HomeMy WebLinkAboutCHANGE ORDER - RFP - 7455 FORT COLLINS SENIOR CENTER EXPANSIONCHANGE ORDER NO. 1 F6rt
Clty ®f
PROJECT TITLE: Fort Collins Senior Center Expansion Collins
CONTRACTOR: The Neenan Company
PROJECT NUMBER: 7455-OP-424311POO 6' 13 a 5;�7
DESCRIPTION: Project Design Changes
In preparing change orders show in order as separate numbered paragraphs the following:
1 . Reason for change: Project team made several changes to the original proposed plan to improve the
unction and pertormance ot the tacility.
2. Description of change:Refer to scope changes and description noted on Neenan Document OCO-001
ate 10 9 13, -023 an -024 dated 10 4 13
3. Change in contract cost: $648,625.50
4. Change in contract time: Add Five (5) days to give a new project completion date of May 22, 2014
(Attach additional sheets as required)
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
Total C.O. % of Original Contract
ADJUSTED CONTRACT COST
ACCEPTED BY:
ACCEPTED BY:__,,41
Project
REVIEWED BY:
APPROVED BY:
Print
cc: City Clerk
Contractor
Engineer
$4,383,702.00
$0.00
$0.00
$648,625.50
14.80%
14.80%
Representative Randolph P.
ager
$5,032,327.50
A�
Date
A e A -1,.3
Date
�, 4 � /0 -- Av �3
Name Bob Adams - Recreation Dept. Date
Ken Mannon - Operations Director Date
Project File APPROVED BY: I o ZZ ( 3
Purchasing Print Name: qy4
(If over $60,000—Purchasing Director)
n y�
CHANGE ORDER NO. 1
PROJECT TITLE: Fort Collins Senior Center Expansion
CONTRACTOR: The Neenan Company
PROJECTNUMBER:7455 oP-424311
DESCRIPTION: Project Design Changes
co�r
of
Ft` Collins
In preparing change orders show in order as separate numbered paragraphs the following:
1. Reason for change: Project team made several changes to the original proposed plan to improve the
unction and performance of the aci rty.
2. Description of change:Refer to scope changes and description noted on Neenan Document OCO-001
ate an ate
3. Change in contract cost: $648,625.50
4. Change in Contract time: Add Five (5) days to give a new project completion date of May 22, 2014
(Attach additional sheets as required)
ORIGINAL CONTRACT COST $4,383,702.00
TOTAL APPROVED CHANGE ORDERS $0.00
TOTAL PENDING CHANGE ORDERS $0.00
TOTAL THIS CHANGE ORDER $648,625.60
TOTAL % OF THIS CHANGE ORDER 14.80%
Total C.O. % of Original Contract 14.80%
ADJUSTED CONTRACT COST $5,032,327.50
(Assuming all change orders a roved
ACCEPTED /3
Contrac s Representative Randolph P. Myers Date
ACCEPTED BY:—/-
Prniprt Mnnnnpr Date =
REVIEWED BY: 6e1 (,�" /y" /CJ - r3
Print Name Bob Adams - Recreation Dept. Date
APPROVED BY:
Print We Ken Mannon - Operations Director Dat
cc: City Clerk Project File
Contractor Purchasing
Engineer
FACILITIES. REOUISITION FORM
FCSC Change Order #1 Comparison with Original Budget
Original
Cange
In
Division Description :
Proposal
CO #1 Amount
Price
Comments
1 General Conditions
$
242,615
$
242,615
$
2 Site & Demo
$
713,355
$
758,351
$
44,996
Storm Water Work
3 Concrete
5
156,274
$
202,807
$
46,533
Auditorim Expansion
4 Masonry
$
317,820
$
266,502
$
(51,318)
Reduced Ext Walls
5 Steel
$
362,532
$ .'
404,203
$
41,671
Fill in storage Locations
6 Rough Carpentry
$
64,163
$
43,402
$
(20,761)
Moved to Roofing .
6 Cabinets
$
64,056
$
46,537
$
(17,519)
Reuse more existing
7 Thermal & Moisture
$
212,768
$
323,154
$
110,386
Imp Air Barrier/Rgh Carp
8 Doors & Windows
$
158,146
$
171,891
$
13,735
Improve windows
9 Framing & Drywall
$
189,550
$
221,586
$
32,036
Added walls
9 Painting
$
26,142
$
32,024
$
4,882
Added Walls
9 Flooring
$
116,532
$
97,005
$
(19,527)
Reduce tile work
9 Wall finishes
$
42,174
$
54,377
$
12,203
Add walls
10 Specialties .
$
19,370
$
32,295
$
12,925,
Add Op Partition
12 furnishings
$
4,000
$
4,900
$
900
Ballet Bars.
13 Fire Protection
$
38,255
$
43,381
$
5,126
Storage Areas
15 Mechanical
$
469,110
$
. 829,613
$
360,503
WSHP/Booster/Snow Mit
16 Electrical
$
258,475
$
299,752
$
41,277
W5HP/Outlets Added Walls .
$
618,048..
The Neenan Company LLLP
2607 Midpoint Drive,
Fort Collins, CO 80525
Tel: 970 493-8747 fax: 970 493-5869
OWNER CHANGE ORDER
Project #: 2761 A Change Order #: OCO-001
Project Name: Fort Collins Senior Center Contract: 2761 A
Project Address: 1200 Raintree Drive Change Order Date: 10/09/2013
Fort Collins, CO 80526
Owner: City Of Fort Collins Title: DO Permit Set Scope Modifications
Address: P.O. Box 580
Fort Collins CO 80522
Attn: Brian Hergott
Tel: (970) 221-6804
Fax: (970) 225-6534
NEENAN and Owner previously entered Into an Agreement for the above referenced project. NEENAN and Owner desire to Issue a change order
for the Agreement as described below. As modified hereby, the Agreement remains in full force and effect and NEENAN and Owner ratify and
affirm the Agreement In all respects. The attached cost estimate is for informational purposes only; NEENAN is not bound to these unit costs.
Description: Modify size and scope of proposed building additions and renovation in accordance with:
100% DD Drawings (CDN2761-027)
Outline Specifications (CDN#2761-039)
Open Items List (CDN#2761-042)
Cost Estimate (CDN#2761-041)
Schedule (CDN#2761-040)
Scope changes include but are not limited to the following:
1. Modify and increase footprint of additions in accordance with CDN#2761-027
2. Construction costs associated with revisions
3. Added Civil and Stormwater infrastructure work due to stormwater modeling findings
4. Upgrade HVAC system to water -source heat pump with Johnson Controls
5. Deleted interior track extension
6. MDF/IDF construction and MEP components, with 5k allowance for WSHP upgrade
7. Conduits between new IDF and MDF rooms
8. Standard aluminum sunshades in lieu of steel to match existing
9. Upgraded exterior punched windows to Alpen 525 fiberglass
10. Fiberglass (FRP) exterior doors with Alpen 525 Series glass
11. 1-inch Spray applied interior insulation .
12. Upgrade fitness Flooring to Biocushion LP
13. Hydronic snowmelt system at front entry
14. 5ea additional tubular daylighting devices
15. Upgrade HVAC system to water -source heat pump with Johnson Controls
16. Eliminate hearing loop allowance from contract, to be Owner provided
17. Eliminate security camera system allowance from contract, to be Owner provided
18. Eliminate 39 parking spaces shown as Phase 2 parking on current plans
19. Unfinished Auditorium space has not drywall. Owner understands that drywall is required on exterior
walls prior to occupancy. To be added over the course of construction.
20, Booster pump for domestic water due to low pressure
21.
22. Additional Conceptual design and budgeting services or the proposed Auditorium
Change Item Change Item Description Amount
OCI-023 DO Permit Set Scope Changes $730,803.50
OCI-024 Return Camera Allowance and Hearing Loop Allowance. Add Additional Design Services $82,178.00 .
Page 1 of 63
Total: $648,625.50
r' r
, T
r ' .• ' The Neenan Company LLLP
2607 Midpoint Drive,
Fort Collins, CO 80525
archistructionm Tel: 970 493-8747 Fax: 970 493-5869
OWNER CHANGE ORDER
Project #: 2761A Change Order #: OCO-001
Project Name: Fort Collins Senior Center Contract: 2761A
Project Address: 1200 Raintree Drive Change Order Date: 10/09/2013
Fort Collins, CO 80526
The Original Contract Price was.............................................................................................................. $4.383,702
Net Change by Previously Authorized Requests and Changes..............................................................:..... $0.00
The Contract Price Prior to This Change Order was $4.383,702
..................................................
The Contract Price will be Increased By................................................................ ..... $648,625.50
The New Contract Price Including This Change Order will be....................................................................... $5,032.327.50
The Contract Time WIII Be Changed By a .:::..:..:.::...............::... 5 days
The Scheduled Substantial Completion Date as of this Change Order therefore Is ....... :............:.:...I ... ...... I......
ACCEPTED:
The Neenan Company LLLP
By: Nee n Management Company
Its: Ge gr)tepSigne
By: Randolph P. Myers
Its: President & CEO
Date: _ la - /a - l 3.,
Page 2 of 63
City Of Fort Collins
By:
Date: /df//
,
The Neenan Company LLLP
1 . 2607 Midpoint Drive;
Fort Collins, CO 80525
Tel: 970 493-8747 Fax: 970 493-5869
i#rChiStruCtione
OWNER CHANGE ITEM DETAIL
Project #: 2761A
Project Name: Fort Collins Senlor Center
Project Address: 1200 Ralntree Drive
Fort Collins, CO 110526
OCI 023j DD Pe`rmlfset Scope Chang s j
- -
Status: APP
OCI Date: 10-04-2013
Owner CO #. OCO.001
Due to Owner:
Scope Description:
Source:
Descriptlon
Quantity
Final Amt..
Vendor Name
Contingency
S18,541.41
Scope Changes
$618.047.0
0
Subtotal:
$636,588.41
Mark Ups
Quantity,
Final Amt.
Vendor _
Design Services
S43,606.31
Fee
$27.055.01
Insur, Bond, Warranty
$23,553.77
Mark Ups Total:
$94.215.09
Total Including Mark Ups:
$730,803.50
Approved By,
The Neenan Company Date
Page 3 of 63
Date
The Neenan Company LLLP
2607 Midpoint Drive,
Fort Collins, CO 80525
Tel: 970 493-8747 Fax: 970 493-5869
archistrudione
OWNER CHANGE ITEM DETAIL
Project #: 2761 A
Project Name: Fort Collins Senior Center
Project Address: 1200 Raintree Drive
Fort Collins, CO 80526
Status: APP OCI Date: 10.04-2013
Owner CO #: OCO.001 Due to Owner. -
Scope Description: Source:
Description
Quantity Final Amt. Vendor Name
Auditorium Concept Design
$6.422.00
Delete Camera Allowance
$.
--.19,200.00
Delete Hearing Loop Allowance
$-
69,900.00
Structural PV Review
$500.00
Subtotal: $-82,178.00
Mark Ups Quanta Final Ant Vendor
Mark Ups Total: $ 0.00
Total Including Mark Ups: $-82,17B.00
Approved By:
The Neenan Company Date
Comer
Page 4 of 63
Date
SECTION 00530
NOTICE TO PROCEED
Description of Work: 7455 Fort Collins Senior Center Expansion — Phase II of contract for
Design and construction services with total cost for this phase II not to exceed $1,900,000.00
prior to December 31, 2013.
To: The Neenan Company
This notice is to advise you:
That the contract covering the above described Work along with Change Order 001 has been
fully executed by the CONTRACTOR and the OWNER.
That the required CONTRACTOR's Performance Bond and Payment Bond have been received
by the OWNER.
That the OWNER has approved the said Contract Documents.
Therefore, as the CONTRACTOR for the above described Work, you are hereby authorized and
directed to proceed within (5) calendar days from receipt of this notice as required by the
Agreement.
Dated this 11th day of October, 2013.
Phase III Notice to Proceed is to be issued in January 2014 and it is not to delay your overall
project Completion which shall be May 22, 2014
City of Fort Collins
OWNER
By:
Name: Brian Heroott
Title: Project Manger
ACKNOWLEDGMENT OF NOTICE
Receipt of the above Notice to Proceed is hereby acknowledged this //THday of 6�VD5Er-
20 1$
CONTRACT t R: Neenan Company
By; ;
Name: S
Title: TCVJfr�� Nwvigr�e—_
—MIF, Klof f, j Lantippw