Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 7392 CIVIL ENGINEERING DESIGN DRAFTING & SURVEY SERVICES ON-CALL (2)'Yl - La 33 EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS and AECOM DATED: August 2, 2013 Work Order Number; : /j — 2-5 Y fps — Project Title: Arthur Ditch at Myrtic Street Commencement Date: August 2, 2013 Completion Date: October 31, 2013 Maximum Fee: (time and reimbursable directs costs): not to exceed $22,450.00 Project Description: Replacement Bridge Design Services. Scope of Services: See attached scope of service. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terns of the Services Agreement and this work order (including the attached forms), the Services Agreement shall control. Service Provi(lc� r`'> By: /,✓ Date: Approved By: Purchasing Agent over $60,000 0 The attached forms consisting of five (5) pages are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given. City of Fort Collins Date. August 1, 2013 Scope of Service EC® City of Fort Collins Arthur Ditch CBC Replacement at Myrtle Street Additional Design Services Additional Work Overview Several changes have been requested by the City and new work items will be required that were not part of the original scope and fee for the project. Following is a rough breakdown of the revisions and additional work that has been requested. Task I —Project Coordination/Data Collection 1.1 Project Coordination/Additional Data Collection Additional survey information has been provided on several occasions, requiring additional effort to incorporate the information into the existing surlacc and topo files, and adjust the design accordingly. Additional project management and coordination effort is required due to the increased work and requested revisions. Task 2 —Additional Preliminary Design 2.1 Sherwood Sinkhole Preliminary Design. The northeast corner of the intersection of Myrtic and Sherwood experienced some failure after the project was initiated. This involved additional curb and gutter, new sidewalk ramps, and pavement repair. These additional items were included in the preliminary submittal, and repair be addressed further during final design. 2.2 Additional Submittal with Aerial for Landowner Meetings. To aid in the discussions with the adjacent landowners, new roadway sheets were provided to the City. These new sheets included a reduced amount of technical information, added removal information, and included some design revisions resulting from the comment resolution meeting. The topo file was honed off, and the provided aerial photo was attached to the new sheets and plotting adjustments were required as a result of the aerial imagery. This was done for both the Mountain Avenue as well as the Myrtle Street roadway plans. 2.3A(Iditional Preliminary Quantities and Estimates. AECOM developed preliminary quantity calculations and a cost estimate for the Mountain Avenue as well as the Myrtle Street projects which were not included in the original scope. This effort will be combined with our initial task order efforts and no additional hours will be required. 2.4 South Sidewalk Revision, Curb & Gutter Shift, Resubtnittal. Following the meeting with landowners, AECOM was directed to reduce the roadway width by shifting the south curb and gutter, and revise the sidewalk location from detached to be connected to the revised top of curb. The revised roadway sheets were submitted for use for utility conflict identification and relocation efforts. 2.5 Preliminary Driveway Redesign: for Curb & Gutter Shift. Preliminary redesign of the southern driveways was required due to the curb and gutter shift and the revised location of the sidewalk prior to the submittal for the utility work. Scope of Service, Additional Work Arthur Ditch CBC Replacement At Myrtle Street August 1, 2013 2.6 Relocated Catch Basins and New Storm Drain Manhole Preliminary Design. Preliminary design was required for two new catch basins and a new manhole and approximately 30' of existing storm drain replacement. The new catch basins replace the existing catch basins at the corner of Sherwood and Myrtle due to the Sherwood sinkhole and associated repairs, and the existing catch basin in the relocated southern curb and gutter line near Meldrum. The existing storm drain manhole near the existing box culvert was in conflict with the new wider box, and the City has requested a new manhole be placed on the other side of the new box, and the existing storm drain replaced under the new box. None of this work was anticipated or included in the original scope of work. Task 3 —Additional Final Design AF,COM will be required to perform additional final design services that were not anticipated or included in the original project scope. The following sections describe the anticipated level of additional effort required. 3.1 Roadway Plans. The following additional activities and revisions will be performed: 3.1.1 Removal/Reset Plans Removal and reset plans will be need to be revised and updated due to the shifted curb and gutter, additional work at Sherwood, the revised sidewalk location, and additional items of work. 3.1.2 Roadway Plans and Profiles The roadway profile will need to be adjusted so the bottom of the new attached sidewalk is essentially at grade near the large tree locations, while still allowing off -site water to be caught in the new curb and gutter. The project limits will need to be extended to the east, and the revised profile will have significant impacts on the previously design driveways.. Revisions to the centerline profile will impact the existing grading on both the north and south side of Myrtle. 3.1.3 New Drainage Sheets New drainage detail sheets will be required for the two catch basins impacted by the revised design, and removing the storm drain manhole and placing a new manhole west of the Arthur Ditch with approximately 30' of new storm drain will be shown in the plans. Storm drain and catch basin capacity will not be checked; the nearest size of similar catch basin as the existing will be utilized, and the existing pipe inverts will be matched. 3.1.4Intersection Detail Revisions /Sherwood Sinkhole Detail sheets will be included to address the repair of the Sherwood and Myrtle intersection. This will involve new sidewalk curb ramps, sidewalks, revised curb radii to meet current standards, and removal and replacement of unsuitable material and repaving the disturbed area based on recommendations from CTL. Utility relocation or repair plans are not included. 3.2 Grading Plans 3.2.1 Grading Platys Revisions /Additions Grading plans will need to be revised and supplemented for the curb and gutter relocation and the profile revisions. 3.2.2 Sidewalk Redesign and Vertical Adjustment for Curb & Cutter Shift and Profile Revision Page 2 Scope of Service, Additional Work Arthur Ditch CBC Replacement At Myrtle Street August 1, 20) 3 The preliminary grading plans and details were based on an independent sidewalk. Placing the sidewalk adjacent to the revised curb and gutter will require extensive grading revisions, recalculation of grades for ADA compliance, and significant rework and back -checking of the detailed grading information in the plans. 3.2.3 Redesign at Alley for Curb & Gutter Shift and Proftle Revision The alley approaching Myrtle Street from the south between Sherwood and Meldrum is very flat. The revised curb & gutter location will make the alley grades even flatter and any profile revisions may require significant reconstruction of the alley to promote drainage. This may require additional survey, and significant effort may be required to ensure the existing drainage patterns are maintained and additional ponding avoided. 3.3 Hydrology and Hydraulics for Curb ct Glitter /Drivewav Design. Raising the profile of Myrtle Street has caused several of the proposed driveways to be significantly higher than the existing condition. All the existing driveways currently allow offsite drainage into the existing curb and gutter while preventing flow out of the gutter on to the private property. The required roadway profile has caused several of the new driveways to be higher than the adjacent ground, and pavement drainage may no longer be contained by the driveway allowing the water to outlet on to the private property. AECOM will analyze the depdr of water at each driveway location based on a design storm intensity provided by the City. The driveways will have the appropriate vertical revisions made to maintain the design storm in the gutter. 3.4 New Parking Design & Striping Details. Reducing the roadway with on Myrtle Street will reduce the parking length on the south curb line to be less than the desired criteria for the standard vehicle and for most parking configurations for compact vehicles. If desired, AECOM can provide striping details to promote efficient parking along Myrtle Street. End of Scope Page 3 Proposal for Arthur Ditch CBC Replacements City of Fort Collins - Myrtle Street Date August /. 2013 St .. wa Task Descinfio,, I PAJ CADO I 1 04 J1Yd,odLC1 I Admire . Road.1 i I OWN AfGnaoer i Structure C Iffl) '�eu P,,J . ert Adnd.i3tmriv: Employee CW.,Uk.1i .. E,�,mecr I D,1 11 Enghw", /11 Jldnge, E"ttinee, fl Sub Tot.1 Y,,b C,,vf Votes Ix"i, (7mck I& Je .. : Dave Lindahl ?;UrJ Noji .. I Chipm,", Jfcn ✓,, Narson 75 33 It J S I , S )65 !-S '3 IS 851 $ 60 To (A I - Project ( v,dze.arvm !4 difidaired Dora Oollretior Adda,, V Inc-, 2 6 4 12 5 1,120 1,Ak Additio,ttl Vexign f i 0 S )I- D.--sixt, I 2 I 2 4 S ��20 ,ma; 2 4 12 ig S I 4 4 6 Clab sh,/1 I I 8 2 I r 10 S 2 2 S .1n T,i,k 3 -90% De.utgrr Pions iddiii.nal Wn,A 31 R',ad" Rem. .o r, i?L,,,! 31! 2 5 0 1 14 $ I -, p Piun ?�, Profil', Roarom iddij,�, 2 20 16 38 S 7,A 3 ! i $11MY I 4 r 32 24 60 S 2 31,4 6 i 6 12 D 3 7 i G,,aw� 1 9r ....... uAd,,?,ror,, 2 I 6 I 12 20 .1 2.2 2 12 20 S %F 373 f,,, Curb &- G.ve, 1 41, i 2 6 1 2 10 $ 33 Ndroloz K, Hyblndic, !,,, i ?Cftr Drtvv, c) 2 4 1 0 j 12 S i 3cu. 4 -Vviv ParkmA: Dc,,pm & Striping Vtad I j I 0 $ Pro posnl for Arthur Ditch CSC Replacements City of Fort Collins - Myrde Street Date August 1, 2013 Ile,..... .1mr , urr. I ' .,. ._.. �....... I r•A nn I 11"; I Ifee.n..r I .lYn.rmn• i iU:11 ..... .IJminislrutiurt 1 I asK uarnpunn ' I I'r,jeet C.I 1)1) I I'rnjccr I rlJHuni.ttrulrre Earplayee Cluss canon lla+u;;a rup'nrrrl !)mJ)er 11 Enghwer/if Uen,;err lingire,r1 Engineer 11 :lntismN .Sub T;,I.l SO CuaT Ln:'ii C'Iruck j lenn Frr;uv+r. Clniv f.irl+nA ;11a\c l.il:dnhl Kennedy Gary I-�'r.+n lrofinn; Chipman .tlognu Pcurrm: j5 1, 15 75 15 8.5 15 121,1 5 165 15 75 I 5 ,fs I S 69 .Suntrrrttrl' � I 7a1k1 %'rajCG G4'OruUla....j ri✓;ajo,ml llala Collarg4g 2 6 4 0 0 0 ! U D 12 5 1,12D ?i+Sk]• dddammui Prelmrnr::rl Ih;vgn 2 16 22 2 0 0 0 44 S 3,790 la,k3-20Y, pcncn Plum Iddaa..ol zvuk 16 60 80 30 0 ( 0 i 0 0 186 5 17.540 mr, i 21) 84 706 32 U I 0 I U 2 22.450 I I ( s 22.450 ..w d:",I l.abar j 5 S 22.4a6 Tntat Costs ! (vile, Dir.C14 "0, � 5 - 12aprxlurnon. yrn;rng ' P(1\:ag✓ LFOfi'S1':::ra�l ' I i Milcage I � 1Os:Ycxl snn•ryeo:i 11 ! I