Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7417 ASPHALT SURFACE TREATMENT PROJECT (3)Fort Collins Change Order Form PROJECT TITLE: 2013 Street Maintenance Program, ASTP PROJECT NUMBER: 902120 CONTRACTOR: A-i Chipseal Co.(PO 91351") CHANGE ORDER NUMBER: 1 In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for charge. 2. Description of change. 3. Change in contract cost. 4. Change In contract time. 1.92. See attached for details 3. The contract cost will decrease by $50,514.93 4. There will be no change in contract time. Planning, Development & Transportation Streets Departmam 625 Ninth Street P.O. Box 560 Fort Collins CO 60522 0580 970.221.6615 - Phone 970.221.6270 - Fax ORIGINAL CONTRACT COST $496,294.30 TOTAL APPROVED CHANGE ORDERS $0.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER ($W,514.93) TOTAL % OF THIS CHANGE ORDER TO. rr4% TOTAL C.O. % OF ORIGINAL CONTRACT 10.r6l6 ADJUSTED CONTRACT COST SM,779.37 ACCEPTED ICYL.. tnI f !^-r X [mil c.� DATE: �5 (Contractor's nepressnta0ve) Stephanie Wallis, Corporate Secretary t SUBMITTED BY: DATE: ) is } 3 (Street Maintenance Program Me ger) APPROVED BY: (Purchasing Agent over $60,000) cc: cawacta Purc aine Projea Fir DATE: 3NtoL/9 P, A qGl0&-7 902j-�v. *53301° 2011 Pay Estimate - Reconciling CO City of Fort Collins 2011 HACO Proiect A-1 Chipseal Bid No. 7256 ` Item No ,- Description Unit Contract - Quantity, Unit Cost ..-.:+�. Contract Cost �....: me. .. _ Actual Quantity .,.:.k+x,., r : - Actual Cost..; < .. .. ♦i- OUANTOTY 105.111 SWIi11FING-ALLSTM LTSURVAC1S ENCH 2 $ 8.465.00 $16.930.00 2.00 S 16.930.00 S - 20H.01 STONMW,STF.K I'ROTIiLTION . WATTI.Ii 4' ♦ Man, (H,wk or RuhleO I.F 1500 $ 5.25 $7.875.00 826.00 $ 4.336.50 $ (3S,t8.50) 20x.02 STORMWATER PIR(MiLT10N . Fabric and Walk Protection FACH I0 $ 253S $257.50 $ - S (257.50) 409.01 CHIT' SEAL(AKTERIAL) S Y 1) $ - $0.00 $ - $ 409.02 CHIT' SEAL (COI.I.ELTOK) S Y 0 $ - $0.00 $ - $ - 409p3 CHIT' SEAL (RESIDENTIAL) S Y 0 $ - $0.00 $ - $ - 41h/.01 DOUBLE CHIT' RHAI. IHESIDUNTIAL) SY 0 $ - S0.00 $ - S - 49J15 TYI'li 11 SLURRY SEAL (COLLECTOR) S Y 0 $ - $0.00 S - $ - 40906 TYFIi11SLUKRYNEAL(RESIDENTIAI4 SY 2v000 $ 1.58 $458.200.00 267.434.00 $ 422.545.72 S (35.654.28) 41(9A7 TYI.11 H SLURRY NIiAl. (TANKING LOTS) S Y 0 $ - SO.00 $ - $ - 409.00 CAPE NEAL (COLI.RCTOR) S Y 0 S - $0.00 $ 4W.01 CAYf: NEAL (RESIDENTIAL) S Y 0 $ - $0.00 $ 41y.10 CAPE SCAI. (PUKING LOTS) S Y U S - SO.00 $ 401.I I SLURRY TRAY CRACK LINFLING (30' haul wkith. 314 to 2' crack LF vx) $ 3.95 $1.975.00 $ - $ (I.975.00) 4119.12 SLURRY SURFACE LEVELING (IN to I/2- thlckmt, pet late SY 9" $ 7.95 $7504.80 247.44 S 1.967.15 S (5.537.65) 610.111 VARIABLE MESSAGE BOARD ENOAY 6 $ 192.00 $1.152.00 S - $ (1.152.00) 6.10.01 AIIDITIONAI.11�Vi(iIN(il'I:KSONNI'l. HR I01 $ 24.00 $2.400.00 S - S (2.400.00) Orimat Conrad Amaum 8 $4%.294.30 $ 445,779.37 �$ (50,514.93) - $ (50,514.93) q._ ITOTALC 445,779.37 �.$ 445,779�37 00 NOTES: C:\Cocumants and Settings%sullivanu ocal Settings\Temporary Internet Files\Content.Outlook\5AE082V81CONTRACTORBOY 6SFIMATE Sluny.xlsx