HomeMy WebLinkAbout509412 WARD ALTERNATIVE ENERGY LLC - CONTRACT - RFP - 7508 TRANSFORT COMPRESSED NATURAL GAS FUELING FACIAmendment 1
to the
Professional Services Agreement between
WARD ALTERNATIVE ENERGY
and the
City of Fort Collins
This is Amendment 1 ("Amendment 1") dated August 22, 2013 to the Professional. Service Agreement
("Agreement') by and between Ward Alternative Energy and the City of Fort Collins for the purchase
and installation of an additional CNG direct fill dispenser at the Transfort CNG Fueling Facility.
WITNESSETH:
Whereas, the parties desire to amend the Agreement to clarify payment terms and incorporate the
Davis -Bacon Wage Determination schedule.
Now, therefore be it resolved, in consideration of the foregoing and of the mutual covenants and
agreements set forth herein, and for other good and valuable consideration, the parties hereby agree
as follows:
1.. Amendments. The parties hereby amend the Agreement as follows:
a. Replace item 3, Payment Schedule (on page 1 of the Agreement) to read as follows:
The parties agree to the following progress payments with net 30 pay terms:
- 30% of contract amount billable upon placement.of purchase orders for long -lead
materials (copy of purchase order to be provided upon request by the City)..
- 30% billable at completion of underground and site work.
- 40% billable upon Final Acceptance of the Project.
b. Incorporate the specific Davis -Bacon Wage Determination pursuant to Exhibit E Federal
Requirements. See attached Wage Determination General Decision Number C01300.12
07/26/2013 CO12.
2_ Full Force and Effect. This Amendment 1 shall be read in conjunction with the Agreement, all
terms and conditions of which shall continue to have full force and effect, except to the extent as
varied by this Amendment 1.
In witness whereof, the parties hereto have caused this Amendment 1 to be executed by their duly
authorized representatives as of the date first written above. -,
Ward ternativEnergy
i
Paul Nelson
President
City of Fb# Colli
Director Purchasing and Risk Management
Page 3 of 6
bowls .......................$ 24.57 8.62
Trackhoe....................$ 24.42 8.62
----------------------------------------------------------------
IRON0024-003 07/01/2011
Rates Fringes
Ironworkers: ..................... $ 23.80 18.07
Structural
----------------------------------------------------------------
LAB00086-001 05/01/2009
Rates Fringes
Laborers:
Pipelayer...................$ 18.68 6.78
----------------------------------------------------------------
* PLUM0003-005 07/01/2013
ADAMS, ARAPAHOE, BOULDER, BROOMFIELD, DENVER, DOUGLAS,
JEFFERSON, LARIMER AND WELD COUNTIES
Rates Fringes
PLUMBER ..........................$ 35.68 12.34
----------------------------------------------------------------
PLUM0058-002 07/01/2012
EL PASO COUNTY
Rates Fringes
Plumbers and Pipefitters......... $ 32.55 12.95
----------------------------------------------------------------
PLUM0058-008 07/01/2012
PUEBLO COUNTY
Rates Fringes
Plumbers and Pipefitters......... $ 32.55 12.95
----------------------------------------------------------------
FLUM0145-002 07/01/2011
MESA COUNTY
Rates Fringes
Plumbers and Pipefitters......... $ 35.17 11.05
-------------------------------------------------------------
PLUM0206-004 07/01/2013
ADAMS, ARAPAHOE, BOULDER, BROOMFIELD, DENVER, DOUGLAS,
JEFFERSON, LARIMER AND WELD COUNTIES
Rates Fringes
PIPEFITTER .......................$ 33.35 12.27
----------------------------------------------------------------
SHEE0009-002 07/01/2012
http://w%vw.wdol.gov/wdol/scafiles/davisbacon/CO12.dvb?v=8 8/15/2013
Page 4 of 6
Rates Fringes
Sheet metal worker ...............$ 31.77 12.32
----------------------------------------------------------------
TEAM0455-002 07/01/2011
Rates Fringes
Truck drivers:
Pickup ......................$ 18.41 3.87
Tandem/Semi and water ....... $ 19.04 3.87
----------------------------------------------------------------
SUCO2001-006 12/20/2001
Rates
BOILERMAKER ......................$ 17.60
Carpenters:
Form Building and Setting...$ 16.97
All Other Work ..............$ 15.14
Cement Mason/Concrete Finisher ... $ 17.31
IRONWORKER, REINFORCING .......... $ 18.83
Laborers:
Common ......................$ 11.22
Flagger.....................$ 8.91
Landscape ...................$ 12.56
Painters:
Brush, Roller & Spray ....... $ 15.81
Power equipment operators:
Backhoe.....................$ 16.36
Front End Loader ............ $ 17.24
Skid Loader .................$ 15.37
------------------------------------------------
Fringes
2.74
3.37
2.85
3.90
2.92
3.80
3.21
3.26
2.48
3.23
4.41
---------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification
and wage rates that have been found to be prevailing for the
cited type(s) of construction in the area covered by the wage
determination. The classifications are listed in alphabetical
order of "identifiers" that indicate whether the particular
rate is union or non -union.
http://www.wdol.gov/wdol/scafiles,ldavisbacon/CO 12.dvb?v=8 8/15/2013
Page 5 of 6
Union Identifiers
An identifier enclosed in dotted lines beginning with
characters other than "SU" denotes that the union
classification and rate have found to be prevailing for that
classification. Example: PLUM0198-005 07/01/2011. The first
four letters , PLUM, indicate the international union and the
four -digit number, 0198, that follows indicates the local union
number or district council number where applicable , i.e.,
Plumbers Local 0198. The next number, 005 in the example, is
an internal number used in processing the wage determination.
The date, 07/01/2011, following these characters is the
effective date of the most current negotiated rate/collective
bargaining agreement which would be July 1, 2011 in the above
example.
Union prevailing wage rates will be updated to reflect any
changes in the collective bargaining agreements governing the
rates.
0000/9999: weighted union wage rates will be published annually
each January.
Non -Union Identifiers
Classifications listed under an "SU" identifier were derived
from survey data by computing average rates and are not union
rates; however, the data used in computing these rates may
include both union and non -union data. Example: SULA2004-007
5/13/2010. SU indicates the rates are not union majority rates,
LA indicates the State of Louisiana; 2004 is the year of the
survey; and 007 is an internal number used in producing the
wage determination. A 1993 or later date, 5/13/2010, indicates
the classifications and rates under that identifier were issued
as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change
until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can
be:
an existing published wage determination
a survey underlying a wage determination
a Wage and Hour Division letter setting forth a position on
a wage determination matter
a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests
for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted
because those Regional Offices have responsibility for the
Davis -Bacon survey program. If the response from this initial
contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
http://www.wdol.gov/wdol/scafiles/davisbacon/COI 2.dvb?v--8 8/15/2013
Page 6 of 6'
With regard to any other matter not yet ripe for the formal
process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an
interested party (those affected by the action) can request
review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and by any information (wage
payment data, project description, area practice material,
etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
http://www.wdol.gov/wdol/scafiles/davisbacon/COI2.dvb?%r8 8/15/2013
General Decision Number: C0130012 07/26/2013 C012
Superseded General Decision Number: CO20120012
State: Colorado
Construction Type: Heavy
Counties: Adams, Arapahoe, Boulder, Broomfield, Denver,
Douglas, El Paso, Jefferson, Larimer, Mesa, Pueblo and Weld
Counties in Colorado.
HEAVY CONSTRUCTION PROJECTS
Modification Number
Publication Date
0
01/04/2013
1
03/08/2013
2
04/05/2013
3
04/19/2013
4
04/26/2013
5
05/03/2013
6
05/17/2013
7
07/05/2013
8
07/26/2013
ASBE0028-001 10/01/2012
Rates Fringes
Asbestos Workers/Insulator
(Includes application of
all insulating materials,
protective coverings,
coatings and finishings to
all types of mechanical
systems) ....................$ 28.98 13.03
----------------------------------------------------------------
BRC00007-004 01/01/2011
ADAMS, ARAPAHOE, BOULDER, BROOMFIELD, DENVER, DOUGLAS AND
JEFFERSON COUNTIES
Rates Fringes
BRICKLAYER .......................$ 22.13 9.89
----------------------------------------------------------------
BRC00007-006 06/01/2011
EL PASO AND PUEBLO COUNTIES
Rates Fringes
BRICKLAYER .......................$ 21.97 9.88
----------------------------------------------------------------
ELEC0012-004 09/01/2012
PUEBLO COUNTY
Rates Fringes
ELECTRICIAN
http://www.wdol.gov/wdol/scafiles/davisbacon/CO 12.dvb?v=8
Page 1 of 6
8/ 15/2013
Page 2 of 6
Electrical work where the
cost is $150,000 or less .... $ 24.50 11.84
Electrical work where the
cost is over $150,000....... $ 27.00 11.91
-------------------------------------------------------------
ELECO068-001 12/01/2012
ADAMS, ARAPAHOE, BOULDER, BROOMFIELD, DENVER, DOUGLAS,
JEFFERSON, LARIMER, AND WELD COUNTIES
Rates Fringes
ELECTRICIAN ......................$ 32.10 12.53
----------------------------------------------------------------
ELECO111-001 09/01/2012
Rates
Line Construction:
Cable Splicer ...............$ 28.65
Equipment Operator -
Underground .................$ 25.06
Groundman...................$ 22.31
Line Equipment Operator ..... $ 27.24
Lineman and Welder .......... S 39.03
ELECO113-002 06/01/2013
EL PASO COUNTY
Rates
Fringes
13.753+4.75
12.759+4.75
9.78
10.60
14.42
----------------------
Fringes
ELECTRICIAN .......................5 29.55 14.48
----------------------------------------------------------------
ELEC0969-002 06/01/2010
MESA COUNTY
Rates Fringes
ELECTRICIAN ......................S 20.75 5.66
----------------------------------------------------------------
ENGI0009-001 06/25/2012
Rates Fringes
Power equipment operators:
Blade: Finish ...............$
24.57
8.62
Blade: Rough ................$
24.27
8.62
Bulldozer ...................$
24.27
8.62
Cranes: 50 tons and under..$
24.42
8.62
Cranes: 51 to 90 tons ......
$ 24.57
6.62
Cranes: 91 to 140 tons .....
$ 24.72
8.62
Cranes: 141 tons and over ...
$ 25.48
8.62
Forklift ....................$
23.92
8.62
Mechanic ....................$
24.42
8.62
Oiler .......................$
23.57
8.62
Scraper: Single bowl
under 40 cubic yards ........
$ 24.42
8.62
Scraper: Single bowl,
including pups 40 cubic
yards and over and tandem
http://www.wdol.gov/wdol/scafiles/davisbacon/CO 12.dvb?v=8 8/15/2013
Page 3 of 6
bowls .......................$ 24.57 8.62
Trackhoe....................$ 24.42 8.62
----------------------------------------------------------------
IRON0024-003 07/01/2011
Rates Fringes
Ironworkers: ..................... $ 23.80 18.07
Structural
----------------------------------------------------------------
LAB00086-001 05/01/2009
Rates Fringes
Laborers:
Pipelayer...................$ 18.68 6.78
----------------------------------------------------------------
* PLUM0003-005 07/01/2013
ADAMS, ARAPAHOE, BOULDER, BROOMFIELD, DENVER, DOUGLAS,
JEFFERSON, LARIMER AND WELD COUNTIES
Rates Fringes
PLUMBER ..........................$ 35.68 12.34
----------------------------------------------------------------
PLUM0058-002 07/01/2012
EL PASO COUNTY
Rates Fringes
Plumbers and Pipefitters......... $ 32.55 12.95
----------------------------------------------------------------
PLUM0058-008 07/01/2012
PUEBLO COUNTY
Rates Fringes
Plumbers and Pipefitters......... $ 32.55 12.95
----------------------------------------------------------------
PLUM0145-002 07/01/2011
MESA COUNTY
Rates Fringes
Plumbers and Pipefitters......... $ 35.17 11.05
----------------------------------------------------------------
PLUM0208-004 07/01/2013
ADAMS, ARAPAHOE, BOULDER, BROOMFIELD, DENVER, DOUGLAS,
JEFFERSON, LARIMER AND WELD COUNTIES
Rates Fringes
PIPEFITTER .......................$ 33.35 12.27
----------------------------------------------------------------
SHEE0009-002 07/01/2012
http://w-,vw.wdol.gov/wdol/scafiles/davisbacon/COI2.dvb?v=8 8/15/2013
Page 4 of 6
Rates Fringes
Sheet metal worker ...............$ 31.77 12.32
----------------------------------------------------------------
TEAM0455-002 07/01/2011
Rates Fringes
Truck drivers:
Pickup ......................$ 18.41 3.87
Tandem/Semi and Water ....... $ 19.04 3.67
----------------------------------------------------------------
SUCO2001-006 12/20/2001
Rates Fringes
BOILERMAKER ......................$ 17.60
Carpenters:
Form Building and Setting...$
16.97
2.74
All Other Work ..............$
15.14
3.37
Cement Mason/Concrete Finisher ...
$ 17.31
2.85
IRONWORKER, REINFORCING ..........
$ 16.83
3.90
Laborers:
Common ......................$
11.22
2.92
Flagger.....................$
8.91
3.80
Landscape ...................$
12.56
3.21
Painters:
Brush, Roller 6 Spray .......
$ 15.81
3.26
Power equipment operators:
Backhoe.....................$
16.36
2.48
Front End Loader ............
$ 17.24
3.23
Skid Loader .................$
----------------------------------------------------------------
15.37
4.41
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification
and wage rates that have been found to be prevailing for the
cited type(s) of construction in the area covered by the wage
determination. The classifications are listed in alphabetical
order of "identifiers" that indicate whether the particular
rate is union or non -union.
http://www.wdol.gov/wdol/scafiles/davisbacon/COI 2.dvb?v=8 8/15/2013
Page 5 of 6
Union Identifiers
An identifier enclosed in dotted lines beginning with
characters other than "SU" denotes that the union
classification and rate have found to be prevailing for that
classification. Example: PLUM0198-005 07/01/2011. The first
four letters , PLUM, indicate the international union and the
four -digit number, 0198, that follows indicates the local union
number or district council number where applicable , i.e.,
Plumbers Local 0198. The next number, 005 in the example, is
an internal number used in processing the wage determination.
The date, 07/01/2011, following these characters is the
effective date of the most current negotiated rate/collective
bargaining agreement which would be July 1, 2011 in the above
example.
Union prevailing wage rates will be updated to reflect any
changes in the collective bargaining agreements governing the
rates.
0000/9999: weighted union wage rates will be published annually
each January.
Non -Union Identifiers
Classifications listed under an "SU" identifier were derived
from survey data by computing average rates and are not union
rates; however, the data used in computing these rates may
include both union and non -union data. Example: SULA2004-007
5/13/2010. SU indicates the rates are not union majority rates,
LA indicates the State of Louisiana; 2004 is the year of the
survey; and 007 is an internal number used in producing the
wage determination. A 1993 or later date, 5/13/2010, indicates
the classifications and rates under that identifier were issued
as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change
until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can
be:
an existing published wage determination
a survey underlying a wage determination
a Wage and Hour Division letter setting forth a position on
a wage determination matter
a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests
for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted
because those Regional Offices have responsibility for the
Davis -Bacon survey program. If the response from this initial
contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
http://www.wdol.gov/wdol/scafiles/davisbacon/COI2.dvb?v=8 8/15/2013
Page 6 of 6' -
With regard to any other matter not yet ripe for the formal
process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an
interested party (those affected by the action) can request
review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and by any information (wage
payment data, project description, area practice material,
etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
http://www.wdol.gov/wdol/scafiles/davisbacon/CO 12.dvb?v=8 8/15/2013
General Decision Number: C0130012 07/26/2013 C012
Superseded General Decision Number: CO20120012
State: Colorado
Construction Type: Heavy
Counties: Adams, Arapahoe, Boulder, Broomfield, Denver,
Douglas, El Paso, Jefferson, Larimer, Mesa, Pueblo and Weld
Counties in Colorado.
HEAVY CONSTRUCTION PROJECTS
Modification Number
0
1
2
3
4
5
6
7
8
ASBE0028-001 10/01/2012
Publication Date
01/04/2013
03/08/2013
04/05/2013
04/19/2013
04/26/2013
05/03/2013
05/17/2013
07/05/2013
07/26/2013
Rates
Asbestos Workers/Insulator
(Includes application of
all insulating materials,
protective coverings,
coatings and finishings to
all types of mechanical
systems) ....................$ 28.98
----------------------------------------
BRC00007-004 01/01/2011
Fringes
13.03
----------------------
ADAMS, ARAPAHOE, BOULDER, BROOMFIELD, DENVER, DOUGLAS AND
JEFFERSON COUNTIES
Rates Fringes
BRICKLAYER .......................$ 22.13 9.89
----------------------------------------------------------------
BRC00007-006 06/01/2011
EL PASO AND PUEBLO COUNTIES
Rates Fringes
BRICKLAYER .......................$ 21.97 9.88
----------------------------------------------------------------
ELEC0012-004 09/01/2012
PUEBLO COUNTY
Rates Fringes
ELECTRICIAN
Page 1 of 6
http://www.wdol.gov/wdol/scafiles/davisbacon/CO12.dvb?v=8 8115/2013
Page 2 of 6
Electrical work where the
cost is $150,000 or less .... $ 24.50 11.84
Electrical work where the
cost is over $150,000....... $ 27.00 11.91
----------------------------------------------------------------
ELEC0068-001 12/01/2012
ADAMS, ARAPAHOE, BOULDER, BROOMFIELD, DENVER, DOUGLAS,
JEFFERSON, LARIMER, AND WELD COUNTIES
Rates Fringes
ELECTRICIAN ......................$ 32.10 12.53
----------------------------------------------------------------
ELEC0111-001 09/01/2012
Rates Fringes
Line Construction:
Cable Splicer ...............$
28.65
13.754+4.75
Equipment Operator -
Underground .................$
25.06
12.759+4.75
Groundman...................$
22.31
9.78
Line Equipment Operator .....
$ 27.24
10.80
Lineman and Welder ..........
$ 39.03
14.42
----------------------------------------------------------------
" ELECO113-002 06/01/2013
EL PASO COUNTY
Rates Fringes
ELECTRICIAN ......................$ 29.55 14.48
----------------------------------------------------------------
ELEC0969-002 06/01/2010
MESA COUNTY
Rates Fringes
ELECTRICIAN ......................S 20.75 5.66
----------------------------------------------------------------
ENGI0009-001 06/25/2012
Rates
Fringes
Power equipment operators:
Blade: Finish ...............$
24.57
8.62
Blade: Rough ................$
24.27
8.62
Bulldozer ...................$
24.27
8.62
Cranes: 50 tons and under..$
24.42
8.62
Cranes: 51 to 90 tons ......
$ 24.57
8.62
Cranes: 91 to 140 tons .....
$ 24.72
8.62
Cranes: 141 tons and over ...
$ 25.48
8.62
Forklift ....................$
23.92
8.62
Mechanic ....................$
24.42
8.62
Oiler .......................$
23.57
8.62
Scraper: Single bowl
under 40 cubic yards ........
$ 24.42
8.62
Scraper: Single bowl,
including pups 40 cubic
yards and over and tandem
http://www.wdol.gov/wdol/scafiles/davisbacon/CO 12.dvb?v=8 8/15/2013