HomeMy WebLinkAbout466764 UNION PACIFIC RAILROAD COMPANY - CONTRACT - PURCHASE ORDER - 9135697Public Road Improvements — Colorado Form
Estimated Costs — Billing Based on Actual Costs
Form Approved-AVP Law 051911
9(-�5-60�
IMPROVEMENTS TO EXISTING PUBLIC ROAD AT GRADE CROSSING
FOR HEMLOCK STREET, DOT 804-SIOB
M.P. 32.77 FORT COLLINS INDUSTRIAL LEAD
FORT COLLINS, COLORADO
TI4IS AGREEMENT ("Agreement) is executed in duplicate this day of , 2013, by and
between ANION PACIFIC RAILROAD COMPANY, a Delaware corporation ("Railroad"), and CITY
OF Fort Collins, a municipal corporation of the State of Colorado ("Political Body").
RECITALS:
Political Body has requested Railroad to improve the existing hemlock Street crossing, at grade,
along, over and across Railroad's track and right of way at Railroad Mile Post 32.77, on Railroad's Fort
Collins Industrial Lead , DOT No. 804-510B, in City of Fort Collins, Larimer County, State of
Colorado (the "Crossing"), to which Railroad is agreeable, but solely upon terms and conditions
hereinafter set forth.
The location of the Crossing is generally shown on the print marked Exhibit A, attached hereto
and hereby made a part hereof.
AGREEMENT:
NOW TI3EREFORE, in consideration of the premises and of the promises and conditions
hereinafter set forth, the parties hereto agree as follows:
1. Railroad shall furnish all labor, material, equipment and supervision for, and shall (a)
remove the existing asphalt crossing, (b) install a 40 ft. precast concrete crossing, (c) field weld rail, (d)
relay track at the Crossing with 133 pound rail, (e) renew the crossties, and (f) surface the track with new
ballast.
2. The work to be performed by Railroad pursuant to 4 CCR 723-7-7211 is described in
Railroad's Material and Force Account Estimate dated August 23, 2013 marked Exhibit B, attached
hereto and hereby made a part hereof (the "Estimate"). As set forth in the Estimate, Railroad's work
associated with the project is estimated to cost Eighty- wo Thou sl and, Six Hundred Seventy -Eight
Dollars ($52,675.00), with such estimated cost being $47,456.00 for material including, without
limitation, costs associated with the shipping, handling and taxes for such material and $35,222.00 for
labor. Pursuant to 4 CCR 723-7-7211, Political Body is to bear• the actual material cost grid Railroad is to
bear the actual labor cost. Railroad shall determine an actual material cost within one hundred twenty
(120) days after it has completed its work involving the project and submit such actual cost billing to
Political Body. Political Body agrees to pay Railroad for such actual material cost within thirty (30) days
of its receipt of billing.
3. All crossing surface renewal and maintenance costs shall be consistent with the Colorado
Public Utilities Commission Rule found at 4 CCR 723-7-7211. Specifically, Railroad shall install and
maintain a concrete grade crossing surface between the track tie ends. Railroad shall bear the labor costs
of installation, maintenance, repair, or replacement of said crossing surface. Political Body shall bear the
cost of the materials to maintain, repair or replace said crossing surface. Further, if the widening of
Hemlock Street necessitates a surface extension of the Crossing, Political Body shall pay the initial cost
of same pursuant to 4 CCR 723-7-7211(d).
G1Uun10SURl0al0ontiz.¢#trmlzt Strcv Frn CNIiWu ro8013102hD1rc Re�C Improvmurus-CetmGFgnn051911 dec
Public Road Improvements — Colorado Form
Estimated Costs — Billing Based on Actual Costs
Form Approved-AVP law 051911
4. Political Body, at its cost, shall provide all labor, material and equipment associated with
traffic control, barricades, detour signing, advanced warning signs, pavement markings and improvements
involving the Crossing's approaches. All such work shall be in compliance with the current Manual on
Uniform Traffic Control Devices.
5. If Political Body's contractor(s) is/are performing any work described in Section 4 above,
then Political Body shall require its contractor(s) to execute Railroad's standard and current form of
Contractor's Right of Entry Agreement. Political Body acknowledges receipt of a copy of the
Contractor's Right of Entry Agreement and understanding of its terms, provisions, and requirements, and
will inform its contractor(s) of the need to execute the Agreement and to obtain and provide to Railroad
the insurance policies, binders, certificates and endorsements that are required in the Contractor's Right of
Entry Agreement. Under no circumstances will the Political Body's contractor(s) be allowed onto the
Railroad's premises without first executing the Contractor's Right of Entry Agreement and providing the
aforesaid insurance documents.
6. Fiber- optic cable systems may be buried on Railroad's property. Protection of the fiber
optic cable systems is of extreme importance since any break could disrupt service to users resulting in
business interruption and loss of revenue and profits. Political Body or its contractor(s) shall telephone
Railroad during normal business hours (7:00 a.m. to 9:00 p.m., Central Time, Monday through Friday,
except holidays) at 1-800-336-9193 (also a 24-hour number, 7 day number for emergency calls) to
determine if fiber optic cable is buried anywhere on Railroad's premises to be used by Political Body or
its contractor(s). If it is, Political Body or its contactor(s) will telephone the telecommunications
company(ies) involved, arrange for a cable locator, and make arrangements for relocation or other
protection of the fiber optic cable prior to beginning any work on Railroad's premises.
7. Political Body, for itself and for its successors and assigns, hereby waives any right of
assessment against Railroad, as an adjacent property owner, for any and all improvements made under
this Agreement.
8. Covenants herein shall inure to or bind each party's successors and assigns; provided, no
right of Political Body shall be transferred or assigned, either voluntarily or involuntarily, except by
express written agreement acceptable to Railroad.
9. Political Body hereby confirms that funds have been appropriated for the work set forth
in this Agreement.
10. The person signing this Agreement on behalf of Political Body hereby confirms that
he/she is authorized under Political Body policies and procedures to execute this Agreement and to bind
Political Body to the obligations under this Agreement.
{Rest of Page left blank intentionally)
C\U==UR10Nlu.=.WHmlxk 9=1 Fan Cc7m CO M-9109PIUa RwOCDl..& Ir 031911�
Public Road Improvements — Colorado Form
Estimated Costs — Billing Based on Actual Costs
Form Approved-AVP Law 051911
IN WITNESS WHEREOF, the parties hereto have duly executed this Agreement as of the date
first herein written.
UNION PACIFIC RAILROAD COMPANY
By
Title:
CITY OF fort Collins
By
Title:
C:1Usar'ASIIR1oDDecmeaSFkalock Sant Fat CdN. CO 904-510RPdlic RW lm�N- Cdordo rr 051911.d.
DATE: 2013-08-23
ESTIMATE OF MATERIAL AND FORCE ACCOUNT WORK
BY THE
UNION PACIFIC RAILROAD -
THIS ESTIMATE GOOD FOR 6 MONTHS EXPIRATION DATE IS :2014-02-21
DESCRIPTION OF WORK:
2013 RECOLLECTIBLE PROGRAM
FORT COLLINS INDUSTRIAL LEAD
I4P 32.77 DOT 0 804510B
INSTALL 40 TF OF CROSSING SURFACE INCLUDING TIES,RAIL AND OTM
ALSO REMOVE RAIL FROM SIDING CROSSING AND FILL IN.
PID: 83620 AP70: 20899 MP,SUBDIV: 32.77, FTCOLLIND
SERVICE UNIT: 14 CITY: FT COLLINS STATE: CO
DESCRIPTION QTY UNIT LABOR 1ATERIAL RECOLL UPRR TOTAL
----------- --- ---- -------------------- ----- -----
ENGINEERING WORK
ENGINEERING
1000
1000
1000
LABOR ADDITIVE 158%
1580
1580
1580
TOTAL ENGINEERING
-------
--------
2580
--------
----------------
2580
2580
SIGNAL WORK
LABOR ADDITIVE 158%
1195
1195
1195
SIGNAL
756
5
5
756
761
TOTAL SIGNAL
1951
5
5
1951
1956
TRACK & SURFACE WORK
BALAST
2.00 CL
5
1831
1831
5
1836
BILL PREP FEE
900
900
900
ENVIRONMENTAL - PERMITS
10
10
10
EQUIPMENT RENTAL
10000
10000
10000
FOREIGN LINE FREIGHT
750
750
750
HONELINE FREIGHT
900
900
900
LABOR ADDITIVE 158%
15648
15648
15648
MATL STORE EXPENSE
243
243
243
OTM
485
3429
3429
485
3914
RAIL
360.00 LF
1262
7747
7747
1262
9009
RDXING
40.00 TF
899
9278
9278
899
10177
SALES TAX
1139
1139
1139
SAW CUT STREET APPROACH
5000
5000
5000
SWTIE
32.00 EA
1181
1903
1903
1181
3064
TRK-SURF,LIN
2874
2874
2874
WELD
348
249
249
348
597
XTIE
82.00 EA
7989
4072
4072
7989
12061
TOTAL TRACK & SURFACE
------- --------
30691
--------
47451
47451
--------
30691
-------
78142
LABOR/MATERIAL EXPENSE 35222 47456----------------
RECOLLECTIBLE/UPRR EXPENSE 47456 35222--------
ESTIMATED PROJECT COST 82678
EXISTING REOSEABLE MATERIAL CREDIT 0
SALVAGE NONUSEABLE MATERIAL CREDIT 0
RECOLLECTIBLE LESS CREDITS
THE ABOVE FIGURES ARE ESTIMATES ONLY AND SUBJECT TO FLUCTUATION. IN THE EVENT OF
AN INCREASE OR DECREASE IN THE COST OR QUANTITY OF MATERIAL OR LABOR REQUIRED,
UPRR WILL BILL FOR ACTUAL CONSTRUCTION COSTS AT THE CURRENT EFFECTIVE RATE.