Loading...
HomeMy WebLinkAboutCORRESPONDENCE - AGREEMENT MISC - VEOLIA ES TECHNICAL SOLUTIONS (2)TECHNICAL SOLUTIONS NORTH AMERICA Veolia ES Technical Solutions, LLC 9131 East 96th Ave, Henderson, CO 80640 tel: 303-884-4541 fax :443-264-2530 www.veoliaes.com Letter of Statement November 18, 2013 Mr. Ed Bonnette City of Fort Collins 215 North Mason, 2nd Floor Fort Collins, CO 80522 Subject: 2014 Service Renewal Dear Mr. Bonnette, Veolia Environmental Services is pleased to submit a revised Exhibit C Cost Schedule to the City of Fort Collins for services to be provided in 2014. Both Larimer County and the City of Fort Collins will be receiving a 3% increase for all services to be provided in 2014. Please contact me at the phone number listed below or via email with any questions or comments. And thank you for your confidence in VEOLIA and our environmental philosophies. Subject: Sincerely, Agreed to and Accepted by: Mitchell Garrity Account Manager 303-884-4541 mitchell.garrity@veoliaes.com EXHIBIT C COST SCHEDULE Description UOM Sell Project Manager Hour $55.70 Environmental Specialist/Tech/Driver Hour $50.13 Mobilization/Demobilization to One Day Events Mile $4.01 Transportation, per drum or cylinder Each $27.85 Transportation, per cubic yard box/pallet Each $111.39 Oil Based Paint 55-gal Drum $139.25 Oil Based Paint – too solid to pour up CY Box $417.73 Paint With PCB’s 55-gal Drum $668.37 Solvent Waste 55-gal Drum $77.98 Corrosive Liquids, Acids (*) Pound $0.90 Corrosive Liquids, Bases (*) Pound $0.90 Flammable Toxic Liquids (*) Pound $0.90 Toxic Solids (*) Pound $0.90 Paints with Some Liquid, not all pourable (*) Pound $0.90 (*) -> Minimum Charge Per Drum $195.21 (*) -> Minimum Charge Per CY Box $769.15 PCB Ballasts Pound $1.53 PCB Ballasts, Minimum Charge Per Drum $195.21 Liquid Ni-Cd Batteries (**) Pound $0.93 Alkaline Batteries (**) Pound $0.45 Lithium Batteries (**) Pound $2.97 (**) -> Minimum Charge Per Drum $79.57 Lab Packs (to include Flammable Solids, Oxidizers Pound $2.03 & Non-Temp Control Organic Peroxides) (***) Lab Packs (to include Water Reactives, & Temperature Pound $3.34 Control Chemicals) (***) (***) -> Minimum Charge Per Drum $79.57 Dioxins 30-gal Drum $1,002.55 Dioxins 20-gal Drum $721.41 Dioxins 5-gal Drum $601.53 Aerosol Cans Pound $0.97 Aerosol Cans, Minimum Charge CY Box $636.54 Elemental Mercury/Debris/Inorganic Compounds 5-gal Drum $374.50 Elemental Mercury/Debris/Inorganic Compounds 30-gal Drum $560.16 Elemental Mercury/Debris/Inorganic Compounds 55-gal Drum $1,042.86 Cylinders Each CBC PIH Exempt DOT Box Each $16.97 5 gal poly drum Each $11.14 10 gal fiber drum Each $14.48 15 gal fiber drum Each $16.71 20 gal fiber drum Each $28.64 30 gal fiber drum Each $38.99 55 gal fiber drum Each $50.13 55 gal metal drum (recon) Each $45.62 55 gal poly drum (new) Each $84.87 85 gal metal overpack Each $150.65 Cubic Yard Box Each $66.84 Vermiculite Each $20.16 Energy & Security Surcharge: 17% Veolia reserves the right to invoice additional amounts as surcharges due to increases in fuel, insurance, energy and security costs. This surcharge is currently 5%. Pricing will fluctuate based on the current weekly cost of diesel per the following table pricing: $ Diesel 2013 Surcharge $3.00 10% $3.15 11% $3.30 12% $3.45 13% $3.60 14% $3.75 15% $3.90 16% $4.05 17% $4.20 18% $4.35 19% $4.50 20% $4.65 21% $4.75 22% $4.85 23% $4.95 24% For alternate drum sizes, the following odd size container charges will apply: Container Size Price as % of 55 GL Drum 220 GL/ Cubic Yard Box 400% 110 GL 300% 85 GL 175% 55 GL 100% 30 GL ` 90% 20 GL 80% 15 GL 70% 10 GL 60% 5 GL 50%