HomeMy WebLinkAboutCHANGE ORDER - RFP - 7023 SOUTH TRANSIT CENTERCity of Planning, Development & Transpo • ation Engineering F6rt CoWns College281 North P.O. Box 580 Fo.,t Collins, CO80522.0580 - 970.221.6605 970.221.6378 - fax _ fcgov.correngineering CHANGE ORDER FORM PROJECT TITLE: Mason MAX BRT Project - South Transit Center PROJECT NUMBER: 400903280 CONTRACTOR: Aller-Lingle Massey Architects (PO#9955240) CHANGE ORDER NUMBER: 8 In preparing change orders show in order as separate numbered paragraphs the following 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 1. & 2. See attached for reason and description of change. 3. The contract cost will increase by $18,000.00. j 4. The contract time will be extended to February 28, 2014. ORIGINAL CONTRACT COST $474,750.00 TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTEDE SUBMITTED REVIEWED BY: APPROVED BY: APPROVED BY: cc: City Clerk Contractor Purchasing Project File (Purchasing Agent) $61,620.00 $0.00 $18,000.00 $554,370.00 DATE: i t.Lz51),�7 DATE: i(• ?G�'I3 E: E: //'25-/3 DATE: ALLER • LINGLE • MASSEY "000��� ARCHITECTS P.C. September 30, 2013 Mr. Keith Meyer, P.E. Ms. Erika Keeton, Special Projects Engineer Ditesco Engineering Department 1315 Oakridge Drive, Suite 120 City of Fort Collins Fort Collins, CO 80525 P. O. Box 580 Fort Collins, CO 80522 RE: Proposal for Additional CA Phase Services South Transit Center City of Fort Collins, Colorado Project No. 0926 Dear Keith and Erika: Aller•Lingle•Massey Architects P.C. is pleased to provide you with this Proposal for extending our design team's involvement in the South Transit Center's construction administration phase beyond the expiration of our A/E Agreement in July 2013. In response to our meeting of August 26, 2013, we propose the following scope and associated fee allowances. Extended Project Scope Extend the Construction Administration (CA) phase services from July 15, 2013 to an assumed final completion of March 1, 2014. (Refer to the letter to Steve Seefeld dated July 18, 2011, that extended our contract through July 15, 2013.) These services are itemized as follows: 1. RFI Responses: RFIs will be processed by the City of Fort Collins (CFC) and forwarded to the ALMA design team as appropriate.. If the CFC chooses to send a RFI directly to our subconsultants, ALMA will be copied on such request and the response will come through ALMA for review prior to being sent on to the City. 2. ASIs: The same process will be followed. The CFC will request ALMA to issue an ASI (if required), and ALMA will direct the appropriate subconsultant to prepare the ASI. The ASI will then be sent to ALMA for review prior to being sent to the City. 3. Submittal Review: The ALMA design team will review any submittal that had been previously rejected for non-compliance or had been determined to not be complete. The CFC will review these for completeness prior to forwarding to .the design team for review. Any submittals that were not previously submitted and reviewed will be completed as a part of the original base scope. 4. Field Observations: Field observations will be performed by the design team on an as -requested basis, but the Architect shall be on site not less than once per month, and subconsultants as needed. Requests will come from the City. 5. O/A/C Meetings: ALMA will attend O/A/C meetings as requested by the CFC, and we should assume that our attendance will be at least two (2) meetings per month. Subconsultants will not participate in these, except possibly civil engineering. 6. Safety and Security Management Plan: Attendance at five (5) SSMP workshops, review meetings, conferences, etc., that were beyond the initial kickoff meeting that was included in the original base scope. Preparation of SSMP submittal documentation exhibits, response to SSMP compliance questions, design calculations, etc., will be part of the extended scope of work. (This work is partially based on a proposal sent to Steve Seefeld in 2011, but not acted upon.) 7. General Design Team Scope Revisions: The CFC has requested that any time that the ALMA design team expended during the original CA phase through the termination of the original general con- 712 WHALERS WAY • BLDG. B, SUITE 100 • FORT COLLINS • COLORADO • 80525 (970) 223-1820 phone • (970) 223-1833 fax • office@aller-tingle-massey.com • mm.aller-lingle-massey.com 10 Proposal for Architectural/Engineering Services - 2 tractor that we believe was above and beyond what would be required by a "normal' project be included in this proposal request. This category includes things such as excessive field visits and follow-up reports due to field quality control issues or materials placed out -of -compliance with the contract documents, excessive reviews of submittals due to same being incomplete, out of compliance or unacceptable substitutions, excessive LEED coordination, incomplete LEED submittals, and backtracking through the process, etc. Work Not Included 1. All CA phase work that would be considered part of the original scope of work, and that not yet been completed and/or started. This includes: a. Punch list observations and reports. b. Project close-out, including review of O&M manuals. C. Record documents. d. LEED construction certification documentation and submittal. e. Submittal review for products or systems that had not yet been submitted by July 2013. f. CA phase work related to the Park and Ride, since no work had begun on this part of the site, except for submittals for the site concrete, site lighting, etc., that have already been reviewed. 2. Planning submittals for the Minor Amendment for the, proposed bike locker structure. This is being processed as a separate Proposal. 3. CA phase services that we were not originally involved in, including change order reviews and pay application reviews. 4. Preparation of an ALTA survey or other documentation to certify as -built grading and drainage improvements. 5. Special inspections required by the specifications, City of Fort Collins, CDOT or FTA. Fees Alter- Lingle -Massey Architects P.C. and our design team propose to complete the extended scope of work for the following additional fees, provided as Allowance per your request: A[ler•Lingle -Massey Architects P.0 RFI Responses and ASIs: Allowance of $ 5,800.00 Submittal Re -review: Allowance of $ 1,000.00 Field Observations and Reports: Allowance of $ 1,800.00 0/A/C Meetings: Allowance of $ 1,800.00 SSMP Consulting: Allowance of $ 4,500.00 General Scope Revisions: Allowance of $ 2,000.00 Subtotal: $ 16,900.00 BHA Design (Landscape Architecture) RFI Responses and ASIs: Allowance of $ 200.00 Submittal Re -review: None Field Observations and Reports: None O/A/C Meetings: None SSMP Consulting: Allowance of $ 400.00 General Scope Revisions: Allowance of S 1,150.00 Subtotal: $ 1,750.00 HDR (Civil Engineering) RFI Responses and ASIs: Allowance of $ 3,100.00 Submittal Re -review: Allowance of $ 1,400.00 Field Observations and Reports: None O/A/C Meetings: Allowance of $ 1,200.00 SSMP Consulting: Allowance of $ 1,700.00 General Scope Revisions: Allowance of $ 1,900.00 Subtotal: $ 9,300.00 Proposal for Architectural/Engineering Services - 3 KL&A Inc. (Structural Engineering) RFI Responses and ASIs: Allowance of $ 500.00 Submittal Re -review: None Field Observations and Reports: Allowance of $ 625.00 0/A/C Meetings: N/A SSMP Consulting/Structural Calculations: Allowance of $ 650.00 General Scope Revisions: Allowance of $ 1,000.00 Subtotal: $ 2,775.00 Design Balance (LEED Consultant) Additional LEED Consulting: Allowance of $ 3,300.00 The Ballard Group (Mechanical Engineering) No anticipated changes in scope. IES (Electrical Engineering) No anticipated changes in scope. ABD Inc. (Interior Design) No anticipated changes in scope. Total Allowance for Design Team: $ 34,025.00 Reimbursable Expenses The balances remaining in the reimbursable expense allowances included in our original contract appear adequate to cover the extended scope of work, so no modifications are necessary. Billings Additional scope of work will be billed monthly on an hourly basis per each firm's current hourly rates, as requested. Our billings will be split 70% transit and 30% park and ride, as agreed to in our meeting of September 25, 2013. Aller•Lingle•Massey Architects P.C. Principal: $150/hour Sr. Project Manager/Architect: $115/hour Architecturallntern/CAD Technician2: $75/hour BHA Design Inc. Landscape Architect Project Manager: $98/hour Irrigation Designer: $85/hour HDR Sr. Project Manager: $195.50/hour Engineer II: $117/hour CAD/GIS: $110/hour Project Controller/Admin.: $75/hour KL&A Inc. Project Engineer: $125/hour Structural Designer: $100/hour Design Balance Principal LEED Consultant: $150/hour LEED Technical Coordinator: $60/hour Proposal for Architectural/Engineering Services - 4 Schedule Extended scope of CA phase services for this project will be performed on an as -requested basis. The City is anticipating the project will be completed by March 1, 2014. Standard Contract Terms and Conditions All terms and conditions of this Proposal shall be in accordance with our original contract with the City of Fort Collins. This Proposal extends CA phase services to March 1, 2014. Thank you for the opportunity to submit this Proposal. Give me a call if you have any questions, or if I have misunderstood any aspect of your intent. We took forward to a successful completion of the South Transit Center. Sincerely, ALLER•LINGLE•MASSEY ARCHITECTS P.C. David B. Lingle, AIA, LEED AP DBL:IIs �rof t� Collins If►/Rt7.1J_ell _hItUm Planning, Development & Transportation Engineering Department 281 North College Avenue P.O. Box 580 Fort Collins, CO 80522.0580 970.221.6605 970.221.6378 -fax fcgov. com/engineering To: Gerry Paul, Director of Purchasing and Risk Management From: Erika Keeton, Special Projects gineer' _ Date: 11 /22/2013 Re: Aller Lingle Massey Architects CO No. 8 — Addition of a Secure Bike Locker at the South Transit Center Aller Lingle Massey Architects (ALMA) requires a supplement (CO#8) to include site planning and construction documents, and all required meetings and administrative items for the addition of a secure bike locker for the South Transit Center project. Transfort is requesting the addition of the prefabricated steel structure bike locker as it was determined there was lack of secured bike parking on site. The bike locker will consist of a steel cage like structure with a roof, interior lighting and will be electronically access controlled. The bike locker will require a minor amendment from the City of Fort Collins, and that process will also be included in this change order. ALMA is currently managing the construction administration activities for the South Transit Center and should be utilized for this particular work effort for maximum efficiency. ALMA is requesting a supplemental budget increase of $18,000.00 for the preparation of design and construction documents related to the Bike Locker. I have prepared an Independent Cost Estimate (ICE) also attached, which is slightly higher in cost at $19,370.00. The ICE is based on rates used in previous change orders provided by ALMA, and are comparable to other consultants used in this project. The difference between the ICE and the proposal is due to a variation in hours deemed necessary to complete the work. Based on my experience, I believe the requested Change Order #8 for the amount of $18,000.00 for the addition of a secure bike locker is reasonable and I recommend approval of this Change Order. Foty0 rt Collins Date of Estimate: 26-Aug-13 Contract Type: Architect -Engineer Existing Contract or PO (Y/N): Y Description of Services (B): Independent Cost Estimate Change Order #8. Provide design, minor amendment submittals, and, construction plans, and all related meetings and administrative support for installation of a prefabricated bike locker at the South Transit Center. Hours have been estimated to provide a minimum of 8 hours per disipline. The Landscape Architect will be overseeing the City of Fort Collins minor amendment process and is estimated to take a week. Additional time was aloted to the Sr. Architect Project Manger who will be overseeing the entire design and construction process. Rates are known from previous change orders for ALMA. stained the following estimate from; or Technical Estimate (performed by) Karl Craven Cost Estimate Details: (Estimate calculated in US Dollars) B Cost of Services. Repairs. or Non -Standard Items Materials or Work Description Other Direct Costs Labor Rate $ Labor Hours Labor Class TOTAL A/E RFI/Field Observations $ - $ 115.00 8 Sr. Project Manager - Architect $ 920.00 A/E Design and Submittals $ - $ 116.00 20 Sr. Project Manager - Architect $ 2,320.00 A/E Support Staff $ - $ 75.00 10 Architect/Intern $ 750.00 Civil SSMP $ - $ 195.00 8 JCivil Engineer Project Manager $ 1,560.00 Civil RFI/Field Observations $ - $ 195.00 8 JCivil Engineer Project Manager $ 1,560.00 Civil Submittals $ - $ 115.00 20 Civil Engineer $ 2,300.00 Structural Submittals $ - $ 150.00 8 Structural Engineer Project Manager $ 1,200.00 Structural RFI/Field Observation $ - $ 150.00 8 Structural Engineer Project Manager $ 1,200.00 Electrical Submittals $ - I $ 135.00 8 Electrical Engineer Project Manager $ 1,080.00 Electrical RFI/Field Observation $ - $ 135.00 8 Electrical Engineer Project Manager $ 1,080.00 Landscape Architecture $ - $ 135.00 40 Landscape Architect Project Manager $ 5,400.00 Total 1 1 $ 19,370.00 Signature of Preparer: OM C/tg�� ALLER • LINGLE • MASSEY ARCHITECTS A D P.C. Revised November 8, 2013 October 9, 2013 Mr. Keith Meyer, P.E. Ditesco 1315 Oakridge Drive, Suite 120 Fort Collins, CO 80525 Ms. Erika Keeton, Special Projects Engineer Engineering Department City of Fort Collins P. 0. Box 580 Fort Collins, CO 80522 RE: Proposal to Add Prefabricated Secure Bike Shelter Structure South Transit Center City of Fort Collins, Colorado Project No. 0926 Dear Keith and Erika: Alter. Lingle -Massey Architects P.C. is pleased to provide you with this Proposal for adding a prefabricated steel bike shelter structure to the north end of the South Transit Center site. In response to our scoping meeting of October 24, 2013, and our follow-up research, we propose the following revised scope and associated fees. Project Description Design and planning services for adding an approximately 18' x 27' prefabricated steel bike shelter enclosure to the South Transit Center site, based upon the "Cycle Station" by Dero (and represented locally by Streetscapes). The shelter structure needs to be Buy America compliant. This alternative represents the direction selected by the City of Fort Collins, but with the intent that the "standard" design be customized in the following ways: Dimensions • Roof profile design • Materials and finish for roofing • Finish for structural steel frame components • Type and finish for wire enclosure panels We have determined that the addition of this structure will trigger a Minor Amendment through the City's planning review process. Scope of work shall include: 1. Site Planning: BHA Design will create a conceptual site plan design to locate the structure, modify sidewalks, landscaping and other site features, and submit to the City's STC staff for review. 2. Design: ALMA will work with Streetscapes to determine how and to what extent their standard shelter design will be customized. Based upon this, we will develop a conceptual design and submit design drawings to the City for review and approval. 3. Minor Amendment: BHA Design will prepare planning submittal documents as required to go through the City of Fort Collins Minor Amendment process.. ALMA will create architectural elevations of the approved conceptual shelter design to accompany the submittal, and HDR will redesign the approved site grading plan as required. BHA will provide all coordination, staff review responses, etc., as required for approval. 4. Construction Documents: ALMA and our team of consultants will prepare construction documents based upon the manufacturers customized prefabricated steel structure, foundations, roofing, wire 712 WHALERS \NAY • BLDG. B, SUITE 100 • FORT COLLINS • COLORADO • 80525 (970) 223-1820 phone • (970) 223-1833 fax • office@aller-tingle-massey.com • www.aller-lingle-masseycom Proposal for Architectural/Engineering Services - 2 enclosure panels, gates and hardware, for use by the General Contractor in constructing the structure. These CDs will include: • Architectural floor plan • Architectural elevations • Architectural sections and details • Electrical lighting and power plan • Revisions to the site improvement plan, grading plan, landscape and irrigation plans, etc., as required for the new structure • Technical specification section to cover the prefabricated shelter and all customized features Work Not Included 1. Design of a custom bike shelter structure. 2. Foundation engineering design and drawings. This will be provided by the shelter structure manufacturer. 3. Mechanical engineering design for any potable water to the location of the bike shelter. We assume that no permanent wash down capability is needed. 4. Development of a "performance" specification to allow competitive bids. We will provide a Division 13 specification based upon the "Cycle Station" by Dero, listing approved equals. 5. MAX graphics, panels and signage. Dero recommends that this be done by a local sign company. 6. Bidding and Construction Administration phase services. These will be provided by the City. City -Provided Information 1. Minor Amendment application fees. 2. Bicycle rack purchase and installation. 3. MAX graphics and signage components. 4. Access control requirements for the shelter gate. Fees Aller•Lingle -Massey Architects P.C. and our design team propose to complete the added work for the following additional fixed fees: Aller•Lingle -Massey Architects P.C. Minor Amendment: $ 1,100.00 Construction Documents: $ 4,395.00 Subtotal: $ 5,495.00 BHA Design (Landscape Architecture) Minor Amendment: $ 1,375.00 Site Design and Construction Documents: $ 4,440.00 Subtotal: $ 5,815.00 HDR (Civil Engineering) Minor Amendment: $ 1,110.00 Site Design and Construction Documents: $ 3,580.00 Subtotal: $ 4,690.00 KL&A Inc. (Structural Engineering) Not included IES (Electrical Engineering) Electrical Design and Construction Documents: $ 2,000.00 Total Design Team: $18,000.00 Proposal for Architectural/Engineering Services - 3 Reimbursable Expenses The balances remaining in the reimbursable expense allowances included in our original contract appear adequate to cover the added work, so no modifications are necessary. Billings Additional scope of work will be billed monthly on a fixed fee basis. Our billings will be split 70% transit and 30% park and ride, unless otherwise advised. Schedule Upon approval of a C.O. for this work, we will prepare the conceptual design for the Citys review in 2-3 weeks. Minor Amendment documents will be prepared within 3 weeks of the City's approval of the design. Construction documents and specification will be prepared while the Minor Amendment is being reviewed by the City of Fort Collins. These schedule timelines do not account for the City's review periods for the Minor Amendment. Standard Contract Terms and Conditions All terms and conditions of this Proposal shall be in accordance with our original contract with the City of Fort Collins. Thank you for the opportunity to submit this Proposal. Give me a call if you have any questions. Sincerely, ALLER•LINGLE•MASSEY ARCHITECTS P.C. David B. Lingle, AIA, LEED AP DBL:IIs TC Planning, Development & Transportation �'�� �" Wins Engineering Fo �P. North College Avenue P.O. Box 580 Fort Collins, CO 80522.0580 - 970.221.6605 970.221.6378 - fax fcgov.com/engineering CHANGE ORDER FORM PROJECT TITLE: Mason MAX BRT Project - South Transit Center PROJECT NUMBER: 400903280 CONTRACTOR: Aller-Lingle Massey Architects (PO#9955240) CHANGE ORDER NUMBER: 9 In preparing change orders show in order as separate numbered paragraphs the following 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 1. & 2. See attached for reason and description of change. 3. The contract cost will increase by $34:025,00. 4. The contract time has been extended to February 28, 2014. ORIGINAL CONTRACT COST $474,750.00 TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED[ SUBMITTED REVIEWED BY: APPROVED BY: APPROVED BY: cc: City Clerk Contractor Purchasing Project File (Purchasing Agent) $61,620.00 $18,000.00 $34,025.00 $588,395.00 DATE: DATE: DATE: DA i E: / I� 2 J '3 DATE: City of F6rtCollins f� Planning, Development & Transportation Engineering Department 281 North College Avenue P.O. Box 580 Fort Collins, CO 80522.0580 970.221.6605 970.221.6378 - fax fcgov.com/engineering Memorandum To: Gerry Paul, Director of Purchasing and Risk Management From: Erika Keeton, Special Projects gin f Date: 11/20/2013 Re: Aller Lingle Massey Architects Change Order No. 9 - Cost Analysis and Sole Source & Justification Aller Lingle Massey Architects (ALMA) requires a supplement (CO#9) for the South Transit Center project extending the contract time and for additional construction administration. The current ALMA contract concluded on July 15, 2013 and will be extended to March 1, 2014 in conjunction with this change order. The completion of the building was expected on July 1, 2013. The contractor for the South Transit Center was terminated on July 8, 2013 for lack of performance, and the bonding company has assumed control of the project. Due to these delays in project completion, an extension of ALMA construction phase services is necessary to mirror the revised building construction schedule. This change order provides for additional time to attend O/A/C meetings, perform field inspections, and review RFI's and submittals which have extended beyond the original building schedule. Excessive field visits, numerous submittal and RFI reviews, and extensive coordination efforts were performed by ALMA and their sub -consultants as a result of quality control issues and incomplete documentation by the original contractor prior to termination, utilizing more of the original budget than expected. Also included is preparation of documents related to the Safety and Security Management Plan that were not included in the original scope. ALMA is currently managing the construction administration activities for the South Transit Center and should be utilized for this particular work effort for maximum efficiency. ALMA is requesting a supplemental budget increase of $34,025.00 for additional construction administration support. I have prepared an Independent Cost Estimate (ICE) also attached, which is lower in cost at $27,240.00. The difference between the ICE and the proposal is due to project staff not anticipating the future need for additional LEED design consulting or Structural Engineering. It is not expected that these sub consultants will be utilized beyond their original scope, but this provides a budget should they be needed in the future. In addition, these two sub consultants included time expended during the original phase through the termination of Growling Bear that was above and beyond what would be normally required. The ICE is based on rates used in previous change orders provided by ALMA, and are comparable to other consultants used in u111S Project. Based on my experience, I believe the requested Change Order #9 for the amount of $34,025.00 for anticipated work from the end of the current contract through project completion is reasonable and I recommend approval of this Change Order. Fort of Date of Estimate: 26-Aug-13 Contract Type: Architect -Engineer Existing Contract or PO (Y/N): Y Description of Services (B): Independent Cost Estimate Provide architectural and engineering construction administration related support necessary to progress the project through completion and include meeting attendance, submittals and approvals, field inspections and items related to the Safety and Security Management Plan. Hours are estimated for project needs for a 5 month duration. It is anticipated that workload should drastically reduce by January and minimal requirements will be needed after that to project completion. Rates are known from previous change orders for ALMA. Stained the following estimate from; I or Techincal Estimate (performed by) Erika Keeton Cost Estimate Details: (Estimate calculated in US Dollars) B Cost of Services. Renairs. or Non -Standard Items Materials or Work Description Other Direct Costs Labor Rate $ Labor Hours Labor Class TOTAL A/E SSMP $ $ 150.00 25 Architect Principal $ 3,750.00 A/E OAC $ $ 115.00 40 Sr. Project Manager - Architect $ 4,600.00 A/E RFI/Field Observations $ $ 115.00 40 Sr. Project Manager - Architect $ 4,600.00 A/E Submittals $ - $ 116.00 40 ISr. Project Manager - Architect $ 4,640.00 A/E Support Staff $ - $ 75.00 20 Architect/Intern $ 1,500.00 Civil SSMP $ - $ 195.00 15 Civil Engineer Project Manager $ 2,925.00 Civil RFI/Field Observations $ - $ 195.00 15 Civil Engineer Project Manager $ 2,925.00 Civil Submittals $ - $ 115.00 20 Civil Engineer $ 2,300.00 Total $ 27,240.00 Signature of Preparers