HomeMy WebLinkAbout296701 TIBURON INC - CONTRACT - PURCHASE ORDER - 9116546TIBURAN0
July 18, 2013
Brian Ainsley
CRISP Project Manager
2221 S Timberline Road
Fort Collins, CO 80525
Subject: Change Order (CP)-018: Software Backup to Include Hardware
Reference: EP-1272: Unix to Windows Migration by and between Tiburon, Inc. and the City of Fort
Collins and Larimer County
Dear Mr. Ainsley:
Tiburon, Inc. is pleased to present the City of Fort Collins (hereinafter, "Client") with this Change Order
for Tiburon to provide a Software Backup to Include Hardware (hereinafter, referred to as the "Change
Order").
Scope Description and Responsibilities
The attached Exhibit 1, Statement of Work ("SOW") describes the project tasks, responsibilities of each
party and defined completion criteria.
Price Description
1) Firm fixed price: $1 15,550
a. Tiburon Professional Services: $25,836
b. Third Party Hardware: $89,714
2) Upon achievement of the completion criteria set forth in the SOW the Tiburon Annual Maintenance
Fee will increase by $2,873. This additional maintenance fee will be prorated and added to the
following year's annual maintenance'renewal.
3) This Change Order does not include:
• Warranty
• Documentation
4) Any taxes levied by a government agency. Taxes, if applicable are the sole responsibility of the
Client.
Effective Date and Payment Schedule
l) The work described herein will be scheduled to commence at a mutually agreeable date after Client's
acceptance of this Change Order.
City of Fort Collins
CP-018: Software Backup to Include Hardware
Page 2 of 6
2) Payment Schedule:
Tiburon Professional Services:
• 50% Upon Tiburon receipt of the signed acceptance of this Change Order.
• 50% Upon achievement of the completion criteria set forth in the SOW.
Third Party Hardware:
• 100% Upon Tiburon receipt of the signed acceptance of this Change Order.
Note: No scheduling of resources will occur until after the first payment milestone is paid. This
Change Order may be cancelled at Tiburon's discretion upon written notice to Client if the first
payment milestone is not paid when due.
3) Client's acceptance of this Change Order in the signature block provided below, authorizes Tiburon
to proceed with the work described herein and confirms funding will be obligated. Any requisite
contractual documents required by Client's purchasing procedures are the responsibility of the Client.
4) The terms and conditions of the above referenced Agreement, and this Change Order prevail
regardless of any conflicting or additional terms and conditions on any Purchase Order or other
correspondence. Any contingencies or additional terms obtained on any Purchase Order are not
binding upon Tiburon. All Purchase Orders are subject to approval and acceptance by Tiburon.
5) This fixed price Change Order is valid through July 31, 2013.
Upon review and acceptance of this Proposal, please have a duly authorized person sign below and return
the signed copy of the Proposal to Ron Lovejoy via e-mail at ron.lovejoy@tiburonine.com or fax
510.217.6466. If you have any questions or require further information, please contact Ron at
951.898.0447, at your convenience.
Sincerely,
Donald Doepke
Executive,f*ector of Operations
M
this Change Order:
11C
Date
C-ifw ?1+V PvkciOASE
Printed ame / Title
City of Fort Collins
CP—O IS: Software Backup to Include Hardware
Page 3 of 6
City of Fort Collins
CP-018: Software Backup to Include Hardware
Page 4 of 6
Exhibit 1
Statement of Work
Scope Description
Onsite, Tiburon will install and configure the provided hardware components and test remote access as
required to prepare servers and storage.
Tiburon will provide Client with the hardware specified on Exhibit 2 to this Proposal. All hardware is
being provided by Tiburon as -is, Tiburon does not provide warranty on third party products. Client will
receive the manufacturer's standard warranty for all such hardware. For warranty support, Client shall
contact the manufacturer directly.
Tiburon Responsibilities
1) Install and configure the provided hardware per the Scope Description.
2) Test remote access as required to prepare servers and storage.
Client Responsibilities
1) Designate a person to be the principal point of contact for all technical questions and administrative
arrangements relating to this Change Order.
2) Provide VPN access to Tiburon.
3) As required, coordinate the participation of non -Tiburon provided third parties and outside agencies.
Completion Criteria
This work will be considered complete ten (10) business days after Tiburon has provided the Client with
written notification that the provided hardware has been installed and configured. If Client does not
confirm completion with a sign off letter presented by the Tiburon project manager within ten (10)
business days of submittal of such letter, or otherwise notifies Tiburon in writing why completion sign -off
has not been provided any final invoice(s) will be issued and will be payable in accordance with the
payment terms of this Proposal.
City of Fort Collins
CP-018: Software Backup to Include Hardware
Page 5 of 6
Exhibit 2
Hardware
PowerVault
TL2000
`
',owerVaultTL2000 -
PVTL20002U;LTC'6,25AS
TL26S2
[225-4174]-1`
Controllers
6Gb SAS HBA, Dual Port
6GBAH
[342-1091]
01' 2;,6G,b EXT;CBL I/O,SAS;4MTR
CBC2Q4M
[330,8773]
Hardware Support Services
5 Year ProSupport and NBD On -site Service
U51P
[984-9654]
96941.�,
[985-32281
x '
s-3267]
[988-9300]
tiP-
-__
[989-3439];
Installation Services
Tape Library Remote Configuration Assistance
REMINST
[986-3347]
` <'
Proacti'Maintenance
ProActive.Mgint Declined` , .,; ` "`;y
NOMAINT_
[92'6 2979] ,y
Tape Media
Free! Tape Media for LTO-3, 400/800GB, 5 Pack
LTOSDQ
[468-4814]
LgTO,MediaR,Labels , .:
C}T,0 6,TapeLabels t121,180'yxt ' .
16L121 ':[
[412 1�106];;
Backup5oftwaresa;r
,', `
-'AM V`^, .
_,.
Data Protection Software
CommVault Simpana 20 Server Bundle
CV20BDL
[421-4685]
Data Protection'Soffware
tommVault Client`Agent (Fi16Syst`em iDA) ocADlAgent
CVFLIDA
Data Protection Software
CommVault Virtual Server Agent - Unlimited VM's
CVUNLM
[421-4231]
M'IData;Proteetion
yg°. i,
Software
rr`'x� .' . "x.. '
Co' mmVault ClientfAgent for UM'Guest OS or Virtual Node or
PSRM° �_ »� r . a-
CVSRM
.a `t '
[421 4204] :-
<
City of Fort Collins
CP-018: Software Backup to Include Hardware
Page 6 of 6
PowerVault
MD1200
PowerVault MD1200
PV MD1200,RKMNTSAS12'Bay
B
MD1200
[224-7198]
Hard Drive
HD Multi -Select
HDMULT
[341-4158]
Enclosure' ana ement
g>
Module "
2 End M mt Modules; SAS O' I � '
g 3 Y
EMM '
�.
330-6058
[ ]
Bezel
Bezel ASSY,MD1200
BEZEL
[313-88So]
Cables
6Gb SAS Cable, 1M
2XC61M
[330-6062]
[330-6062)
Server Raid Controller
PERC H800, SAS Ext 512MG
P800
[341-9869]
Rails
RackRails, Versa Rails, Round Hole Universal
VRAIL
[330-6047]
Hardware Support Services
5 Year ProSupport and NBD On -site Service
U51P
[906-5184]
[906-5224]
[907-8368] ..
[907-8597]
[909-3640]
[989-3439]
;Installation Services;
RemoteConfiguration;Assistance
_-REMINST
[983-7217],
Proactive Maintenance
Maintenance Declined
NOMAINT
[926-2979]
Power Cords.
No Additional Power Cords .x ' ;
°NOPWRCD
[310-9057]
Hard Drives
(4) 30OGB 15K RPM SAS 6Gbps 3.5in Hot -plug Hard Drive
30OA53
[342-0123]
[342-0123)
[342-0123]
[342-0123]
Hard Drives
(8) 1TB 7.2K RPM Near -Line SAS 6Gbps 3.5in Hot -plug Hard
Drive
1TBNL6
[342-0122]
:.T•
[342-0122]
City of Fort Collins
CP-018: Software Backup to Include Hardware
Page 7 of 6
[342-0122]
r
[342-0122]
[342-0122]
[342-0122]
[342-0122]
[342-0122]
PowerEdge R620
PowerEdge R620
PowerEdge R620
R620
[225-2108]
Warranty & Service
5 Year ProSupport and Mission Critical 4HR 7x24 Onsite Pack
U51PME4
[934-6194]
[934-6234]
[936-1787]
5- _n "•
[936-1817]
[939-4668]
'[989-3439]
[989-5181]
Installation Services
No Installation
NOINSTIL
(900-9997]
Proactive Maintenance
Maintenance Declined
NOMAINT
(926-2979]
,Shipping ; ,
PowerEdge R620 Shipping - 4/8 Drive Chassis
SHIP48
[331-4761],
PCIe Riser
Additional Riser with x16 PCIe Slot for x8, 2 PCIe Chassis with 2
Processors
RX162P
[331-4514]
Embedded,Systems
Management r
�iDRAC7 Expresso • :
DRAC7
[318-2036]
sSelec I'Network Adapter
Broadcom 5720 QP1Gb Network Daughter Card
5720QP, .
[430-4418]
Chassis Configuration
Chassis with up to 4 Hard Drives and Software RAID, 2 PCIe
Slots (Requires Additional Riser)
4HSWR2P
(317-8649]
City of Fort Collins
CP-018: Software Backup to Include Hardware
Page 8 of 6
Bezel,
Bezel - 4/8'Drive Chassis
BEZEL48
[318-1431]
Power Management BIOS
Settings
Performance BIOS Setting
HPBIOS
[330-3492]
RAID Configuration
SW RAID 5 for S110 (3-4 SATA/SATA SSD HDbs)
RSS110
[331-4219]
RAID Controller
S110, Software RAID (for Microsoft OS Only)
SWRD
[331-4368]
Processor
Intel® Xeon® E5-2660 2.20GHz, 20M Cache„B.OGT/s QPI,
Turbo, 8C, 95W, Max Mem 160OMHz
41
E52660
[317-9593]
[331-4762]
Additional Processor
ntel® Xeon® E5�2660 2.20GHz, 20M Cache,=&DGT/s QPI,
Turbo, 8C, 95W ;
2E52660
[317-8688]
[317-9607]
[331-4762]
Memory Capacity
(2) 16GB RDIMM, 1333 MT/s, Low Volt, Dual Rank, x4 Data
Width
16R3LDR
[317-9639]
[317-9639]
Memory DIMM Type and
Speed
1333 MHz RDIMMs
1333RD
[331-4422]
Memory Configuration Type
Performance Optimized
PEOPT
[331-4428]
Hard Drives
(3) 50OGB 7.2K RPM SATA 3Gbps 2.5in Hot -plug Hard Drive
50OS3C
[341-9251]
[341-9251]
[341-9251]
System Documentation
Electronic System Documentation and OpenManage DVD Kit
EDOCS
[331-4513]
Internal Optical Drive
DVD+/-RW, SATA, Internal
DVDRW
[318-1391]
Rack Rails
ReadyRails'" Sliding Rails With Cable Management Arm
RRCMA
[331-4765]
Power Supply
Dual, Hot -plug, Redundant Power Supply (1+1), 750W
RPS750
[331-4605]
Power Cords
(2) C13 to C14, PDU Style, 12 AMP, 2 Feet(6m), Power Cord
12A2FT
[330-3150]
City of Fort Collins
CP-018: Software Backup to Include Hardware
Page 9 of 6
xCvsv'ak;`.: ",..
m:;' - •„' xt t .
,t�::',d�.�.
[330-3150]
.4(��ti
Operating System °
'•R?FLrit3kfi
Window"s Server 2008 R2rSP1Sfandard Edition x64 mindudes:5r
ACAS , 6 h '
W58SE5C
[42=15'433]' '
OS Media Kits
Windows Server 2008 R2 SP1, Standard Edition,x64, Media Kit
WSSTDEM
[421-5440]
11'��
'ate 0
OS Part fions i ;,_SOGB
� x . _ 4 �,
Microsoft OS'P-'artition OJernde, r-g �. r` .:"'
�. k
t80GBPAR
, 4206967
[ 1