HomeMy WebLinkAboutCHANGE ORDER - BID - 7534 AIR BARRIER WORK AT EXISTING SENIOR CENTER/ ii Cio F6RIC'othns �0 p e t Services Change Order Form PROJECT TITLE: Senior Center Air Barrier Work PROJECT NUMBER: 7534 CONTRACTOR: Powers Thermal Corp. CHANGE ORDER NUMBER: 7534-0 1 Xi / --,) $ OPERATION SERVICES Project Management, Planning & Design 300 LaPorte Avenue P.O. Box 580 Fort Collins. CO 80522-0580 970.221.6610 970.221.6534 - fax In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change 2. Description of change 3. Change in contract cost 4. Change in contract time. 1 &2 Install Spray Thermal Barrier in lieu of batt insulation (See attached sheet for detail) Increase from 1.5" R10 to 2" R14 above grid ceilings and 3" R19 at pool and gym locations. 3 The contract cost will be increased by $3,980.00 4 There will be no change in contract time. ORIGINAL CONTRACT COST $44,855.00 TOTAL APPROVED CHANGE ORDERS $0.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $3,980.00 TOTAL % OF THIS CHANGE ORDER 8.87% TOTAL C.O. % OF ORIGINAL CONTRACT 8.87% ADJUSTED CONTRACT COST $48,835.00 (Assuming all change orders approved) ACCEPTED BY: REVIEWED BY: DATE: 7 / (Contr 's Re ntative) DATE: (CitvV Ft. Collins) APPROVED BY: DATE: (Purchasing Agent over $60,000) cc: Contractor Purchasing Project File s � � 2645 Durango Drive Colorado Springs, C080910 Phone:719596-1655 Fax:719-596-2305 THERMAL INSULATION Pueblo Phone: 719543-0985 "Quality Oriented ... Service Minded" Email: inro@powersinsulation.com Proposal for Insulation ( Job Description 7534 Raintree Dr. Ft. Collins Senior Center Date ! 7/30/2013 1 Proposal # { 48006 We hereby submit specification and estimates for: Bayer SPFcc 2" Nominal depth R14 Above Grid Locations.. (!l1CAH]B r.6M& hn.66'" .1 some 9ulmen Bayer SPF cc 3" Nominal depth R-19 Above Block Wall Locations Gym and Pool. Base Bid: $44,855.00 Option #1 Change Order for Thermal Barrier Add: $3,980.00 ED Exclusions: Moving light fixtures. Contractor will work carefully with ceiling tiles to remove. City of Fort Collins will re install ceiling tiles. Contactor is not responsible for final air barrier test results. Includes: Materials and labor. Necessary spray backer boards. Estimator Jeff White ACCEPTANCE OF PROPOSAL: The prices, specifications, and conditions set forth above and on the back of this proposal are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined in this proposal. DATE ACCEPTED: SIGNATURE: We are fully covered by Workers Compensation and Liability Insurance. Owner to carry fire, tornado and other insurance. Any alteration or deviation from the above specification involving extra costs will be executed only upon written orders, and will become an extra charge over and above the estimate contained in this proposal. This proposal may be withdrawn from us if not accepted within thirty days of the above date. Account Is payable in full upon receipt of our invoice. It is agreed that if this account is not paid when due, Interest shall accrue at the rate 1 % per month, annual rate of 12%. In the event a law suit is required for cotlection. the customer agrees to pay all reasonable costs of collection including reasonable attorneys fees and court costs.