HomeMy WebLinkAboutCHANGE ORDER - BID - 7528 EDORA POOL & ICE CENTER NATATORIUM VENTILATON UPGRADECHANGE ORDER NO, 2 PROJECT TITLE: EPIC Natatorium Ventilation Upgrade: CONTRACTOR: Kuck Mechanical PROJECT NUMBER: 7528 Pa q ) 3 9 cl 3� DESCRIPTION: Add Low exhaust and Big Ass Fans In preparing change orders show in order as separate numbered paragraphs the following: 9. Reason for change: Need to relocate frequency drives to within 10 ft. of fan they control -thus we need new roof penetrations for controls an a ectnca 2. Description of change -Add 4 additional roof penetrations for electrical wiring to VFD's 3. Change in contract cost: $1449.00 4. Change in contract time: NA ttach additional sheets as require ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER Total C.O. % of Original Contract ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED BY: ACCEPTED BY: REVIEWED BY: APPROVED BY: $157,853.00 $2,524.25 $1449.00 0.92% 2.52% Contractor's Representative Ted Goggin Project Manager Steve Strickland n Print Steve Strickland e Ken Mannon cc: City Clerk Project File Contractor Purchasing Engineer $161, 826.25 Offzoi� Date 10/8/13 Date /O Date Date CHANGE ORDER NO. 3 PROJECT TITLE: EPIC Natatorium Ventilation Upgrade: CONTRACTOR: Kuck Mechanical PROJECT NUMBER: 7528 DESCRIPTION: Add Low exhaust and Big Ass Fans City of Fort CoWns In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change: Need to swap frequency drives from Center 16' to Dive Well 12' 2. Description of change -Labor only for 24 hours for 3 men at 8hrs each to detach, hoist, swap VFD's and reset 2 Big Ass fans 3. Change in contract cost: $2230.16 4. Change in contract time: NA (Attach additional sheets as required) ORIGINAL CONTRACT COST $157,853.00 TOTAL APPROVED CHANGE ORDERS $2,524.25 TOTAL PENDING CHANGE ORDERS $1449.00 TOTAL THIS CHANGE ORDER $2,230.16 TOTAL % OF THIS CHANGE ORDER 1.41% Total C.O. % of Original Contract 3.93% ADJUSTED CONTRACT COST $164,056.41 (Assuming all change orders approved) ACCEPTED BY: Contractor's Representative Ted Goggin ACCEPTED BY: 1�oe0, . �/d11 - - - Project Manager -Steve Strickland REVIEWED BY: Pfint Name Steve Strickland APPROVED BY: , Name Ken Mannon cc: City Clerk Project File Contractor Purchasing Engineer /e�zo.3 Date' 10/8113 -Date - - - - - — Date IdIg -// - --2 ) Date CHANGE ORDER NO. 4 City Of PROJECT TITLE: EPIC Natatorium Ventilation Upgrade: 6r CoWns CONTRACTOR: Kuck Mechanical PROJECT NUMBER: 7528 DESCRIPTION: Add Low exhaust and Big Ass Fans In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change: Need to relocate frequency drives to within 10 ft. of fan they canto I.. thus we need weather light enclosures 2. Description of change -Build brackets, forweather tight enclosures forfrequency drives.(3 pcs) 3. Change in contract cost: $1700.58 - 4, Change in contract time: NA (Attach additional sheets as required) ORIGINAL CONTRACT COST $157,853.00 TOTAL APPROVED CHANGE ORDERS $2,524.25 TOTAL PENDING CHANGE ORDERS $3,679.16 TOTAL THIS CHANGE ORDER $1,700.58 TOTAL % OF THIS CHANGE ORDER 1.08% Total C.O. % of Original Contract 5.01% ADJUSTED CONTRACT COST $165,756.99 (Assuming all change orders approved) ACCEPTED BY: Contractor's Representative Ted Goggin ACCEPTED BY: Project Manager Steve Strickland REVIEWED BY: �.. Prin ame Steve Strickland APPROVED BY: �l Pro ame Ken Mannon cc: City Clerk Project File Contractor Purchasing Engineer _ j6�e Zvr3 Date 1018113 Date 10 Date Date CHANGE ORDER NO, 5 City of PROJECT TITLE: EPIC Natatorium Ventilation Upgrade: Flirt oRins CONTRACTOR: Kuck Mechanical PROJECT NUMBER: 7528 DESCRIPTION: Add Low exhaust and Big Ass Fans In preparing change orders show in order as separate numbered paragraphs the following: t. Reason for change: Relocate Frequency drives to within 10 Ft of motors. WireBig Ass fans directly toJohnson Controls 2. Description of change -Run control wire from JCI panels to frequency drives and to Big Ass fans directly. 3. Change in contract cost: $10277.15 4. Change in contract time: NA (Attach additional sheets as required) ORIGINAL CONTRACT COST $167.853.00 TOTAL APPROVED CHANGE ORDERS $2,524.25 TOTAL PENDING CHANGE ORDERS $5,379.74 TOTAL THIS CHANGE ORDER $10,277.16 TOTAL % OF THIS CHANGE ORDER 6.51% Total C.O. % of Original Contract 11.52% ADJUSTED CONTRACT COST $176,034.14 (Assuming all change orders approved) ACCEPTED BY: Contractojs Representati e Ted Goggin ACCEPTED BY: Project Manager Steve Strickland REVIEWED BY: Al" �,- e PrinT Name Steve Strickland APPROVED BY: � Print Name Ken Mannon cc: City Clerk Project File Contractor Purchasing Engineer /� rJ 2oi Date 10/8113 Date Date ' ' /,A Date CHANGE ORDER NO. 6 PROJECT TITLE: EPIC Natatorium Ventilation Upgrade: CONTRACTOR: Kuck Mechanical . PROJECT NUMBER: 7528 DESCRIPTION: Add Low exhaust and Big Ass Fans Flirt Collins In preparing change orders show in order as separate numbered paragraphs the following: Reason for change: Clean up power cords to Big Ass fans. 2. Description of change:Trim and shrink wrap 3 power cords to three Big Ass Fans to match ceiling white 3. Change in contract cost: $258.75 4. Change in contract time: NA (Attach additional sheets as required) ORIGINAL CONTRACT COST $157,853.00 TOTAL APPROVED CHANGE ORDERS $2,524.25 TOTAL PENDING CHANGE ORDERS $15,656.89 TOTAL THIS CHANGE ORDER $258.75 TOTAL % OF THIS CHANGE ORDER 0.16% Total C.O. % of Original Contract 11.68% ADJUSTED CONTRACT COST $176,292.89 (Assuming all change orders approved) ACCEPTED BY: Contractor's Representative Ted Goggin J /f ACCEPTED BY: Project Manager Steve Strickland REVIEWED BY: 411 Prin Name Steve Strickland APPROVED BY: Pfl Name Ken Mannon cc: City Clerk Project File Contractor Purchasing Engineer e' ZtD/3 Oate 10/8/13 Date /d / Date /die/ Date