Loading...
HomeMy WebLinkAboutCHANGE ORDER - RFP - 7548 MIDTOWN COLLEGE AVENUE CORRIDOR PLANpity of %��F6, t_ Collins Change Order Form PROJECT TITLE: Mid-Town/College Avenue Corridor Study PROJECT NUMBER 901021 CONTRACTOR: Fox Tutge Transportation Group (PO #9135832) CHANGE ORDER NUMBER: 1 In prepar(ng'change orders show In order as'separate numbered paragraphs the following: 1. Reason for change. 2. Description of change. 3. Change In contract cost. 4. Change in contract time. 1&2. See attached sheet for detail: 3. The contract cost will Increase by $ 7,600.00 4. There.wi8 be no change In contract'time. Planning, Development.&,Tmnsportgtion- FC Moves 281 N. College Avenue P.O. Box 580 Fort Collins, CO 80522,6580 970. 1.6706 -- Phone ORIGINAL CONTRACT COST S198,600.00 TOTAL APPROVED CHANGE ORDERS $0.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $7,500.g0 TOTAL % OF THIS CHANGE ORDER '3.81 % TOTAL C:O. % ORORIGINAL CONTRACT 3.8.1% ADJUSTED CONTRACT COST $204,100.00 (Assuming all change orders approved) ACCEPTED BY: DATE - 12-10-13 (Contractors R sentative) lo REVIEWED BY: (Senior SUBMITTED BY: DATE:, 62-7'C (i (Project Manager) " APPROVED BY: DATE- jz qJ -13 — , (Department Head) APPROVED BY: (Purchasing Agent over $60.1)(10) m CoMraaer Puwchaft Project File DATE: College Avenue Through Traffic Study Scope of Services December 6" 2013 Task 1: Collect Through Traffic Data on College Avenue The Fox Tuttle Transportation Group will subcontract with All 'Traffic Data to collect motor vehicle traffic data in the College Avenue corridor. The data will be collected for one day on Wednesday December 11, 2013. The data collection will include the use of electronic devices that can be used to match vehicles based on locations in exhibit A. The data will be collected as follows: Video data for vehicle matching: • 8:00 AM to 9:00 AM • Noon to 1:00 PM • 4:30 PM to 5:30 PM Tube counts with hourly summaries by direction: • 24-hours (on the same day that video data is collected) The data collection equipment will include: Four bluetooth readers • Four tube counters Task 2: Analyze and Prepare Through Traffic Data Summary The Fox Tuttle Transportation Group will obtain the processed traffic counts from All Traffic Data and Miovision's data center. This will include vehicle matching information and total traffic volumes as shown on exhibit A. This information will be used to prepare summary graphics that show: • Total daily and peak traffic volumes • Percentage of daily vehicles traveling 'through" the corridor, summarized by direction and peak hour • Percentage of vehicles traveling a "portion" of the corridor, summarized by direction and peak hour • Estimate of total daily travel "through" the entire corridor and only in a "portion" of the corridor Budget and Timeline The total cost of Task 1 and 2 will not exceed $7,500 including all expenses. All of the data collection and processing will occur in December 2013. =TUTTLE College Avenue Through Traffic Study Scope of Services December 6, 2013 Task 1: Collect Through Traffic Data on College Avenue The Fox Tuttle Transportation Group will subcontract with All Traffic Data to collect motor vehicle traffic data in the College Avenue corridor. The data will be collected for one day on Wednesday December 11, 2013. The data collection will include the use of electronic devices that can be used to match vehicles based on locations in exhibit A. The data will be collected as follows: Video data for vehicle matching: • 8:00 AM to 9:00 AM • Noon to 1:00 PM • 4:30 PM to 5:30 PM Tube counts with hourly summaries by direction: • 24-hours (on the same day that video data is collected) The data collection equipment will include: • Four Miovision LPR cameras • Four tube counters Task 2: Analyze and Prepare Through Traffic Data Summary The Fox Tuttle Transportation Group will obtain the processed traffic counts from All Traffic Data and Miovision's data center. This will include vehicle matching information and total traffic volumes as shown on exhibit A. This information will be used to prepare summary graphics that show: • Total daily and peak traffic volumes • Percentage of daily vehicles traveling "through" the corridor, summarized by direction and peak hour • Percentage of vehicles traveling a "portion" of the corridor, summarized by direction and peak hour • Estimate of total daily travel "through" the entire corridor and only in a "portion" of the corridor Budget and Timeline The total cost of Task 1 and 2 will not exceed $7,500 including all expenses. All of the data collection and processing will occur in December 2013. �TUTTLE