h et jeqI).ifis`timended.Wffi timetolifne: - "I I � I Yf.b. fieeitlar Hroiking-. Hourr4mkila6vorkinli,hours are 6.000qLunlcz_6thcrwisc (31 Rejiden):Projeci R,eplvsenita6%v-_Tfie authtifiied representative of L Nor.-IMER Who may lx assinii.eqlo,thc Isttepr un pan thereof 1.34m S6nipIe5PhysiLaI'm examples or' equipment, or wor -mans ip :t hat nre--rWescruntive OL ' Portion of the W4�rl.;4und whi"h: establish the istaiidneds, by Which such prytion'of the WA iWl 13e u c 1.35: Shop 7JFdu*i js'—All ;dmw,inAsAiigaffis.- I ilWrati6ns,- schedules ; -bILh.c-r'data or in'Md_odnalio_n Which ve spccrcalyI1yeparod or RssLmbledby or4or CONTFWCtbR iintl submiiied b}_CONTRA&CR, to :11lustrntesortie pprtionotti 136, �YpecfpcatiqpsI ho.w-portions oumma the Co ,ri&umenis,corsistinp of written I n technical ddscri'ptimm of :materials, 6quilp M_wnt, construction s�� aiid uorkrnarship as aj�ifiitf to the %VorL and certain 13T $a6evn r fruvtorAn indiv,idbal,•firTb.oi'c6rr)dratioti th o .4cMtftielpr or-..x�rgloeiii rrranct: qf:liiiar!A ... Waik-'I'll thZsite. " 1.39! Svb&Fahfid eomplefion�Thc. Work (iv, 'a, tt ' T_ I_ I here , i� erco pr �g �7 . 1 Avidalxd 'by *��'in McNfie . �'%o the PoInt where.: v I ifie the ENIGINEER's defi oft6bitsniial the`C&itmct -Docuniehts, so Ahat;thc, Work (tir qxcir,61 pan)' Can, t a, rtilized f6i ifiti pfieim'ses .'for' Which it'lis intended;l orif no iuch,certifii:utc lslssde'd, wlo� the Work- is complete a . nd, ready- for- tutal" pay rnTt as &i&-need by FNX'NFFR's written recommendation of _ �6al paviii° nv in accordance with"[`xLragmphj*131, The teens substantially -ctiinolite" and substlumiall f I - "., -_y oonipleted " l_-`d iF - refer'* to tum ot Ort 0 111' W* as app le 139. Savplem'rifaq Coqdihoui-The, part 61 � the Cmtract'Dociiffiera-which 'am- ends or:s_uppjl M_herjt's.6,4e L� I C1. sapPI M,-A manuf atiturer Iiibri6stor,- 'supph distributdr• ruaterialmEri or,venhy lmv�ilg a direqicqntract' withcowRkcnbior •ah A ) Sub6ontnctoi�io tarnish rtiateriaLsor-equip'ment'16,he inico'h'S d'Im'Ahe , wm(c Work by CONTRACTOR or any' SubcbrdracLdr.' 1:41. Under K growid Facilifies.-All P'lipelirm CondW du6tsL cables, vvitesW, !uniie S, � �ai-�r�such _(46ilitic-s- -,6n6a-=cnft qord47urIg such.' -facilities ' which v en instAcd uncleigoundMg see to:fumish any of the'folIcAy' 5 0 17J • 0 tnNtznals eiectrtaty,: - - gale; steitm,, Itymd ptrolzutit t;Evoducts tekohork .or •ether ctim`murucetions cable. )television .sctivage and ihau[age remotat truftivorpther^ `eontrol systtins cv N at8t.,, 1 �4 (b irl�ricz lYniR `Arnrb ta_he" id fpr.im'the psis• . Eg . :oGunit proles. , 1:43 K ork-The entire rcompleted. construction, of, the:, various separately tdeiitiLable ppeeAnss Thereof ray l"d lobe' f iinished uridei the Contract Dacnatnants Work .meludes. r T. :arid is the result of per Caming orligriishine labor aiid turn shing and tncorpnrattng materm s and equipn ent,rnto 'I}ie construction, and p5irpru iv or,[u"nushing services anil;. Cumtslung documents ill ns required by the (;on mcl;: -1.45. Writrei .�lmartr nertt A 1vrittcri;amettdnicnt of Wc` Contmet Documents, signed `hy OWNF;R and iCONTRAGPbR on or iifter-the Efteane Mte.of the agrccmcn[ ind normally, Jcahng witli;thc rmneiteineering. .ter' nomechn ail' rather::dian strictly ,construction-relaied :.aspects of t}ie'Cuntmct'Documents. i1RTICLE 2-1'RELi141fNARY MATTERS Dahl &-, rif Aoii is '2:1 ',When, CON -RAt'TOR.:delivers the executed :t�temenls',to ULV�;GR,CUhTRi�CT02 •_s}iall'elo• 'dehver to;'p\ Rlmeh^Bonds is CONTRACTOR miry" tz require) inurmshin liccordance with paraemTm 5.1, 'G'npies ofDocuments:, -2U\\'NERshall rurtashIto`CONTRACTOR ;uptotan, ctipnes funlzss uthen�ise sp cited in'Ihe Supplemeitery :Conditions) of the CciMricl Documcriii as are trasoriably +neccsary forlhe execution of the Work. Additianml copics: Hill be fumisfied upon request at the oast oCrepro l e ivnr tComriiencvment ojCyntrnct Tiiries;.iVatiee taPro2•ee'd�; 23 The,Ccntraci Times will cmnmenCe to tiut.on'ihe' -:thirgeth day..afler the EtTectnve, )ate oF.the Agreej>len;';or; biC GiNFRA[ &N61TONS IM-B ti 4V E.5hai1; wta ry or rg2T cvcl.itas �iouuac4lttjiv�.(luw artwm of a'Npt tx to Ptoctzd is g vzn ;mt thz day indicated ui ili Notice t6!Pr(xeW.I ANotine,to-Proceed mnv be given al any; time within+tfuri'y days aQer•lhe Elleett3e Dute,`of Jie Agreement - of Rii}opavirtg or jhethirueth day-after-the•6timn�e•[1Fte . 4-IlIe;Agrzanent w}uchevtr iletz isr�niier: Saartingthe lirork > 4. t 0*3TRAl TOR shall: start to peHcirro thc;SVark on 'the date when the Contmet Tunes.ccmmence,to,iia . boil no Work shall tie dine at -the site pniorto the date `o t which the Contnici Times coniiricnce to run. ,73efnri• $Yartutg'(:o�isrrudnri' 26Within ten idays.hfier the, Effective: Date of the Agrecincnt {unlcss;othcrwice specified imffic General Rcquiremenis), CONTRACTOR shall.: ,submit: ' to - review: r.1 a preliminary picgress schedule indicating the tunes {nutntiersfot days;or,dalcs} fciF starttttg tend. ,emplaning tl)c wvtous stages'of dic tV64', including arrv,'Mdz�onzs speeed'in the Conht ci Da unients 2`6.2apralimimschiduleofShop;Dmwtrtgand, iplc sdhnuttals -'which; will list 'each requird :�vhmttutl aitd,tlie times for. submitting; rtvttwing Iui`d ".processing sucFi sutmiitial 2Fef .. iln.no ,case will --a ScfiiJilc'.;be ;"acc— "ble-wNchialloWiless'thin.."_I catehdar . days for each review bv: En&neer, 2.53 A preliminary schedule ol•'vulues fvr,oh.of the'Alork wh ch will include yuanttlies arnl,prices'bf ,items aggregating thy: Commct price an'd '.will subdivide the Work Into component parts m suifiuenl detail^lo sense as thz basis Cor prgres� payninents ldtuingrconstrudion. Such picas twill' m lode: an' apprepnele.amdum of overf cad and,prRGt appticable'- dti:eaahltem of,Woilr:_ '.T Befbrctiiny; Work .=.at the site_, is swit6d.' (X)M'RAGfOR,-flT OW?'EiiR,�shall'z,& k deliver to;tka^ ,61htlF OIVINER. -With copies �tv e"h-addi :-.w i-aLRKBd rdenti tied-[n-Fhe�li •. _:.. .,:PPS!n?r±tatj`'.Le?idaiensENGINF6'EL• 3, --lneiiEh 01'4§6%mC.—ice;(-1-) ot -A:evidenoi :92i%i�n .A, cY, requested -97:6w";ER) t-vhich 'to purchase and nd n,- iniwri in.accordance- , . ,�w•iih J11iiiW41"4ce g tokedules.- ARTICLE;3_-,-CONTRACT DOCU.%M, NTS: INTENT, Al1_l�]�NGJZEUSL Artent.- 3'11 Thav Cohtid& Documents. corrp-p,',,'.,e the e- lagreement, beh%iicri� OWNIM. iurid- 3CON'TIZAmire; conce L triing *the 'Work. .Thr Codraci :Dowalefits are. called for , by o . n , e . is: I as'biiijffig RS if Doctjitte� will ibe 6116d -lbr bit. The ci)ntrva co-rw'mcd in 'acwrdan& t%4th the lacy of, thi -pla"Ce of the Vilic intent . It'is ntent of, the! Contract DMUYA66, to E1 e(JE:iiiALC-OND-111V&S OTYOF FORT.ODLLIMMGDII"ICATIONSot.EV4/IOW)r. e.5dejbe n:4;fictioally p I :to be' con-structeid in �Nlc(iheo CbntrBel Pocurni,fits. Any- equipment that ffimy rcwx . )niibly bc`ir& frzd from en�i& in , pjg:rcqutrC produce; flie :ffitqn, dresult lt *ill �be ffirrwh�d',4ano , performed'whether or not specifically, called f6r; : When[ ��hich-hqyi'ii i%e111-kivown tecWical '0311 corutrucuon Sir .y Or trade, nleariing, are, U..kd' t, dekphn.fib: Work;-maicrials or,eqLupirient. such words or. d- ft, Vqprit�- ly) ,,- rnea�irg.'Glafifi6ifims'and interpretations Of the.Contraci bcadiimehi: shell be issued hy%NGllWHhkl pro �-,irid-adlfi Technlc,iV 'Societies; ' RepoAhj. iufd RtEsli4vin-g, .biierejrdnmer: 3.3:3. Ex'cvp.t,n-.;,otherwise - specitimlly stalcil'in,the Contract Docuffiem5 ci'as may'llica"pruvided by 'amendifient i or stipp�St� ' thereto ibiaictl %,. orie`bf the methodsdiidiEted, E paragraph 3.5 6T 3.6,. thi proraibhi of the take prect; ce.in ot'discrepancy-blde - i'5^' of f lhe.ConLract prov 10T . Is ,3.3.3.1. 'the prbvisi&%- 6f iihV such 'itindaril.' V-0cifinfitih- I friRn . ua I ro,�c, I or i risinacti6r, (ivhalicr or hot -spicilljob,11y incorporateil by ref !'in& ,CDo onriiict cumcn�y, iirl� 11 0 3 R332ptihe;eons amch a egulonsppwfeyo6bohnhre'. WoiT . (unless 's ch an _ interprataUun of ithe; provisicais of the'C6nlrad boiiumenls would resiilt� mGiolahonoCaich`,LaivorRegiiJaponl.. • •_�Imenibnl; atd';Suppinrienririg;Coiitinct Docriment 35. The•Contnict DcicumenLeymay be amended ,p ovtdc.•Cw,"aitdtlions, "deletions aril rcVmons ui tfie Work' m do m1"fy the trrms':and conditions 66'6C in,oiic or,' :mole of the ColloKm:Nvys: '3 5 I. a,Camial+Written 4meridrtierit; a Changcbi4cr (p�ant to paaraiaph IOA)ror - `FJC'O(; 9ET�6RAL'tGM�1T10NS tvi 6-a. ti?1� EiGtipi. tiw4©7'1f OF FORT QILLIF6 \SOUaiCATI&N (It4i,2ULIG) 0 35,�; a �Vutl. C;hahge Directive iPursunnt<;to paragraph 14`I)� 36. ,;� addition; the rcyuiicmenta of the GdntraLt `Docuiueiib mav'betyuppicmrnted, ancl:mirior tana4iins . .and deViattor>$ aj tfie l+/etl, may'he, dq mied, m nne;oC mole oGthe'fallenvir`>_q wntn:� . 3,54 Afieldbider .(pur.4mttopar ngrap}i9.$�, 3 6 2; EIQGTNCLTt's appio} al'of a Sfi ip Dratviiig y, r Jample (pursuant to paragraphs 6 26 and 6.27).,ar 3.63. ENGINEERS ,w7itcri rnteiprclaU&I •or clarificauon (pirsriant,to �ntagiph_9.4): Xeuse ofDocumenm: ARTICLE 47AVAiLA[it IT,Y OF LAi\'bS SJkl SURFACV;,AND PHYSIC AL `CONDITIONS; AF,FFRF.NCF ROTNTS ilinilubt(ity ojl an'f714 -�I ''.C_-TO,R CO ,H#�vjde f'* "llhtI Inndsrani access IheriA .ih3lmay be required it r •custrction , atflI,es-& st e* ,6e niteri1s -'and (qumm&fit YST !it! 416tm -%.2:f. -Repoqs,cid1D_ransiqgs M&ence is tnq& to' tite:S�a*anefttkV Conditions for identifizition of: -4-2.1 L and C&a ens 'v explorations �te�fs orsu6s�RiW' u se or coniijuo�-_io the'sile that: have SeA`tiitiii2ed FoyENG1 , NEER in prepaFirig the'C"act Docuraicrits;- ,421.2i P1D*jca1,Cohdi11uiq., Tm-i ho"se-dimng's-ul' physica I c I onditibmin or mlitin's to xisiing surface er c ti 0 to*"C,_S-Lt 'Facifiti S �(c\ccpt Underground that have bcl� utiliwd by ENGINEER' in nfruct� Pre .9- 4.22 1 die.c6j-niikti56i:ss of siticli re-o-m p5.�m drawings for CONi'Rr\CTORs ildicluding,,but not 4tutted'16,, aq aspects of th'e mmmi, ffi&hk1s, sequences and procedures -i,bf s6tistruction 'cnl16y1cd 'by CONTRAGTIOR and 'safely precdut-ns ,d prc 6 is itici ,gm d6t ffiereto, or other diiiw. Ji"'r mrapti%s: eh*' ,and contune tusurepoiUcirshown or-indi6at6d ti h debcwuAqT 4-113. any, CONTRACTOR ir�rz6661ri Of. or -a n-y ['ethnical daM"'tu Any s uch t ita:„ int rpretaitorm 6PinP ums or 4.2.3 Vap,qe ciI, bAinnx &ii6sitrf(zqtic Plpstcrrl ojujjn&jy. ' 'it _WNfF�&Ok �,belicvz that. any :subadrfHce.orphys6ii1 cx6rtdhidnhI.cr-cbTaiI(u&us to the site- :tha 1s_ le _v, is of-such'a riialiire as to.ekabi tlait - any , -'I - uchrfi da 1. diia' on"witlellcoNT kACY(5k is .entitled - t . u Cely I as I pro% i&d'm pairaoplis 4.2.1 -and, .4.2 41s or 42.33 'is of such 6 riatLITC 8 S, Q 'Ji charWe in[tie Contriiet Doumients or ,42:33. 61-Y uiF6#66L,Lj'N"s - 6 mobti q.,cknOiidt6 4iOUG) indicated in the CotitriiK Dociiriieri4r;'iir *2 -3:4. is of Hfi units*j:rmtiui: and d i 116n; scat d -- inhu_' nuze a! 'in in. waf k 6 'N -thi character I7rovided tor in . e' .,Contra- Ducumiedi, t1teri ,4.2A, ENGINEEH's �miew.' ENICiiNak will p . ro , m pily review the r uc rtincrit'oondiparm'detmime tlic' necessity-b IIOWI�ER's obtaining .. tidditio , na I e.*lora tion o r. MVA'K:ir� writing (icth"'a• &py- to ENCUNEER's findings and mncluaions .. T NIGINEAR'concludes Iha I w change in the Q8numct Documents; is mmiuircd as a'icsult of ti,cMditim thatmic'JIS" .one,or rkiore ofthe 'q'ate '11ii CIJ alwork gories ti�.parag�p � ,,,, , _ �.Iiangc Nivetive 6r 2 Cha* Order will Jj- MUCU as. provided in, Article 10 . to reflect - and dba inient the h 'hh ,�quenecs or- 4.2:6: P6isibk lerni hjidFinies .44i4miien&:. Aft 6quitahlcadjustmeht.iTi ific idoritra<Piaz or in the Corarkt-ThM of both, will be iillqvied to the exient diai �6t Ci�Strra�e :6f Such 'Ure6ve't'Wi or f&'eqlcd •60ruditicirt 'ca , us . es 'an I In , c r , case'W'decrease; in MINT RACT ORs: cost �or: oi•Liai6 i4u,e. d,ror _PerfurtiianbcoC th 1, e I York: stibie6i, however;to the folloN . v . Ing, .6 , I -.SUChLocruli1ion must meet anyone or more- of '� the 6_teg_o6es._ ' 'described- in usivc; plis; 41�1;1,pough`41 3A,-i)i6l 47.2.63M, .0 a 67art - "' ihtk'C raruct bocUnuints; , ge _ I , 5 , ruie-ki6fit' to paragraph �4.-215 *will not 6tienni&iC Atill� tio; of nor h. .condition1 1. pre&&Lt to entitlement to aiiy such.i,djijstniai with iesixci-to Wo&,thit, is paid ec�- ori a Lhit lkiev Fasi s,4u - ny . adUutsGentm, Contract" Prii will' be s6ject' to AKt: "Or-ovii;ions of paragrqiijs 9:10 arid, I L9. and 4i2.6.4. CONTRACTOR "ll not bc�iniitled to An"Y", adjuslme,rd ` m-, - t}teCidttracl Priec W�7:ri M, if; - - 4.2,6.4 1: CONTRACTOR w' kne, or' th� I existence of �s Udh _'u6nditlem at. the `timeI CO,r . R . AI N .�;rQR a. final Corkiniiitinciii Cc OWNER 'In a C of Cohtriicit,f)i* 6nd Conitmci Times lry-:ihe 0 ,sub il n bmi4d de 't Cw failed' to and ,as reqUi.red:b -ji6ragiph4.2.3:, 43; 4.JJ. ;§&im orindcaied'.-. The ifiRwmiatidn.and daii. .h in W cumcptslwitli msfibot,th existing Undcrground Fiflifticis at of it foiniinatiai aM,dnta rumished to OWIITFRor E1 (7, the -Owners of such ILTfidetgro4iid Feed Ities'or.by, others ,Unless it is tic ,uthewb, rCvixomluvl. -, In l—, Supnlemenkiry ConcLtions 431- A; bwNER,,qiiid ENGINEER 'sliall,66i b& responsible .. any . Pon, sjo 0 Reference PoiNsi PC . Bs J"be ri . tb ,eQN I KAU I L)K.- .2>11I)CMtraCtors,' . .sUppllcrst or anyone; :else ;for "whom ,CONTRACTOR is rrsPons le- 41 ;7, SECTION 00100 INSTRUCTIONS TO BIDDERS • • ARTICtiE 5`=BOi�iDS;iND:INS[JRAtyGE .Perfainianci.Payni dandOtherBonds. 52 it, ,the, sukz . un -an`y, Bond, tutntshed by 'C QNITRACTOR' is declared a lenkrupt :or litxomcs .insolvent it -its iigf w:dn busine-w-is"tzrmtnated-in any state lvher� an} jiisrt, of mjcct is lacateii or dceases to mot the icgwrcmcnts•ofparagraph 5 t, CONTRACTOR •shall within ten days,thcrc?Rcr suhstnutc another Wnd •and sttret}•; both ufwhich must be acceptable to OXN NFRR. '53. Licensed'Sure$rs.untlInsurer•-Cegiftu+tes,oj lasmm�ce• A like �(- t-.. t; � -i14a'.IVidf�F7f3}j{36f34HL',d •. ai ieveakd'nt the'sitt: . . eicize uEvtzi ureoNORnt tsR Fe t t9x� ra �mt; .w U1- or rgR T.onLcir�s MOD.11icxnoivs OcyJ.trfnuoi;. 0 0 +CONTRitCTOR's•Lllrbitlty Iristirnrtce: 5 41 ' claims under Wcirl:m' compensation dispbiI4 hencfirs and Other shnilar em-fAcWca bencfit act's;- SA?; 'claims for damagas bccau.w or hndll)I,injury, occupational 514ness or disease_ x death 'cif CONJ'RACTf�UR'sem�loyeei; 43; .claims foi'datnag' htc3use of hoifily�.mjury•,.. stcl,ncss'or dtseasc;'or"death of an} persori otlicr than 't;0NTf RACE OR's "ens pl oy ecs �44.—;alaints nor-dainngew- tiisurad bv-uustuiiiniy' cie.:f-r,�rsen-sr..F-.c 1 -FirRR Offe go a �radirea{c-Falelad-tithe-entplayv"ne^•.er�sn-by ether-raseii< 45_ claims Cox. _damages ;kher,;than 6die Woik. rtsel( b&biuse of:injury-to; cx destrunion. of ta66Me proliuity,'whcnrJir locWiL including Igks of use, tesidtingtherefrom ari'tt - 3. 4 6. claims fordam gas b Gaus'of boil ly ry'oi' dcnth of hp, y person,or. proper] ,damage arisii glout of the ottm'ershnp ma" enance or. use of uny motor ve,pW ' The polrcres:af msurAnciso required;byth s painp{n{ili 54 jo. be "pilrclt5sed1urrd maniuiiii d shgll: 5 4 8. 'mcludc4c sprciGc,eavcruyyes ar � be whiten• Cor not leis than tlie'limru oC liability provioed;in tfie, Suppler eMary Criidlitiorrs or'7ryulred.:by;'G6 or Rcguladiris whtchevcr tsgreater. 5 4 include co» ipleted oixmtitius insu nee;, iEJ�[X: Ulw'^t1iRAL ZONI)ITION5 tYl V-S ! ISKi ElLtimi. '�w'J ©IV OT (�OItT OULLI PLS �1tJD117G1'f10NJ tjttl� 1�^. W UI. r?:4i1O,, include contracit al bitSiliiy' tn"suiance .covering CONTRACTOIR's mdemrdty; obhga i6rs uiuliz paragrfiFllis 6 l' 6.16 ard16.31'thnc oft r 6 33; 5'4:1� remalii�ut efleci at.least until.fuml paycnrnt and -at all attics thercaflcr when (ONTRiat.l OR.may. be'co rrec:t- removing cil;replactrg der/ thve`Woi • in;c�ordance With paragraph j3N?:5and .'OI4NER'r: Lealiititylnsurnnre:• �:�: Tmaddiuon.to.ihsuranec,ri:quireJto`bepro�•ded by CONTRACTOP: under, pa mgmph S,a,: OWNER' at OW13fiKs option.,;may putch 'e and,maintain tat {yl�'Ils,rxprtuc'OWNER's iiµgr habthty_insuranci�us k'lll'fuuteci OWNERgpiriA. di uits i hick may zu seiia opera4ons,undci the ClcmI6 1)Do untrnts I'roprrtt�.Insurane , 5:6--ljnless.otherwrsa jxuvi lid in-the-Suliplemateiy Ea�nditi�ns—OWNER s1m11=purchnsi—aisl=maavein of-cth��fup replaseitimt ceo-t-f}iernet-(sul+ject-to .ate} {dedurAilile--amounFs� as=may-»ha—previiiidl--m-.Ow SupplcrnenFerw Corr3tumrs ,or=rzgnired .lij) Onyx aiefl Rgulnttom) Tfiisinstuatica slutll, 5;6:1---include--the-intrlxsis—of—{�1VN6FZ; 'r'f1PTMCpa\r"FEII�"Suhu`erlF'ntatlars,�r•16CS+iEERc E4�Ei��bFSA-ti„C-�'3%tllF entities Identified lit, t1ic45upp1emenWrv-6ondrnoris',' eac}i ofwh�m r§'dzemrd tc lievtan uvs�irsble rntrrrsi ariEshakFbe�hslril ns an�irisivacl�aik#ni�iw4visurad�: 66:�?—be wrrttea cs a-$utldds-Itul�- �alL-rt�lc or thane }feF� en',firkl tended a -wor e1w. - 9;F aN mu ,gee et -efwi(K`Ur3—aiw -9654 - --------- b-8en-, -thGt-T -h- i4ed ftt � qwc�,� jA 4 . Fudd*pal, id 1 0 :a,vtq;F ' ar isif 9 RAO 1 'I TOR h -- ------ ell, I se -n q I IU M 0 C . UENT.OW; I CONDM6M jv16-9 (OWEdikti), OF F6ft_r4 C�O 'V�t LLINS -icx6oNs(RE' . Lily I - - . — . _A6iii,- I - - � , v -id000) 9 0 0 Irk& '0 trxciers- 'drFastei; 89 a qciprbae4&. 0. lipp!ica ,partid lifi6zilion4Pr iroInsirittw . ..... . -9 rpom , an or 1- p �oQ rtl I tis of XV&V'r�6r i6 Suim�ial . . 'I - . ".. I , 1. mit. I cI , 64CON- WACCOR;,s. ,,"NSIBILMES, `t%t Utilrss othrrw�tsc sprcifigd. m the' '�erizmL Requirements CONTRACTOR-shail"futnlsh aiid;tissume, Cull respt>rniblhty . Cor :all materiaLti equipihtnt lalio%:. 'lrarispurialitai, cOrts�ruction equipment and mat,}uneq, Wols apphanccs CrieL payer light hcaL telephtir a water, s"viitar} fa'ciliueg �mppoorraaTfacilities and'• all "otligF Catuldiw raid ineitktnlals,ne3rsury.for the �furnashing. perfomuincz,;tasting,±$tart-up;aiu3 completioti oftfie�Vot1:4 6:4.1: Ptuclmsirm 'Restrictions: tUN'rRACI'OR- must maaph• with the -Citi+'sr'y rchssffigmstrictiuns A. u6p%-of.the iesulutiuris ere'aysilablcIif. eyi'ew in'the offices of 4he• Nrahasinc 'afd 'Risk`-vMansknieiit. Division or the Cilo` Cleak's office.&4.2: Ciciucnt-Rahetiom: Oti' 'of 'Fort Collins. Resolution 91-121 rettuims thWsutmlieisand-Producers. df.ccmcnt>cir �aroduct4.coruainiri€.`cemenrl ecniry that:.. the cenumC tuns nut rnadc is cement lalr s-that'.. burn-' Wardous'wastcas,-fuel: +Progress Sche[hrle• 6:6CUNTRACr,c,A ,hall adh'crc to tt c; .tirogress• :schedule VstWislwd in ace-cWanve.with pamgmph 19;as;v, fmay bedi .austetl Ggm,time to time a§"provided below: G,G,I_ `;CONTRACTOR shall mbntit.to GNGWEER for aixeptericer (tor ,the- erient .indicated in. Iungr6Ph'91`propcised adjasUnents in the',progress schegc3.d-mvwill not charge the 'I Timcs (iv Nfilesto' — Such ndjustmzitt3 will cmiprrn generally to lFie prggrr s scl ittiilr then'•in effect ar cl at4lit ja ally wdl coltiply wad%arty piovi3ions of the Gcrieral 'Rcqu"vtmants applicabletherelm. G G3; Propukd adjustments :in liar p ogrzss'"schedu'le 'that 'will &hinge the Contract: Timis (or ?voles tines) shall be submitted in"accortlnrie:e with aria requirements. of .pacanjaph 12A. 'Such';adjugweais may only„he made b}f'a Chan'g6c-0r&r;i_Y Written *Artiendm tilt in accordance wit6AAicle 12'. ,G7: Sti6�titiites uiiQ,.^O�=Equd1""Iteinii 47A.., Whenever mi item 8f inaterial or-eyuipmcnt.is• specifzd;or drsc.ril d in the"Cortlmct Docuinznts by usmk llemime oC apropriett)rv.•item or the name gC.a' pancculan Supphcr, Ihe.specificauon to dciixipuon is intended lo.establish aria ytvpe:'[unties 'anl;quahty re9ttire& 'unless. ihe_-specification' or description. ear t11911M(1996 12 v/1Y0FFORDI. TaLiN3M1l01)InCATIONS(RgV•!llaWj iUntaULS'pi is followed bvords reading that eq ti-121 t or'"nrecptal', item ur.nn.substihition is permatfed otlirr,ilems oC material ar equipment or maternal iv ryWpmrni of other $upphrrs may -be accepleil by.'ENGIlVEER Lanier- -t}ir folio}ping circumstances; - is ,0 11 "'a 611 of ,k - N *W: be' 'y "'i' ' -, 6� . , ' coniiclerl%��-109,CR in Val ingi, ' ihz p �Fd,-,subsfitutdr, P�GINEER.,--ni" •- U i ' r E, 11,201, -C.r%4RACTOR't6,f6'6'ia'addiO'd'al, ti'a -ul substitute: in support Iv � AV, p - r CONTRAC ' TOR' I ' �f. - I - — e - rn dl be propbseJ ets" or biaiwi Ate IN, Concenibm Sdb6kraciars, -SUjjfiers, aid. 4,7006 0 4.1 CONTRACTOR: shall roerform 'not less 4ian, 20 — mt,of-.,the,WorVwith'its uNiTi fumes:Cthat is- -shaH be undenitood ii.)'mfcf to,the'Mcirk th6,value,of `which tbWN �n6t, les :diid 20 riicciit b4the Cofitrictpriee �'spol 01e2 wail ,of. 6i14 The dii tstons on sectigru pC the Specific[ do u anil: [the Ideflhfi.'3CTDRS oC ed} Dratciii''shnll,hoY!wnVnl: CONTFaCTOR ii 'iLvtding 'the Work ,among' :SuhetinVactors nr SuppGers:ordelinennn� the,LVixk•to'be.- ,rertmnicdb}'snysperificiradc,, - .Nient Feesru it Rojidder- �,iCuc, u�vtsw:`coNtandt.^s i'sttNtr t iy"pit emum IA a7un oFFORTOOLuris,ntaiuICATIONSOIX-V IRnnol rmhitr, All, Zaivsandl eguliitiurs: 6:14 t 'COM,'RAc.1'C)'R' k, u )&6 ai iotioes and ,CuM�Iy, With all I aas.atid;heeulations applipblc'io Curruslung arul:perfomt_ me uC the'.lVorl EriePt .ivtiere athenvtse expressly' required I apphcabl`e Laws and ,Regulations;; n6therOWNER nor. EUGINfFi2',shvll, be ,re$ponstble;fm�mnnituring: CON I RAG"I'Ok's ,cnmpliat c� cwith any Laws or �Rcgulauanc' ` 7'ase8 G.li; CONTRACTOR iKall pay.at! sales, eopstihwi :usti ,nnd other similar laces. raquiietl to -I paid' .by 301,rl'RAG7OR' 'iri' accordatice with '.the ,Laws wW Regi lations of the pla6a" of the Project Which arc upplicabie duruig the pert'ixtnarax of the,Woilz . -6.15:1. b-iVAR and lo©lrs�les- andiise;. wxe 'on . malef.iN 'to be perriio lc ly vlr t poruled iiito the ffQ ect:_Said two s shall not W included in theConimaTrice. Ada�eu: . Colotalo DztiattinetiFbfReveriue: ;State ('aaital Annex ' i 0 9 1375:S art §t-rw,, .Soleg ihrid -Use' Takezi4''',r 'ih, R666riHI -Trin�LiorfDistriet,YRTM-iiiiij! certain': Colorado, i3ottnticsl.arc: 4oll&W! by the'-:State-,6fi ,Colo 6 "1 d-,afe-:incltfdcd,in the'Ccrtification',of lxemption7 AI'driplica ble,'Svi les 6ridJUlic Tucesliricluairiiz"Sww, ,coltected twxcs),rcifi anv.items other'thari-constructibri, intolh n'RAC-*I'OW rind we'to "included inte bid items. 'else nfl'icadses �6;18 CONTRACTOR shall not Wed nor permit any pan of lo'beluadcd in ar&smfihnef',thdt will •any RV - Work or iidjitx'nt,prup'erty or Trcssrrrq% diiii kill .-c"Ma,l mnSerit., :%iviC'3'T'lYb,;'FO**Rll 66, LLI M , MOD LFI , CA , flONS , r , LV R-, 4,70M Sqfi*,'and,Protection: 6,20. cowrR.AtTOR shA be resporMlc farInitialing,mainla . min I & "and I . all! salet y, Firecatitions; "wid programs in copmection''-widi the %Vdk-. awvp.�Nq,roi�.sfiau ankic�ail rie'wasaryprcaa'u-tiorts"for', thc.-s�qfety 6C- and skill ' i I d the Li —ii,;, rue Cqdamage njuq- 6,r,Iossjq: 5 a all,Nisorm on theVorktsitc or i%66.6 -' be' a h. 0 te I k. c by 6c wor , id Eq all the wk iliafaatcriAisirdiinnefit i6- j, � _7I - C' - -, , Incorporn -4, tfierck'.�Thi&r, in on-ci D -,fl, `di site: and .6.20.3F otlier property at the site or.adjaccrit thereto! ancludi ng trek 'ihnubi ln*Wfilks;.-p iV cm cfits; roadways ff's ulitiltcs and :Undo rwiid Figiti snc! %si. 'ate " icplic6ierk in c course of cgristruc6oa:" qi0tiec to OWNER 6'hd` CONTRACTOR in accoidande - Vvith-pmilgaph 141.W jiltat Lh�cirk Is'ac'c'xpta'ble'(e'xoc`p_I ss .6thcrtvis6 c:Kpicssly. :piuvitW4 in. &nntxii6n. "with 6.211.E 'SqfeIj,Rip CONIfRACT(5f2, shall 6661c qu-Mified - and 5_xperienc , W.. safety lepresentitive,at the site 'whose .duties` and rczpdnsibilkiesshall be the p evgnuon of acci cots and gi - ' .-Pffy fay '622, CONTRAQTOR .4aJU be icsponsibl& 'for',Zowdi.atin-gany, exchangeo - � I - F'm.ate- ns " Fsafety �Latfi'sh6eC% or l hither hai2td-oommunication ufwmationst , c , quired to"he, :Made -av6ilablc'tc� of c.�chang&d'bcLW�n or' 'Llong: �61`p I �yirs 'i a*t thcl- site in - ace' daricc' '%iith � I a�vs , of .M11, " '"' 6.24.2.,C0NTRAqbR_sbaIl also submit. Samples I& ENGINIM-R for 'piview aad Ulip�ro_V_hl 'U'_1 ak_eeaddrk_cl I I . with said' accepted schedoli; of 'ShopDruiviris-,and Sa pte, subinittals. _' Each Samplc will ;V'c��id�rdified clearly is to material ateml: Supplier. jiert ; ineni datalsueh-as catalog 'n-urnMis'and thic . use' f6t 'l%C6 In-m"m6a arid oileiivise.bs ENGINEER may jrequirc :'16 6mble' PruGINRW to r ieiv'thi sLbrnifiiil f6i.thc lin itid,� -1 1- 11 ey! . , , I _ 'FaCIic (;640LAL'60Nit n6ro;191Gma(0WE(hdQ(ij4 WIP-TYoFrc)RT66i:LiiisNtW6,-jC'A'T[6NS' ' " qWV4f2QW), ire _ par _�e purposes required by. ' aoohfij!6�. T'.. rojr6beis ,of cich,&Unple to btsubraitted wUbe itssfe660 in th-Spc6iricatibi& U& , SahrhivalPrvcidicres. '&25,1, 1386re- !iubrniiI4, ca6h-,Sfip_ p E)ruwiFq tr 6.1511. all field uuensibn!, %pei; Bed parponalance cntene installation, niquiiernentsmaterials, castfil6t pl6n&ns iniihti in(brunaticin with respect 6.25.1:2. all materials with respect to intemej rise . , fabric . �ati on . shi — n dl' ,g, in, ing, storage.; Mon :pd 11 e fe of am rmance' 6,25.13. 611 ififoirfi4fioh feliafie to COWRA I C CI-, r600rvit flitics tri.reTect ,of��ieahs',' ,methods, techniques, seq�ermees and proccclurc.s.of construction a n:0 safety , precaution's �aiiq progruins i.nciden"hercloi MNTRA7DR "I :SIso I&c--.r6icwod and .c , oxdialej 'e I a'ch Shop-P-rawliri `Shop. Drawligs'and Samples and'awith 'ific' '.requirements of •the Work. 'Fun-d -,the �Contnlci .6:25.2.Nacft'.suhmdtal will hear a;stapip or specific CONTRACTOR's obligations tfn&r. the Contract;D&unwnik%rith reaped to c0NTitA(�.T()R's!fvvi6v, and -app'rc-!vd4617that -submittal,, 0 0 0 -6.A,f Whurcta I ibop Dm"ing-*,or S arp6lc is rNuifed by' 17qcum` chtsor- the'scheckik of.Shii DriiV4np b - ' — ' ` d' hj '-CTtl��ER Z' iand Sam�lc' su mussions uccpte FN . :by., pkijoa_151i2.0. any led Worlc.per onned Ip noi- - toFINGNFEWs4cyi4r and approval 'of the 'p6runent, stibmirml will Wit thesold axpepsc and resp6nibilftv of, - 6,29_,' CONTRACTOR' shA can, on the Work and �adhciv to &-'- -_ * ' whodil - dr' di ut 1 -1 Frogrest; UCu , - is Cs of disn mlswithOIANM. No, 6 - dela' 'd disagreemcnls,,ok•pt as,pcyniified by l ragmph,15 5 "or OWNTER ,and CQI%TTMCT(?,R may a. 4CTOR's� Cefterid, n, .6A d ranted:, 630. IXONTELAC:rbl.�_ wariants - _ahj juininiecs jo- OVINM LNGMEER arid ENOWEER's Consjtlftariis. that all Work ' with ith,the_i2o,n_ti*cv D6ciihicnt`q_ - ATM 'will 7�01, "be , &40"clit"O, (j,ONTTRAC-fOR'.;, &y arid gUiwaiiieeheWuri&i excludes defects'tir WREIIIII )ugecausedby: 636.1A, ibw�r,. modification or improperin iiih - temrx 11 1 .— - by persons oil er than, 'CONTRACT091�4 S bt 1- 11- - I - _- 630.1.2., n6rmiiP..w6f,md tear •under, normal usage,, .6.30� . I coNmActbks: lbb'fipti ooinplqcjhc Work in, accordanct wilhAheContract'. . iocumcntssfialfle , :Wjl,I,00risiitple an"Ac- rk �fti Ji� �6t, �Cmicdf' 'q- W� , '. ., in - .• .- ;66)&drE coiohfoNg i9iv-8 ii*Sa Iiqij .; 'I &ik br 16fa CULU NS MOOLFI'(RE , . I 1. - (CATIONS i1, _Y4 t !Mlb) or Oks obligthon jo.pafomt,tha in 11c64dan '-with�the Conna Di3cuments:: �6.- , 30.2 1:1 1; obsaviiiions W R2TGDR; . . I 6.3012. pro, Lae=. -Or. is5uancc', iof, a 'cenihcuic,,ot mintia t"Cmpegqn, or any. I)Y-, 6ih� -lo CON7 pAqTbR uiiax the, Contract s or 9L eWorkornov Ixtrtthcigof -d ipuphncyqr�h hiys.),M0 fiiiltFe to do W,,:, 6.3(I,i26:. iabv-i varid approval'oFwSh6O Dii inGle bffiitfia'lAr.the issuanceOf , .!Y!i - " , - , -- " 2 notice ji hNU NP k W j: any irqxc 6 bn,-tcst or approval by O"FR. Idd,.nmi)'i 632! hi any tand ;all claimsagainst 'OiOqEk, Or.MqGrNJT.ER or any o*rthcif re, Tective'c6nisuliants: ugeftts� offil , —diia" 'b Itnilil3yei'(dr & _.�ers, _cctomor'p'a` I any 4. poyeim"y SLtf%,tV&. rcpr=ntativc of such employee') OF CONTRACTOR- anj'Su6c6iitniau4 anySdoplier.' "any -di ' ye q!.#ga67.quOnfecff orIndi_, . reedy eraploy60;;b)i 17 SECTION 00100 INSTRUCTIONS TO BIDDERS 1.0 DEFINED TERMS Terms used in these Instructions to Bidders which are defined in the Standard General Conditions of the Construction Contract (No. 1910-8, 1990 ed.) have the meanings assigned to them in the General Conditions. The term "Bidder" means one who submits a Bid to OWNER, as distinct from a sub -bidder, who submits a Bid to Bidder. The terms "Successful Bidder" means the lowest, qualified, responsible and responsive Bidder to whom OWNER (on basis of OWNER's evaluation as hereinafter provided) makes an award. The term "Bidding Documents" includes the Advertisement or Invitation to Bid, Instructions to Bidders, the Bid Form, and the proposed Contract Documents (including all Addenda issued prior to receipt of Bids). 2.0 COPIES OF BIDDING DOCUMENTS 2.1. Complete sets of Bidding Documents may be obtained as stated in the Invitation to Bid. No partial sets will be issued. The Bidding Documents may be examined at the locations identified in the Invitation to Bid. 2.2. Complete sets of Bidding Documents shall be used in preparing Bids; neither OWNER nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents. 2.3. The submitted Bid proposal shall include Sections 00300, 00410, 00420, and 00430 fully executed. • 2.4. OWNER and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids on the Work and do not confer a license or grant for any other use. 3.0 QUALIFICATION OF BIDDERS 3.1 To demonstrate qualifications to perform the Work, each Bidder must submit at the time of the Bid opening, a written statement of qualifications including financial data, a summary of previous experience, previous commitments and evidence of authority to conduct business in the jurisdiction where the Project is located. Each Bid must contain evidence of Bidder's qualification to do business in the state where the Project is located or covenant to obtain such qualification prior to award of the contract. The Statement of Qualifications shall be prepared on the form provided in Section 00420. 3.2. In accordance with Section 8-160 of the Code of the City of Fort Collins in determining whether a bidder is responsible, the following shall be considered: (1) The ability, capacity and skill of the bidder to perform the contract or provide the services required, (2) whether the bidder can perform the contract or provide the service promptly and within the time specified without delay or interference, (3) the character, integrity, reputation, judgment, experience and efficiency of the bidder, (4) the quality of the bidder's performance of previous contracts or services, (5) the previous and existing compliance by the bidder with laws and ordinances relating to the contract or service, (6) the sufficiency of the financial resources and ability of the bidder to perform the contract or provide the service, (7) the quality, availability and adaptability of the materials and services to the particular use required, (8) the iamof thenv.0 performor fuffiish 64 of� the' Work,&.. .anyone'for whm�scu.any, of thern' rhay bi1itible I . I . inwmn�fica6ch I obligaUon'tto�kr gaph46 31 shi� not' be h mited'in' an-y-,'Way by any limitation on the;ti�-moun YPC 0Cdai89M culqnp,e for CON nRAm or any ku&Sub66�vridt6r: Supplier'or' iihtr personoro'r-mamiza'tion -u-n*de-r-,V��•6ike-rs' 6pt4mtion .acts, disability benrfft acts brother emilploycibanefit cqf&; 63 Y- The indcctitibn obfi�aticins ;op ZU4TRA&rmirifi OR' ufid6 parag6p.h* JI shell itacl 'esteto; . 6 - Wfcqrs 4,re-c-tor,s,, vws or agents causM; bythe _Siir' iW,6f -634- 'All reprew'matioris', tndemnifibAicrhs, N�arrifitiei� :find guamntecs with chntmcy'Documents, as will.'as; all :oontinuitio obhgations iiilicit5d in'the 0ontrai't -, 1)6curfiig6, Will nd thz` Workand rinina-tiBn:c,)r.completion. of the A S ,,ik-flC-LlE;i'-O-T-'FE'E'R'NiOIkk' kehded Wrk- al SWi." 18 W, kil-Y OFFCOLLINSJ ORT COLNS MOD�_CkFIONS tREY 4�iOUG) V visiom I'd - = the b� - nifit of CONTRACTOR in :sAid �c, cchtracmbii�v—OW-NIER and -such utAity.owneig tdid tither contractors, JA IT 'OWfor`'% w NFR. conrmc�i�h others the P.d �ojectrfij bf,61hij j�j�rl,�6hdte'Pr,the siie, the f011( ff.be set forth 7,4,1- �I the 0&,nfi;firmor'c6rpo,ration,who,%%f,iu- have authority'ara respottiibility fcrioordimiorzofathc activitieslan ng the van*obspFimec4irflct0rsvilFhc 7.4; 2., thc�spicific matters to bc.,`cbwrdd by such utiiltort raters' ht Pam: bZ 1tcm_1z_c!d:o hd" the extent of such, inithdrih, and r . C . S -voWitiEs mill 6x6iWilded- ,c,v, provided 'in, ih S'upplem-enta ,it lc�. `henwo C, su shall "Have iry, e authbrity and ty. ,OWNER'S RESPQNSMELITEES; I Except•as otherwise piovided in :thesv.General condition 'OWN FR -'slialVissue "all ' r... .-- . "to CONTRACTOR 0iough UNGMEM. 812. ' in 6k. of. termination of the enjpi6inEfil ;Of, r_N.GrNEM:(jXNq,MR shall,: a-plpobu on eng*-me'e'r-m2�6inbi whosestntus umer* thei�Contm_ct ocuments�sh�albbkhat ;of the roiiinir, ENGTNFX-R- 83. OVINMR shall f rnish the daw f6cluired of OWNER CunLruct pc�aufit4ifs promptly, and "ll, mat 'L.'pa`y,'m 'to CONTRACTOR promptly wha sA. bWft.Rs duties in ' reispect of�pruvidimg.lan,ds and easer6cnLs and' piro'V'idiig "c'namicering stu'v Is to I I I I � ore - . — .1 1 . - e�4ablisWr&rence Wines are set forth in paim Z I , grap 4 'and 4A Niiiiii IF .1 ph 4:2 'i8:rs' 6 '01WER's iden-yyyng and miking av ' hilable to ,C0NTR.4QT0R copies Of .wp- ' I ' * te of subsw�acc-cibnditions fit exp orations and sts the sae and drawings of p*iiical comfflticits ikexisking 0 E 0 site ftt have been uti I&M, C66iraii Drict ma ts.. aZ,.. t7� w4m oi� .,forth to S.Z., OWNER is obllgqtid i6- ��Cila '-'d'-' Sm efs4s in mte6pa ' -iii pfi;04.- u! '17 ryceHairi .inspectioris.•• Tests. ;.and' pprbv tlib . In cbnneation with OV.\ikks right to stop.lVork or, and" sriigcndi hi'j 'i 6 '; We MM9111P. , haarraph 15.2 dekLs with OWNER's n -1, 6,tefirirate 9. QL, -"OW g", ��ef-uflrli:€lesed 7- resN Fntrespe�:tttliefod-vi svpooient-�y -,G I tons-. 4kRbd1F. '9-FNGINEFWS SfAllfk� *TWTNG CONSTRUCTION " 9A, ENGINEER hill be'%-MVNER!ii.,-uEirikritafive' duiihg the, p cru;d,, Tht�,, Lduties and itz;ionsibilitics. knd:;tK-. -Ijmiuui&� �;f—auifiorit;, ";f ENGINEER'.' as -�OWNER's rrpresentativr durifig, and ii-i"6roWNER 4iikIIINGIN-EER.- I I I 11119tsfesite 9.2', ENGINEER' will,miake� �kitS to the site at. ifiLeNUIS .a oM c to various stages .of, construction as ENGINEER deems n66zi - in order'n; obkwias an ifi6d destgrr:PyofehSlma -,-e:PrcgreM • Troject kepriyeittakv,e: ;rhe tk dentirig- in matters gartaimri,,Lolliedo .itewmkwi[Lin.ene Lbemith :the.ENGJN -;gnd;C0NTRAC-T 1;� BuL the IRWes-entativ-e will keed, tW OW1`ER.rropesly ad6wd ab6iit-sucb'niitter 7he'-IZ6&a ,Nita iels -,dealih&%v,ith�subcdnb4ctors will only be thwiijah CONTRACTOR Diiiies arid. Rawbnsibiliti'es:. RcoicisentaLiv 19 schedule-ahti bditr.schedules vie"paW by .the COMPRACTOR" =rind '.Consult- '-with-- -the' ENGINTER:ccSfi6rrhmcgcc66Wbilitv gan: 4Confcrertces--an`d-lyfociing- - - Attend mectifw with the-CONTRAM-'OR -such -.'as rfstruct .1 n ' Sohrm- nwx s- o &otherlb cbnWenres-;rnj prepare and ,circulW comes ofminutes otmectings. 9323- Liai-son 93j,3'L mSave :as. +.NdNE6R:S7 li6riml- %6th -CONTRACTOR; %%iurking ;Prmcip8Hv through C-ONI*W?\C'f'OR:S.-qLjpeEinteriderd t Ir,sist •thc CONTRACTOR'i6 lindekanding -the Contract DocCunems. adcbfional.' dclaiLs -o r, 0123:3. :advise -lhc Eiidlt4SHR find CONTRACTOR of -they corgmencement o ,s,Mpjc'subrnissicm if the glarission has not been approved'L y, the P4N(;MIFFR U-214AC�vi��"&fw_prk_kcticn oLD fectijs Work: lMp6ons-and-Tcsts - R3.2.4. 1. C6mitict 6ft-kitc 6hs&iiti6ni of' theMork-Iii Vrogress to assist:the ENG [NEER jjjAtcrffiimn&.!hqt tl c,,Work_!Lpjq=di%, in accordarke ivith the ContfacfDocurrieniig A3.2143. . A&Wrnpar& Sisifirm `M— ca6is representin--pubfic or other,ap6fcics havtne ,jqELAqcqfi!qfir�,ovefjhc ProiecL robed the, results` of thew. jrispactions and "report rt to the ENGINEER 5 Interpretation, of Cbnimut, Documents.. - e- t to MiGMTER: clirifialiuw.And mtaprctations,of- the, Contract Documents are needed "and'. —transmit:. to CONTRACTOR clarikation,and inteipretation ,of' the Cbntrict:DociLment%tias?�Lsmied"bv- RiGNEER 93.16: h4otliGcelions Considei .and evakiat6,'CONTRACTOR'S' juggeaUom, for wibl'yoy.F6fcTtyjt.-UNs M�uricxnoNsft-Owwo) � -,— I -- .. -m6difi6tidn it,DraWmiis or SpRW6tions'and PT—C91. those,TeEdgurfemblions toENGWM-R- Accilrat6,transmit. to' CONTRACTOR: 4decisionsissual by -the ENGD41IR I 9.327�ftec6rds, E3U 8 �l Fftrftish - M' ;G EEC JR--wjj!gab-c -lepc -K-Llle-pnog Ltss-or-t Ll� WorL and of 'die - CONTMCTORS Ith dLe_progm sjjedqLt anA ,SM,,'pd-ullV'of -Jiop, Dru%Ninp and"sample - submittals with,MqGINEER in advubde -6f'..-sLh6duhrx, niayK-tcsts, bases ofthe 93218,1 -- -Draft propoied'CWc-Order ,and ;Work. Directive -obtamm backup material lrom 'the comrR.Agrog, and -recommend' tc3-.L,-L\IGM-rR Change Orders: - WcalC Difectivc �Qhangcs'afid field orders: 9328A RO&I 6mc&t6l$ • t6 LNGWEEIZ and MVINER'Ihe�mcturdfcc of any uccident. N,vmeAt RcouesIsA6icw. imolkations; • fd.ffiyteni,�ith CONTRAGTORIbr�qMkIianc6 jwc&&rr , uleir with '..the_ cswbhsWd submission and forward With recommendation to 0 E 0 Ll 0 E MqGINEEP, jjWA'i5niligklv theWlqlidrisEp'bf- the mment requga-d to ihe'sc}ieitule'of values %vbrk.i�-Y'd and. :delivercal�iq svleut nA , i vated in h&, ,93. - 2! 1 0., , CmnPiki6m 'Nr I ffi caWo P-Su �Ust an ,L&,C0'NTrRACT0W'a list,61-ob-,,&vcd item' recitiEria co ymLi6n bf e6ffifilctkxji 6.31�2zl1l3. 'C-6nddcL-finnFinspccdoA in aomt INGINIERIt: OWNER Rand' -CON1'RAc:roR :md, bLerare'!s- flEal Aisv; 6 'items to be voacctcd or conipMed 9�.3alo3. SObse o dwAf, dents -.of the firdHist-Mve:hcen corr&wd'or,bo;fiplctcd an The kipr fafiv'e;shill snot 9.3.31 h Attificrize ariy_&rstiotw from_ lllc- -coll fil w !j ikss,a horjz�d b F�IdFNfiFR- 93.3.2. 1:icec6a iiffiiLiti6m- of E NC NNEW S 'Autli6ri ML !'k-' forth C6htfficfD&uinenfs---- T3.3.3the Kiibiliti :CONTRACTOR, Subcbntmct6m,, or tei2 M 933A, .Advii;c on orlssue dif&tjqm relative Lo over 41TIVaspei:-t,'pC thg m'onsi. methodsiecfiluaues,+ sequences :.orb, - specificaljv called Foi in thefbnlractl)miniems - Ad-_i--cqn or issue 4Lrections, oycr pArca m 6muiectimf �%vithAhg Lutidis and hurLogmj�s� -Work. 9j. 31.6,Accept Shot Drswvtes or_sample' .submiltale from anyone ffi -ocr. --thin, the ,CONTT-RACTOR- Work: in Whole cr in timl! sEccaali label atorytests cfTinsi dibri§candati dbv.6the txcept,-fm -specifically-'authurized:- by,, -the ENGINEER ;Clrutfication"s and 'P.4:. --IE.N,O 'INEER NviH i's%uc w-ith =6�a- b-liji,bmp-im :such i-hiiens -Air�cntm*iTd!w anfis -bfl,th�e- I- Aii biiied na & ifi Wvik- !Uji(#!g,Pef e Work; Aol) Arawblgs, 64ojg4,.o4rspied ' P-'qjmM'rs: A7. Jn eonfteo46ri shiop',I)raw-ini's a--nd, Sam-ple� we p;i�li&4phb 6 - .24 "o :12. 17 ,9.9- hiconnection t1tU%•ENGINEER's,authonty`as^tg tincLimifimums, I of'. Unit' Pfic e Work oprtf by 'CC - NITRACTbk�- ' ENGINEER 4ilF ic'Vil-e"W' -- With' ,wNri, AcrC)R 'ith6 -P 'd I -T� derininatiors an,such iniinembefore rendering s-written rdcc 'h -rec m en 81 LqM.t ewn'ft 6 66 po ArViientlan Diewolu oft vispurev 22- W'/ ZIly M�FORTODL'U &S OWN, -16m), tO Wbthiiivise agri5idjnwfitir*by OWNM • aid CONTRACrOP, Heippruih N4,'! 's,,ARlh&rW and s, Lhfikations ion DYGI iNGINHER will, not sup Lnc,direct;. cii 'ar:hrive,auth or1q, P 1 T T"qTOR'i meads, method,-,. whrtiqu6s. sc. .-b?the liarety. CCQLIP -Qqd-p-J" 'dent thereto or rctq;�brFor any, ;failure of CON fRACT Regulations ozwi 16, the or., feffil- &,of i 'T lilu not Ix . , , , - �ro I. , -. . re-, T Rs failure i6 r 0 ifaccordance tviiF the Contract 9..03. -LT-NTC;iNT-,E,-R MII,nbt-be ies�otutbli.Coi the o,r Q an), 'Sutxxinirbuor�;Iny upplier."Oro,anY�Udwi,persm,i;i. �,- - .,. ' .11 1 11. - - urganpvlm pLr , -mg or fuxivish4,s6y of'I'the Work" 9:13,5., The !in*nlit* upon Auth-ori)7 fl,nd E E 1J I -'Sir also Pr �p7p Repr *11N',-THE WORK 10 -, kACtOR are dniibli: to !Rsret as to, the if, -Qj4illek;IiAhe, Contrfictflrici:�of an udjList!nM-t'or the commia -l'ilil6s that. WON *Nnge I)iee" should bc,'Mli�i;ed ji�i'fi result eifra'`C7 CfiVe, inny ' be""- il�ici�forws 4rticwj2: nl4k provide in Article I I or 103: ,CO"NTR-.AC,TO,R" :saU.n'-o"t,bc entitled to, an, In "12s" ii'dicContractry c1q:e�ermof tlecofi�Oct Tories; ,with resrxtt� !`6k,perf�Ted, rat is not required lly, trite Contract Documents aiahendedmMAed' end Ad'S.6, cx cr- in-thecase ofamemergency as provided in f4rinamph 6.23 'Cift in the, .-' , , Lljfc- I-. .- W, rase 'of ovcring Wort. ,as-� pr-ovided - in, paragraph 119.� -1 OA. 0" MR -and,,C'ONTRAGT6R sW1 cgewlc za ' - ppr.*iiite bv�LNGLNmk 10.4,1.- chqngcs'in the Mcirk- Whicb'iiC(i) ofdd 6d by bWNEkOtTr�uto- pmg (n rc ... r ., q��ied because 'of-adiceptaricz, of 'defective -I' Work * uthlec �P� = lorid jifi�h'l 3,13 of corfecti er pamgrnh:13-14-or(iij 10.4. 2. -n i'n"ItHe Ccxntract Ptic'c'or'Corilracl , � Timcs"WIlich,&ifi2=Firere agreed tdby j1he-partiesi um' , or. Contni& T 411 e0%vh.ich embody the subsiaricc.q. any %%Tl!cn OM rWde-r&'d-' "by---F'-'NG'LNbEX ip"uTit ;to, prir ,provided t dh,lieu of C*de4t " 'd tayl appeg_muy be ak� from -qny suchion'. in :acccedarice,-Mth thc'provisi6m-,bf th6-Contiacl IXX:i 619 is d kppficable,Laws and ReLti1iiioiL*'b6i.daiiig,any,iui:h i Vl1*'CONrTXA(-1'OX..shaU' 16h,-tht: Wcik 4W ere..A6 'ANpr(Wos iW pr6vidQ if' 16.5.- ffnotice ofarychan� '&jet I soi�' gea he .of.the W ik,6r.the.prbivisi6ins bfthVTnisct TV �66�ai�st AL PIIiiT1UN5 iviOB (OwgEa .- m) �4iC'3-1y-01;t;6kf -I C'AFl 6NSik&yino ad) (including, i,,d '-O-�!Oc"Pr'ce or Corurtui T es �c ns by pr`%-i�o �r ny Vv t� the giving ofin Mnd;Bt CO �T Ica 'C 'W1 'ap . Pi �1 'Borld ,AR . TICLE-41-CFUNGE OYCOINTWiCT PkiC-F" ill' 'rhe '(:6.fitnact 11'rice: oqfimirktcs the tn'ta-1 o"M �to RW--tok�' t"-[ the Worts Alldm4s', I I . - jor.per ormung lrekponsibilitic.i�and obligations assigned to,or undertaken' by C6NTkAUMI� - shall WaRMNIT - RACTOR TOR's t'C'tfi�ct'PA i - p4 c. h _nge in _c onAcc� I Pj, the ir;iliiie- of any ,W-`--oovc" re—d b3:Ia IC"hani -Order 6r, any; claim adrus"ent in.the CbnrUC'L d 11:1.1. where & Work'ifiv6-lvaks cbv'crcd try '-Iunit pnccs-,oprt:pin to - e-,Coqtraq 4)6. ii;qts, tij; applic ' afion bf,such unitpricesto Lhc,4uargilies of the items ;iheOIVTLa. .('subject - to the, �- �mViU,Oai - '.bf I., _ I— 21 pa rggnphsll yl tllrouJi l l'.9:3, inclo5iia); ll32:, ivF&i;,thc Work. involved is riot covered•by umt piiixs conta_inzd in the Contract Dcwtin_fertts, byna . muluallyagieed paymen1.t basis includirig I'umP'sysit' (ivliich niay include an allotpence for overhead and profit .not t ces anly 'in accorovinti tviih Iztit 011 l I G,3} 10.3, where the'.Work involved is not cuveral by unit, 'prtqq contained in the Contriict Documents arid asreement to a lump stun . is, ".not reached under pamgriiph 11 2 cio.the basis of the Cost of thz,M*k (determmtd'as provided in,puagaphs I1 14 and I i,.5)' plus a'CCINI RAGTOK s fee for overhead nnd,pio6l. (dctcrtn ir}�Ld as p i+yided in paragraph l ('nsi of the Mirk- 1 IA trhe temi 4ost of the Work,mcans,the,sum of:all �ctzas neassai'il} urcurred and paid,by'CONTRACTOR in, the propel`Mro'rntance of the WA: Fisepl its bthertvise' ,may be agreed to tnwilling by i�i�,NEK such coIsts shall be tn;aniouats,no higher,thmi`,thosa prevailing,, in the Iq�lity -of ibc' Project: -Ball iniludc_•cnly the, following items and shall not include'apy .6f,thc costs itemized in IP°tagmph 11.5; _ 11:4.3. Paynients", made. by COYrRACTOR to'the 'Subcontractors (or Work perfcrmcd orft .'irnidua, by Sulconaactors, If required by.. r}tV1JF.i2, Z4" EJCUCtiEvkiiAL''CAiiD17101�il9 ni,%fIY'YJ EtVUtiil;, w/ dry pit,64OOLLINS M6 ifgdiiioi tityv•1!)ntia). CONTRACTOR shall obtain c6mpetitive bids.frotii Solxantialnrs; acceptable to,' OWNER arid CONTRACTUR•.and.',shill deliver.•such bids ,to OWNERwhoviillthendetermme'ivittftheadvice fl 1. ENGWEERwhichbi&`Jfany wilfte'atx.eptcd: R[ 'any'subcantmat provides'"thd'the Subcontractor -is to be, paid on,lhi .basis of Cost of the Work plus'a fee, the Subcontteotdes-Cost of the Work suit fee shalt be determined' in�tlie some manner as'CONTRACTOR's Cost 4f`_the " Wort' a ul fee ` as ":pim ided in pa_ramaphs t l,a, 11 grid 11 7 AR sulxvntraits 'shall be subject to the other;provisions of the;Confmdt Uoatments irisofar as 6Jplicahle. 11, 4 (;8sts of gice (;consultants (including but not {limited to cngii cis architects, testfnc ;Labuialon2s;sut\eyors; ,eltorneys anti. accountiuits) cmpinyed; kir .s6viccs spccihcally. -related .to' the 1Vtark IJ:3 S 'Strpplememeftgstsuutlodir�"tfie fnllowine:" I14. 1'. the "pproportion ,of necessary. v nsponation travel and subs 4ence.enpenses of CONTRAGIOhs citplogecs', incurrcd`_:in di'.sctmrgc,of duties c"ontiatedwith the Woik 11.4552. Criss, .includuig • umnsponation and nntnterianci. of "Stjll 'materials supplizs" equiptnerit, mac mer appliances office and temporary facthues:etthe site`nitd ictrid tools -act owtted by the workem4hich arc,c6iisum6d in the peifornianoc at the;�1'ork, and oust less"mtuket value ofstich items kt] hut "net 'consumed which remain 'the property of C: NIRACTOR. 114.53. Rrnets of dll construction • equi it mac}iioery ancl'the parts thereof whether rerdcd frtmi CONTkAGr f? tv vihers in' accordmtce_a t rvnfaYagrocmenwiipprovLd by ORrNGR' w•rth dtz advit`.e of GNOMM and the costs of .transportation 'toadhiv, unloailii}i;; irstaWition disntaiitlug and removal lher6"Il m acco'dance ,w'jOi terms of said renml agrezmznt5: I— rental,oFany`suchequipment, manhinen..or ptrtsshall cease_%ihen 6e use .11Wi oN iio,longer:rtectssary;fort)ie,Work: i 1.4.5A Salzs.' peisumer, lttse or similar taws rzltited'_ to `the Work and, tor', which 'CONTRACTOR is'liable unpgsed by Lai@s unit R auh3licns. 11 4 5,5:. Deposits ;lost. for_,'ceuses other than negligence or CONTRA TOK eny Sobcontnrigor or "anyone directly or mdireclly_' employed by'any, of them or;for for any, of them may liable,, and ,rcyalfy payments and fees for;perm its nna Lcenses. iIA5.6. Lasses and damages (arid related etpens s) ;caused by damage to the 14or1, tint comperis'atgd by iisurance sustained by . CONTRACTOR" in' connection w7t1Y" the 0 11Aj.7 l hc:east of uttliucs, fuel and :sanitary fecililiesatthesite- - 11 4.5;8Jvlincir crp6nscs such.as tcl grams, long.distadce'telephone calls, telephone s ivlce.et ihe`site exprespage and similar, petty, cash items in ,comKvKian with :the Work; st'ot premruniy'fnr addtuo ial Bonds: and'iiutuance.requiredl'caits of;chiutges:ut!dte. Work. -- it 5, The term CostBfthc Work shall not can yrot; ;I}icCollotvingr' - � - 11 52. Gzpen�cs,of'C'.ONTRACTORs principal ind branch' offices ntheethan cot3TRACTORs-otl3ee "et• flu site: 111.53 Any part ;of, CONTTRACTOR's,. capil¢i' e.Xpenses, fnclucltn. interest �.on- CONTRACTOR'S, rap'W et"' I - W' Cor, the W&k'and chargesl.aEainst. CONTRACTOR his. 1I54 Cost of preiuitmsor`n.,CoFSaIllBon(1s.andiCor;a11; utsunance whethc . tt CONTRACTOR is.requir d by �ha Cor traU Docurt eras to purchase end maintain the -same (Accept for chi:,cost;df ucmxc:Z tutncWed by subparagtiph FJCO(. GttifiRAL C614biRONS010-9(i ap Wtiait, iii a-tg or i+ORr�oti�u Ks �iouuacano+vs tiuv.Xrziwioi. • EOKs clue i'o' the' "ntghgence.— 'of CONTRACTOR am" Subcoittrastoi:' or ;anvime .directly or utdireeily employed by'am+of them to= -for ,w liar aCLs tarty' of em Y. be hali�e;'ineludmg b i hmnrd't'o, +thethexmticdon of i&%rein d Work;. dspisal of metenaLs or equipment uTgnSly supplied and mat ing gt od eny,tlama6#to Pro peiiy t_I 5 6 Other ov2rhead.or`gen6t,expense casts of any lcu d and the costs of+m y uqn not spa iGcully and �pTe_ cncludl d to par uyaPh,i 1,4: 11'i6 '1 he CON'I RAO1',OR's •fei, allowe i. io CUTITRt1C2OR` fin o�verheail aitl' profit sh9llr;be ..determineo e'"s follows " -' " .l'1{6.1, e•mutually acceptable hied fer;;or 11.62 tt a fired Cee ts,nol,agrecd;upon Ihen a 'lce based+on the followin .perecntages,of the vanoiis pOrtlO17S Of dle'CO5t of NC Work-:, t 1 $?.I'. •Car castsm"WT d under paragrpp,.%11 41' end Y.1;4', . ' :the CONTRA(r Ohs fee shall be fiRien percent n 1162:1 for' ;rusts ;ipcufied under parIagraphyt l -0 3, thc'CnNTRi�CTC)Rs.fcc shall be five percent, 11'6,2.4., : n tecasiiall be payable on''the- ies'is of asts.item'tmd under;'paragraphs.t1.4.4,11:4:$ and`I 1 116 2.5, t the nmount;oC credit ta" bz-allowEd by ,CoNTRAC fOR io-;OWNER for any atratye wl ich results in a n�v decease-tn cost'wdl be the arntttatu itthd autil neCdeciease in cost plus a .drd lion in,CONTRACTOR's fee 6y ah mnniu i equal to five percent oNuch rut a=ease arid." 116':6: when both tidditiorts:and credits ere -ittvolve4,'in.&nyy one cha �a the�xrljttstment.0 CONTRACTOR's,le6'4wil be' e a')MWputed. 1 n' th bases cif the nel hii y;e to .s`ecor6i tiitlt Para .phi 11 b: A, through 11. fi ? 5„tnclu'srve� 11.7, :Whenever the - cost of atf} It Ork ts. to ,6e, dete .4 to rifitp�s, I 1 15. .07\ rrR&py. OR will ests h.s a On Oin records . 'All j tthvvcir, iri O`Cw'rduilce with generally'-'acceptc accounting PrUl -,and s6brnivin f6rin -k;ceptable t6 ENGNTER-7an ;aem cad k dbA o to S uppuOmglata brea ðer?w@�, f-fis understilcid that Cd&MA&6khas inlilu&d,' iiii the Cotura6iPrieall �Oftc4varc'es "so inained la_`tlli' WcirVSb'cbv&6d sumsiisaiia�: bi a to b� fLuilidi-ed and,•perfurnied for, such acceptable _ i' OM��k i-R_RAqr() jccepta.b15 0 OM EWIMM S' R iecs that:_ 11iKA; the allowances jftcludc, the c6kt to LCn,OR: (leisiin%6pliciiblo iradp'dvsiooums) -Fi"' Is 11.8:2.�CONTRACTOR's costs for. unloading and 1. 1 - I - � .. t - -- -_fi �'. , WOul-,on the sit6j6bar.: insotil lotion-costs,"Over ena, ,g an profit maiid" , other , ex'[�xois_cs� - ptiit I W' ;:roc, the allowarices,ha%4 h&h' ' included iit the C oritiaet Price and -not- in thc_;ilIlcnv'anocslindnci dt&nawid for additonafa�yrne,nt,cri nccqunt or iiiiy,Of,,tii1c ri*Fgoiirg• will bc,'Sand. 1'rikii to fimi paxineitt.'an ifipropiiaiii7jvlltge 04yll L� Wi issued 2s_:-n;�6liimcridLd hy.KNOCKEER'lo retlect actual diiouncbfof Wdrk co�cred :amounts due CONTRACIbR,r - - I I :tiy mic�aa�s, imi th&. Contra - On& '- shall ' bc' ` `dinij A- _M ,corriespon . y a juste I M. Unit Price Work 11.6.2.'Euch- unit price will be deemed to include On arnourd cbrtsdei-ed by CON TRACTOR to & adequate: to�cover'CIJNTRACTOR's overhead and pi6fi( f4ir s6 aieW Par identified tlem.. ii.qA.oiANviA or comrk;\ OR y "�w,it COXclaim` for an-adjustailed -in th7 a Frice,iri. I LAIL Ilie quantity -of any item of UoiVPricc ffimm by q iNrrRACFOR'dj cm, .materially and significantly from, ,quiji6Of'sfich,iterfi'irat�alid,in'e the Agre- . - I . . I _.. . . _gre�mzht;- &CDCULNLRALCONDITION'S 191 '90 E um 76 w/ a 1-Y OF F61ii'O'D-L LI li- %10-61111 CATI ONS Oih: . V-1/2 I 0M), and 1 139.%1T 'there IS no Cc witNT5SrXxt,tOV,, _anLd,ier'i1cm of WOW' I and v1 9.,33; it' !CONTRA . CFOR belie' :that _ , �ves -. CON17kACT01k� to an qncrease ,in ,:Contract: Price ,as-6 result Of havW Incurred dilitional `ux?eilSi' ,Or OWNER believes 'that •:OVINEURentitled to a decrease'utConauct Nice and a jp,�!0 are unable- , , toj gree as' tothe amount, ofariv such increase or dCLTCHSC. - 17' th(F OWNER, has the riaht to add or delete items iii the f3id or7chan66, quaOtJtics.at0WNFR'S1&ok discTctidnAvithotivaffe-dirig the Contra& Priceof ifirly-remainitili item iso -Ione as, the dcletion or. ,addition: does•nof cicecd hycrity-five Percent of tlic�originnl total Cbntract 13rim ARtICLE stateil in thimct Do6urnwti _ Ie,Q6n- are of the es ofthe A - e-emenr 9-r.- ... 0 Ll 0 0 • sii•ithtn-thy control U'2*"P-P"' deemed be delays Vi2m 1orCONTRACTOR. 13--r-twr,§ . ANrD-jlNSPFC I'l ONS ;((1RRECYI'16N, R- FANIO%I.kli,()R.,ACf'lVfANC6,'OF Dp1F!-,07I/p,wOW .prompt notice of all defecrive. Work -of,which CAME 'Ror . , 14F —. I ,1 11-1 ,FN.61,1 -.'ER havc.,aftut !bc'i'Vc"q Aq, mqv' fiC! r6cct4 d'- -d " "dcd a rt -Cmr=tc or.!CCC)IAC 3�sjwml in'thi .A ilcI;]31- AccesF to ;Mork.:, CONTRARTOR sIvIl OvE, U,4101NEER, timely. ,rl6ficc urr-eaiiine�;'of fliAVork forAl , recIdired i'- - --. - I - - IPT-eM.or!S.; lesU.or-, appm,viff.,�a�r-vd awo coo inspection and pepte,wil ije4iiig personneltitfacilitate r4ui5cd,m . s p - e t . tons -, a I r - tests. 113.4. ON\iqGZ shall empkw-und pay'Ver the,iervtcesiOt nt tesim all pp yi--pt!n,leafs, g. laboratory'. or� - d I . b6� Pet 1. MS PC - 11 mg —or a - p * proy'as, 'rq,ture th— tilict, eept, ISAL f6r ini=tibmiesWw apprqyakxo�ert�d tty- pd,ragrap6 1151 13 4. f.- that costs inLvri8in teas or tnspzciinrts Pon- Pw7imn! to mgapji,13.9. FicDcuithMALCOMM-n OM t9il)-8 ti* WIWI �w 6it-6f ii6kT cixu,-z %i66UfCA'T'1 -0 N-8 (R'4V'4',"2'UU6, pRra9rHWI19:'H'iid ConiniciD66uim' Is. 13-6: If an-V,WprL' (or the ",xv,ork.o*f.afliirs*)Ithat7,is to be inspected,- d-' - .tested 'or approved "m covered IT -CONFMOTOW v;iihoiUL' riTitten Lonc-urrence i?f be unoo'vcrcdlfO'rollstirv';iti'o-n',,, 117. 1 . Jncovdri t - W6TVM,pxmri&d in 1ia rapl' 1.3,6 shill ka, at "(AN1RaC'CC1Rs unless -CONTRACTOR Ithi CONTRACTOR'S.'- micnu' $'iK, ul 0" to :cover same' at lT1\IGlNI3Fk ha,js'.6'�.acd W16 r'ca'sonabIc'Ofomf,,tn='in ,response to such nbtioiet 'Uriciriierurg Work.% 'on, to -dic wTiftd6 r . eques't - , of ENGINTEEP,' I a- must, requestM by 'INOMI-k ,andicplacedatCbNTRAcTOks