HomeMy WebLinkAboutCHANGE ORDER - BID - 7528 EDORA POOL & ICE CENTER NATATORIUM VENTILATION UPGRADECHANGE ORDER NO. Z
PROJECT TITLE: EPIC Natitorium Ventilation Upgrade
CONTRACTOR: Kuck Mechanical
PROJECT NUMBER: 7528
DESCRIPTION: Add Low exhaust and Big Ass Fans
City of
F6rt Collins
In preparing change orders show in order as separate numbered paragraphs the following:
1. Reason for change: Need to relocate frequency drives to within 10 ft. of fan they controLthus we need
weather tight enclosures
2. Description of change:Build brackets, and supply weather tight enclosures for frequency drives.(3 pcs)
9
Change in contract cost: $2524.25
4. Change in contract time: NA
(Attach additional sheets as required)
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
Total C.O. % of Original Contract
)ADJUSTED CONTRACT COST
(Assuming all change orders approved)
ACCEPTED BY
$157,853.00
$0.00
$0.00
$2,524.25
1.60%
1.60%
Contractor's Representative
ACCEPTED BY:_fli2�iri
Project Manager Steve Strickland
REVIEWED BY
APPROVED 13�
cc: City Clerk
Contractor
Engineer
Project File
Purchasing
$160,377.25
Date
08/20/2013
Date
Date
,F1,"o / -?
Dare
K(ICKAfEGf/RNIGtL
COA7RACroQsuC
395 West 67th Street
P.O. Box 368
Loveland, CO 80539-0388
Phone: (970) 461-3553
Fax: (970) 461-3443
DATE: 08/19/13
TO: Steve Strickland
JOB: Edora Pool (#01334)
1801 Riverside Drive
Fort Collins, CO 80525
DESCRIPTION: VFD Changes
PCO #: - 1
PROPOSED CHANGE ORDER
PAGE: 1 of 1
Kuck Mechanical Contractors, LLC has reviewed the above referenced change(s) and we have determined that our work is
impacted as follows:
Net Amount of this Proposed Change: $2,524.25
Schedule Impact:
Proceeded with proposed work:
This proposal is based on the Terms and Conditions as follows:
This price includes:
Change (2) 5 HP. and (1)10 HP drive to NEMA 3 R outdoor enclosures, drive and bypass. Cost impact below.
Equipment cost: $2,195.00
15% Overhead and profit: $329.25
Total change order- $2,524.25
This price excludes:
Electrical, wiring, conduit, installation and labor.
If you have any questions, please contact Kuck Mechanical Contractors, LLC as soon as possible. This
proposal remains in effect for 30 days.
Sincerely,
Ted Goggin