HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 9136840WORK ORDER
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
Western States Land Services, Inc.
DATED: December 16, 2013
Work Order Number: WS-400901812-13
Purchase Order Number:
Project Title: Horsetooth and Timberline Intersection Improvements
Original Bid/RFP Project Number & Name: Sole Source Request for Consulting Federal Aid Acquisition
Mentoring services
Commencement Date: December 16, 2013
Completion Date: July 1, 2014
Maximum Fee: (lime and reimbursable direct costs): Not to Exceed $9,000.00
Project Description: Review of City documents for the preparation of Right of Way and Easement
Acquisition per Federal guidelines.
Scope of Services: See Attached
Professional agrees to perform the services
identified above and on the attached forms in
accordance with the terms and conditions
contained herein and in the Professional Services
Agreement between the parties. In the.event of a
conflict between or ambiguity in the terms of the
Professional Services Agreement and this work
order (including the attached forms) the
Professional Services Agreement shall control.
The attached forms consisting of Five `) pages
are hereby accepted and incorporated herein, by
this reference, and Notice to Proceed is hereby
given.
Professional
BY �r
I L — 13
City of Fort Colli ir
By:
Project Man er 7�If
Date: 1?11 r
By:
Gerry Paul
Director of Purchasing and Rick Management
(over$60,000.00)
Date:
Land Services, Inc.
November 12, 2013
Lindsay Kuntz, Real Estate Specialist II
City of Ft. Collins
300 LaPorte Avenue
P.O. Box 580
Ft. Collins, CO 80522-0580
Acquisition and Relocation Specialists
505 North Denver Avenue
Loveland, Colorado 80537
(970) 667-7602 • Metro (303) 938-1414
Fax (970) 667-6580
Re: Federal Aid Right of Way Acquisition Mentoring Services
City of Fort Collins Horsetooth Road / TimberIine Road Intersection Project
Federal Aid Project AQC M455-010
Dear Lindsay;
Please accept this letter as our brief proposal and cost estimate to provide consulting federal aid
acquisition mentoring services for the City of Fort Collins staff regarding the above referenced
project. As we have discussed, our services for this project are intended to provide mentoring of
specific individuals within the City Real Estate Services staff in order to provide them the
opportuuties to submit examples of their work performed on this project to the Colorado
Department of Transportation (CDOT) and request pre -qualification for future federal aid
acquisition work for the City. The mentoring will consist of assistance in preparation of
appropriate documentation during the acquisition process and periodic review of the acquisition
procedures employed as the acquisition process moves forward for this project. The standards to
provide mentoring as provided by CDOT are not set forth in writing and have been established
generally through the CDOT Region 4 office.
The mentoring process envisioned for this current project is a continuation of mentoring that was
provided to the City staff on Phase II and III of the North College Improvements Project. During
the last phase of that project, the City staff prepared all documentation and Western States
performed review of primary acquisition documentation such as Notice of Interest letters, Offer
letters, Final Offer letters, Last Written Offer letters and negotiation logs. Additionally, we
reviewed the City's valuation process including development of Fair Market Values and Value
Findings. We do not envision being involved with day to day specific negotiations with the
project property owners, however, we are available and anticipate that we will be requested to
advise the City staff regarding selected situations that may arise during the negotiation process,
If necessary, we can review properties in the field with City staff and discuss 'potential
resolutions to acquisition circumstances that may arise. During the negotiation process, we will
periodically monitor the negotiations including random review of the negotiator logs. At the
conclusion of the acquisition phase of this project; it is our understanding that the specific agents
engaged in the acquisition activities on behalf of the City may submit their work product
documents to CDOT Region 4 and request placement onto the CDOT Pre -Qualified Federal
Acquisition Agents list for future City of Fort Collins projects.
Page 2 of 4
BASIC PROJECT DESCRIPTION
The Harsetooth Road / Timberline Road Intersection Improvements' Project will entail
acquisition of property interests from approximately 10 individual and distinct property
ownerships. Three of the acquisitions are considered to be very small temporary construction
easements which will likely qualify for Value Findings. There are 7 fee acquisitions however,
one, McDonalds, may be small enough to also qualify for a Value Finding. Prior investigations
by the City have determined that there will not be any relocation involved with this federal
project. It is our understanding that the City has already obtained City Council authority to
acquire die necessary property interests and expects that the right of way plans will be approved
for this project during the month of November. The City has retained an independent third party
appraiser to provide appraisals for all acquisitions that exceed the Value Finding thresholds. All
appraisals and Value Findings will be submitted to CDOT Region 4 for review and approval and
establishment of a Fair Market Value (FMV) as a basis for the upcoming Offers. The City has
legal descriptions and title commitments for each of the acquisitions and intends to use its
standard form of real estate contract. It is noted that one acquisition from the Poudre School
District is expected to be dedicated pursuant to a pre-existing agreement reached with the City of
Fort Collins. Normally, it is anticipated that these transactions will flow through an independent
title company providing clear title and title insurance to the City. In exception to this may be the
closure of small value acquisitions involving temporary construction easements only which can
be handled by the city staff. The City proposes to go to ad on or about the Spring of 2014 and
therefore we anticipate the acquisition activities should be closed or to the point of legal
acquisition by the City by that time.
BASIC SERVICES TO BE PROVIDED
Western States will review by signature each of the following documents that are prepared by
city staff prior to issuance:
1. Notice of Interest to Acquire (appraisals)
2. Notice of Interest to Acquire (Value Findings)
3. Offer to Acquire
4. Offer of Fair Market Value
5. Final Offer or Last Written Offer to Acquire
Other documents that will be reviewed for completeness but not counter -signed by Western
States will include:
1. Inclusion of right of way plans
2. Inclusion of legal descriptions
3. Inclusion of CDOT Demographic Informational form
4. Inclusion of right of way acquisition policies and procedures pamphlet
5. Additional miscellaneous attachments on a case by case such as Colorado Statutes 38-
1-121, City Ordinance approval acquisitions, appraisal guidelines and the like.
Initially, Westem States will review a single set of acquisition documentation prepared by the
City for a particular acquisition. Once the initial acquisition documents have been reviewed and
approved by Western States, we expect that the City staff will then prepare multiple document
P:\FORT COLLINS\C08il20\PROM0 2013\L. Kuntz promo Itr 11-12-13.doc
Page 3 of 4
packages in groups such as Notice of Interest to Acquire, Offer to Purchase / Offer of Fair
Market Value letters, etc. and we will review multiple packets for review and transmittal onto the
subject property owners. We anticipate that our review of the aforementioned documeniation
may occur at the offices of the City of Fort Collins Real Estate Services or, in the event it is
convenient, agents with the City may bring the documentation to our offices for initial review
and approval. During the acquisition activities, Western States will main a reduced set of
acquisition files, including primary letters, offers, e-mails, legal descriptions, title commitments,
right of way plans, closing documents and other pertinent documentation on an in-house basis.
As a part of our mentoring, we will inspect the City's file keeping process to ensure that the
appropriate record documentation such as agent certification and activity logs are kept current
with the status of the acquisitions. As the negotiations proceed, we will review with the City
acquisition staff the overall status of the acquisitions and discuss specific negotiation issues that
may require an interpretation of the aforementioned Federal Uniform Act. For -this project, we
understand that the City proposes to utilize its own funds for payment of monies due to property
owners and therefore we anticipate that administrative settlements will not be required for
presentation to CDOT Region 4. We do recommend, however, that in the event settlements are
reached greater than the FMV monetary amount, that the City staff document those transactions
to be used for administrative settlement form for fixture reference and demonstration to CDOT
Region 4 at the conclusion of the project. Included in our mentoring services will be attendance
at selected progress meetings and special meetings necessitated by special issues that may arise
during the acquisition process that relate to the federal rules and procedures. At the conclusion of
right of way acquisition, or such time as the City has obtained legal possession or court dates for
Immediate Possession hearing relative to any condemnation filed, Western States will work with
the City acquisition staff to prepare the appropriate right of way clearance request documentation
for presentation to CDOT Region 4. At that time a final and thorough review be conducted of all
City acquisition documents relating to this project to verify compliance with the Uniform Act
and the request of CDOT Region 4 relative.to our Right of Way Clearance Request.
ESTIMATED COSTS FOR SERVICES
As the overall mentoring process is not well defined and Western States is not in control of the
schedule of the various acquisition activities that will ensue, it is difficult to derive an exact
estimate of our expected time and expenditures for these efforts. Considering that our work
effort will be sporadic and will continue into the Spring of 2014, we have budgeted the following
costs for these services:
Agent (80 hours x $75 per hour) $6,000.00
Administrative (50 hours x $40 per hour) $2,000.00
Expenses (mileage conies telecom postage etc.) $ 500.00
Total $8,500.00
Western States will bill for its time on a monthly basis and pursuant to the attached Fee
Schedule. Note the Fee Schedule is the scheduled established for Federal Aid Projects in 2014.
The above calculated budget amount is not presented in a fixed bid and the City will be billed
only for the actual time and expenses incurred. In the event our efforts expand beyond the
current estimate, we will not bill in excess of the amount provided above without prior
authorization by the City.
P:\FORT COLLIMC086201PROM0 2013\L. Kuntz promo Itr It- 12-13.doe
Page 4 of 4
Thank you and please advise should you have any questions in regard to the information
contained herein. Once we receive notification from the City that we are approved to move
forward with our services, we will begin coordinating specifically with the City Real Estate
Services staff.
Sincerely,
WESTERN STATES LAND SERVICES, INC.
PresidentPhil B. Mazur — SRIWA
PM/lpk
Enclosures: Fee Schedule
CC: C08-20 (file)
PAFORT COLLINSlC08920TROM0 2013E. Kuntz promo Itr 11-12-13.doc
WESTERN STATES LAND SERVICES, INC.
FEE SCHEDULE
CITY OF FORT COLLINS
Calendar Year 2014
HOURLY *
Supervisor............................................................................................$75.00
Acquisition / Relocation Specialist 1........ :........................................ $75.00
Acquisition / Relocation Specialist Il...... ..... ..................................... $60.00
Clerical) Administrative Assistant .......................................... $40.00
EXPENSES
Expenses are charged at actual costwith no surcharge
Vehicle mileage ................................:...............Federal Rate (+/- $.51/mile)
Photocopies................................................................................... $.201page
Facsimile transmissions .................................... ........ _............. $1.00/page
Direct expenses for items such as postage, telephone, etc. are
charged at actual cost with no surcharge
* There is no surcharge for overtime hours worked
(Daily and monthly rates available upon negotiation)
PAFORT COLLINSCO9920TROMO 20131Fce Scbedulc 2014 Federal Aid Projects.doe
Ciw:.::
F6rt Cdbw�
MEMO
Date: December 11, 2013
Planning, Development & Transportation
Engineering Department
281 North College Avenue
P.O. Box 580
Fort Collins, CO 80522.0580
970.221.6605
970.221.6378 - fax
Icgov. com/en gin eering
To: Gerry Paul, Director of Purchasing and Risk Management
John Stephen, Senior Buyer
From: Tim Kemp, Civil Engineer III
Through: Dean Klingner, Capital Projects Program Manager
Re: Sole Source Request for Western States (Horsetooth and Timberline)
Background:
The Capital Projects group is currently designing an intersection improvement project for
Horsetooth and Timberline to mitigate operational, congestion and safety issues. The project
requires the purchase of right-of-way and easements from various property owners adjacent to the
intersection. The design and right-of-way acquisition phases are being funded by Building on
Basics (BOB) Intersection Qocal) funds. The construction phase is being funded by Building on
Basics (BOB) Intersection funds and a federal grant.
The project team is following all requirements mandated by the Federal Highway Administration
(FHWA) and the Colorado Department of Transportation (CDOT); similar to the processes we
follow for a majority of out- projects. The proposed acquisition areas have been approved by City
Council and the right-of-way plans are awaiting approval by CDOT. Upon approval from CDOT, the
team will enter into the right-of-way acquisition phase for this project. Construction of the project
is expected in the summer of 2014.
Sole Source Request:
Lindsay Kuntz, of the City's Real Estate Services Group (RES), has been working toward meeting her
CDOT qualification requirements relating to right-of-way acquisition on federal aid projects. Going.
into this project, the team had assumed that Lindsay would meet her CDOT requirements on the
Third Phase of the North College Project. However, the right-of-way acquisitions are still on -going
for North College so CDOT has stated that Horsetooth and Timberline needs a third party reviewer
of our federal aid acquisition paper work. This service was not included in our engineering design
contract.
city of
Fort Collins
We are asking the Purchasing Department to grant a "sole source request' for Western States Land
Services, Inc. (Phil Mazur) to provide consulting federal aid acquisition mentoring services based
upon the following:
Western States has been serving RES in this same capacity for North College Phase II and
Phase III, see the attached scope and fee estimate from Western States
Western States has a long-standing, professional relationship established with the CDOT
Real Estate staff members and experience with the acquisition process
Western States estimated fee has been reviewed by RES and Engineering and found to be
reasonable when compared to similar project scopes
Summary:
In conclusion, the Engineering Department is asking the Purchasing Department to grant a "sole
source request' for Western States services on the Horsetooth and Timberline project. This will be
the last project requiring a third party review of the acquisition phase documents. Western States
estimated fee of $8,500.00 is slightly higher than the maximum amount for a mini order.
Please contact me if you have questions or concerns with this request.
Tim Kemp
x 2719
Attachmentfrom Western States(5 pages)