HomeMy WebLinkAboutCHANGE ORDER - BID - 7426 TRANSFORT MAINTENANCE FACILITY EXPANSION (7)791 9i2/,�v Change Order No. 10 P OJECT TITLE: Tranfort Maintenace Facility Expansion CONTRACTOR: Heath Construction BID NUMBER: 7426 DESCRIPTION: 1. Reason for change: Incorporation of Pricing Change Request (PCR) #22 Into the Contract. 2. Description of change: PCR #22 - Provide all labor, materials and equipment to place four Austrian Pines (20-24' high) at the Transfort Meintenace Facility - $6,211.60. 3. Change In contract costs: $6.211.60 4. Change In contract time: 20 Days ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST $2,156,000.00 $141,876.36 $39.340.18 0.29% $6,211.80 8.59% $2.343,427.14 REVIEWED BY: (\J� �4"L/LntQ A )G-__=- - DATE: l Z _. Facilities Pro*A Manager ACCEPTED BY: DATE: ®� O r Contractor resentative REVIEWED BY: DATE: 4t;;Ifon Manager ll APPROVED B(w, DATE: _ (0 ' l (3 cc Connor Pwdutig PMW F3 MAX Field Construction Office 3000 South College Ave., Suite 201 Fort Collins, CO 80526 fcgov.com/maxconstruction Delivery by hand September 26, 2013 Ms. Erika Keeton, PE MAX Project Manager City of Fort Collins — Engineering Dept 281 N. College Ave. Fort Collins, CO 80524 RE: MAX Bus Rapid Transit Project — Transfort Maintenance Facility Expansion 7426 Independent Cost Analysis — Change Order No. 10 Heath Construction Pricing Change Request #22 Heath Construction was requested to provide Pricing Change Request (PCR) #22 in order to provide additional buffering for our residential neighbors to the east by planting four 20-24 feet tall Austrian pine trees in the open area west of their homes. This action is in response to a letter from the neighbors that requested evergreen trees for addressing their concern with noise and site pollution from the Transfort facility throughout the year. These mature trees being transplanted from the Bellvue Nursery will provide such a buffer to address the neighbors' concerns. These trees will be transplanted with a 100 inch spade, dirt wells will be constructed around each tree and each tree will be staked. The labor, materials and equipment costs proposed by Heath Construction were evaluated against an Independent Cost Estimate and are consistent with pricing for similar work. As such, I find the cost of this Proposed Change Order No. 10 in the amount of $6,211.60 to be reasonable for the required increase in scope. As such, I recommend acceptance of this additional cost and the request for an additional 20 days to enable completion of this request. ��� 1 Ron Kechter Project Engineer City of Fort Collins Operational Services - Facilities Cc: job file System for Award Management Page 1 of 1 R. C. HEATH CONSTRUCTION CO. DUNS: 086341062 CAGE Code: 4LGA6 Status: Active Entity Information Entity Overview Name: R. C. HEATH CONSTRUCTION CO. Doing Business As: HEATH CONSTRUCTION CO Business Type: Business or Organization POC Name: None Specified Registration Status: Active Expiration Date:03/28/2014 Exclusions Active Exclusion Records? No SAM I System for Award Management 1.0 Note to all Users: This is a Federal Government computer system. Use of this system constitutes consent to monitoring at all times. 141 RACQUETTE DR FORT COLLINS, CO, 80524-3244 , UNITED STATES IBM v1.1149.20130801-1829 WWW2 https: //www. sam. gov/portal/public/SAM/?portal : componentld=fb67166e-75 d6-44cc-b77f... 10/ 10/2013 Change Management Checklist EA 3.15.3 — Visual Impacts — Reviewed for compliance with Environmental Assessment 9/26/13 these trees will enhance views RK from the neighboring community Reviewed for construction/safety impacts 9/26/13 This work will follow all standard RK construction and safety practices Independent cost estimate prepared 9126/13 Costs are in keeping with recent RK costs on similar work Reviewed for PCGA grant compliance 9126/13 Part of Build Altemative Scope RK included in SCC 30.02 Reviewed for real estate impacts/needs 9/26/13 All of this work is within the project RK site and not in the right-of-way Reviewed for compliance with design These trees will provide additional criteria/ADA mitigation for trees removed from htW:/hwrv.access-board.aov/ada-aba/ada- 9126/13 this site and for one tree from the South Transit Center, per the City RK standards-dot.chn Forester cit Fort Collins ,lam Independent Cost Estimate Date of Estimate: 22-Aug-13 Contract Type: Fixed Price Existing Contract or PO (YIN): Yes Description Services (B): Provide all labor, materials and equipment to plant four Austrian pines 20'-24' from Bellvue Nursery with 100" spade, including staking. dirt well and mulching at the Transfort Maintenance Facility. have obtained the following estimate from: Engineering or Techincal Estimate (performed by) - Ron Kechter B Transfort Maintenance Facility Expansion Materials or Work Description Quantity Unit Unit Cost TOTAL Change Order #10 - PCR #22 Austrian Pines - 20' - 24' 4 EA $ 450.00 $ 1,800.00 100" Spade to Transplant Trees 4 EA $ 800.00 $ 3,200.00 Provide 3 stakes at Each Tree 4 EA $ 105.00 $ 420.00 F'rovicle Dirt WellMulch at Eachree Subtotal I Is 5,900.00 Bond @ 1 % $ 59.00 loverhead ro it o ota Signature of Preparers (j� O�v�_ Q J®RDAYS TREE MOYINC & ®9 MAINTENANCE, INC. 1025 Smithfield Drive Fort Collins, CO 80524 970-482-6331 Fax 482-6532 www.jordanstree.com I NAME/ADDRESS I Heath Construction PO Drawer H 141 Racquette Drive Fort Collins, CO 80522 Attn: Paul Estimate DATE 9/11/2M P.O. NO. TERMS PROJECT Net30, I8%APR Transfort DESCRIPTION CITY COST TOTAL Transfortsite: Purchase four Austrian Pines (23, 20', 21', 24' in height) from 88 20.00 1,760.00 Bellvue Nursery. 100" spade to transplant the above four pints to the Transfort 4 800.00 3,200.00 Project Stake trees at new site (estimate 4 stakes each tree). 12 35.00 420.00 Provide dirt wells and mulch to newly planted trees. 4 120.00 480.00 We appreciate your business. Checkout our web site www.jordanstree.com TOTAL S5,860.00 SIGNATURE Heath construction Job: Project No. 12SO531 Tifle: Provido 4 additional Austrfan Pine Project Transfort To: Ann: Ron Kechter City of Fort Collins • Facilities Management 281 N. CollegeAve. Fort Cotlins, 0080524 DESCRIPTION OF PROPOSAL Provide 4 add0lcrul Auatrun Pins trese. Pricing Change Request No. 22 Back Up kftnrutlon OdglnetingDocument: o ..Rw Originating Document Date: 9/11/2013 PCODate: Sr11/2013 Item Description Type Oty I Unit nit Labor I Material Equip 3ubcomractor Other Total- 1 Jordan s TV" Service S 1.00 LS 1 0.00 0.00 0.00 6,660. 0.00E 5,860.00 2 S 1.00 Ea 0.00 0.00 0.00 0.011 0.00 $ 3 S 1.00 LF 0.00 0.06 0.00 0.00 0.00 4 S 1.00 EA 0.00 0.00 0.00 0.00 0.00 $ E 5 S 1.00 Ea 0.D0 0.00 0.00 0.00 0.00 Fa 7 0.00 0.00 0.00 0.00 0.00 8 0.00 0.00 0.00 0.01) 0.00 $ 0.00 0.00 0.00 0.00 0.00 $ 10 0.00 0.00 0.001 0.00 0.00 11 0.00 O.DO 0.00 0.00 0.00 S 12 0.00 0.00 0.00 0.00 0.00 $ 13 0.00 0.00 0.001 0.00 0.00 S 14 _- 0.00 0.DO 0.00 0.00 0.00 $ 15 Additional General Conditions O 0.00 Da 0.00 D.00 0.00 0.00 0.00 16 GC Ca nter Labor/forman-Addition L 0.00 hr 68.00 O.DO 0.00 0.00 0.00 0.00 $ 17 GC Carpenter Labor/forman-Chassis L 0.00 hr 68.00 0.00 0.00 0.00 0.00 0.00 E 18 GC Pro eh Mana ament L 0.00 hr 0.00 0.00 0.00 0.00 0.00 $ 19 0.00 0.00 0.00 0.00 0.00 $ 21 Subtotal 0.00 0.D0if 0.00 $ 5860.00 23 Sales Tax NA % 0.00% 0.00$ 24 Bond Premium 0 5 860.00 % 1.0096 $ 58.60 25 Lfabill Insurance O 5.860.00 % 0.63% $ 26 Builders Risk O 5,86( % 0.39% S 28 Subtotal 0.00E 58.60 30 Labor Burden O - 0.00% floo a00 32 Subtotal 0.00 S 34 Overhead O 5 660.00 $ 175.80 Profit O 5 86000 W00%175.80 117.20 117.20 35 38 Subtotal 0.00 0.00 0.00 $ 293.00 Note: 20 Additional days of Um am rpuaeted as a mutt of We &At,^ Total Cost 3 e,211.ao Issued By: Reviewed By: Approved By; Paul L Ehrlich Jr., Project Managar Ron Keehfar Meath Construction City of Fort Collins Data Project Architect Mier Lingle Massey June 5, 2013 Mr. Ron Kechter Facilities Project Manager City of Fort Collins - Transfort Hand Delivered June 6.2013 Dear Ron Thank you for taking the time to speak with me fast week. Per our discussion, myself and my adjoining neighbors who have our properties with our back yards and decks being across the narrow open space directly east of the Trilby Facility, we would respectfully request a mitigation project for excessive noise, dust and air quality. The City relocated mature pine trees that previously blocked some of the noise pollution and diesel engine exhaust and the loud backup safety buzzers in continuous use at the facility. You explained that the trees were removed because they interfered with the construction project. We were aware that there would be construction for the expansion of the bus terminal, however, we are concerned that the City is not considering the additional activities and pollution issues for the neighbors who live directly behind the east side of the depot. We now have even more reverberation from the flat brick walls and will have more noise from the additional garage entries for the busses. We request that the City replant the entire fence line with bushes and/or hedges, including evergreen trees (for winter protection). Currently the noise is so loud that we cannot sit on our decks and carry on conversations. We hear the bus automatic wash system constantly in the evening, back up buzzers and diesel idling of the busses. It is all of our concerns that the City never addressed noise and site pollution for the depot once the budget was approved for the expansion of the facility and the large parking lot which will entail bus driving training. This will also involve constant backing up maneuvers. The additional dirt bean that was graded for the northern adjacent houses will probably help somewhat for those neighbors, however, currently the dust situation is intolerable from all of the raw dirt and the berm. We hope that part of the project will be to spray the exposed dirt sections with hydro seed. Thank you for addressing this problem on our behalf. Peter Remy Michael Morrison �verd . , Q 6525 Westboum Circle 6519 Westboum Circle 6531 Westboum Circle CC Fort Collins, CO 80525 Fort Collins, CO 80525 Fort Collins, CO 80525 970/682-2424 970/207-1196 970/846-3218