HomeMy WebLinkAbout506424 EXCERGY CORPORATION - PURCHASE ORDER - 9134845 (2)Req. #
Entered by:
PURCHASE ORDER REQUISITION
FORT COLI.INS UTILITIES
P
Vendor Excergy Corporation
Address Suite 575
3773 Cherry Creek North
Drive
Denver, CO 80209
Date:
MOT�AL
__ ACHARGE,NUMBER, _ ?
1
Technical Consultation and Program
Management Services per RFP #7414
and associated Work Order #6
1
$92,500.00
460210.521210
Comments
1��i1t✓3� 2�I
'�� j� vk�.C's1
requested By Date
orized
3
Technical Consultation and Program Management
for support and integration of smart grid solution and related services
WORK ORDER #6:
This Work Order is as provided in Professional Services Agreement dated May 1, 2013
by and between the City of Fort Collins, a Municipal Corporation hereinafter referred to
as the "City" and Excergy Corporation, hereinafter referred to as "Professional", this
Work Order for Professional Services is agreed to by these parties.
This Scope of Work summarizes the steps and deliverables for a Utilities Strategic
Planning. In order to support the realization of the benefits of the Advanced Meter Fort
Collins (AMFC) project, Utilities is embarking on development of a new strategic
direction to guide the organization for the next five years. The overall objective is to
align with AMFC and build from the direction established by the Utilities for the 21"
Century (U21 C) to develop an enduring strategic direction. We will accomplish this by
conducting a series of six workshops that engages a broad cross-section of the
organization in constructive dialog and decision making.
Based on years of strategic planning experience and leveraging a proven process, we will
provide a clear strategic framework, prioritization of activities and tactical
implementation steps as illustrated on the diagram below.
C cte-&e`
the Market D
_ Environment i
*Research /survey
•Current & Future
State (Gap, SWOT)
•Benchmark
•Scenarios
Scope of Work
t Pry ep
Strategic D
_21 n
-Planning Horizon
.Vision /Mission /Values
-Issues/Goals
•Aligned Strategies.
The following tasks are included in this effort:
fFep re
llmelement=&
_.
Business
Monitor
3Plan
,Performance
•Key Performance
•Implementation
Indicators
.Accountability
■Tactical Action Plan
.Measure Progress
•Budgets
.Adapt 8 Modify
■Assignments
Task 1/Kick-off Project, Data Request & Outline Logistics: Consultant
will first issue a data request for various background documents necessary for
development of a comprehensive plan. We will then conduct a kick-off meeting with
Senior Staff and/or the designated Project Manager to review scope, outline expectations,
1
direction and desired outcomes. We will refine the format, review participants, finalize
dates, and discuss the scope of online research to be conducted (per Task 2 below). In
order to weave the U21C effort forward, it will be helpful to have a focused discussion on
participation and integration of that work with the new planning effort. Similar to the
U21C effort, we recommend approximately 20 people on the Core Planning Team,
comprised of a cross-section of the organization, with some thought also given to
integration of others (i.e., City sustainability). Lastly, we will discuss the potential role of
an Advisory Panel during the process, similar to the engagement method used during
development of U21C.
Task 2/Conduct Online Research & Interviews: Seeding strategic planning
with a comprehensive external and internal view is an essential element of characterizing
the market environment. Research serves to ground the entire effort in a view based on
direct input from stakeholders. This task includes work to develop, field and 'analyze
results of a brief (approximately five-minute) online survey of all Utilities and select City
staff, as well as customers. We will then incorporate the findings into presentation used at
the planning workshop.
Based on our recent conversations, we will work to field a portion of the bi-annual
customer satisfaction survey as an online survey during the September/October time
frame. The goal will be to test the standard battery of questions and limited others,
keeping within the brief format indicated by an online methodology.
In addition, consultants will conduct up to 12 interviews (30 minutes in length) of
selected external and internal stakeholders including the following:
• City Manager
• Sustainability Service Office Manager
• Electric Board Representative
• Water Board Representative
• Platte River Power Authority Director
• Selected Staff (not on the Core Planning Team)
• Others to be determined
The goal of the interviews is to gather a broader and more diverse perspective, again as
inputs to the planning process.
Pending further clarification, the timeline for market research will be conducted to align
with the City planning timeline, which calls for sharing data with ELT toward the end of
October 2013.
Task 3/13repare for Workshops: Consultant will prepare support materials for the
workshop including the following:
✓ Detailed agendas
✓ Initial presentation, including overview of industry trends
✓ Workshop presentations, used for guiding the process
2
✓ Examples/benchmarks to stimulate discussion
✓ Workshop process/interactions
Consultant will also develop details of the facilitation approach, designed to make the
most productive use of the allotted time.
Task 4/Conduct Core Planning Team Workshops: Consultant will facilitate
a series of six full -day workshops according to the schedule outlined in the graphic
below. Specific dates to be determined at project kick-off in Task 1 above. Additional
workshops can be added to the scope if deemed necessary (not included in cost).
Task 5/Conduct Program Inventory: In order to align existing initiatives,
programs and projects with plan direction, consultant will review data gathered during
Task 1 and align efforts with the key issues developed during the planning process. We
will use this inventory to understand how current efforts support the strategic direction, as
well as to conduct a gap analysis to identify new initiatives, programs or projects.
Task 6/ Document Plan: Based on the results of the workshop, prepare draft plan
document for Utilities' review; incorporate consolidated comments and issue final
document. The plan will be based on the output of the workshops, plus our refinements
based on subject matter expertise/experience.
Schedule
The following graphic outlines the project schedule to meet your need for input to the
2014 budgeting process. Specific details will be developed at project kick-off. Pending
specific dates set for meetings and workshops, the schedule will align with the City
planning cycle as closely as possible.
0
Utilities Strategic Planning Overview/Timeline
•August -September 2013
*Recognize U21C accomplishments
*Define how to weave into new Plan
*September -October 2013
a
*Finalize process scope/logistics
City Planning Cycle:
•Kick-off communications
Data Collection; Data Analysis
Service Area Info
*conduct market research
Share with ELT (October)
City Planning Cycle:
•November2013- January 2014
*Gather market insights
Strategic Objective (i.e.,
•Conduct planning workshops (dates
TBD)
Issues)
Write up; Metrics
Review with ELT
*February 2014 City Planning Cycle:
•Prepare draft and final Strategic Plan Review with Council
•Include assignments; budgets; accountabilities
*February 2014
*Implement Plan according to structure/process
defined (e.g., Issues leads)
• Use Plan direction as input to BFO process
*ongoing
• Focus on effective Plan execution
• Monitor & adjust plan on regular basis
4
Staff
Services will be provided by Communications Specialist Lynn Adams, who will
coordinate project performance and Tony Georgis ofNewGen Strategies & Solutions,
both of whom have substantial background with Utilities on various projects. Other staff
will be assigned to the project as necessary for successful project completion (e.g.,
analysts, administrative staff).
Cost Estimate
To accomplish the tasks outlined above, we estimate budget of $92,500 on a time and
materials basis, including minimal travel and other expenses billed at cost. Estimates for
optional or additional tasks would be developed as requested. We would rely on Utilities
to supply all support equipment and materials for the workshop series including but not
limited to meeting space, meeting supplies (flip charts, easels), lunch/refreshments, and
miscellaneous supplies.
5
This Work Order is agreed to by:
Excergy
By:
Jim Ketchledqe, President
DA
THE CITY OF FORT COLLINS, COLORADO
Dennis Sumner, Project Manager
Date: Get. IC 3 ! ?J:�) ( a
By:
S eve Catanach, L&P Operations Manager
Date: h
By:
Brian Janonis, Utilities Executive Director
(greater than $1,000,000)
Date:
By:
Gerry Paul
Director of Purchasing & Risk Management
(greater than $60,000)
Date:
System for Award Management
Page 1 of I
Search Results
Current Search Terms: excergy* corporation*
No records found for current search.
SAM I System for Award Management 1.0
Note to all users: This is a Federal Govemment computer system. Use of this
system constitutes mnsent to monitoring at all times.
IBM v1.1199.20130801-1829
https://staging.sam.gov/portaUpublic/SAM/?portal:componentId=d 1011732-a781-4ea5-b0... 9/27/2013