Loading...
HomeMy WebLinkAboutCHANGE ORDER - RFP - 7429 BRYAN AVENUE BRIDGE REPLACEMENT DESIGN SERVICEEYIIIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS and IMG Engineering LLC DATED: July 30, 2013 r er Numbel': PO 9126577 Project Title: Bryan Avenue Bridge Replacement Commencement Date: July 26, 2013 Completion Date: October 31, 2013 A'Iaximum Fee: (time and reimbursable directs costs): not to eNceed 533,140.00 Project.Description: Replacement Bridge Design Services. Scope of Services: See attached scope of service. Service Provider agrees to perform the services identified above and on the attached forms in accordance Fvith the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conflict benveen or ambiguity in the terms of the Services Agreement and this work order (including the attached forms), the Services Agreement shall control. Sex -vice Provider Date: 71-3 Approved By: Purchasing Agent over $60,000 The attached forms consisting of ttivo (2) pages are hereby accepted and incorporated herein by this reference, and Notice to Proceed is.hereby given. City of Fort Collins Date: -7((zA- in� g KDG En ineerin LLC 3500 S. Wadsworth Blvd. Suite 400, Lakewood, CO 80235 Ph.: 720.420.9069 Fax:303.957.5477 K12007 July 26, 2013 Mr. Jin Wang City of Fort Collins Engineering 281 North College Avenue Fort Collins, CO 80521 Subject: Proposal for Additional Services Fees — Change -Order 1 Bryan Avenue Bridge Replacement Dear Jin: As discussed over the last year, there have been two clear additions to our scope of work that have required additional work hours. The additions are the lighting and electrical work for the urban design elements of the bridge and evaluating and layout of a public access way during construction. The attached Exhibit A has the fee proposal. Please review my fee proposal and scope of services to verify that they are. acceptable to you. If you have questions or need additional information, please contact me at 720-420-9069 or a, -mail me at skobayashi64@msn.com. Sincerely, Stan Kobayashi, PE Project Manager Attached: Exhibit A, Engineer's Estimate of Fees ® KDG Engineering LLC 5.Wad.rth8 d.Sulea00 Lekeeoad.0040235 Ph:72 20-9069 sk.bxyash1akdpugwu,,dr ;... EXHIBIT A - FEE SCHEDULE - CHANGE ORDER 1 ENGINEER'S ESTIMATE OF FEES FOR DESIGN CHANGE ORDER 1 LIGHTS & PUBLIC ACCESS BRYAN AVENUE BRIDGE W2612013 LABOR HOURS' KDG Engineed]CADTcch Clanton B Assoc. Roth. Engr. BridgeSr. Prq. Civil Scope Item Sr. Bridge 2 Engr. 11Engineer CADTcch PMCivil Engr Tot. Hrs. LaborBilling Subs Expenses Total Rates: $120.00 $100.00$100.00 $65.00 $110.00 $100.001 `ADDITIONAL-SERVICES;,e..- n_313;0i:; d2.0.-:r N,1 Or.-t ___ 10.0 -,i F;_5;03�y ,__'-.0.0%, $ ; ,'..143:0;� -$13;140.0 - 7 1$0:00 ��$13;140;00 1.1 Lighting plan, lumma've schedule, lighting specifications, mounting 3.0 2.053.5 7.0 65.5 S6,365.oc $6,365.00 details, electrical englneeringand coodination 1.2 Incorporate lighting and electrical plans, specifications, and quantities 4.0 too 6.0 20.0 $1,730.00 $1.730.00 and costs into project. 1.3 Pedestrian Handrail Design and Plans for Plan Area, coordination 4.0 10.0 20.0 4.0 3.0 41.0 S3,375.00 $3,375.00 with Urban Designer. - 1.4 Construction Services: Lighlrxi equipment shops, respond to RFI's, 1.0 7.5 8.5 $870.00 $870.00 one site visit for punch list. 1.5 Public Access: evaluation, co0rdination. layout, quantities, 1.0 2.0 5.0 8.0 $800. $800.00 plans, site visit, Toral Addendum Not to Exceed 13.0 12.0 32.0 71.0 10.0 5.0 143.0 $13,140.0 $13,140.00 Hours and Fees Fees $1.560.00 $1 200.00 $2 080.00 $7 100.00 3650.00 5550.70 S0.0011 Total Fees Per Firm 54,840.00 $7,750.00 $550.00 Footnotes- 1- Clanton's hours includes $250 for expenses 2. Ttes u; Square K Consulting. I wanted to show the hour breakdown but didn't have another column avaaablo for another subconsultant.