Loading...
HomeMy WebLinkAboutWORK ORDER - BID - 7391 MISCELLANEOUS CONCRETE ANNUAL (17)�/--�?607s' WORK ORDER PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND VOGEL CONCRETE, INC. DATED: 8/5/2013 Work Order Number: 06-VOG-254903300-13 Purchase Order Number: Project Title: West side of Bryan (Oak to Mountain Avenue) Original Bid/RFP Project Number & Name: 7391 (Annual Concrete Maintenance Contract) Commencement Date: 8/12/2013 Completion Date: 8/26/2013 Maximum Fee: (time and reimbursable direct costs): $22.370.00 Project Description: Install 446' of new sidewalk and two ADA accessible ramps Scope of Services: Conduct onsite meetings as necessary, perform general excavation removal of improvements, construction of new sidewalk and ramps, and fulfill material testing requirements as necessary. Upon project completion to be reviewed by contractor and City engineering staff. The scope of services does not include authorization to deviate from the approved location without approval from engineering project manager. Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of I (ONE-) pageg are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Professional By: Jeff Hubbard Date: 8/5/2013 City of Fort Collins By: Robert Mosbey Project Manager Date: 8/5/2013 By: Gerry Paul Director of Purchasing and Risk Management (over $60,000.00) Date: