PROJECTTITLE: . N. College Rd. Improvements
PROJECT NUMBER: 400903960.6 (Bid 47273)
CONTRACTOR: Connell Resouces,'lnc. (PO #9116026)
CHANGE ORDER NUMBER: '23
n preparing change orders show in order as separate numbered paragrepns me rallovnng:
1. Reason forchenge. 2. Description of change_
3. Change In contract cost. 4. Change in contract time.
1&2. See attached sheet for detail.
3. The contract cost will increase by $56,960.47
4. There will be no change In contract time.
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % THIS CHANGE ORDER
TOTAL C.O. % ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
ACCEPTED BY:
REVIEWED BY:
SUBMITTED BY:
$6,111'000.00
$6.00
$74,673.60
$56.W.47
0.93%
Y.15%
$6,242,634.07
DATE: t ( II I I h 5
DATE:
APPROVED BY: DATE:
�( .rtment Head) _
APPROVED BY: DATE:
(Purchasing Agent over $60,000)
cc Contractor
Purcheelag
PrcpU Re
North College - Vine to Conifer
SUMMARY OF WORK
Item
Quantity
Unit
$ / Unit
Total
1
Woodlawn Ave. Emergency Flood Repairs
1
LS
$ 56,960.47
$ 56,960.47
Total Cost
$ 56,960.47
F
� ( -.REASON FOR CHANGE
y
1. Repairs needed at Woodlawn Avenue due to storm flooding. Repairs to roadway, sidewalk, pedestrian arbor, pedestrian lighting, irragtion
and landscaping.
WHEN POSTED_, , Pay App6catigP #14,,