Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7426 TRANSFORT MAINTENANCE FACILITY EXPANSION (5)Change Order No(DT PROJECT TITLE: Tranfort Maintenace Facility Expansion CONTRACTOR: Heath Construction BID NUMBER: 7426 DESCRIPTION: 1. Reason for change: Incorporation of Pricing Change Requesl5 (PCR) t113,14 & Two T&M Changes Into the Contract. 2. Description of change: PCR 413 - Overexcavation In the area of concrete removal - $2,856.59; PCR 414 -Soft spot removal east & west of addition - $2,024.27; T&M -Removal of Mock Station from Training Area - $1,021.15; T&M - Raise two stormwater Inlets and repels to mechanic pit - S1,017.96. 3. Change in contract costs S6,919.97 4. Change in contract time: 0 Days ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS. TOTAL THIS CHANGE ORDER TOTAL % THIS CHANGE ORDER TOTAL C.O. % ORIGINAL. CONTRACT ADJUSTED CONTRACT COST $2,156,000.00 $141,875.36 $19,548.52 56,919.97 0.32% 7.81% $2,324,343.85 ct O REVIEWED BY: .. X .D �� DATE: � . Facilities Pruledt Manager ACCEPTED REVIEWED APPROVED rx CaWar3or A*,d tom: DATE l L C oyt DATE: /"Z/3 DATE:- !/ • I Heath 1=1`nY:.it construction Job; PrOJOCt No. 12BO531 Title: Excavate Area of Additional Concrete Removal Project: Transfort To: Attn: Ron Kechtef City Of Fort Collins - Facilities Management 261 N. CollegeAve. Fort Collins, CO 80524 oeeca�noh of PRDposu- Ovar'x Wa, f111 rq compact 1800 aF am of added corrcraro paving area. _.__-- ,_oo,.v,,. . a a a Mun a mh chrga. Pricing Change Request No. 13 Back UP hfornW Ion Originating Document: o.nrnrrrre Originating Document Date: 8/19/2013 PCO Date: 8P2612013 Total Coat $ 2,95e.59 rsaued ey: Revbwed By: Approved By: PaW L E earth Jr., Project Manager Ron Ko tftr Heath Conavuctlon City of Fort Collins Project Archlt d Aller Lingle Mnsaey Raise Two SW Inlets + Repairs to Mechanical Pit lad TMFE *7/11 /)n1 :2 Description Unit Quantity Unit Cost * Total Cost Carpenter Labor HR 11 $ 53.24 $ 585.64 Remove 14" Curb from North, South & East Sides HR 8 $ 21.21 $ 169.68 Bush Hammer HR 4 $ 14.06 $ 56.24 Concrete Saw HR 3 $ 7.84 $ 23.52 Subtotal $ 835.08 Mark-up @ 1S% $ 125.26 Subtotal $ 960.34 Additional Bond @ 1% $ 9.60 Overhead @ 3% $ 28.81 Profit 2% F44 $ 19.21 Total $ 1,017.9696 Removal of Mock Station from Training Area @ TMFE 6/3/2013 Description Unit Quantity Unit Cost * Total Cost Remove 14" Curb & 2' Gutter on West Side LF (60.00) $ 25.00 $ (1,500.00) Remove 14" Curb from North, South & East Sides LF (98.00) $ 20.00 $ (1,960.00) Remove 1121 SF of 4" Deep Concrete - SF (1,121.00) $ 4.25 $ (4,764.25) Remove 4 Bollards Each (4.00) $ 400.00 $ (1,600.00) Delete Labor for Placing Concrete and Bollards Hour (10.00) $ 45.00 $ (450.00) Delete 19" Base CY (65.75) $ 5.00 $ (328.75) Add Rebar Mat (#4 @ 18" O.C.) & Placement SF 1,200.00 $ 1.25 $ 1,500.00 Add 9" Deep Concrete CY 33.33 $ 95.00 $ 3,166.35 Add Placement & Finish 9" Concrete SF 1,200.00 $ 5.75 $ 6,900.00 Subtotal $ 963.35 Additional Bond @ 1% $ 9.63 Overhead @ 3% $ 28.90 Profit @ 2% $ 19.27 Total 1 $ 1,021.15 M COLORADO DEPARTMENT OF TRANSPORTATION INSPECTOR'S REPORT FOR FORCE ACCOUNT WORK Project No.: Transfort Maintenance Facility Project Code (SA#): 7426 CMO or F/A No.: Contractor's Name: Heath Subcontractor's Name: Duran Description of Work: Stabilize su rade under additional pavernent removal and building corners Date: 6/16/13 5/20113, 5121/13 528/13 611/13 LABOR Employee Name Occupation Hours Total Hours ST OT S7 OT ST OT ST OT ST OT ST OT Jarrod -, i . lam, Foreman 4 2.5 3 2.5 2 I �_ Mason �- �' , - "1 `'1 Operator 2.5 1 2 0.5 1 Tim i-t i Operator 1-5 j J" Tim ') , ' I Truck Driver 1 5 (p Mike _' 'y� , ; % Truck Driver 1 John 1•.tl �,, �i -j Operator 0.5 2 '1 The hours shown here were checked against the certified payrolls. Checked By: Date: EQUIPMENT Code No. Shift Rate Hours Total Hours 1 SB Kamatsu PC 300 Trackhoe r1� n i / , V, � 1.5 2 J F Cat 928 G Loader ` Dynapac Sheepsfoot (Cci . C1 ;'� 1 0.5 Cat D 6 Dozer 1 �, l 1.5 1 5 Cat 236 B Skidsleer ��- ?, 2 2 Cat 140 H Blade i t 0-5 2 2" submersable pump Tandem ��'� , u 2 I 5 MATERIAL - Type Unit Number of Units Total Units Note: A Certified Invoice for Materials is re uired as pad of billing. Crushed Concrete Ton r 1.,; , (a 16.1 Pit Run Ton , r; r 15.5 Select Fill ?A -Leads(5 Contractor/Subcontractor Initials Billing procedures shall conform to applicable project specifications. I certify that this is a correct record of employee & equipment hours and material units on the above project as authorized by the above modification order or agreement. Signed: Title: uisuiuuuuu: region rmaas mngineer longmaq CDOT Form 10 07102 Project File Contractor Previous editions may be used until supplies exhausted ]Mark-up $245.41 Bond $28.22 Grand Total $1,909.69 Sincerely, Dustin Duran Project Manager Duran Excavating, Inc. 418 N 9`h Avenue • Greeley, Colorado 80631 (970) 351-0192 Change Order NOO PROJECT TITLE: Tranfort Maintenace Facility Expansion CONTRACTOR: Heath Construction BID NUMBER: 7426 DESCRIPTION: 1. Reason for change: Incorporation of Pricing Change Request (PCR) #16 Into the Contract 2. Description of change: PCR #18 - Provide an Audio Intercom at the main entrance gate, a Nema 3R enclosure for the gate controller and provide a card reader with lockset 8 electric strike for the door to the MDF - $4,909.39. 3. Change in contract costs; $4,909.39 4. Change In contract Ume: 0 Days ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST $2,156,D00.00 $141.875.36 $26,468.49 $4.909.39 0.23% 8.04% $2,329,253.24 REVIEWED BY.• (JZ OLA ,. � I��� DATE: Faellities Project Manager ACCEPTED BY: REVIEWED BY: DATE: ( r Z6 ` 13 DATE: APPROVED BY:Ly4a:`!✓v "L DATE: WNER'9 REPRESENTATIVE cG C *&dor Povha*g Pra]W FU MAX Field Construction Office 3000 South College Ave., Suite 201 Fort Collins, CO 80526 fcgov.com/maxconstruction Delivery by hand September 20, 2013 Ms. Erika Keeton, PE MAX Project Manager City of Fort Collins — Engineering Dept 281 N. College Ave. Fort Collins, CO 80524 RE: MAX Bus Rapid Transit Project — Transfort Maintenance Facility Expansion 7426 Independent Cost Analysis — Change Order No. 8 Heath Construction Pricing Change Request #16 Heath Construction was requested to provide Pricing Change Request (PCR) #16 in order to provide an audio intercom for the main entrance gate so that the gate can be closed all of the time and vendors can use the intercom to reach Dispatch to open the gate. This intercom will be placed in an enclosure, along with the.card reader already included in the contract, and attached to a pedestal that is located just outside of the main gate. This will enable continuous positive security of the Transfort complex: Additionally, Heath was requested to provide with this PCR the pricing for a card reader, lockset and electric strike for the MDF in order to control access to this room where the main IT hub is located for the Transfort facility. The labor, materials and equipment costs proposed by Heath Construction were evaluated against an Independent Cost Estimate and are consistent with pricing for similar work. As such, I find the cost of this Proposed Change Order No. 8 in the amount of $4,909.39 to be reasonable for the required increase in scope. As such, I recommend acceptance of this additional cost. Ron Kechter Project Engineer City of Fort Collins Operational Services - Facilities Cc: job file System for Award Management Page 1 of 1 R. C. HEATH CONSTRUCTION CO. DUNS: 096341062 CAGE Code: 4LGA6 Status: Active Entity Overview Entity Information Name: R. C. HEATH CONSTRUCTION CO. Doing Business As: HEATH CONSTRUCTION CO Business Type: Business or Organization POC Name: None Specified Registration Status: Active Expiration Date:03/28/2014 Exclusions Active Exclusion Records? No SAM I System for Award Management 1.0 Note to all Users: This is a Federal Govemment computer system. Use of this system constitutes Consent to monitoring at all times. 141 RACQUETTE DR FORT COLLINS, CO, SOS24-3244, UNITED STATES IBM v1.1149.20130801-1829 WWW2 https://www. sam. gov/portal/public/SAM/?portal: componentld=fb67166e-75 d6-44cc-b77f-... 9/3 0/2013 Change Management Checklist Reviewed for compliance with EA Re-Eval — Safety and Security Environmental Assessment 9/20/13 — This work enhances the security RK for the Transfort facility Reviewed for construction/safety impacts 9120/13 This work followed all standard RK construction and safety practices Independent cost estimate prepared 9/20/13 Costs were in keeping with recent RK on similar work Reviewed for PCGA grant compliance 9/20/13 Part of Build Alternative Scope RK included in SCC 30.02 All of this work was within the Reviewed for real estate impacts/needs 9/20/13 project site and not in the right -of- RK way Reviewed for compliance with design criteria/ADA htto:/hwmaccess-board bov/ada-aba/ada- 9/20/13 N/A RK standards-dot.cfm ,.Forof t` CoLLIns Independent Cost Estimate Date of Estimate: 11-Sep-13 Contract Type: Fixed Price Existing Contract or PO (Y/N): Yes Description Services (B): Provide an Audio Intercom for the main entrance gate, a Nema 3R enclosure for the gate controller and provide a card reader with lockset & electric strike for the door to the MDF. I.have obtained the following estimate from: Engineering or Techincal Estimate (performed by) - Ron Kechter/Dave Grice B Transfort Maintenance Facilitv Expansion Materials or Work Description Quantity Unit Unit Cost TOTAL Change Order #8 - PCR No. 16 Audio Video Intercom Enclosure 1 EA $ 190.00 $ 190.00 Intercom Interface 1 EA $ 1,120.00 $ 1,120.00 Master Station 1 EA $ 1,290.00 $ 1,290.00 .Power Supply 1 EA $ 120.00 $ 120.00 Nema 3R Enclosure 1 EA $ 370.00 $ 370.00 HID Thinline II Card Readers 2 EA $ 350.00 $ 700.00 Lockset 1 EA $ 150.00 $ 150.00 Electric Strike 1 EA $ 400,00 $ 400.00 Installation 4. HR $ 75.00 $ 300.00 Subtotal $ 4,640.00 Bond @ 1 % $ 46.40 Overhead Profit o Is ota * Unit Cost Based on Recent Experience & Pricing from Lock Depot Signature of Preparer: CL-ti .p c System for Award Management Page 1 of 1 R. C. HEATH CONSTRUCTION CO. 141 RACQUETTE DR DUNS: 086341062 CAGE Code: 4LGA6 FORT COLLINS, CO, 80524-3244, Status: Active UNITED STATES Entity Overview Entity Information Name: R. C. HEAT CONSTRUCTION CO. Doing Business As: HEATH CONSTRUCTION CO Business Type: Business or Organization POC Name: None Speified Registration Status: Active Expiration Date:03/28/2014 Exclusions Active Exclusion Records? No SAM I System for Award Manageanent 1.0 Note to all Users: This is a Federal Government cxxnputef system. Use of this system constitutes consent to mnitoring at all times. IBM v1.1149.20130801-1829 WwW2 ® ®-JSA:gg https://www. sam.gov/portal/public/SAM/?portal:componentld=tb67166e-75d6-44cc-b77f-... 9/30/2013 Heath construction Job: Project No. 12SO531 Title: Access Control Changes Project: Transfort To: Attn: Ron Kechter City of Fort Collins - Facilities Management 281 N. CollegeAve. Fort Collins, CO 80524 DESCRIPTION OF PROPOSAL IP Audio Video Itercom, Add access control on 21T room access control,add access control on second cottage door. Pricing Change Request No. 16 Back Up Information Originating Document: OwarritNuest Originating Document Date: 8/19/2013 PCO Date: 8/27/2013 Item Description TYPe Oly Unit $/Unit Labor Material Equio Subcontractor Other Total 1 Colorado Dooms s S 1.00 LS 0.00 0.00 0.00 3 469.00 0.00 $ 3.469.00 2 Colorado Doorvras S 1.00 Ea 0.00 0.00 0.00 1,162.50 0.00 $ 1,162.50 3 S 1.00 LF 000000 0.o0 0.00 0.00 $ 4 S 1.00 EA 0.00 0.00 0.00 0.00 0.00 $ 5 S 1.00 Ea - 0.00 0.00 0.00 0.00 0.00 $ a 7 0.00 0.00 0.00 0.00 0.00 $ 8 0.00 0.00 0.00 0.00 0.00 $ 9 0.00 0.00 0.00 0.00 0.00 $ 10 0.00 0.00 0.00 0.00 6.00 $ 11 0.00 0.Do 0.00 0.00 0.00 $ 12 0.00 0.00 0.00 0.00 0.00 $ 13 0.00 0.00 0.00 0.00 0.00 $ 14 0.00 0.00 0.00 0.00 0.00 $ 15 Additional General Conditions O 0.00 Days 0.00 0.00 0.00 0.00 0.00 $ 16 GC Carpenter Labor/fonnan-Addition L 0.00 hr 68.00 0.00 0.00 0.00 0.00 0.00 $ 17 GC Carpenter Labor/forman-Chassis L 0.00 hr 68.00 0.00 0.00 0.00 0.00 0.00 $ 18 GC Project Management L 0.00 hr 0.00 0.00 0.00 0.00 0.00 0.00 $ 19 0.00 0.00 0 no 0.00 $ 21 Subtotal 0.00 0.00 0.001 4.631.50 0.00 $ ":-: 4,631.50 23 Sales Tax NA % 0.00% 0.00 $ 24 Bond Premium O 63 41.50 % - 1.00% $ 46.32 25 Liability Insurance O 4,631.50 % 0.63% $ 26 Builders Risk O 4,631.50 % 1 0.39% $ 28 Subtotal 0.00 $ 46.32 30 Labor Burden O 0.00% 0.00 $ 32 Subtotal 0.00 $ - 34$ Overhead O 4 631.50 $ 3.00% 138.95 $ 138.95 r35 Profit O 4,631.50 $ 2.00% 92.63 92.63 36 Subtotal 1 0.00 0.00 0.00 0.00 0.00 $ 231.58 Note: 0 Additional days of time are requested as a result of this change. Total Cost It 4,909.39 Issued By: - Reviewed By: Approved By: Paul L Ehrlich Jr., Project Manager Ron Kechter Project Architect Heath Construction City of Fort Collins Alter Lingle Massey Date Ron Kechter From: Ron Kechter Sent: Wednesday, August 28, 2013 12:32 PM To: 'Paul Ehrlich' Subject: RE: Transfort - Access Control Changes Paul, Per my e-mail dated August 15th I told you the following when you presented these proposals to me then: I want to do the first quote - $3,469; 1 want to only do one card reader on the MDF - $2325/2 = $1,162.50? 1 do not want to do the card reader on the second door to the Cottage - $3,250 => $0 Please adjust PCR #16 accordingly. Thanks, Ron -----Original Message ----- From: Paul Ehrlich [mailto:pehrlich@heathconstruction.com] Sent: Wednesday, August 28, 2013 8:19 AM To: Ron Kechter Subject: Transfort - Access COntrol Changes Ron, Attached are the access controls changes Paul Ehrlich Project Manager / Project Engineer 970-221-4195 Main 970-221-4258Fax paul.ehrlich@heathconstruction.com www.heathconstruction.com -----Original Message ----- From: OPPScans@heathconstruction.com [mailto:OPPScans@heathconstruction.comj Sent: Wednesday, August 28, 2013 8:18 AM To: Paul Ehrlich Subject: Scanned document from Operations Xerox copier Number of Images: 4 Attachment File Type: PDF Heath construction Job: Project No. 12B0531 Title: Access Control Changes Project: Transfort To: Attn: Ron Kechter City of Fort Collins - Facilities Management 281 N. CollegeAve. Fort Collins, CO 80524 DESCRIPTION OF PROPOSAL IP Audio video ltarcom, Add access control on 2 rr room eccaee comrol,Wd aeeass control on second cetUW door. GCS Forces Pricing Change Request No. 16 Back Up Nlormetlon Originating Document: o.o.r R9go o Originating Document Date: 8/19/2013 PCO Date: 8/27/2013 Item Description Type ON Unit nit I abor Material E ui subcontractor Other Total 1 colorado Doorways S 1.00 LB 1 0.00 0.00 0.00 3 469.00 0.00 $ 3,469.00 2 Colorado 000rAws S 1.00 Ea 0.00 0.00 0.00 2 325.00 0.00 2,325.00 3 Cdwaeo pomways S 1.00 LF 0.00 OAO 0.00 3,250. 0.00 $ 3.250.00 4 S 1.00 EA 0.00 0.00 0.00 0.00 0.00 $ 5 S 1.00 Ea 0.00 0.00 0.00 0.00 0.00 $ a 7 0.00 0.00 0.00 0.00 0.00 a 0.00 0.00 0.00 0.00 0.00 $ 9 0.00 0.00 0.00 0.00 0.00 10 0.00 0.O1) 0.001 0.00 0.00 $ 11 0.00 0.00 0.001 0.00 0.00 $ 12 0.00 0.00 0.00 0.00 0.00 $ 13 0.00 0.00 0.00 0.00 0.00 $ 14 0.00 0.00 0.00 0.00 0.00 $ 15 Additional General Conditions O 0.00 Days 0.00 0.00 0.00 0.00 0.00 $ 16 GC Carpenter Labor/formen-Addition L 0.00 hr 68.00 0.00 0.00 0.00 0.00 0.00 $ 17 GC Carpenter Labor/forman-Chassis L 0.00 hr 68.00 0.00 0.00 0.00 0.00 0.00 $ 18 GC Project Manage ant L 0.00 hr 0.00 0.00 0.00 0.00 0.00 $ 19 0.00 0.00 0.00 0.00 0.00 21 Subtotal 0.00 0.00 0.001 9.044.00 0.00 $ 9,044.00 23 Sales Tax 1 NA % 0.00% 0.00 $ 24 Bond Premium O 9044.00 % 1.00% $ 90.44 25 Liability Insurance O 9044.00 % 1 0.63% $ 26 Builders Risk O 9 044.00 % 0.39% 28 Subtotal 0.00 $ 90.44 30 Labor Burden O 0.009'. 0.00 32 Subtotal 0.00 $ 34 Overhead O 9044.00 3.00% 271.32 27132 Profit O 9044.00 2.00% 180. 88 180.88 35 36 Subtotal 0.00 0.00 0.00 0.00 O.Oo S 45220 Note: 0 Addklorml days of time am requested as a result of thla dwgs. Total Cost $ 9,56a.64 Issued By: Reviewed By. Approved By: Paul L Ehrlich Jr., Project Manager Ron Kechter Project Architect Heath Construction Ctty of Fort Collins Alter Lingle Massey Date 40,00 il[Ionways "'°. 3333 E. 52nd Avenue 110011HRI r Denver, Co 80216-2.322 'C444.e0.4. Tel:303-291-0900 Fax:303-291-0113 Quote Quote # : 416212 Quote Date : Aug 1, 2013 Expiration Date: Oct 30, 2013 Customer Shtp To: Heath Construction — City of Fort Collins Transfort Facility P.O. Drawer H 6570 Portner Road Fort Collins, Colorado 80522 Fort Collins, Colorado 80525 Account Code : RCHEAT Terms : Net 30 Days Purchase Order # Customer Job # Shipped Via Field Service Salesperson : Kevin McAnulla Order Name : Change Order#1-IP Audio Video Intercom Furnish and Install: W Product Description 1 IS IP VDL Color Vid Door Flush IS-IPDVF 1 Aiphone SS Surface Enclosure SBX-ISDVF 1 Aiphone PC-IP Master Station IS -SOFT 1 Aiphone Power Supply PS-2420UL 1 20 X 20 X 8 Nema 3R Enclosure A20R208HCR Installation Pre -Tax Total 4 - EXEMPT @0.00% Quote Total 3,469.00 0.00 3,469.00 The above prices are quoted subject to acceptance within 30 days and credit approval by an officer of our company. State and local taxes are not included unless specifically noted. Material will be billed proportionately as shipped. Full amount of invoice due when rendered - retainage not acceptable. On shipments made by common carrier consigned to the customer, all claims for damages in transit must be filed by consignee. We do not include cost of unloading, storage or protection of material at jobsite. Accepted by: Title: Date: Printed Aug 15, 2013 7:55 AM Page 1 of 1 400 RWAM 36 3333 E. 52nd Avenue [WORWi O BOWWAY Denver, Co 80216-2322 °f *1°""^! SeG.Y:a.s' Tel: 303-291-0900 Fax: 303-291-0113 wMw.doowq"lne.c Quote Quote # : 416483 Quote Date : Aug 16, 2013 Expiration Date: Nov 13, 2013 Customer: Ship To, Heath Construction — City of Fort Collins Transfort Facility P.O. Drawer H 6570 Portner Road Fort Collins, Colorado 80522 Fort Collins, Colorado 80525 Account Code RCHEAT Terms Net 30 Days Purchase Order # Customer Job# Shipped Via OurTruck Salesperson Kevin McAnulla Order Name Change Order #2- It Room Access Control Add Access Control on TWO IT Room doors. QbL Product Descrintion 2 Lockset ND80JD RHO 626 4 Modernizing Plate RP-13515-2 630 2 Electric Strike 5000C 12-24VACNDC 2004M 630 2 HID ThinLine II Card Reader CICR2349P GR 1 Plenum Cable Installation Pre -Tax Total 4 - EXEMPT ®0.00% Quote Total 2,325.00 0.00 2,326.00 The above prices are quoted subject to acceptance within 30 days and credit approval by an officer of our company. State and local taxes are not included unless specifically noted. Material will be billed proportionately as shipped. Full amount of invoice due when rendered - retainage not acceptable. On shipments made by common carrier consigned to the customer, all claims for damages in transit must be filed by consignee. We do not include cost of unloading, storage or protection of material at jobsite. Accepted by: Title: Date: PrInW Aug 15, 2013 7:27 AM Page 1 of 1 490 RWAYS bUL 3333 E 52nd Avenue 11110o111119M 10001111W" Denver, 00 80215-2322 SA4.0". Tel:303-291-0900 Fax: 303-291-0113 Quote Quote # : 416485 Quote Date : Aug 15, 2013 Expiration Date: Nov 13, 2013 Customer. Ship To: Heath Construction - City of Fort Collins Transfort Facility P.O. Drawer H 6570 Portner Road Fort Collins, Colorado 80522 Fort Collins, Colorado 80525 Account Code RCHEAT Terms Net 30 Days Purchase Order # Customer Job # Shipped Via Our Truck Salesperson Kevin McAnulla Order Name Change Order #3- Second Cottage Door Access Control Add Access Control on Second Cottage Door r= Product Description 1 CIC Super Two CICP1300 2 Lockset ND80JO RHO 626 1 Latch Protector LELP-208 SL 1 Electric Strike 1006CS 12124VDC 630 2 HID ThinLine II Card Reader GICR2349P GR 1 Plenum Cable Installation Pre -Tax Total 4 - EXEMPT Q0.00% Quote Total 3,250.00 0.00 3,250.00 The above prices are quoted subject to acceptance within 30 days and credit approval by an officer of our company. State and local taxes are not included unless specifically noted. Material will be billed proportionately as shipped. Full amount of invoice due when rendered - retainage not acceptable. On shipments made by common carrier consigned to the customer, all claims for damages in transit must be filed by consignee. We do not include cost of unloading, storage or protection of material atjobsite. Accepted by: Title: Date: Prkded Aug 15. 2013 7:27 AM Page 1 of 1 0 Change Order No� PROJECT TITLE Tranfort Maintenace Facility Expansion CONTRACTOR: Heath Construction BID NUMBER: 7426 DESCRIPTION: 1. Reason for change: Incorporation of Pricing Change Requests (PCR's) #17 & #18 Into the Contract. 2. Description of change: PCR #17 -Provide all labor; materials and equipment to fabricate and install signage for ail of the overhead doors In the Transfort Mainlenace Facility - $7,611.44; PCR#18 -Paint the upper potion of the Chassis Wash exposed precast wall - $350.86. 3. Change in contract costs: $7,962.30 4. Change in contract time: 0 Days ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL'% OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST $2,156,000.00 $141,875.36 $31.377.88 57,982.30 0.37% 8.41% $2,337,215.84 REVIEWED BY:- DATE: Z S /� Facilities Project Manager r ACCEPTED BY: DATE: ( i r� 3 ContractoeaPP&IRtafive REVIEWED BY: DATE: ,\ Manager APPROVEDB DATE. 5 REPRESENTATIVE x Canbauar Rxd=i g Bolan FN MAX Field Construction Office 3000 South College Ave., Suite 201 Fort Collins CO 80526 fcgov.com/maxconstruction Delivery by hand September 25, 2013 Ms. Erika Keeton, PE MAX Project Manager City of Fort Collins — Engineering Dept 281 N. College Ave. Fort Collins, CO 80524 RE: MAX Bus Rapid Transit Project—Transfort Maintenance Facility Expansion 7426 Independent Cost Analysis — Change Order No. 9 Heath Construction Pricing Change Requests #17 and #18 Heath Construction was requested to provide Pricing Change Request (PCR) #17 in order to provide sequential numbering for all of the overhead doors as one goes around the facility with the 8 doors in the addition added. With this Change, doors 1-5 will remain as existing, doors 6-13 on the addition and doors 19-20 on the Chassis Wash will be new and doors 14-18 will reuse the existing signs that will be refurbished with new numbers. Additionally, Heath was requested to provide with PCR #18 the pricing for painting the exposed precast wall in the Chassis Wash; above the FRP already placed, to enable better cleanliness of this area. The labor, materials and equipment costs proposed by Heath Construction were evaluated against an Independent Cost Estimate and are consistent with pricing for similar work. As such, I find the cost of this Proposed Change Order No. 9 in the amount of $7,962.30 to be reasonable for the required increase in scope. As such, I recommend acceptance of this additional cost. Ron Kechter Project Engineer City of Fort Collins Operational Services - Facilities Cc: job file System for Award Management Page 1 of 1 R. C. HEATH CONSTRUCTION CO. 141 RACQUETTE DR DUNS: 086341062 CAGE Code: 4LGA6 FORT COLLINS, CO, 80524-3244, Status: Active UNITED STATES Entity Overview Entity Information Name: R. C. HEATH CONSTRUCTION CO. Doing Business As: HEATH CONSTRUCTION CO Business Type: Business or Organization ROC Name: None Specified Registration Status: Active Expiration Date:03/28/2014 Active Exclusion Records? No SAM I System for Award Marugemenr 1.0 Note to all Users: This is a Federal Government Computer system. Use of this system constitutes consent to n onitoring at all times. IBM v1.1149.20130801-1829 uu1Nw2 ® ® USA.gov,F https://www. sam.gov/portal/public/SAM/?portal:componentld=fb67166e-75d6-44cc-b77f—... 9/30/2013 Change Management Checklist Reviewed for compliance with EA 3.15.3 — Visual Impacts — the Environmental Assessment 9/25/13 signage is in keeping with City of RK Fort Collins sign standards Reviewed for construction/safety impacts 9/25/13 This work will follow all standard RK construction and safety practices Independent cost estimate prepared 9/25/13. Costsvere in keeping with recent RK costs on similar work Reviewed for PCGA grant compliance 9/25/13 Partof Build Alternative Scope RK included in SCC 30.02 All of this work was within the Reviewed for real estate impacts/needs 9/25/13 project site and not in the right -of- RK way Reviewed for compliance with design ess-b a/ADA httoi/Mtiwv.astandards-d cov/ada-abalada- 9/25/13 This signage is in keeping with City of Fort Collins sign codes Y 9 RK standards-dot.cfrri MAX Field Construction Office 3000 South College Ave., Suite 201 Fort Collins, CO 80526 fcgov.com/maxconstruction Delivery by hand September 19, 2013 Ms. Erika Keeton, PE MAX Project Manager City of Fort Collins — Engineering Dept 281 N. College Ave. Fort Collins, CO 80524 RE: MAX Bus Rapid Transit Project — Transfort Maintenance Facility Expansion 7426 Independent Cost Analysis — Change Order No. 7 Heath Construction Pricing Change Requests #13 and #14 and T&M Reconciliations Heath Construction was requested to provide Pricing Change Requests (PCR's) #13 and #14 in order to reconcile work that was done in the field to repair soft spots in the soil during compaction of the soil for concrete paving. One of the soft spot areas was under the additional concrete we had removed under Change Order No. 1. The other two soft spot areas were on either side of the addition. Steve Bignall kept track of this work in the field and it was determined that his records showed 85 tons of structural fill where Duran Excavating initially showed 185 tons, but our discussions enabled Duran Excavation to change to the 85 tons also in their latest proposal. There was also a discrepancy in the amount of dozer time between Steve's log at 2.5 hours and the Duran Excavating proposal at 3.5 hours; in this instance I went with the Duran Excavating proposal amount. This Change Order also includes T&M work for removal of the Mock Station from the Training Area pavement and T&M work for the raising of two badly deteriorated existing stormwater inlets to bring them up to the proper elevation and T&M work to make additional repairs to one of the mechanical pits that was being filled in per the plans. The City prepared spreadsheets with reconciled costs for the T&M work, based upon records of the work done, to which Heath Construction agreed. Execution of this Change Order will reconcile all outstanding T&M work for the site. The labor, materials and equipment costs proposed by Heath Construction were evaluated against an Independent Cost Estimate and are consistent with pricing for similar work. Heath Construction was also in agreement with the T&M reconciliations that were prepared by the City. As such, I find the cost of this Proposed Change Order No. 7 in the amount of $6,919.97 to be reasonable for the required increase in scope. As such, I recommend acceptance of this additional cost. Ron Kechter Project Engineer City of Fort Collins Operational Services - Facilities ,I c. wv I, ��t_ f1 Independent Cost Estimate Date of Estimate: 23-Aug-13 Contract Type: Fixed Price Existing Contract or PO (Y/N): Yes Description Services (B): Pricing Change Requests - #17 - Provide all labor materials and equipment to install matching new signs and refurbish existing signs (18" x 18") to match the new door numbers for the adddition and the existing facility in sequence; #18 - Provide all labor, materials and equipment to paint the exposed precast wall in the Chassis Wash above the FRP. I have obtained the following estimate from: Engineering or Techincal Estimate (performed by) - Ron Kechter B C.O. #9 Materials or Work Description Quantity Unit Unit Cost TOTAL Pricing Change Request #17 Fabricate New Aluminum Signs - 18" X18"x1 3/4" 10 EA $ 520.00 $ 5,200.00 Paint & Place New Numbers on Existing Signs 10 EA $ 30.00 $ 300.00 Refurbish & Place New Numbers on Existing Signs 5 EA $ 35.00 $ 175.00 Installation Labor 24 HR $ 65.00 PCR #17 Subtotal $ 7,235.00 Pricing Change Request #18 Paint 3 GAL $ 26.00 $ 78.00 Installation Labor 1 PCR #18 Subtotal s #17 & 18 Subtots Bond @ 1% $ 75.23 Overhead ro i o ota Unit Costs Based on Recent Experience Signature of Preparers � ��� � .Sl•-2__ N Huth construction Job: Project No. 12BO531 Title: Custom Bay Sigange Package Project: Translort To: Attn: Ron Kechter City of Fort Collins - Facilities Management 281 N. CollegeAve. Fort Collins, CO 60524 MCRIPTION OF PROPOSAL Provide and Install custom bey door slgm. Pricing Change Request No. 17 Beck Up information Originating Document: o.,..nw,v Originating Document Date: 8/19/2013 PCO Date: 8/27/2013 Item Description Type City I Unit Unit Labor Material Equip subcomnctm Other Total I Avelu S 1.00 LS 0.00 0.00 0.00 7180.60 0.00 7180.60 2 S 1.00 Ea 0.00 0.00 0.00 0.00 o.00 $ 3 S 1.00 LF - 0.00 O.Oo 0.00 0.00 0.00 $ 4 S 1.00 EA 0.00 0.00 0.00 0.00 0.00 $ 5 S 1.00 Ea 1 0.00 0.00 0.00 0.00 0.00 $ 5 1.00 Ea 7 0.00 0.60 0.00 0,00 0.00 $ e 0.00 0.00 0.00 0.00 O.DO $ 9 0.00 0.00 0.00 0.00 0.00 $ 10 11 O.DO 0.00 0.00 0.00 0.00 $ 0.00 0.00 0.00 0.00 0.00 $ 12 0.00 0.00 0.00 0.00 0.00 13 0.00 0.00 0.00 0.00 0.00 14 75 Additional General Conditions O 0.00 Da 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $ 16 GC Carpenter Labodforman-Addition L 0.00 hr 68.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $ $ 17 GC Cementer Leborflorman-Chassis L 0.00 hr 68.00 0.00 0.00 0.00 0.00 0.00 $ 10 GC Project Mana ement L 0.00 hr 0.00 0.00 0.00 0.00 0.00 19 0.00 0,0010.00 0.00 0.00 21 Subtotal 0.001 0.00 0.00 7180.60 0.00 $ 7180.60 23 Sales Tax NA % 1 O.00%l 0.00 $ 24 Bond Premium O 7 180.60 % /.00% $ 71.81 25 Uabili Insurance O 7180.60 % 0.63% $ 26 Builders Risk O 7 180.60 % 0.39% $ 28 Subtotal 0.00 $ 71.81 30 Labor Burden O - 0.00% 0.00 $ 32 Subtotal 0.00 $ erhead O 7180.60 $ 3.00% 215.42 215.42 H-biotal ofit $ 2.00% 143.61 143.61 0.00 0.00 0.00 0.00 0.00 $ 359.03 Note: o Addelenal drys of time an rer usated as a mull of this change. Total Cost s 7,611.44 Issued By: Reviewed By: APProved By: Paul L Ehrlich Jr., Project Manager Ron Kschter Pa y Archery Heath Construction City of Fort Collins stir urtgls Massey Date Estimate Avalis Wayfinding Solutions, Inc. m 301 C Smokey Street Estimate: AWS- 5240 alaualis FORT COLLINS, CO 80525 w.Yli.dln9 [.[.[Iona Inc ph. 970-223-9211 Sign Up... the Right people, the Right Way.' fax 970-223-9230 Printed 8/23/2013 10:19:02AM email: info@avalisway.com Description: CUSTOM BAY DOOR SIGNS/TRANSFORT CENTER ADDITION Prepared For: PAUL EHRLICH ph: (970) 221-4195 Company: R. C. HEATH CONSTRUCTION fax: (970) 221-2907 Dear PAUL: Thank you for considering Avalis Wayfinding Solutions Inc. for your sign needs. The quotation we discussed is attached below. If you have any questions, please don't hesitate to call me at 970-223-9211. This quote is good for sixty days. Sincerely, XGGc.w LOUANNELYLES Product Font Qty Sides Height Width Unit Cost Install Item Total 1 TO SPEC 10 1 18 18 $585.56 $650.00 $6,505.60 Color: White on BLACK Description: CUSTOM ALUMINUM CABINETS, 18" X 18" X 1.75" DEEP, ALUMINUM FACES, BACKS AND RETURNS. MOUNTING CLIPS FOR ATTACHMENT. WHITE VINYL LETTERING FOR EACH DOOR. Text: 2 REMOVE RTA VINYL 5 1 0 0 $65.00 $0.00 $325.00 Color: White Description: REMOVE RTA VINYL LETTERS & CLEAN SURFACE FOR NEW LETTERS. FOR 5 EXISTING BAY DOOR PLAQUES ON SITE. ADD ABOVE TEXT ON THE 5 EXISTING BAY DOOR PLAQUES. Text: 14 15 16 17 18 3 ACTUAL 1 1 0 0 $350.00 $0.00 $350.00 Color: LIFT Description: COST OF LIFT IN ORDER TO COMPLETE WORK Text: Notes: DOWNPAYMENT OF 50% WOULD BE REQUIRED BEFORE BEGINNING THE JOB. Company: R. C. HEATH CONSTRUCTION P.O. DRAWER H 141 RACQUETTE DRIVE FORT COLLINS, CO 80522 Avalis Wayfinding Solutions, Inc. Line Item Total: $7,180.60 Tax Exempt Amt: $7,180.60 Subtotal: $7,180.60 Taxes: $0.00 Total: $7,180.60 Deposit Required: $3,690.30 Received/Accepted By: r w K.C.Walker 2013-0802 Garage Door Re -numbering k �ti i Heath vi rj u. L4 iconstruction Job: Project No. :1 Title: Paint Upper portion of Chassis Wash bay Wall Project: Transfort To: Attn: Ron Kechter City of Fort Collins - Facilities Management 281 N. CoilageAve. Fort Collins, CO 80524 DESCRIPTION OF PROPOSAL Palm the chasers wash bay walls above the FRP. Pricing Change Request No. 18 Back Up kdomatlon Originating Document: o.o..R., Originating Document Dale: 8/1912013 PCO Date: 8/2712013 Item Description TVpe ON I Unit I S/Unit Labor I Material I Equip Subwrara - ctorl Other Total 1 Maximum Pa!nEW S 1.00 LS 0.00 0.00 0.00 331.00 0.00 $ 331.00 2 S 1.00 Ea 0.00 0.00 0.00 0.00 0.00 $ 3 S 1.00 LF 0.00 0.00 0.00 0.00 0.00 $ 4 S 1.00 EA - 0.00 0.00 0.00 0.00 0.00 $ 5 S 1.00 Ea - 0.00 0.00 0.00 0.00 0.00 $ a 7 0.00 0.00 0.00 0.00 0.00 $ e 0.00 o.Do 0.00 0.00 0.00 $ 9 0.00 0001 0.00 0.00 o.DO $ 10 0.00 0.00 0.00 0.00 0.00 $ 11 0.00 0.00 0.00 0.00 0.00 $ 12 0.00 0.00 0.00 0.00 0.00 $ 13 0.00 0.00 0.00 0.00 0.00 $ 14 0.00 0.00 0.00 0.00 0.00 $ 15 Additional General Conditions O 0.00 Days 0.00 0.00 0.00 0.60 0.00 $ 16 GC Carpenter Labor/forman-Addition L 0.00 hr 68.00 0.00 0.00 0.00 0.00 0.00 $ 17 GC Carpenter labor/fonnan-Chassis L 0.00 hr 68.00 0.00 0.00 0.00 0.00 0.00 $ 18 GC Project Mana ement L 0.00 hr 0.00 0.00 0.00 0.00 0.00 $ 19 0.00 0.00 0.00 $ 21 Subtotal 0.00 0.00 0.00i4c.00 $ 331.00 23 Sales Tax NA % 0.00% 0.00 24 Bond Premium O 331.00 % 1.00% 3.31 25 Liability Insurance O 331.00 % 0. 53% $ 26 Builders Risk O 331.00 % 0.39% 28 Subtotal $ 3.31 30 Labor Burden O 32 Subtotal 34 Overhead O 331.00 $ 300% $Profit O 331.00 $ 2.00% 6.62 3536 Subtotal 0.00 0.00 0.00 $ 16.55 NOW 0 Addltlorol days at time are requseted as a result of this dunes. Total Coat $ 350.86 Issued By: Reviewed By: Approved By: Paul L Ehrlich Jr., Project Manager Ron Kechter Project Architect Heath ConsbucUon City of Fort Collins Alter Lingle Massey Heath Construction Company August 7, 2013 141 Racquette Drive Fort Collins, CO 80522 Attention: Paul Erhlich Reference: Fort Collins Transfort Facility Expansion Paul, Enclosed, please find our costs to paint the existing walls in the chassis wash bay. (See enclosed breakout) Paint Concrete panels $ 331.00 Please call if you have any questions or need additional information. Sincerely, Maximum Painting LLC eT CSC.. H Rick Haynes Estimator Maximum Nintina I 1 (' 1M Cnnth Melrinim Rtrrrt Fnrt Cnllina rn ROi71 Phnne• 970477.4079 FAX• 970 477.1640 Change Management Checklist EA 3.8.4 — Water Resources and Reviewed for compliance with g/19/13 Water Quality — Straw waddles, RK Environmental Assessment rock socks and silt fence were in place during all of this work Reviewed for construction/safety impacts 9/19/13 This work followed all standard RK construction and safety practices Costs were determined based Independent cost estimate prepared 9/19/13 upon logs for this work and is in RK keeping with recent costs on similar work Reviewed for PCGA grant compliance 9119/13 Part of Build Alternative Scope RK included in SCC 20.04 All of this work was within the Reviewed for real estate impacts/needs 9/19/13 project site and not in the right -of- RK way Reviewed for compliance with design criteria/ADA http://vAm.access-board.aov/ada-abatada- 9/19113 N/A RK standards-dot.cfm �Fort� CrL="s Independent Cost Estimate Dale of Estimate: 10-Sep-13 Contract Type: Fixed Price Existing Contract or PO (Y/N): Yes Description Services (B): Provide all labor, materials and equipment to place the continuous concrete slab in the training area in lieu of placing the mock training platform. Provide all labor, materials and equipment to raise two Slormwaler inlets and provide repairs to the mechanical pit by T&M. Provide all labor, equipment and materials to stablize subgrade under the additional pavement and at the building corners under the Training Area slab. I have obtained the following estimate from: Engineering or Techincal Estimate (performed by) - Ron Kechter B Transfort Maintenance Facility Expansion C.O. #7 Removal of Mock Station from Traininz Area P TMFE 6/3/2013 Description Unit Quantity Unit Cost' Total Cost Remove 14' Curb & 2' Gutter on West Side LF 60.00 $ 25.00 $ 1,500.00 Remove 14" Curb from North, South & East Sides LF 98.00 $ 20.00 $ 1,960.00 Remove 1121 SF of 4" Deep Concrete - SF 1,121.00 $ 4.25 5 4,764.25 Remove 4 Bollards Each 4.00 $ 400.00 $ 1,600.00 Delete Labor for Placing Concrete and Bollards Hour 10.00 S 45.00 $ 450.00 Delete 19' Base CY 65.75 S 5.00 $ 328.75 Add Rebar Mat #4 @ 18" O.C. & Placement SF 1,200.00 $ 1.25 $ 1,500.00 Add 9" Deep Concrete CY 33.33 $ 95.00 $ 3,166.35 Add Placement & Finish 9" Concrete SF 1,200.00 $ 5.75 $ 6.900.00 Subtotal $ 963.35 Additional Bond i% $ 9.63 Overhead @ 3% $ 28.90 Profit @ 2% $ 19.27 Total 1 $ 1,021.15 Raise Two SW Inlets +Repairs to Mechanical Pit (d TMFE 7/31/2013 Description Unit Quantity Unit Cost' Total Cost Carpenter Labor HR 11 $ 53.24 S 585.64 Laborer Labor HR 8 $ 21.21 S 169.68 Bush Hammer HR 4 $ 14.06 S 56.24 Concrete Saw HR 3 $ 7.84 5 23.52 Subtotal $ 835.08 Mark-up 15% 5 125.26 Subtotal $ 960.34 ABond 1% $ 9.60 Odditional verhead 3% $ 28.81 Profit @ 2% S 19.21 I otat ) $ 1,U17.96 Stabilize Suerade Under Additional Pavement & Buildine Corners - PCR's #13 & #14 9/10/2013 Description Unit Quantity Unit Cost" Total Cost Foreman Labor HR 14 $ 41.63 S 582.82 Operator Labor HR 7 S 25.79 S 180.53 Operator Labor HR 1.5 $ 41.44 $ 62.16 Truck Driver HR 6 S 28.87 S 173.22 Truck Driver HR 1 $ 28.87 $ 28.87 Operator Labor HR 2.5 S 41.44 5 103.60 Trackhoe HR 3.5 S 92.87 S 325.05 Loader HR 5.5 $ 71.50 S 393.25 Sheepsfoot HR 1.5 $ 69.02 $ 103.53 D6 Dozer HR 3.5 $ 79.64 S 278.74 Skidsleer HR 4 $ 29.83 $ 119.32 Blade HR 2.5 $ 82.53 $ 206.33 Submersible Pump HR 1 $ 4.48 $ 4.48 Tandem HR 7 $ 58.43 $ 409.01 TON 16.1 $ 10.05 S 161.81 TON 15.5 $ 8.50 $ 131.75 TON 85 S 8.75 S 743.75 Subtotal S 4,008.21 Mark-up 15% $ 601.23 Subtotal $ 4,609.44 Additional Bond @ 1% $ 46.09 Overhead @ 3% S 138.28 Profit @ 20/6 $ 92.19 Iota] ( $ 4,886.00 Grand Total $ 6,925.12 Signature of Preparers 0 II"ran 1m MI WMxcav\aV2 May 21, 2013 Heath Construction Attn: Paul Ehrlich 141 Racquette Drive Ft. Collins, CO 80522 RE: Job ##389 Ft. Collins Transfort Maintenance Facility soft spot removal & replace with concrete Dear Paul, The following is a cost breakdown for the removal of soft spots oil the East and West areas North of building where ground water was running in the fill areas. DEI filled with 4" crushed concrete and topped it off with Pit Run. 5/21/2013 Soft spot removal & replace with concrete & pit run on the West side of building. dug up 3' deep x 8' wide x 18' long 4" Crushed Concrete 12.00 to x $10.05 = S120.60 Pit Run 11.00 ni x S8.50 = $93.50 Pump 1.0 dy x $40.00 = $40.00 Trucking Tandem 2.0 hr x $65.00 = S130.00 Excavator K300 2.0 In' x $135.00 = S270.00 Dozed 1.0 hr x $110.00 = 5110.00 Loader 2.0 hr x $120.00 = S240.00 Foreman 3.0 hr x S45.00 = S135.00 Subtotal = $1,139.10 5/28/13 Soft spot removal & replace with concrete & pit run on the East side of building. dug up 3' deep x 9' wide x 6' long 4" Crushed Concrete 4.10 to x S10.05 = $41.21 Pit Run 4.50 to x S8.50 = $38.25 Skid Steer 2.0 hr x $95.00 = S190.00 Dynapac Roller 0.5 hr x $110.00 = $55.00 Grader 0.5 hr x $120.00 = S60.00 Foreman 2.5 hr x S45.00 = $112.50 Subtotal 8496.96 418 N 90' Avenue • Greeley, Colorado 30631 (970) 351-0192 Heath construction Job: Project No. 12BO531 TIOe: West Skip of Building Soft Spot Removal Project: Transfort To: Attn: Ron Kechler City of Fort Collins - Facilities Management 281 N. CollegeAve. Fort Collins, CO 80524 DESCRIPTION OF PROPOSAL PWnQVal of soh sPo4 on the Ee41 and West areas North of the building. Pricing Change Request No. 14 Beck Up Information Originating Document: o.o.ragw.r Originating Document Date: a/19/2013 PCO Date: a/27/2013 Item IDescription TVDG Oty Unit nit I Labor I Material I Eguip Isubcontractor101ht Total Total 1 Rose Ef"c 5 1.00 LS 0.00 0.00 OX 1 909.69 0.00 $ 1,909.69 2 5 1.00 Ea 0.00 0.00 0.00 0.00 0.00 3 S 1.00 LF 0.00 0.00 0.00 0.00 0.00 $ 4 S 1.00 EA - 0.00 0.00 0.00 WOO 0.00 b 5 S 1.00 Ea 0.00 0.00 0.00 0.00 0.00 $ a 7 0.00 0.00 OI29k 0.00 $ 8 0.00 0.QO 0.00 go 0.00 0.00 $ 9 0.00 0.00 0.00 0.00 0.00 $ 10 1 0.00 0.00 0.00 0.00 0.00 $ 11 0.00 0.00 0.00 0.00 0.00 $ 12 13 0.00 0.00 0.00 0.00 O.DO S 14 0.00 0.00 0.00 0.00 0.00 $ 15 AddiDonal General Conditions O 0.00 Da 0.00 0.00 0,00 0.00 0.00 0.00 0.00 0.00 $ 16 GC Ca nter Lab 11 rma Addition L O.DO hr 68.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $ S 17 6C Ca nter Labor/forman-Chassis L 0.00 hr 68.00 0.00 0.00 0.00 O.DO 0.00 S 79 GC Pro'ed Maria emont L 0.00 hr 0.00 0.00 0.00 0.00 0.00 S 19 1 0.00 0.00 0.00 0.00 0.00 S 21 ISubtotal 0.00 0.00 0.00 1909.69 0.00 $ 1,909.69 23 Sales Tax NA % 0.00% 0.00 $ - 24 Bo nd Premium O 1 909.69 % 1.OOYo $ 19.10 25 Liabili Insurance 0 1909.69 % 0.63% $ 26 Builders Risk O 1 909.69 % 0.39% 28 Subtotal 0.00 S 19.10 30 Labor Burden 0 0.00'Y, 000 E 32 Subtotal 0.00 $ 34 Overhead O 1909.69 S 3.00% 57.29 5729 Profit O 1 1,909.691s 2.00% 38.19 $ 38.19 35 36 Subtotal 0.00 0.00 0.00 0.00 0.00 $ 95.48 Not*: 0 Addhlonal day, of 11M ue rarluxted u I resuh of lhl. chug.. Total Cost S 2,024.27 i Issued By: _ Reviewed By: Approved By: Paul L Ehrlich Jr., Project Manager Ron Kechler Pro)ect Architect Heath Construction City of Fort Collins Alter Lingle Massey Date nale _ . Subtotal S2X8.75 Mark -Up $34632 Band $39.83 Grand Total $2,694.9D Sincerely, 46 Duran Project Coordinator Duran Excavating, Inc. 418 N 9te Avenue • Greeley, Colorado 80631 (970)351-0192 161c".0ting Ix September 12, 2013 Revised Heath Construction Attn: Paul Ehrlich 141 Racquette Drive Ft. Collins, CO 80522 RE: Job # 389 Ft. Collins Transfort Maintenance Facility Over Excavate on East Side of Building Dear Paul Ehrlich, The following is a cost breakdown to over excavate under concrete drive on the East side of building 6" to 24" deep, Graded out and compacted soft area. 1,600 sf. 5/16/2013 Over excavate on East side of building 6" to 24" deep 1,600 sf x 1' / 27=60cy 60 Loader 2.5 cy hr x $120.00 = Excavator K300 1.5 hr z $135.00 = Foreman 4.0 hr x $45.00 = 5/20/2013 Grade out area and compact soft spots on East side of building Dynapac Roller 1.0 hr x $110.00 = Dozer 1.5 hr x $110.00 = Foreman 2.5 hr x $45.00 = 5/21/2013 Remove tmport fill to ict dry out 37' x 27' Dozer D-1 1.0 hr x $110.00 = 6/1/2013 Compacted and graded out soft area east of the building and hauled in 5loads of structural fill. Import & Place 100 sf of structural fill Import MatcrW Trucking Loader Grader Skid Steer Foreman $300.00 $202.50 $180.00 $682.50 $110.00 $165.00 $112.50 $387.50 S 110.00 $110.00 85 to x $5.75 = $488.75 1.0 hr x $120.00 = $120.00 2.0 hr x S120.00 = $240.00 2.0 hr x $95.00 = $190.00 2.0 hr x $45.00 = $90.00 S1,128.75 418 N 9`a Avenue • Greeley, Colorado 80631 (970)351-0192