Loading...
HomeMy WebLinkAboutWORK ORDER - BID - 7391 MISCELLANEOUS CONCRETE ANNUAL (23)qI -�cci— WORK ORDER PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND VOGEL CONCRETE, INC. DATED: 9/30/2013 Work Order Number: 16-VOG-400903700-13 Purchase Order Number: Project Title: South side of Sycamore (Whitcomb to Sherwood) Original Bid/RFP Project Number & Name: 7391 (Annual Concrete Maintenance Contract) Commencement Date: 10/712013 Completion Date: 10/28/2013 Maximum Fee: (time and reimbursable direct costs): $38,725.00 Project Description: Install a total of 605' of new sidewalk (88' along Whitcomb and 100' along Sherwood), three ADA accessible ramps, and reconstruction of three drive approaches, Scope of Services: Conduct onsite meetings as necessary, perform general excavation, removal of improvements, construction of new sidewalk and ramps, and fulfill material testing requirements as necessary. Upon protect completion to be reviewed by contractor and City engineering staff. The scope of services does not include authorization to deviate from the approved location without approval from engineering prolect manager. Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of one (1) page are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Professional By: Jeff Hubbard Date: 9/30/2013 City of Fort Collins By: Robert Mosbey Project Manager Date: 9/30/2013 By: Gerry Paul Director of Purchasing and Risk Management (over $60,000.00) Date: City of / Fit Collins EXHIBIT "A" WORK ORDER FORM AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND VOGEL CONCRETE, INC. BID NO: 7391 DATE: 9/30/2013 REQUESTED BY: Rob Mosbey Email work orders to mail(cbvogelconcrete.com WORK ORDER NO: 12-VOG-400903700-13 PHONE NUMBER: 970-221-6659 (office) BILL TO (name, address, zip): Rob Mosbey 281 N. College Avenue Fort Collins, CO 80522 EMAIL ADDRESS: rmosbey(d,)fcgov.com DEPARTMENT: Engineering PROJECT TITLE/DESCRIPTION: Accessible Ramps - North side of Rolland Moore east of Shields SCOPE OF SERVICES: Install two new ADA accessible ramp(s). COMMENCEMENT DATE: 10/14/2013 CITY OF FORT COLLINS, BY: Rob Mosbey COST: $7,500.00 COMPLETION DATE: 10/21/2013 DATE: 9/30/2013 Vogel Concrete, Inc. agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms), the Services Agreement shall control. VOGEL CONCRETE, INC: DATE: 9/30/2013 BY: CC: Purchasing; the attached forms) consisting of = page(s) are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given. Miscellaneous Concrete Annual - Page 1 of 1