Loading...
HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9135298i City of Fort Collins 3 ��q g' Traffic Operations Price Analysis Worksheet Name of Contractor: Intermountain Analysis: The price submitted by Intermountain is reasonable ($28,536.00). Total bid values between the next lowest responsive quote (AM Signal, $35,438.00) and Intermountain differed,by about 24 percent ($6,903.00). The current bid reflects a decrease in price for the signs since our last purchase. Similar quantities based on previous purchases would total $33,401.50, 17% higher than the current quote. Price Analysis was conducted based on one or more of the following (documentation attached). ® Written quotations from 2 or more vendors AM Signal $ 35,438.00 Gades $ 37,475.00 Intermountai­T'� Wk,�,�$ M28�535'00 Traffic Signal Controls $ 36,288.75 ❑ Documented phone quotations (indication contact person, phone number) ❑ Published price lists from 2 or more vendors ® Previous purchases by Fort Collins of same or similar items(s) from this or another vendor Previous Purchase Quantity Prior Price Current Low Quote Cost Difference Blankout No Left R3-2 , 24" X 24" 4 $ 10,600.00 $ 7,600.00 $ 3,000.00) Blankout No Right R3-1 , 24".X 24" 2 $ 5,300.00 $ 3,800.00 $ 1,500.00) Blankout TRAIN, 12" X 24" 5 $ 5,247.10 $ 7,525.00 $ 2,277.90 Blankout "BUSES EXEMPT', 18" X 24" 2 $ 3;974.40 $ 3,270.00 $ 704.40) Blankout Do Not Enter R5-1 , 30" X 30" 2 $ 8,280.00 $ 6,340.00 $ 1,940.00) TOTAL 1 $ 33,401.50 1 $ 28,535100 1 $ (4,866.50 ® Comparison to in-house estimate Estimate Quantity Estimated Cost Current Low Quote Cost Difference Blankout No Left(R3-2), 24" X 24" 4 $10,800.00 $ 7,600.00 $ 3,200.00 Blankout No Right R3-1), 24" X 24" 2 $ 5,400.00 $ 3,800.00 $ 1,600.00) Blankout TRAIN, 12" X 24" 5 $ 6,000.00 $ 7,525.00 $ 1,525.00 Blankout "BUSES EXEMPT', 18" X 24" 2 $ 6,000.00 $ 3,270.00 $ 2,730.00 Blankout Do Not Enter R5-1 , 30" X 30" 2 $. 7,0001.00 $ 6,340.00 $ 660.00 TOTAL $35,200.00 $ 28,535.00 $ (6,665.00) ❑ Other TRAFFIC SIGNAL CONTROLS, INC. 255 Weaver Park Road Suite 100 Longmont, C0.80504 (303)-772-2787 Fax (303) 776-1270 Ship To: City of Fort Collins Traffic Operations 626 Linden Street Fort Collins, CO 80522 ;Bill To: Fort Collins, City Of Attn: Accounting Department PO Box 580 Fort' Collins,; CO 80522-0580 Celebrating 29 Years of Customer. Service Invoice Date : 08/28/112 Invoice #: 63045 TSC Job #, Y Customer #: RG t"' Purchase Order 912391'0 Purchase Order Dat Ship Via: UPS LTL F.O: &. Origin Terms : Nef 30 `t2:SEP -411;29m, Part Number Description Umt,Price i Amount. � S S 5 S S 5 $ 3 3 Trans -Tech LED Sign $ 2650.00 5 7950:00 24"x24"'No Right Turn Symbol with Sun Visor 12 12 'Trans -Tech LED Sign $ 1049 42, $' 12593.04 12"x24" Train :Sign with Sun Visor $ $ S S $ S T otal S ZQ543.CA i alh x 3D„ = 900 Traffic Signal Controls, Inc. Retains Title to All Material Until Invoice is Paid in'FuII Service' Charges wil be charged on Past Due Accounts Attorney Fees and Costs will' be charged if collection is necessary Returns are subject to restocking ctiarges Thank you for your business! City of Price Analysis Fort CoRlhs Cost Analysis Details: (Estimate calculated in US Dollars) Cost of Standard.ltems Engineering AM Signal Intermountain Traffic Signal Intermountain vs.- Intermountain vs. Product Quantity Estimate Quote Gades Quote Quote Controls Quote Prior Purchase Prior Purchase Estimate Blankout No Left (R3-2), 24" X 24" 4 $ 10.800.00 $10,136.00 $ 10,600.00 $ 7,600:00 $ 10;120.00 $ 10,600.00 $ (3,000.00) $ (3,200.00) Blankout No Right (R3-1), 24" X 24" 2 $ 5,400.00 $ 5,068.00 $ 5,300.00 $ 3,800.00 $ 5,320.00 $ 5,300.00 $ (1,500.00) $ (1,600.00) Blankout TRAIN, 12".X24" 5 $ 6,000.00 $ 9,380.00 $ 10,475.00 $ 7,525.00 $ 5,631.25 $ 5,247.10 $ 2,277.90 $ 1,525.00 Blankout "BUSES EXEMPT', 18" X 24" 2 $ 6.000.00 $ 4,458.00 $ 5.310.00 '$ 3:270.00 $ 6,820.00 $ 3,974.40 $ (704.40) $ (2,730.00) Blankout Do Not Enter (R5-1), 30" X 30" 2 $ 7,000.00 $ 6,396.00 $ 5,790.00 $ 6,340'00 $ 8,397.50 $ 8,280.00 $ (1,940.00) $ (660.00) Total .$ 35,200.00 $ 35,438.00 $ 37;475.00 $..28,535'.00 $ 36,288.75 $ 33,401.50 $ (4;866.50) $ (6,665.00) 23.4% 24.2% 31.3% 0.0% 27.2% 171% $ 6,665.00 $ 6',903.00 $ 81940.00 $ - $ 7,753.75 $ 4,866.50 Traffic Signal Blank=out Sign and Hardware Quotation Request-8/29/2013 Please return completed, quotation by 9/4/2013. This project is funded by the Federal'Transit Authority (FTA) and ail.contractors must meet Buy America requirements (certification required). All items must be quoted with delivery time to be.considered for.award. All freight charges must be incitided in pricing submitted on quote and not entered as separate pricing. Specifications for materials:are provided. — Item --- '— NO.LEFT Description ; P _ Blankout No LefC(R3 2) 24!'X 24" and i mou Quantity- 1 Unit Uni ($/t Cost— 61 Extended i i I NO RIGHT - ------- TRAIN _ntinghardware Blankout No Right (R3 1) 24_ X 24"- and mounting hardware _ -- - Blankoirt TRAIN; 12" X 24' and �— '' fing 4 2 �. each each t. —"F� j, �06 — 7— ,t70 3, QUO -1 T---I MOUn hardware "BUSES 5 each — BUSES EXEMPT -- Blankout EXEMPT", 18' X 24" • andmountin hardware 2 each / 1a3 5 3 D DO NOT Blankout Do Not Enter'(RS-1)', 30" X 30" ENTER I -- _ and mountin hardware _ 2 each / (�, 7A '---- - — ------ ----- .. Total —. $ $ Delivery Time.. 6o - [� 1,� FIRM NAME: l�j}'iOU YI )GtlA, E-MAIL ADDRESS: _ t 1 �! //.Y '(j Traffic -Signal Blank -out Sign and Hardware Quotation Request — 8/29/2013 Please return completed quotation by 9/4/2013. This project is funded by the Federal Transit Authority (FTA) and all contractors must meet Buy America requirements (certification required). All items must be quoted with delivery time to be considered for award. All freight charges must be included in pricing submitted on quote and not entered as separate pricing. Specifications for materials are provided. Unit Cost Extended Item Description Quantity Unit ($/unit) Cost Blankout No Left (R3-2), 24" X 24" and NO LEFT mounting hardware 4 each $z53D.00 $10,12o.00 NO Blankout No Right (R3-1), 24" X 24" RIGHT and mounting hardware 2 each $2,eEo:00 $5,32o.OD Blankout TRAIN, 12" X 24" and TRAIN mounting hardware _ 5 each $1.125.25 $5,63125 BUSES Blankout "BUSES EXEMPT', 18" X 24" EXEMPT and mounting hardware 2 each $3,410.00 $6,82o.00 DO NOT Blankout Do Not Enter (R5-1), 30" X 30" ENTER and mounting hardware, 2 each $4,198.75 $8,397.50 Total $ 36,288.75 Delivery Time; 4-6 FIRM NAME: Traffic Signal Controls, Inc. E-MAIL ADDRESS: _cna�9ccrn Traffic Signal Blank -out Sign and Hardware Quotation Request — 8/29/2013 Please return completed quotation by 9/4/2013. This project is funded by the Federal Transit Authority (FTA) and all contractors must meet Buy America requirements (certification required). All items must be quoted with delivery time to be considered for award. All freight charges must be included in pricing submitted.on quote and not entered as separate pricing. Specifications for materials are provided. Unit Cost Extended Item_ Description Quantity Unit ($/unit) Cost Blankout No Left (133-2), 24" X 24" and NO LEFT mounting hardware A each $Z534-00 $10,136.0C NO Blankout No Right (R3-1), 24" X'24" RIGHT_ and mounting hardware 2 each $Z534•00 $5,068•OC Blankout TRAIN, 12" X 24" and _ TRAIN mounting, hardware do ble StrCic2 5 each $1 87600 38000 BUSES Blankout "BUSES EXEMPT", 18".X 24" EXEMPT and mounting hardware, 2 each $Z229•00. $4,458.00 DO NOT Blankout Do Not Enter(R5-1), 30" X 30" ENTER and mounting hardware 2 each $3,198.00 $6,396,0C Total $ 35,438: og ALTB:4-ATE TRAIN 12524' (sirijestrdce) $1,6220C Delivery Time: 8-9vv3eks FIRM NAME: AMSignal, Irr E-MAIL ADDRESS: &E_ awn signallna= Lades Sales co.lnc. TRAFFIC CONTROL SPECIALISTS www,ga'destraffic.com CITY OF FORT COLLINS JOB NAME BLANK OUT SIGNS We are pleased to offer the following quotation on the above mentioned Project 09/04/13 ITEM # QTY .DESCRIPTION PRICE TOTAL EXT 1 4 24X24" R3-2 NO LEFT TURN $2,650.00 $10,600.00 2 2 24X24" R3-1 NO RIGHT TURN $2,650.00 $5,300.00 3 5 24X12" TRAIN _ $2,095.00 $10,475.00 4 2 24X18" BUSES EXEMPT $2,655.00 $5,310.00 5 2 30X30" R5-1 DO NOT ENTER $2,895.00 $5,790.00 TOTAL $37,475.00 DELIVERY INCLUDED SIGNAL EQUIPMENT 30-45 DAYS ARO AND APPROVED DRAWINGS QUOTE GOOD FOR 90 DAYS Please let me know if any further information is needed. Sincerely, JOHN SNIDER BUY AMERICA The contractor agrees to comply with 49 U.S.C. 53230) and 49 C.F.R. Part 661, which provide that Federal funds may not be obligated unless steel, iron, and manufactured products used in FTA-funded projects are produced in the United. States, unless awaiver has. been granted by FTA or the product is subject to a general waiver. General waivers are listed in 49 C.F.R. 661.7, and include final assembly in the United States for 15 passenger vans and 15 passenger wagons produced by Chrysler Corporation, and microcomputer equipment and software. . Separate requirements for rolling stock are set out at 49 U.S.G 53230)(2)(C) and 49 C.F.R. 661.1.1. Rolling stock must be assembled in the United States and have a 60 percent domestic content. A bidder or offeror must submit to the FTA recipient the appropriate Buy America certification (below) with all bids or offers on FTA-funded contracts, except those subject to a general waiver. Bids or offers that are not accompanied by a completed Buy America certification must be rejected as nonresponsive. This requirement does not apply to lower tier subcontractors. Certification requirement for procurement of steel, iron, or manufactured products .Ceftificate of Compliance with 49 U.S.C. 53236)(1) The bidder or offeror hereby certifies that it will meet the requirements of 49 U.S.C. 53230)(1) and the applicable regulations in 49 C.F.R. Part 661.5. Date Certificate of Non -Compliance with 49 U.S.C. 53236)(1) , The bidder or offeror hereby certifies that it cannot comply with the requirements of 49 U.S.C. 53230)(1) and 49 C.F.R. 661.5, but it may qualify for an exception pursuant to 49 U.S.C., 53230)(2)(A), 53230)(2)(B), or 5323Q)(2)(D), and 49 C.F.R. 661.7. Date Signature Company Name ' Title Certification requirement for procurement of buses, other rolling stock and associated equipment.. Certificate of Compliance with 49 U.S.C. 53236)(2)(C). The bidder or offeror hereby certifies that it will comply with the requirements of 49 U.S.C. 53230)(2)(C) and the regulations at 49 C.F.R. Part 661.11. DateCA Signature Company Name CC TVA anyVI LI Title �41�s1� P .7Y��S `i��tVtAt�(iir Certificate ofNon -Compliance with 49 U.S.C.. 53236)(2)(C) The bidder or.offeror hereby certifies that -it cannot comply with the requirements of 49 U.S.C. 53230)(2)(C) and 49 C.F.R. 661.11, but may qualify for an exception pursuant to 49. U.S.C. 53230)(2)(A), 53230)(2)(B), or 53230)(2)(D), and 49 CFR 6613. Date Signature Company Name Title City 0f Fort Collins Date of.Estimate: 8/2812013 Contract Type: Material Bid .Existing Contractor PO (YIN): N Independent Cost Estimate Description of Goods (A) or Services (B): Provide blankout signs per City of Fort Collins specifications for the MAX)BRT project I have obtained the followinq estimate from: Prior City of Fort Collins Traffic Operations job, CDOT cost data 2012 Published Price List / Past Pricing. (date) Current as'of 8/2812013 Engineering or Technical Estimate (performed by) Britney Sorensen Independent Third Party Estimate (performed by) Britney Sorensen Other (specify) Cost Estimate. Details: (Estimate calculated: in US Dollars) .Data Sources: City of Fort Data Source 2: CDOT Cost En ineerin Estimate Collins Prior Purchase Data Book 2012Product Quantit .Unit Cost ($/unit) Total Cost Cost($/unit) Total Cost Cost ($/unit) . Total Cost - Blankout,No:Left R3-2,24". X'24" 4 each $ 2,700.00 $ 10,800.00. .$ 2.650.00. $ '10.600.00 $ 5,435.00 $ 21,740.00 Blankout No Right R3-1 ,.24" X 24" 2 each- $ 2,700:00 $ 5;400.00: $ 2,650:00 $. 5;.'H2N $ 5.435.00 $ 10,870.00 Blankout TRAIN,12" X 24" "BUSES 5 each S 1:200.00 $" 6,000.00 $ 1,049.42 $. 5,247A0 $. 5,435.00 . $ :27,175.00 Blankout EXEMPT", 18" X•24" 2 each 5 3,000.00. $ 6,000.00 $ 1,98T20 $' 3,974.40. $ 5,435.00' $. 10,870:00 Blankout Do Not Enter (IRS-1), 30" X30" 2 each $ 3,500:00 $ 7, non no $ 4,140.00 $ 8,280.00 $ 5;435:00 $' 10,870:00: Source Notes 1: Prior City of Forty Collins purchase (8/28/12) 2; Colorado Department of Transportation Cost Data Book 2012, Signature of Preparer, i��, �