HomeMy WebLinkAboutCHANGE ORDER - BID - 7528 EDORA POOL & ICE CENTER NATATORIUM VENTILATON UPGRADECHANGE ORDER NO, 2
PROJECT TITLE: EPIC Natatorium Ventilation Upgrade:
CONTRACTOR: Kuck Mechanical
PROJECT NUMBER: 7528 Pa q ) 3 9 cl 3�
DESCRIPTION: Add Low exhaust and Big Ass Fans
In preparing change orders show in order as separate numbered paragraphs the following:
9. Reason for change: Need to relocate frequency drives to within 10 ft. of fan they control -thus we need
new roof penetrations for controls an a ectnca
2. Description of change -Add 4 additional roof penetrations for electrical wiring to VFD's
3. Change in contract cost: $1449.00
4. Change in contract time: NA
ttach additional sheets as require
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
Total C.O. % of Original Contract
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
ACCEPTED BY:
ACCEPTED BY:
REVIEWED BY:
APPROVED BY:
$157,853.00
$2,524.25
$1449.00
0.92%
2.52%
Contractor's Representative Ted Goggin
Project Manager Steve Strickland
n
Print
Steve Strickland
e Ken Mannon
cc: City Clerk Project File
Contractor Purchasing
Engineer
$161, 826.25
Offzoi�
Date
10/8/13
Date
/O
Date
Date
CHANGE ORDER NO. 3
PROJECT TITLE: EPIC Natatorium Ventilation Upgrade:
CONTRACTOR: Kuck Mechanical
PROJECT NUMBER: 7528
DESCRIPTION: Add Low exhaust and Big Ass Fans
City of
Fort CoWns
In preparing change orders show in order as separate numbered paragraphs the following:
1. Reason for change: Need to swap frequency drives from Center 16' to Dive Well 12'
2. Description of change -Labor only for 24 hours for 3 men at 8hrs each to detach, hoist, swap VFD's and
reset 2 Big Ass fans
3. Change in contract cost: $2230.16
4. Change in contract time: NA
(Attach additional sheets as required)
ORIGINAL CONTRACT COST
$157,853.00
TOTAL APPROVED CHANGE ORDERS
$2,524.25
TOTAL PENDING CHANGE ORDERS
$1449.00
TOTAL THIS CHANGE ORDER
$2,230.16
TOTAL % OF THIS CHANGE ORDER
1.41%
Total C.O. % of Original Contract
3.93%
ADJUSTED CONTRACT COST
$164,056.41
(Assuming all change orders approved)
ACCEPTED BY:
Contractor's Representative Ted Goggin
ACCEPTED BY: 1�oe0, . �/d11
- - - Project Manager -Steve Strickland
REVIEWED BY:
Pfint Name Steve Strickland
APPROVED BY:
, Name Ken Mannon
cc: City Clerk Project File
Contractor Purchasing
Engineer
/e�zo.3
Date'
10/8113
-Date - - - - - —
Date
IdIg -// - --2 )
Date
CHANGE ORDER NO. 4 City Of
PROJECT TITLE: EPIC Natatorium Ventilation Upgrade: 6r CoWns
CONTRACTOR: Kuck Mechanical
PROJECT NUMBER: 7528
DESCRIPTION: Add Low exhaust and Big Ass Fans
In preparing change orders show in order as separate numbered paragraphs the following:
1. Reason for change: Need to relocate frequency drives to within 10 ft. of fan they canto I.. thus we need weather light enclosures
2. Description of change -Build brackets, forweather tight enclosures forfrequency drives.(3 pcs)
3. Change in contract cost: $1700.58
- 4, Change in contract time: NA
(Attach additional sheets as required)
ORIGINAL CONTRACT COST
$157,853.00
TOTAL APPROVED CHANGE ORDERS
$2,524.25
TOTAL PENDING CHANGE ORDERS
$3,679.16
TOTAL THIS CHANGE ORDER
$1,700.58
TOTAL % OF THIS CHANGE ORDER
1.08%
Total C.O. % of Original Contract
5.01%
ADJUSTED CONTRACT COST
$165,756.99
(Assuming all change orders approved)
ACCEPTED BY:
Contractor's Representative Ted Goggin
ACCEPTED BY:
Project Manager Steve Strickland
REVIEWED BY: �..
Prin ame Steve Strickland
APPROVED BY: �l
Pro ame Ken Mannon
cc: City Clerk Project File
Contractor Purchasing
Engineer
_ j6�e Zvr3
Date
1018113
Date
10
Date
Date
CHANGE ORDER NO, 5 City of
PROJECT TITLE: EPIC Natatorium Ventilation Upgrade: Flirt oRins
CONTRACTOR: Kuck Mechanical
PROJECT NUMBER: 7528
DESCRIPTION: Add Low exhaust and Big Ass Fans
In preparing change orders show in order as separate numbered paragraphs the following:
t. Reason for change: Relocate Frequency drives to within 10 Ft of motors. WireBig Ass fans directly toJohnson Controls
2. Description of change -Run control wire from JCI panels to frequency drives and to Big Ass fans directly.
3. Change in contract cost: $10277.15
4. Change in contract time: NA
(Attach additional sheets as required)
ORIGINAL CONTRACT COST
$167.853.00
TOTAL APPROVED CHANGE ORDERS
$2,524.25
TOTAL PENDING CHANGE ORDERS
$5,379.74
TOTAL THIS CHANGE ORDER
$10,277.16
TOTAL % OF THIS CHANGE ORDER 6.51%
Total C.O. % of Original Contract 11.52%
ADJUSTED CONTRACT COST
$176,034.14
(Assuming all change orders approved)
ACCEPTED BY:
Contractojs Representati e Ted Goggin
ACCEPTED BY:
Project Manager Steve Strickland
REVIEWED BY: Al" �,- e
PrinT Name Steve Strickland
APPROVED BY: �
Print Name Ken Mannon
cc: City Clerk Project File
Contractor Purchasing
Engineer
/� rJ 2oi
Date
10/8113
Date
Date ' '
/,A
Date
CHANGE ORDER NO. 6
PROJECT TITLE: EPIC Natatorium Ventilation Upgrade:
CONTRACTOR: Kuck Mechanical .
PROJECT NUMBER: 7528
DESCRIPTION: Add Low exhaust and Big Ass Fans
Flirt Collins
In preparing change orders show in order as separate numbered paragraphs the following:
Reason for change: Clean up power cords to Big Ass fans.
2. Description of change:Trim and shrink wrap 3 power cords to three Big Ass Fans to match ceiling white
3. Change in contract cost: $258.75
4. Change in contract time: NA
(Attach additional sheets as required)
ORIGINAL CONTRACT COST
$157,853.00
TOTAL APPROVED CHANGE ORDERS
$2,524.25
TOTAL PENDING CHANGE ORDERS
$15,656.89
TOTAL THIS CHANGE ORDER
$258.75
TOTAL % OF THIS CHANGE ORDER
0.16%
Total C.O. % of Original Contract
11.68%
ADJUSTED CONTRACT COST
$176,292.89
(Assuming all change orders approved)
ACCEPTED BY:
Contractor's Representative Ted Goggin
J /f
ACCEPTED BY:
Project Manager Steve Strickland
REVIEWED BY: 411
Prin Name Steve Strickland
APPROVED BY:
Pfl Name Ken Mannon
cc: City Clerk Project File
Contractor Purchasing
Engineer
e' ZtD/3
Oate
10/8/13
Date
/d /
Date
/die/
Date