HomeMy WebLinkAboutWORK ORDER - BID - 7391 MISCELLANEOUS CONCRETE ANNUAL (34)Cfty of mot Collins EXHIBIT "A` i WORK ORDER FORM AGREEMENT ,BETWEEN THE CITY OF FORT COLLINS AND VOGEL CONCRETE, INC, j BID NO; 7391 Email work orders to rTlail(@vogelcoricrete.com com DATE: August 9, 201, WORK ORDER NO: REQUESTED BY: Transfort. Emma McArdle PHONE. NUMBER: BILL TO (name, address, zip): Transfort, PO Box 580 80524 EMAIL ADDRESS: emcardle(a cgov.com DEPARTMENT: Transfort PROJECT TITLE/DESCRIPTION: Food Bank Transit Stop Improvements SCOPE OF SERVICES: Install sidewalk. 2 bus COST: $49,434.49 (estimr pads, and cross walk COMMENCEMENT DATE: 11/1/2013 COMPLETION DATE:5/31) CITY OF FORT COLLINS: BY: Emma Belmont�� DATE: 10/15/2013 Vogel Concrete, Inc. agrees to perform the services identified above and on IN with the terms and conditions contained herein and ,in the Services. Agreement wage rates will apply; for federal eligibility purposes. In the event of a conf terms of the Services Agreement and this work order (including the attached f shall contra. VOGEL BY: DATE: I/_ 00/3 CC: Purchasing; the attached forms) consisting of reference, and Notice to Proceed is hereby given. I pages) are hereby Miscellanenus Concrete Annual - Page 1 of 1 attached forms in accordance etween parties. Davis Bacon a between or ambiguity in the 'ms), the Services Agreement and incorporated herein by this Independent Cost Estimate City of Fort Collins Dale of Estimate: 11-Jul-13 Contract Type: Existing Contract or PO.(Y/N): Y (Vogel Concrete) Description of Goods (A) or Services (B): Transit Stop Improvements - Blue Spruce I have.obtained the following estimate from; Published Price List I Past Pricing (date) Engineering or Technical Estimate (performed by) Tim Kemp Independent Third Party Estimate (performed by) Other (specify) (,Re KNI tWK4 tl [tom., -."-.»,tea .;£,'_ 'ItemIDescrl' tf6h __-_ _ _1 (.- ua661 7J L. 0 nitt ._ i UNtrC� t,if, ofaPCosf 1 202-01 Removal of Asphalt - - - - - 80 SY $ - 5.00 $400.00 - 2 203-01 Earthwbrk(12` Depth) 150 CY $ 15.00 $2,250.00 3 203-62 Embankment (Sidewalk Fill) 300 CY $ :25.00 $7,500.o0 4 403-01 Pavement Patch (Full Depth) 5o SY$ 30.00 $1,500.00 5 604-22 Metal Sidewalk Culvert (2' Opening) .4 EA $ 1,500.00 $6,000.00 Enhanced Crosswalk (10" Red Brick Stamped) 425 SF $ 12.00 $5.100.00 to C Drainage and Storm System 8% LS of A $2,512.00 ,11 D Signing and Pavement Marking �8% LS of A $2,512.00 6 608-01 Concrete Sldewalk 300 SY $ 30.00 $9,000.60 7 609-01 Concrete Curb and Gutter. 150 LF $ :15.00 $2,250.00 8 6D9-02 I Concrete Curb Ramp 25 j SY $ 100.00 $2.500.00 SUBTOTAL OF VOGEL CONSTRUCTION WORK ITEMS: $41,524.00 WortilDescription F '«'-'"_ „"� L:vl]uantlt E E` Unit �_ f Uhi_t(Co`stiA 1 kT,otalfCostW Traffic Control ,,Labor' -Supervision 40' Hr $ 50.00 $2,000.00 Traffic Control - Labor - Flagging 90 Hr $ 25.00 $2,250A0 Signage 65 Sign .$ 1.00 $65.00 Traffic Control Barrels 550 Barrel $ 0.85 $467.50 Reflective Cones 110 Cone $ 0.75 $82.50 SUBTOTAL OF TRAFFIC CONTROL: $4,865.00 PROJECT SUBTOTAL: $46,389.00 �CONTIN6ENCY(107.): $4,638.90 ;IQN-1S.L«e,TOTAL4PPO9EC,TkBUDGET71���?z S:1Tmhsfod%Admin*1nandal Coordinator.- KafiPurchmirg - GeneraNCE- 2013 Bus Stop Improvements - Blue Spruce - RevisedAUBlue Spruce 'tbk1011512013 Estimate for Food Bank - Contract Item No. Description .Unit Price Total _ QuantiUnit 202.03 Saweut Concrete/Asphalt 6" <8" Lineal 141 $ 3.55 $ 500.55 202.06 Repave Concrete Sidewalk Square 310 $ 2.35 $ 728.50 Lineal 202.07 Remove Concrete Curb and Gutter 19 $ 3.65 S 69.35 202.09 Remove Concrete Driveway/Apron/Crosspan Square 296 $ 2.60 S 769.60 Foot 202.12 Remove Asphalt - 6" Square 953 $ 2.25 S 2,144.25 203.02 Excavation -General Over 50 CY CubicYard 65 $ 40.00 $ 2,600.00 208.01 Stonin ater Protection - Rock Filled Wattle IFootl 20 $ 10.00 S 200.00 304.01 Aggregate Base Ton 70 $ 30.00 S 2,100.00 403.01 Temporary Asphalt Patching Ton 4 S 170.00 S 680.00 604.22 Metal Sidewalk Culvert - 2' Opening, Materials Only Each l S 1,770.00 $ 1,770.00 604.23 Additional Square Foot 5/8" Plate Square 8.75 5 185.00 S 1,618.75 608.04 Vertical Curb and Gutter - No Sidewalk LinealFoot 104 S 21.00 $ 2,184.00 608.15 Pedestrian Access Ramp Square 830 S 5.55 $ 4,606.50 - _ - -Foot- - 608.17 Truncated Dome Panel Square 64 S 45.00 $ 2,880.60 608.18 Apron - 8" Square 296 S 5.75 $ 1,702.00 608.20 Valley Pan - 6" Square 9 $ 6.60 $ 59.40 oot 608.22 Flatwork - 6" Square 2021 $ 3.90 $ 7,881.90 Foot 608.23 Replace Flatwork - I" Additional Depth SF ore 3187 S 0.85 $ 2,708.95 608.28 Enhanced Crosswalk - 10" Brick Red, Stamped Square 425 $ 11.20 $ 4,760.00 608.43 Expansion and Caulking Lineal 40 S 4.75 $ 190.00 630.01 'NO PARKING" Sign With Stand Per Day 32 S 1.85 $ 59.20 Per Each 630.03 Channelizing Barrels Per Day 550 S 0.85 $ 467.50 Per Each 630.06 Size A Sign With Stand Per Day 20 $ 1.60 S 32.00 Per Each 630.07 Size B Sign With Stand Per Day 10 S 2.05 S 20.50 Per Each 630.10 Cone With Reflective Strip Per Day 110 $ 0.75 S 82.50 Per Each 630.15 Traffic Control Supervisor Per Day 5 IS 375.00 $ 1,875.00 630.17 Flagging Ilour 90 1 S 25.00 $ 2,250.00 Cont. Contingency(10%) LS I IS 4,494.04 IS 4,494.04 -TOTAL COST _ : _ .. _ .. TOTAL COST ._. : _ ' $ - _ 49 434.49.