Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7501 TURNBERRY ROAD LANDSCAPE & IRRIGATION PROJECT (2)Fort Collins Engineering Planning, Development & Transportation Engineerlog 281 NOMCo" Averm P.O. Box 580 Fors Coft%k CO 80622.0680 870.Y IM08 870.221.8378 - fax Change Order Form PROJECT TITLE: Turnberry Rd. Landscape & Irrigation Project PROJECT NUMBER: 902210 (Bid #7501) CONTRACTOR. Watch Construction, Inc. (PO9132686) CHANGE ORDER NUMBER: 1 1. Reason for change. 2. Description of 3. Change in contract cost 4. Change In con 1.&2: See attached Invoice for details 3. " The contract cost will Increase by $12,941.07 4. There Is no change In contract time. ORIGINAL CONTRACT COST $225.338.60 TOTAL APPROVED CHANGE ORDERS $0.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $12,941.07 TOTAL % OF THIS CHANGE ORDER &74% TOTAL C.O. % OF ORIGINAL CONTRACT S.74% ADJUSTED CONTRACT COST $238,279.67 ACCEPTED BY: REVIEWED Sr. SUBMITTED BY: APPROVED BY: APPROVED BY: ar Ow*eclor PtwchukO hro)egrile (Purchasing Agent over $60,000) DATE: g1Zfn/2 0 ,3 5Q7-/3 :CHANGE ORDER 7 Turnberry Road Improvement Project - - - SUMMARY OF WORK - Item # Item Quantitv unit s# Unit Total Irrigation Revisions and Hand trenching around high pressure 1 Xcel Gas Main 1 LS S 9,710.52 S 9,710.52 Remove and Replace Concrete Sidewalks for additional 2 irrigation sleeves 144 SF 12 $ 1,728.00 3 Additional Rock work at north end of Project 1 LS 1502.55 $ 1,502.55 TOTAL $12,941.07 -.:...% REASON FOR CHANGE. -.. See Attached Description .- -....-`WHEN POSTED - -. :. ... .. :. Pasted to Pay App #3 n� f "A.CoffsvnucTw" „'BO�ORPbi:NTW JOB NAME: JOR NUMBER: ARCHITECT: DESCRIPTION CHANGE ORDER PROPOSAL IURNBERRYROAO LANDSCAPE DATE: IN13 WCPR NUMBER CITYOFFORTCCLLINS PROPOSALNUMBER: OTY UNIT U.P.L. LABOR U.P.M MATERIAL U.P.E 8f207J013 COP-001 EQUIPMENT U.P.S. SUB TOTAL S S S S S CO FROM PYRAMID LANOSCAPE(BACK UP ATTAC14E05%ADDED S $ S S S 1LS S S S S 9T10.52 S 971D52 S 9710.52 S S S S $ REMOVE AND REPLACE CONCRETE FOR S S 5 $ $ - SLEEMNO COMPLETE 144 SF 5 5 5 S 12.00 S 1,720.00 S 1,728.00 S 5 S 5 S WORK ADDED ON NORMERN SOUNORY S S S OFPRCJECTI5%AWED 1 LS S 850.50 $ 850.50 $ 852.05 $ 052.05 S S $ 1.502.55 5 1 5 1 is IS 5 S S 5 S 3 5 S 5 S S S S S f 3 S S S $ 3 S $ S $ S S S S S S 5 5 S S S S S 3 S 5 S $ $ 5 S $ I is I is I I S S TOTALS 5 850.50 S 052.05 $ - 311.438.52 5 12,041.07 WCI OHB P: D% S - GRANDTOTAL: f 12,541.07 ADDITIONAL CONTRACT TIME: TOD DAYS APPROVED BY: APPROVED BY: WALSH CONSTRUCTION, INC. OWNER/ARCHITECT BILL TO Walsh Construction 8139 Openview Place Loveland, CO 80537 Invoice DATE INVOICE# 6/21/2013 4419 TERMS PROJECT Due on receipt 7501 Turnberry Road - WC10... ITEM DESCRIPTION QUANTITY RATE AMOUNT Construction Hand dig June 6th Excel 2 lateral Lines 24 45.00 1,080.00 Irrigation Blow out connection June 7th 9.25 45.00 416.25 Construction Hand dig June 25th Excel sleeves 6 45.00 270.00 Construction Hand dig June 26th Electrical conduit and backflow area. 27 45.00 1,215.00 Construction Hand dig June 27th Electrical conduit and backflow area. 42 45.00 1,890.00 Construction Hand dig June 28th Above retaining walls. 40 45.00 1,800.00 Construction Hand dig July 1st Above retaining walls. 15 45.00 675.00 Construction Materials 1 304.36 304.36 Electrical conduit and wire $215:62 Compression fitting for blowout $69.48 Sleeve materials $19.26 Construction Hand dig country club rd. and turnberry to new installed 35.5 45.00 1,597.50 sleeves and south of county club rd. Total $9,248.11 All accounts are due and payable upon receipt. A finance charge of 1 1/2% per month, which is an annual percentage rate of 18%, will be charged on all accounts unpaid 30 Balance Due $9,248.11 days from date of invoice. City of F6rt Collins �' ngineering Planning, Development & Transportation Englnwring 281 North Cofte Avenue P.O. Box 680 Fort CoI®ro, CO 60622.0580 ( C-2 970.221.6606 970.221.6s78-tax L Change Order Form PROJECT TITLE: Tumberry Rd. Landscape & Irrigation Project PROJECT NUMBER: 9W210 (Bid 07501) CONTRACTOR: Walsh Construction, Inc. (PO 9132586) CHANGE ORDER NUMBER: 2. 1. Reason rdr change. 2. Descilption of char 3. Change In contract cost 4. Change in oonbad 142. See attached ftwo'tca for details 3. The contract coat will increase by $8,129.15 4. There is no change in contract Ume. ORIGINAL CONTRACT COST $225,338.60 TOTAL APPROVED CHANGE ORDERS $ 00 TOTAL PENDING CHANGE ORDERS $12,941.07 TOTAL THIS CHANGE ORDER $8,129.15 TOTAL % OF THIS CHANGE ORDER 3.61% TOTAL C.O. % OF ORIGINAL CONTRACT 9.35% ADJUSTED CONTRACT COST $246,408.82 ACCEPTED BY: REVIEWED BY: SUBMITTED BY: APPROVED BY: APPROVED BY: DATE: (Purchasing Agent over $60.000) cc Contractor P1ecb&*Q Proled Foe $%z4 f Zo t3 zL /3 8 2-G r3 CHANGE ORDER Turnberry Road Improvement Project SUMMARY OF WORK 7771 horn$ nnm OIIAntity Unit t/[nit TnInI Mulch (1.5' River Rock, 3" Depth, Fabric Included) 213-01 8,095 SF $0.70 $5.666.15 213-03 Mulch (12" River Rock, 18" Deep, Fabric Included) -1,194.0 SF $5.00 -$5,970.00 214-10 Shrubs (5 Gallons) 109 EA $27.00 $2,943.00 Versa -Lock Block Landscape Wall (24" Height) (Color 504-01 TBD)(Complete -in- lace)(Installed per detail) 92 LF $60.00 $5,490.00 TOTAL $8,129.15 REASON FOR CHANGES These Items were significantly over -run or under -run. This change order adjusts the contract value to reflect the additional work. . WHEN POSTED Posted to Pay App 93