HomeMy WebLinkAboutCHANGE ORDER - PURCHASE ORDER - 9135165CHANGE ORDER NO. 1 PROJECT TITLE: Parking lot repair CONTRACTOR: Martin Marietta Materials PROJECT NUMBER: op-454606 DESCRIPTION: Demo and re -construct asphalt parking lot City of F6rt Collins In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change: Soft substrate under old asphalt required extra excavation and additional material filledin. 2. Description of change -Removal of spongy soils and add back in extra asphalt 3. Change in contract cost: $510.77 4. Change in contract time: N/A (Attach additional sheets as required) ORIGINAL CONTRACT COST $26,789.32 TOTAL APPROVED CHANGE ORDERS $0.00 TOTAL PENDING CHANGE ORDERS $510.77 TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER 0,00% Total C.O. % of Original Contract 1.91% ADJUSTED CONTRACT COST $27,300.09 (Assuming all change orders approved) ACCEPTED BY: AJ ACCEPTED BY: REVIEWED BY: APPROVED BY, Representative Project Manager Print Name Print Name /,e l0n,0" C�+r6fiwki/opt If over $60,000 - Purchasing Director cc: City Clerk Project File Contractor Purchasing Engineer Date //_�3.. / Date lI- ( 3 - 13 Date ate Date CHANGE ORDER NO. 1 FF,City OfPROJECT TITLE: Parking lot repairpv& Collins CONTRACTOR: Martin Marietta Materials PROJECT NUMBER: op-454606 DESCRIPTION: Demo and re -construct asphalt parking lot In preparing change orders show in order as separate numbered paragraphs the following: I . Reason for change: Soft substrate under old asphalt required extra excavation and additional material tilled in. 2. Description of change:Removal of spongy soils and add back in extra asphalt 3. Change in contract cost: $510.77 4. Change in contract time: N/A (Attach additional sheets as required) ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER Total C.O. % of Original Contract ADJUSTED CONTRACT COST Assuming all change orders approved) ACCEPTED BY: ACCEPTED BY: REVIEWED BY: APPROVED BY: APPROVED BY: Contractor's Representative Project Manager / 1 Print Name Print Name 0.00% 1.91% If over $60,000 - Purchasing Director cc: City Clerk Project File Contractor Purchasing Engineer $26,789.32 $0.00 $510.77 $27,300.09 Date Date t l- r 3 13 Date Date Date �J)0 o�-ySy�c) 6 o'll v� Remit To: Martin Marietta Materials MartinMartin Marietta Materials Inc. PO Box 848241 Dallas, Texas 75284-8241 �r,r ���,13� �g��iNVOICE DATE'�je�€3tt t'�i' November 5, 2013 CITY OF FORT COLLINS 215. MASON ST. 2ND FLOOR FORT COLLINS, CO. 80522 ATTN: MONTY WAGNER 970 221.6775 JobSite 218 W. MOUNTAIN AVE - FORT COLLINS, COLORADO Location INVOICE r �GF „`jz INVOICE N_Or � 1 � »� � PURCHASE ORDER NO 12501746 E`s: "a,}m CUSTOMER NO k , 't , PAGE RETAINAGE-' 656013 1 OF 1 0% Last Day Worked: 10-31-13 Final Billing: YES Estimator. KELLY STEELE Contract: 218 W. MT. AVE. PARKING LOT R&R Job #: 1633272424 Item No Description Original Qty Unit Unit Price Original Amount Quantity This Period Amount Due This Period Quantity To Date Amount To Date 203.1 203, 10 - Excavation- General Less Than 100 CY-4.5"Depth 100.00 CY E 24.26 E 2.426.00 100.00 E 2,426.00 100.00 S 2,426.00 306.01 306.01 - Subgrade Prep 746.00 SY E 1.70 E 1,268.20 727.00 f 1.235.90 727.00 S 1,236.90 403.07 403.07 - Hand Patching Next To New CSG: 3.00 TON E 110.00 $ 330.00 $ - - 6 403.09 403.09 - HMA - Paver Patching 4.5" Depth 187.00 TON E 93.00 E 17,391.00 196.84 E 18,306.12 196.84 S 18,306.12 403.1 403.10 - Sal Sterilanl 1.00 LS E 156.25 E 156.25 1.00 E 156.25 1.001 156.25 630.01 630.01 - Construction Zone Traffic Control 6.54% 1.00 PCNT E 1,675.82 $ 1,717.87 1.00 E 1,675.82 1.00 $ 1,676.82 630.02 630.02-Mobilization 1.00 EACH E 3.500.00 E 3,500.00 1.00 E 3,500.00 1.00 f 3,500.00 700 700.00 - F/A Misc. 1.00 EACH $ 1.00 E 1.00 E - - f E E E $ E E E f E E E f E E E $ $ a a s - E - f E E f TOTAL $ 26.790.32 E 27,300.09 E 27.300,09 TOTAL RETAINAGE E - E - E _ TOTAL DUE LESS RETAINAGE f 26,790.32 f 27,300.09 $ 27,300.09'