Loading...
HomeMy WebLinkAboutWORK ORDER - BID - 7382 MAX BRT SOUTH TRANSIT CENTERChange Order No. 4 PROJECT TITLE: South Transit Center CONTRACTOR: Universal Surety Company BID NUMBER: 7382 DESCRIPTION: 1. Reason for change: Incorporation of Change Order Proposal #16 into the Contract. 2. Description of change: COP#16 - Electrical work per ASI #1 - $12,630.53. 3. Change In contract costs: $12.630.53 4. Change in contract time: 0 Days ORIGINAL CONTRACT COST $4,356,565.70 TOTAL APPROVED CHANGE ORDERS S20,044.57 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $12.630.53 TOTAL % OF THIS CHANGE ORDER 0.29% TOTAL C.O. % OF ORIGINAL CONTRACT 0.75% ADJUSTED CONTRACT COST $4,389,240.80 REVIEWED BY: :t •g , JC.. _ _ DATE: — Project -Engineer ACCEPTED BY: DATE: Contractors Representative REVIEWED BY: DATE: Construction Manager APPROVED cc: Contractor Purchasing Protect File -y-• Zr�O 3 DATE: MAX Field Construction Office 3000 South College Ave., Suite 201 Fort Collins, CO 80526 fcgov.com/maxconstruction Delivery by hand June 27, 2013 Ms. Erika Keeton, PE MAX Project Manager City of Fort Collins — Engineering Dept 281 N. College Ave. Fort Collins, CO 80524 RE: MAX Bus Rapid Transit Project — South Transit Center 7382 Independent Cost Analysis — Change Order No. 5 Growling Bear Inc. Change Order Proposal #23 Growling Bear Inc. was requested to provide Change Order Proposal #23 to enable the completion of the tie-in of the water main within the easement granted by Spradley-Barr for this project. In order to accomplish the tie-in, the existing backflow preventer on the fire line feeding Spradley-Barr will need to be removed, along with the vault that it is in so we can tie-in the water line in that space. This change involves installing a new Reduced Pressure Backflow Preventer that complies with Fort Collins Loveland Water District requirements, in the fire riser room in the Spradley-Barr facility that will allow us to remove the existing backflow preventer. With this new backflow device in place we will be able to tie-in the water line within the easement and complete the water line loop designed into this project without having to go outside of the existing easement. The labor, materials and equipment costs proposed by Growling Bear Inc. were evaluated against an Independent Cost Estimate and are consistent with pricing for similar work. As such, I find the cost of this Change Order Proposal from Growling Bear Inc. in the amount of $9,604.40 to be reasonable for the required increase in scope. As such, I recommend acceptance of this additional cost to the contract. Ron Kechter Project Engineer City of Fort Collins Operational Services - Facilities Cc: job file 'ZO June 27, 2013 Ms. Erika Keeton, PE MAX Project Manager City of Fort Collins — Engineering Dept 281 N. College Ave. Fort Collins, CO 80524 RE: MAX Bus Rapid Transit Project — South Transit Center 7382 Independent Cost Analysis — Change Order No. 5 Growling Bear Inc. Change Order Proposal #23 MAX Field Construction Office 3000 South College Ave., Suite 201 Fort Collins, CO 80526 fcgov.com/maxconstruction Delivery by hand Growling Bear Inc. was requested to provide Change Order Proposal #23 to enable the completion of the tie-in of the water main within the easement granted by Spradley-Barr for this project. In order to accomplish the tie-in, the existing backfow preventer on the fire line feeding Spradley-Barr will need to be removed, along with the vault that it is in so we can tie-in the water line in that space. This change involves installing a new Reduced Pressure Backfiow Preventer that complies with Fort Collins Loveland Water District requirements, in the fire riser room in the Spradley-Barr facility that will allow us to remove the existing backflow preventer. With this new backflow device in place we will be able to tie-in the water line within the easement and complete the water line loop designed into this project without having to go outside of the existing easement. The labor, materials and equipment costs proposed by Growling Bear Inc. were evaluated against an Independent Cost Estimate and are consistent with pricing for similar work. As such, I find the cost of this Change Order Proposal from Growling Bear Inc. in the amount of $9,604.40 to be reasonable for the required increase in scope. As such, I recommend acceptance of this additional cost to the contract. a Ron Kechter Project Engineer City of Fort Collins Operational Services - Facilities Cc: job file Change Management Checklist �541111611c,ITIMM EMEEM MEN Water Resources and Water Reviewed for compliance with 6/26/13 Quality — EA 3.8.4 - contractor will RK Environmental Assessment comply with all re -vegetation and erosion control requirements All of the work Is based upon Reviewed for constructionlsafety impacts 6/26113 standard construction and safety RK practices Costs were determined to be reasonable based upon an Independent cost estimate prepared 6126/13 independent cost esOmate that RK was based upon recent experience with slmilarwork Reviewed for PCGA grant compliance 6126/13 Part of Build Alternative Scope RK included in SCC 30.02 The primary reason for this Reviewed for real estate impacts/needs 6126/13 changed work is for the project work to remain inside of existing RK easement procured for this project Reviewed for compliance with design criteria/ADA htlA:ltwww.access-board.00vlada-abalada• 6/26113 NIA RK standards-dol.dm of F,�c`J,M.0-Uns Independent Cost Estimate Date of Estimate: 26-Jun-13 Contract Type: Fixed Price Existing Contract or PO (YIN): Yes Description Services (8): Change Order Proposal - #16 - Complete electrical work odginally Identified as being on the West side of the property or By Owner, per ASI #1 and subsequent clarificalions. 1 have obtained the following estimate from: Engineering or Techinral Eslimale (performed by) - Ron Kechler & Bryan Garrett (City Master Electrician) Materials or Work Descdpllon Quantity Unll Unit Cost TOTAL Change Order Proposal t116 Add 2 1' conduits from 58 to 1st NE pole 120 LF S 4.05 S 486.00 Add t 1' conduit from tsl to 2nd NE pole 150 LF 5 4.05 5 607.50 Delete JB's In light le bases Delete 2- conduit on west & south sides -4 -285 EA LF S 63 00 5 8.14 $ 252.00) $ 1,749.90 Add 3 2' canduiLs from 58 to 1st SE to 420 LF 5 6,14 5 2.578.80 Add 3 1- conduits from 58 to 1st SE pole 420 1 LF S 4.05 IS 1.701.00 Add 3 2- conduits from 1st to 2nd SE pole 480 LF 5 6.14 S 2,947.20 Add 2 1"conduiLs from 1st 102nd SE poie 320 LF 5 4.05 S 1,298.00 Add 1 1- conduit from 2nd SE polato MonumentSign 100 LF S 4.05 5 405.00 Add 1 2- conduit from 2nd SE pole to Century Link Pedestal 160 LF S 6.14 $ 982,40 Add 2 2' condulls from 2nd SE pWo 10 vault at comer of Fossil & Fairway 700 LF 5 6.14 $ 4,298.00 Add 6• sand from 55 to 2nd SE pole 4 CY S 12.50 S 50.00 Add 18' oownit from 5B to 2nd SE pole to CY S 6o.o0 Electrical Subtotal S 14,430.00 GBI Mark-up on Subcontractor Work @ 5% S 721.50 ' Subcontractor Total 5 15,151.50 GBI Costs Type SV Vault & Lid 1 EA $1.044.46 S 1.044.46 Freight 1 EA 5 250.00 S 250.D0 Install Type SV Vault Equipment Operator 4 HR 5 26.DD S 104,00 Skid Steer 4 HR S 45.00 5 180.00 Superintendent a HR 5 au.00 5 640.00 rolecl Manager GBI Subtotal S 2.558.46 GBt Marx -up an own Work @ 15% S 383.77 GBI Total S 2.942.23 GBI and Subcontractor Total S 18.093,73 Bond 1% 5 180.94 i ena nsurance of Signature of Preparer. (_ Pa,,,,, A ,. s c v MAX Field Construction Office 3000 South College Ave., Suite 201 Fort Collins, CO 80526 fcgov.com/maxconstruction Delivery by hand June 26, 2013 Ms. Erika Keeton, PE MAX Project Manager City of Fort Collins — Engineering Dept 281 N. College Ave. Fort Collins, CO 80524 RE: MAX Bus Rapid Transit Project — South Transit Center 7382 Independent Cost Analysis — Change Order No. 4 Growling Bear Inc. Change Order Proposal #16 Growling Bear Inc. was requested to provide Change Order Proposal #16 in response to AS] #1 and subsequent clarifications. This request changed the route of the fiber optic conduits from the west side of the building in order to utilize the trenches already being dug to the light poles in the parking tot on the east side of the building. This request also Included all of the conduits needed for the installation of the security cameras mounted on the light poles, a feed to the monument sign and a feed to the emergency phone tower. This request also included conduits going to the Century Link pedestal and to an added vault at the corner of Fairway and Fossil for the completion of the fiber optic loop for the entire MAX Project. Additionally, sand and flow fill were added to the trench containing the fiber optic conduits as they ran under the parking lot. This routing of the fiber optic conduits also provided the avenue for providing connectivity to the College and Fairway traffic from a Traffic vault located at Harmony Road. The labor, materials and equipment costs proposed by Growling Bear Inc. were evaluated against an Independent Cost Estimate and are consistent with pricing for similar work. As such, I find the cost of this Change Order Proposal from Growling Bear Inc. in the amount of $1Z630.53 to be reasonable for the required increase in scope. As such, 1 recommend acceptance of this additional cost to the contract. a -4�"'Q' Ron Kechter Project Engineer City of Fort Collins Operational Services - Facilities Cc: job file Change Management Checklist Visual Impacts EA 3.15.3 — Reviewed for compliance with Disturbed areas will be re - Environmental Assessment 6126/13 vegetated; Air Quality EA RK 3.6.5/Noise EA 3.7.3 — contractor will comply with all requirements All of the work is based upon Reviewed for construction/safety Impacts 6/26113 standard construction and safety RK practices Costs were determined to be reasonable based upon an Independent cost estimate prepared 6126/13 independent cost estimate RK prepared in conjunction with our City Master Electrician using an estimating guide Reviewed for PCGA grant compliance 6/26113 Part of Build Alternative Scope RK Included in SCC 30.02 Fiber optic conduits and a data Reviewed for real estate impacts/needs 6/26113 vault are being placed in existing RK right-of-way; All other work is on City owned property Reviewed for compliance with design criteria/ADA httoJ/wnw.access-board.govtada-abalada- 6/26113 N/A RK §tpndards-dotcftn Change Order No. 5 PROJECT TITLE: South Transit Center CONTRACTOR: Growling Bear Inc. BID NUMBER: 7382 DESCRIPTION: 1. Reason for change: Incorporation of Change Order Proposal #23 into the Contract. 2. Description of change: COP#23 - Backflow/Pressure Reducer - $9,604.40 3. Change in contract costs: $9,604.40 4. Change in contract time: 0 Days ORIGINAL CONTRACT COST $4,356,565.70 TOTAL APPROVED CHANGE ORDERS $20,044.57 TOTAL PENDING CHANGE ORDERS $12,630.53 TOTAL THIS CHANGE ORDER $9,604.40 TOTAL % OF THIS CHANGE ORDER 0.22% TOTAL C.O. % OF ORIGINAL CONTRACT 0.97% ADJUSTED CONTRACT COST $4,398,845.20 REVIEWED BY: ACCEPTED BY: 0-4- (2-q-ALs �E �Q.N i��- DATE: Z 7 Facilities Project Manager Contractor's Representative REVIEWED BY: Manager APPROVED BY: (: cc: Contractor Purchasing Project File DATE: 7i DATE: !-n-13 DATE: Growling Bear Construction Inc. PROPOSED CHANGE ORDER No. 00023 2330 4tlr Ave Phone: 970-353-6964 Greelev. CO 80631 Fax: 970-353-6974 TITLE: Backtlow/Pressure Reducer PROJECT: FC South Transit TO: Attn: Ron Kechter M Fort Collins South Transit Center 4915 Fossil Blvd Fort Collins, CO 80525 To: DESCRIPTION OF PROPOSAL DATE: 5/24/2013 JOB: CONTRACT NO: From: Number: Proposal for minor modifications to the Fire Sprinkler System at Spradley-Barr Ford. Scope is primarily for installation of a new 6" reduced pressure backflow device in the Fire Control room so that the existing backflow device can be abandoned in the vault outside of the building (to facilitate a new water main connection). The proposal from Flow Fire Protection, Inc., is attached and is hereby incorporated into this Change Order Proposal, including all exclusions listed. Flow Fire Protection proposal dated 5/22/2013 in the amount of: $6,900.00 Growling Bear Staffing costs: $1,940.00 GBI Mark-up on Subcontractor (5ro): $345.00 GBI Mark-up on self -performed work: $291.00 Proposal Sub -total: $9,476.00 Additional Bond (1% rate): $94.76 Additional Insurance: $33.64 Proposal Total: $9,604.40 Please provide a Change Order for this scope of work at your earliest convenience. Proposal specifically excludes other costs associated with the water main extension (connection) that are not shown on the contract documents. Unit Cost: $0.00 Unit Tax: $0.00 Lump Sum: $9,604.40 Lump Tax: $0.00 Total: $9,604.40 APPROVAL: By: �e / .0 _ By: Gene Leach Ron Kechter Date: s�z/�j Date: u�:wn o Change Order Proposal #23 Fire Sprinkler System modification (back flow) at Spradley-Barr FFP Flow Fire Protection Proposal: $6,900.00 Growling Bear Costs Superintendent (to date) 12 $80.00 $960.00 Superintendent- additional coordination required 8 $80.00 $640.00 Project Manager 4 $85.00 $340.00 $1,940.00 GBI Mark-up - subcontractor - 5% $345.00 GBI Mark-up - self performed 15% $291.00 Sub -total: $9,476.00 Additional Bond 1% $94.76 Additional Insurance $3.55/$1000 $33.64 Proposal Total: $9,604.40 rd ,y �qr Flow Fire Protection, Inc. Change Order Pricing 3054 Lake Canal Ct Unit 100 — Fort Collins, CO Office (970) 494-1817 - Fax (970) 493-7157 page I of 1 Date: May 22, 2013 To: Growling Bear Construction Attention: Gene & Pat Reference: Spradley Barr Specification Section - Fire Sprinkler System modification Change Order Pricing Thank you for the opportunity to provide your company with pricing for the above referenced project. The price has been based on the below scope inclusions/exclusions. Add a new 6 reduce pressure backflow device to the existing fire sprinkler system. New tamper switches to be tied into the existing tampers. Certification of the new backflow device will be performed. The air gap is to be piped to the exterior or to an adequate floor drain. The existing fire sprinkler system will need to have calculations done to verified that the installation of the new device will not affect the operation of the system. Included: 1. The system would be modified to the latest version of NFPA 13 2. Material and installation based on minimum requirements of NFPA 13 & FCLWD Exclusions: 1. Alarms, Detection, Remote Annunciator or Central Station Monitoring 2. IRI, Factory Mutual, or other HRP insurers requirements more stringent than NFPA standard(s) cited above 3. Cutting and patching 4. Changing of any existing pipe if the calculations show that piping will need to be changed out. 5. Removal of the existing backflow device that is located in the vault. 6. Asbestos Abatement or working under asbestos conditions 7. Flushing of the underground pipe 8. Capture or chlorination of water drained from system out of exterior drains or related permits if applicable 9. Off hours or night work Change Order Total----- $6,900.00 Thank you for the opportunity to quote this project to your firm. don't hesitate to contact me. Sincerely, �„�„ `eta„ ,1, o"�,'. an Tony Lyman Construction Manager Flow Fire Protection Accepted By: Title: If you have any questions regarding this proposal please This Bid is valid For 30 Days. Should this bid be accepted please notify our offices by signing and returning a copy of this proposal by either fax or mail. By signing the above acknowledgement, this endorsement confirms full authorization to sign for the Purchaser, and accepts General Terms and Conditions as if written herein. City of Fort Collins Date of Estimate: 11-Jun-13 Independent Cost Estimate Contract Type: Fixed Price Existing Contract or PO (Y/N): Yes Description Services (B): Change Order Proposal - #23 - Install 6" Backflow/Pressure Reducer at Spradley- Barr so we can remove the backflow in the vault and connect the water line loop tie-in to the FCLWD main line going out to College Avenue. I have obtained the following estimate from: Engineering or Techincal Estimate (performed by) - Ron Kechter Materials or Work Description Quantity Unit Unit Cost TOTAL Change Order Proposal #23 Flow Fire Protection Costs Procure 6" RPBF 1 EA $ 5,210.00 $ 5,210.00 Miscellaneous Materials 1 EA $ 250.00 $ 250.00 Install 6" RPBF 16 HR $ 68.00 $ 1,088.00 Test System 2 HR $ 68.00 $ 136.00 Design 4 68.00 272.00 Flow Fire Protection Subtotal $ 6,956.00 GBI Mark-up on Subcontractor Work @ 5% $ 347.80 Subcontractor Total $ 7,303.80 GBI Costs Superintendent 20 HR $ 80.00 $ 1,600.00 Project Manager 4 HR 85.00 340.00 GBI Subtotal $ 1,940.00 GBI Mark-up on own Work @ 15% $ 291.00 GBI Total $ 2,231.00 GBI and Subcontractor Total $ 9,534.80 Bond @ 1 % $ 95.35 Additional nsurance @ 3.55 000 33.85 ota Signature of Preparer C1z cI P .F+ Q7,,!