HomeMy WebLinkAboutWORK ORDER - RFP - 7220 WATER WW TREATMENT & SITE INFRASTRUCTURE DESIGN CONSTRUCTION CONTRACTOR (13)WORK ORDER & NOTICE OF AWARD
TO: HYDRO CONSTRUCTION COMPANY, INC.
WORK ORDER NUMBER: H-WRF-2013-5
PURCHASE ORDER NUMBER: 9L3 (o
WORK ORDER TITLE: DWRF 2013 Electrical Replacements
ENGINEER: N/A
OWNER: CITY OF FORT COLLINS (hereinafter referred to as OWNER)
OWNER'S REPRESENTATIVE: Link Mueller
NOTICE OF AWARD DATE: July 26, 2013
1. WORK. You are hereby notified that the Scope -of -Services dated July 8, 2013 to perform
the following tasks for DWRF 2013 Electrical Replacements has been considered. Pursuant to your
AGREEMENT with OWNER dated May 26, 2011, you have been awarded a Work Order for this
work order description: Procurement, repair and construction as listed below:
South Lift Fiber Install
a. PLC 53/54 Replacement
• Set up and transfer control for both PLC's to City -owned temporary PLC's.
• Demo and rebuild existing PLC's with City -provided materials per the provided loop
drawings
• PLC 53
- 16 Analog Inputs
- 0 Analog Outputs
- 221 Digital Inputs
- 59 Digital Outputs
• PLC 54
- 20 Analog Inputs
- 0 Analog Outputs
- 116 Digital Inputs
- 35 Digital Outputs
b. DWRF Sampler Replacements
• Install (2) - 1" conduits. (1) for 120 volt power. (1) for (2) analog cables to route back
to city directed PLC.
• Owner to provide programming & to coordinate with Hach to set up unit parameters.
Samplers are provided by owner. Owner to furnish loose PH sensor & SC200
controller.
• Electrical sub to mount the controller, work with plant staff to install owner provided
sensor mount and furnish & terminate power & analog cabling.
• (2) Electrical install of owner provide samplers at south splitter box
• (1) Electrical install at Headworks building barscreen area
• (1) Electrical install exterior east side of North Lift at man hole location
4/98 WORK ORDER AND NOTICE OF AWARD
PAGE 00525-1
No. 7724d
POWER OF ATTORNEY
— = - - BERKLEY REGIONAL INSURANCE COMPANY
- - WILMINGTON, DELAWARE
NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully.
KNOW ALL MEN BY THESE PRESENTS, that BERKLEY REGIONAL INSURANCE COMPANY (the "Company"), a
corporation duly organized and existing under the laws of the State of Delaware, having its principal office in Urbandale, Iowa,
has made, constituted and appointed, and does by these presents make, constitute and appoint: Sheryll Shaw, Nicole L. McCollam,
ti Sue Wood, Bradley J. Jeffress, Kristen L. McCormick, Sarah Finn, Robert L. Cohen, Robert, J. Reiter, Michael Liseher, Jr.,
Philip J, Monasch or Jessica Talbot of IMA, Inc. of Denver, CO its true and lawful Attorney -in -Fact, to sign its name as surety
2 only as delineated below and to execute, seal, acknowledge and deliver any and all bonds and undertakings, with the exception of
�° Financial Guaranty Insurance, providing that no single obligation shall exceed Fifty Million and 00/100 U.S. Dollars
c (U.S.$50,000,000.00), to the same extent as if such bonds had.been duly executed and acknowledged by the regularly elected
officers of the Company at its principal office in their own proper persons.
= This Power of Attorney shall be construed and enforced in accordance with, and governed by, the laws, of the State of Delaware,
owithout giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following
resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on,August 21, 2000:
P "RESOLVED, that the proper officers of the Company are hereby authorized to execute powers of attorney authorizing and
qualifying the attorney -in -fact named therein to execute bonds, undertakings, recognizances, or other suretyship obligations
o on behalf of the Company, and to affix the corporate seal of the Company to powers of attorney executed pursuant hereto;
and further
o °o RESOLVED, that such power of attorney limits the acts of those named therein to the bonds, undertakings, recognizances,
or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the
manner and to the extent therein stated; and further
oRESOLVED, that such power of attomey'revokes all previous powers issued on behalf of the attorney -in -fact named; and
7 further
Z RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any
�o power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or
° other suretyship obligation of the Company; and such signature and seal when so used shall have the same force and effect as
3 though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any
person or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have
"a ceased to be such at the time when such instruments shall be issued."
7O b IN WITNESS WHEREOF, the Company has caused these presents to be signed and attested by its appropriate officers and its
wo corporate seal hereunto affixed this I I day of P-�o% 2013.
oV Attest: Berkley Regional Insurance Company
(Seal) By / BY
ro Ira S. Lederman J after
Senior Vice President & Secretary S . e President
o WARNING: THIS POWER INVALID IF NOT PRINTED ON BLUE "BERKLEY" SECURITY PAPER
o ai STATE OF CONNECTICUT) _ -
ss: .
N
o COUNTY OF FAIRFIELD )
N
o _° Sworn to before me, a Notary Public in the State of Connecticut, this / I dayof `�� . , 2013, by Jeffrey M. Hafter and
y Ira S. Lederman who are sworn to me to be the Senior Vice President, and the Senior Vice President and Secretary, respectively, of
. Berkley Regional Insurance Company.
EILEEN-KILLEEN �--�
� � ntrr�t:rit-once sr;ltc ��crN,vecrtcuT Notary Public;. State of Connecticut
My cokImISSION EXPIRES JUNE 30. 2017
CERTIFICATE
Z I, the undersigned, Assistant Secretary of BERKLEY REGIONAL INSURANCE COMPANY, 'DO HEREBY CERTIFY that the
foregoing is a true, correct and complete copy of the original Power of Attorney; that said Power of Attorney has not been revoked
or rescinded and that the authority of the Attorney -in -Fact set forth therein, who executed the bond or undertaking to which this
y Power of Attorney is attached, is in full force and effect as of this'date.
.-Given under my hand and seal of the Company, this 26th day of July ,2013
(Seal)
.T a
Instructions for Inquiries and Notices Under the Bond Attached to This Power
Berkley Surety Group, LLC is the affiliated underwriting manager for the surety business of: Acadia Insurance
Company, Berkley Insurance Company, Berkley Regional Insurance Company, Carolina Casualty Insurance
Company, Union Standard Insurance Company, Continental Western Insurance Company, and Union
Insurance Company.
To verify the authenticity of the bond, please call (866) 768-3534 or email BSGlnquiry@berkleysurety.com
Any written notices, inquiries, claims or demands to the surety on the bond to which this Rider is attached
should be directed to:
Berkley Surety Group, LLC
412 Mount Kemble Avenue
Suite 310N
Morristown, NJ 07960
Attention: Surety Claims Department
Or
email BSGClaim@berkleysurety.com
Please include with all notices the bond number and the name of the principal on the bond. Where a claim is
being asserted, please set forth generally the basis of the claim. In the case of a payment or performance bond,
please identify the project to which the bond pertains.
A� �® CERTIFICATE OF LIABILITY INSURANCE
D07/22 /201/DOYIYV1)
07/223
1
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to
the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the
certificate holder in lieu of such endorsement(s).
PRODUCER 1-303-534-4567
IMA, Inc. - Colorado Division
CONTACT
NAME:HONE
PFAX
_(AIC-N0 ExU: (A/D No):
1550 17th Street
Suite 600
E-MAIL den am@imacor com
ADDRESS: P p•
Denver, CO 80202
INSURER(S) AFFORDING COVERAGE
NAICN
INSURER A: TRAVELERS IND CO
25658
INSURED
INSURER B: TRAVELERS PROP CAS CO OF AMER
25674
Hydro Construction Company, Inc.
INSURER C: PINNACOL ASSUR
41190
INSURER D:
301 East Lincoln Avenue
INSURER E:
Fort Collins, CO 80524
INSURER F:
COVERAGES CERTIFICATE NUMBER: 34857499 REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR
LTR
I 7ypE OF INSURANCE
ADDL
SUBR
POLICY NUMBER
POLICY EFF
MM/DDfYYYY
POLICY EXP
MM/DD/YYYY
LIMITS
A
GENERAL LIABILITY
DTC08743RO16IND12
09/30/1
09/30/13
EACH OCCURRENCE
$ 1,000,000
X COMMERCIAL GENERAL LIABILITY
CLAIMS -MADE IJ OCCUR
DAMAGE TO RENTED
PREMISES Ea occurrence
$ 300, 000
MED EXP (Any one person)
$ 10,000
X PD Ded:$5,000
PERSONAL &ADV INJURY
$ 11000,000
GENERAL AGGREGATE
$ 2,000,000
GENT AGGREGATE LIMIT APPLIES PER:
PRODUCTS - COMP/OP AGG
$ 2,000,000
17 POLICY I " I PRO LOC
I
I
I
I
I
$
E
LIABILITY
DT8108743RO16TIL12
09 30 1
09/30/13
COMBINED SINGLE LIMIT
Ea accident
1, 000, 000
BODILY INJURY (Per person)
$
ANY AUTO
ALL OWNED SCHEDULED
AUTOS AUTOS
POMOBILE
BODILY INJURY (Per accident)$
HIRED AUTOS H AUUTOSWNED
ROPERTY
(Per axiden DAMAGE
$
E
X
UMBRELLA LIAB
X
OCCUR
DTSMCUP8743RO16TIL12
09/30/1
09/30/13
EACH OCCURRENCE
$ 2,000,000
AGGREGATE
$2,000,000
EXCESS LIAB
CLAIMS -MADE
O10,000DED
$
C
WORKERS COMPENSATION
AND EMPLOYERS'LIABILITY YIN
ANY PROPRIETOR/PARTNER/EXECUTIVE
OFFICER/MEMBER EXCLUDED? N❑
N / A
2091550
09 /O1/1
04/O1/14
X WC STATU- OTH.
E.L. EACH ACCIDENT
$ 11000,000
E.L. DISEASE. EA EMPLOYEE
$ 1,000,000
(Mandatory in NH)
If yes, describe under
DESCRIPTION OF OPERATIONS below
E.L. DISEASE - POLICY LIMIT
$ 1,000,000
DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (Attach ACORD 101, Additional Remarks Schedule, it more space is required)
City of Fort Collins is included as Additional Insured on the General Liability Policy if required by written contract
or agreement and with respect to work performed by Insured subject to the policy terms and conditions.
l,Nl� V CLLfi 1lull
RE: DWRF 2013 Electrical Replacements Job# H-WRF-2013-5.
City of Fort Collins
700 Wood Street
Fort Collins, CO 80524
USA
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
AUTHORIZED REPRESENTATIVE
MW
n 19RR-2010 ACORD CORPORATION All rinhtc raearvad
ACORD 25 (2010/05) The ACORD name and logo are registered marks of ACORD
zrm2012
34857499
• Includes one 6'x6' concrete pad
c. South Lift Fiber Installation
• Purchasing & installing 495' of (12) strand fiber from the digester network cabinet to
a new owner supplied network cabinet we install at the South Lift PLC area.
• Electrical sub will pull the fiber in, mount the new cabinet, install 120 volt power to the
cabinet and install the owner supplied UPS.
d. TSSA Installation
• Provide and install to insertion probe assemblies for a waste -activated sludge and DAFT
suspended solids probe.
• Install Two (2) each Electro-Chemical Devices TRITON TR8 Turbidity probes with
associated controllers (4-20 mA).
2. CONTRACT PRICE, BONDS, AND CERTIFICATES. The cost for this work is ONE
HUNDRED SIXTY-THREE, FOUR HUNDRED SEVENTY-SEVEN DOLLARS ($163,477). Payment
Bond, Performance Bond and insurance are required. Pursuant to your AGREEMENT dated May
26, 2011 shared savings shall not pertain to this work order.
3. CONTRACT TIMES. Pursuant to the AGREEMENT and the Contract Documents, the date
for Substantial Completion of this Work Order is October 30, 2013 and after Substantial Completion,
the date for Final Payment and Acceptance November 29, 2013.
4. LIQUIDATED DAMAGES: Liquidated damages do not pertain to this work order.
5. EXECUTION. Three (3) copies of this proposed Work Order & Notice of Award, and
accompanying amendments or supplements to the Contract Documents (except any applicable
Drawings) incorporated herein, are provided. Three (3) sets of any applicable Drawings will be
delivered separately or otherwise made available to you immediately. You must comply with the
following conditions precedent within fifteen (15) days of the date of this Work Order & Notice of
Award, that is, by August 9, 2013.
A. You must deliver to OWNER three (3) fully executed counterparts of this Work Order,
including all amendments or supplements to the Contract Documents incorporated herein.
Each Work Order must bear your signature as provided.
B. You must deliver with the executed Work Order, Payment Bond and Certificate of Insurance
documents, as specified in the Agreement.
Failure to comply with these conditions within the time specified will entitle OWNER to consider your
Bid abandoned and to annul this Work Order & Notice of Award. Within ten (10) days after you
comply with those conditions, OWNER will return to you one (1) fully signed counterpart of this Work
Order with any amendments or supplements to the Contract Documents attached.
CONTRACTOR'S WORK ORDER REPRESENTATION & EXECUTION:
CONTRACTOR agrees to perform the services identified above, in accordance with the terms and
conditions contained herein and in the AGREEMENT dated May 11, 2011, between the parties. In
the event of a conflict between or ambiguity in the terms of the AGREEMENT and this Work Order
(including the attached Contract Documents), the AGREEMENT shall control.
4/98 WORK ORDER AND NOTICE OF AWARD
PAGE 00525-2
CONT ACTOR: HYDRO CONSTRUCTION COMPANY. INC.
Date 7�e
JAMES E. EURICH, COONP
OWNER'S ACCEPTANCE & EXECUTION:
This Work Order and the attached Contract Documents are hereby accepted and incorporated
herein by this reference, and Notice to Proceed is hereby given.
OWNER: CITY OF FORT COLLINS
Submitted By: '100--� Date
Projec anager
Reviewed By: Date
C i& Engineer
J
Approved BDate:
ate ourceqatment Operations Manager
Approved By: Date:
Dire6tor of Purc asing and Risk Management
4/98
WORK ORDER AND NOTICE OF AWARD
PAGE 00525-3
Q H YD R O Standard Estimate Report t
DWRF 2013 Minor Improv. P 7/8207J B:43 :OJ AM
CONSTRUCTION
Project name
DWRF 20Q Mmor lmprov.P
Labor rate taWe
Labor - Bare
Equipment rate table
Equipment
Report format
Sorted by'Slmclum[PmV Item#
'Detain summary
Allocate a idons
Q H YD R O Standard Estimate Report Page 2
DWRF 2013 Minor Improv. P 7/8/2013 8:43 AM
CONSTRUCTION
Labor Matedal Subcontract E ul manl Other Total
Item Description TaMoff Oty Amount Amount Amount Name Amount Amount Amount
F South Lift Fiber Install
unassigned *
-sub Electdcal Sub 1.00 Is
- unassigned'
F South Lift Fiber Install
G General Conditions
* unassigned *
16 Bonds
14 Piojed Manager
14 Superintendent
18 Telephone Chagas
10 Jobsila Truck
' unassigned'
80,00 Laborhours
12000 Equipment hours
G General Conditions
80,00 Labor hours
12000 Equipment hours
P PLC 53154
` unassigned *
-sub Electrical Sub
- unassigned'
P PLC 531.54
S
5,304
5,304
0 0 5,304
1.00 Is
1,00 wk 1,323
1,00 wk 1,470
1,00 wk
1,00 wk
2,793
Z793 0 0
1.00 Is - 79,560
Tll
0 0 79,560
Samplers
unassigned *
10 S.0.G.Ed9e Form <V
45 4500 psi Convele
1 Truck Place Slab on Grade
-sub Electrical Sub
unassigned'
16000 Laborhaun
s Samplers
18.000 Labor hours
T TSSA's
`unassigned *
d 10 Pipe Connections
-sub Electrical Sub
1836 at 529 0 -
122 cY - 130 -
122 cy 529 - -
1 00 Is 28,560
IAS8 IN 28,560
1,058 130 28,560
200 ea
926
714
1,071
1.00 Is
19,380
926
714
20,451
5 3ct
5,304
0
0
5, 304
0
0
255
16
1,594
265
22
1,747
218
218
1.020
1,020
1,530
256
4,5n
1,530 256 4,579
79,560
79,560
0 0 79,560
im 631
130
529
28,560
102 29,961
0 102 29,851
71 33 2,815
_ 19,380
71 33 22,195
T TSSA's
926 714 20,451
71 33 22,195
14.00 Laborhqurs
Estimate Totals
Description Amount
Totals Hours
Rate Cost Basis Cost per Unit
Percent of Total
Labor 4.778
110.000 hrs
2.92%
Material 844
0S2%
Suboontrad 133.875
81.89%
Equipment 1,601
120.000 me
098%
OIAa 391
024%
141AM
141,489
86.55
rmant Band - 2 vr. 3188
B
1 9S%
3,188
144,677
1.95
profit B Ovemeed 18,800
11.500 % T
11.50%
Total
163,477
PERFORMANCE BOND
KNOW ALL BY THESE PRESENTS: that
Bond No. 0176314
(Firm) Hydro Construction Company Inc.
(Address) 301 East Lincoln Avenue, Fort Collins, CO 80524
(an Individual), (a Partnership), (a Corporation), hereinafter referred to as "the Principal, and
(Firm) Berkley Regional Insurance Company
(Address) 11201 Douglas Avenue, Urbandale IA 50322
hereinafter referred to as "the Surety," are held and firmly bound unto the City of Fort Collins, 300 West LaPorte Avenue, Post Office Box
580, Fort Collins, Colorado 80522, a Municipal Corporation, hereinafter referred to as "the Owner," in the penal sum of $163,477.00
One Hundred Sixty Three Thousand Four Hundred Seventy Seven Dollars and 00/100
in lawful money of the United States, for the payment
of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Contract Agreement with the
Owner, dated the 26th day of May , 2011 , a copy of which is hereto attached and make a part hereof for the
performance of City of Fort Collins Project, Work Order No. H-WRF-2013-5 - DWRF 2013 Electrical Replacements -Notice of
Award Date: July 26, 2013
NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the undertakings, covenants, terms,
conditions and agreements of said Contract Agreement during the original term thereof, and any extensions thereof which may be granted by
the Owner, with or without Notice to the Surety and during the life of the guaranty period, and if he shall satisfy all claims and demands
incurred under such Contract Agreement, and shall fully indemnify and save harmless the Owner from all cost and damages which it may
suffer by reason of failure to do so, and shall reimburse and repay the Owner all outlay and expense which the Owner may incur in making
good any default, and then this obligation shall be void; otherwise to remain in full force and effecL
PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time,
alteration or addition to the terms of the Contract Agreement or to the work to be performed thereunder or the specifications accompanying
the same shall in anyway affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration
or addition to the terms of the Contract Agreement or to the work or to the specifications.
PROVIDED, FURTHER, that no final settlement between the Owner and the Contractor shall abridge the right of any beneficiary
hereunder, whose claim maybe unsatisfied.
IN WITNESS WHEREOF, this instrument is executed in three counterparts, each one of which shall be deemed an original, this
26th
IN PRESE CE OF:
Attest:
day of July , 2013
(CORPORATE SEAL)
Hydro Construction Company, Inc.
Principal
r (0
(Title)
301 East Lincoln Avenue, Fort Collins, CO 80524
(Address)
Page t of 2
IN PRESENCE OF:
N/A
I�V PigffNCE OF:
i Hess:
C
Philip J. Monasch
(SURETY SEAL)
L0
M
Other Partners
N/A
Berkley Regional Insurance Company
Surety
C\/(p
By:
J s ica Talbot omeytin-Fact_
11201 Douglas Avenue, Urbandale, IA 50322
(Address)
NOTE: Date of Bond must not be prior to date of Contract Agreement. If Contractor is Partnership, all partners should execute
Bond.
IMPORTANT: Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the Owner.
Page 2 of 2
00601
PAYMENT BOND
KNOW ALL BY THESE PRESENTS: that
Bond No. 0176314
(Firm) Hydro Construction Company Inc.
(Address) 301 East Lincoln Avenue, Fort Collins, CO 80524 ,
(an Individual), (a Partnership), (a Corporation), hereinafter referred to as "the Principal," and
(Firm) Berkley Regional Insurance Company
(Address) 11201 Douglas Avenue, Urbandale, IA 50322
hereinafter referred to as "the Surety," are held and fimily bound unto the City of Fort Collins, 300 West LaPorte Avenue, Post Office Box
580, Fort Collins, Colorado 80522, a Municipal Corporation, hereinafter referred to as "the Owner," in the penal sum of $163,477.00
One Hundred Sixty Three Thousand Four Hundred Seventy Seven Dollars and 00/100
in lawful money of the United States, for the payment
of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Contract Agreement with the
Owner, dated the 26th day of May , 2011 , a copy of which is hereto attached and make a part hereof for the
performance of City of Fort Collins Project, Work Order No. H-WRF-2013-5 - DWRF 2013 Electrical Replacements - Notice of
Award Date: July 26, 2013
NOW, THEREFORE, if the Principal shall make payment to all persons, firms, subcontractors and corporations furnishing
materials for or performing labor in the prosecution of the work provided for in such Contract Agreement, and any authorized extension or
modification thereof, including all amounts due for materials, lubricants, repairs on machinery, equipment and tools, consumed, rented or
used in connection with the construction of such work, and all insurance premiums on said work, and for all labor, performed in such work
whether by subcontractor or otherwise, then this obligation shall be void; otherwise to remain in full force and effect.
PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of
time, alteration or addition to the terms of the Construction Agreement or to the work to be performed thereunder or the specifications
accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of
time, alteration or addition to the terms of the Construction Agreement or to the work or to the specifications.
PROVIDED, FURTHER, that no final settlement between the Owner and the Contractor shall abridge the right of any
beneficiary hereunder, whose claim may be unsatisfied.
Page 1 of 2
IN WITNESS WHEREOF, this instrument is executed in three counterparts, each one of which shall be deemed an original,
this 26th day of July 9 2013 .
(CORPORATE SEAL)
IN PRESENCE OF:
N/A
WitnRFNCE OF:
eR
Bv: 4 �� IMs�l�wtdi�
Philip J. Monasch
(SURETY SEAL)
Principal
Hydro Construction Company, Inc
IWV
Moe)
301 East Lincoln Avenue, Fort Collins, CO 80524
By:
By:
By:
(Adder)
Other Partners
N/A
Surety
Berkl Regional Insurance Company
By:
Attwneydn-Fact
e ica Talbot
11201 Douglas Avenue
(Address)
Urbandale, IA 50322
NOTE: Date of Bond must not be prior to date of Contract Agreement. If Contractor is Partnership, all partners should
execute Bond.
IMPORTANT: Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the Owner.
Page 2 of 2