HomeMy WebLinkAboutWORK ORDER - RFP - 7291 GEOTECHNICAL TESTING SERVICES (4)EXHIBIT 'A" r'Crpol WORK ORDER FORM FortC011lnS PURSUANT TO AN AGREEMENT. BETWEEN THE CITY OF. FORT COLLINS. AND CTL THOMPSON DATED: JANUARY 4, 2012. Work Order Number: GT2-01-2013 Purchase order Number: Project Title: Nix Farm- New Office Building Commencement Date: Novernber08, 2013 Completion Date: April15,2014 Maximum Fee (time and reimbursable direct costs) : S10,570.00 Project Description: Provide' inspections andtesting rocNix Farm per the attach edCTLMompsonproposal dated 10/17/13, Scope of Services: Provide all necessary labor &material costs forcompaction testing, concrete testing, rebar observation, grout resting, asphalt testing, & structural steel weld rind bolt inspections per the attached CtUnompson proposal dated 10/17/13, ACCEPTANCE Ethan Cozzens USER Service Provider agrees to perform The attachedformsconsisting the services identified above and on of rwO U ;pages are hereby the attached forms.in accordance accepted._ and incorporated with the terms and conditions herein by this reference, and - Contained herein and in the.Services Notice to Proceed is hereby - Agreement between the parties. Ingiven the event of a conflict between :or ambiguity in the terms of the Services Agreement and this work - order (including the attached forms( the Services Agreement shall - - - control. $60,000. , CTLITHOMPSON October. 17, 2013 City of Fort Collins 300 Laporte Avenue Fort Collins, CO 80522-0580 Attention: Mr. Ethan Cozzens Subject: Fee Estimate for Construction Observation and Materials Testing Services Nix Farm Office Building 1745 Hoffman Mill Road Fort Collins, Colorado Proposal No. FC-13-0334 At your request, CTLIThompson, Inc. is pleased to provide this fee estimate for Construction Observation and Materials Testing services for the Nix Farm Office Building project located at 1745 Hoffman Mill Road in Fort Collins, Colorado. Wei reviewed the plans you provided as well as the geotechnical report (CTL Thompson project no. FC06039-125, dated January 4, 2013) and the pavement recommendations (CTL Thompson project no. FC06039-125, dated July 12, 2013) in preparation of our proposal. We anticipate that the City will use our estimate for the basis of establishing a budgetfor the project and to issue a purchase order for our services. Our estimated scope of services and associated fees were prepared according to the terms and conditions of our professional services agreement with the City of Fort Collins and are presented. below. Earthwork: Compaction testing may be required for utility trench backfill; footing subgrade; column pad subgrade, stem wall backfill, slab -on -grade subgrade, exterior walkway and patio subgrade, pavement subgrade, curb subgrade, and stone steps subgrade. We estimate a total of 32 site visits will be necessary for this project. We further estimate 3 proctors and soil classifications will be necessary: Engineering Technician 32 days x 2 hrs/day x $60/hr $3,840.00 Standard Proctor 3 tests x $80/ea $240.00 Atterberg Limits 3 tests x $60/ea $180.00 Gradation 3 tests x $70/ea $210.00 Subtotal:. $4,470.00 Concrete Testing: Concrete testing will be required for the footings, column pads, stem walls, slab - on -grade, walkway, patio, steps, curb, and pavement. We estimate 16 concrete tests consisting of 4. cylinders each will be necessary. Concrete Cylinders 16 tests x $160/test $2,560.00 Subtotal: $2,560.00 351 Linden Street l Suite 140 1 Fort Collins, Colorado 60524 Telephone:971}-206-9455 Fax:970-206-94.41 Rebar Observation: Rebar observation may be required for the footings, column pads, stem walls, slab -on -grade, patio columns, and steps. We estimate 10 site visits will be necessary. Engineering Technician 10 days x 2 hrs/day x $50/hr $1,000.00 Subtotal: $1,000.00 Grout Testing: Grout testing may be required for the patio columns. We estimate 1 grout test consisting of 4 cylinders each will be necessary. Grout Cylinder 1 test x $160/test $160.00 Subtotal: $160.00 Asphalt Testing: Compaction testing will be required during asphalt placement. We estimate 2. site visits and 2 samples will be necessary. - Engineering Technician 2 days x 4 hrs/day x $60/hr $480.00 Lab Density (Rice) 2 tests x $80/ea $160.00 .. . AC Content/Gradation 2 tests x $150/ea $300.00 Subtotal: $940.00 Structural Steel Weld and Bolt Inspection: Weld and bolt inspection may be required for the patio cover structure and the building. We estimate 6 site visits will be necessary. Engineering Technician 6 days x 4 hrs/day x $601hr $1.440.00 Subtotal: $1,440.00 TOTAL ESTIMATED FEE:: $10,570.00 It should be emphasized that this estimate is based upon assumptions of actual quantities and contractors schedule. The fee will be charged only for the actual flours and unit rates presented for tests and observations requested by the owner, contractor or subcontractors who schedule the services. , If we can be of further assistance, please contact us at your convenience. Very truly yours, CTL THOMPSON, INC. 4� Heather Grubb Field Department Manager 2 CITY OF FORT COLLINS NIX FARM OFFICE BUILDING - - CTL IT PROPOSAL NO. FC-13A33I