EXHIBIT "A` i
WORK ORDER FORM
AGREEMENT ,BETWEEN THE CITY OF FORT COLLINS
AND VOGEL CONCRETE, INC, j
BID NO; 7391
Email work orders to rTlail(@vogelcoricrete.com
com
DATE: August 9, 201, WORK ORDER NO:
REQUESTED BY: Transfort. Emma McArdle PHONE. NUMBER:
BILL TO (name, address, zip): Transfort, PO Box 580 80524
EMAIL ADDRESS: emcardle(a cgov.com DEPARTMENT: Transfort
PROJECT TITLE/DESCRIPTION: Food Bank Transit Stop Improvements
SCOPE OF SERVICES: Install sidewalk. 2 bus COST: $49,434.49 (estimr
pads, and cross walk
COMMENCEMENT DATE: 11/1/2013 COMPLETION DATE:5/31)
CITY OF FORT COLLINS:
BY: Emma Belmont�� DATE: 10/15/2013
Vogel Concrete, Inc. agrees to perform the services identified above and on IN
with the terms and conditions contained herein and ,in the Services. Agreement
wage rates will apply; for federal eligibility purposes. In the event of a conf
terms of the Services Agreement and this work order (including the attached f
shall contra.
VOGEL
BY:
DATE: I/_ 00/3
CC: Purchasing; the attached forms) consisting of
reference, and Notice to Proceed is hereby given.
I
pages) are hereby
Miscellanenus Concrete Annual - Page 1 of 1
attached forms in accordance
etween parties. Davis Bacon
a between or ambiguity in the
'ms), the Services Agreement
and incorporated herein by this
Independent Cost Estimate
City of
Fort Collins
Dale of Estimate: 11-Jul-13
Contract Type:
Existing Contract or PO.(Y/N): Y (Vogel Concrete)
Description of Goods (A) or Services (B): Transit Stop Improvements - Blue Spruce
I have.obtained the following estimate from;
Published Price List I Past Pricing (date)
Engineering or Technical Estimate (performed by) Tim Kemp
Independent Third Party Estimate (performed by)
Other (specify)
(,Re KNI
tWK4 tl
[tom., -."-.»,tea .;£,'_ 'ItemIDescrl' tf6h __-_ _ _1
(.- ua661 7J
L. 0 nitt ._ i
UNtrC�
t,if, ofaPCosf
1
202-01
Removal of Asphalt - - - - -
80
SY
$ - 5.00
$400.00
- 2
203-01
Earthwbrk(12` Depth)
150
CY
$ 15.00
$2,250.00
3
203-62
Embankment (Sidewalk Fill)
300
CY
$ :25.00
$7,500.o0
4
403-01
Pavement Patch (Full Depth)
5o
SY$
30.00
$1,500.00
5
604-22
Metal Sidewalk Culvert (2' Opening)
.4
EA
$ 1,500.00
$6,000.00
Enhanced Crosswalk (10" Red Brick Stamped)
425
SF
$ 12.00
$5.100.00
to
C
Drainage and Storm System
8%
LS
of A
$2,512.00
,11
D
Signing and Pavement Marking
�8%
LS
of A
$2,512.00
6
608-01
Concrete Sldewalk
300
SY
$ 30.00
$9,000.60
7
609-01
Concrete Curb and Gutter.
150
LF
$ :15.00
$2,250.00
8
6D9-02
I Concrete Curb Ramp
25 j
SY
$ 100.00
$2.500.00
SUBTOTAL OF VOGEL CONSTRUCTION WORK ITEMS: $41,524.00
WortilDescription F '«'-'"_ „"�
L:vl]uantlt E
E` Unit �_ f
Uhi_t(Co`stiA
1 kT,otalfCostW
Traffic Control ,,Labor' -Supervision
40'
Hr
$ 50.00
$2,000.00
Traffic Control - Labor - Flagging
90
Hr
$ 25.00
$2,250A0
Signage
65
Sign
.$ 1.00
$65.00
Traffic Control Barrels
550
Barrel
$ 0.85
$467.50
Reflective Cones
110
Cone
$ 0.75
$82.50
SUBTOTAL OF TRAFFIC CONTROL: $4,865.00
PROJECT SUBTOTAL: $46,389.00
�CONTIN6ENCY(107.): $4,638.90
;IQN-1S.L«e,TOTAL4PPO9EC,TkBUDGET71���?z
S:1Tmhsfod%Admin*1nandal Coordinator.- KafiPurchmirg - GeneraNCE- 2013 Bus Stop Improvements - Blue Spruce - RevisedAUBlue Spruce 'tbk1011512013
Estimate for Food Bank -
Contract
Item No.
Description
.Unit
Price
Total
_
QuantiUnit
202.03
Saweut Concrete/Asphalt 6" <8"
Lineal
141
$ 3.55
$ 500.55
202.06
Repave Concrete Sidewalk
Square
310
$ 2.35
$ 728.50
Lineal
202.07
Remove Concrete Curb and Gutter
19
$ 3.65
S 69.35
202.09
Remove Concrete Driveway/Apron/Crosspan
Square
296
$ 2.60
S 769.60
Foot
202.12
Remove Asphalt - 6"
Square
953
$ 2.25
S 2,144.25
203.02
Excavation -General Over 50 CY
CubicYard
65
$ 40.00
$ 2,600.00
208.01
Stonin ater Protection - Rock Filled Wattle
IFootl
20
$ 10.00
S 200.00
304.01
Aggregate Base
Ton
70
$ 30.00
S 2,100.00
403.01
Temporary Asphalt Patching
Ton
4
S 170.00
S 680.00
604.22
Metal Sidewalk Culvert - 2' Opening, Materials Only
Each
l
S 1,770.00
$ 1,770.00
604.23
Additional Square Foot 5/8" Plate
Square
8.75
5 185.00
S 1,618.75
608.04
Vertical Curb and Gutter - No Sidewalk
LinealFoot
104
S 21.00
$ 2,184.00
608.15
Pedestrian Access Ramp
Square
830
S 5.55
$ 4,606.50
- _ -
-Foot-
-
608.17
Truncated Dome Panel
Square
64
S 45.00
$ 2,880.60
608.18
Apron - 8"
Square
296
S 5.75
$ 1,702.00
608.20
Valley Pan - 6"
Square
9
$ 6.60
$ 59.40
oot
608.22
Flatwork - 6"
Square
2021
$ 3.90
$ 7,881.90
Foot
608.23
Replace Flatwork - I" Additional Depth
SF ore
3187
S 0.85
$ 2,708.95
608.28
Enhanced Crosswalk - 10" Brick Red, Stamped
Square
425
$ 11.20
$ 4,760.00
608.43
Expansion and Caulking
Lineal
40
S 4.75
$ 190.00
630.01
'NO PARKING" Sign With Stand
Per Day
32
S 1.85
$ 59.20
Per Each
630.03
Channelizing Barrels
Per Day
550
S 0.85
$ 467.50
Per Each
630.06
Size A Sign With Stand
Per Day
20
$ 1.60
S 32.00
Per Each
630.07
Size B Sign With Stand
Per Day
10
S 2.05
S 20.50
Per Each
630.10
Cone With Reflective Strip
Per Day
110
$ 0.75
S 82.50
Per Each
630.15
Traffic Control Supervisor
Per Day
5 IS
375.00
$ 1,875.00
630.17
Flagging
Ilour
90 1
S 25.00
$ 2,250.00
Cont.
Contingency(10%)
LS
I IS
4,494.04 IS
4,494.04
-TOTAL COST _ : _ .. _ .. TOTAL COST ._. : _ ' $ - _ 49 434.49.