Loading...
HomeMy WebLinkAboutCHANGE ORDER - RFP - 7260 PROSPECT ROAD BRIDGE & MULBERRY STREET BRIDGE REPLACEMENT DESIGN SERVICES (2)EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS and 1CDG Engineering LLC DATED: July 30, 2013 A- irO -der Number: PO 9116411 Project Title: Prospect Road Bridge Replacement Commencement Date: July 26, 2013 Completion Date: October 31, 2013 Maximum Fee: (time and reimbursable directs costs): not to exceed $8,650.00 Project Description: Replacement Bridge Design Services. Scope of Services: See attached scope of service. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between the parties.. In the event of a conflict between or :unbiguity in the terms of the Services Agreement and this work order (including the attached forms), the Services Agreement shall control. k-- The attached forms consisting of two (2) pages are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given. Service Provider ( Cit B`,: �G1CL e � ci By Date: 71361zz1 Approved By: Purchasine AL�cnt ox er S601 000 Date: ,.7( , I 2,0L) M KDG Engineering LLC 3500 S. Wadsworth Blvd, Suite 400, Lakewood, CO 80235 Ph.: 720.420.9069 Fax:303.957.5477 K11009 July 26, 2013 Mr. Jin Wang City of Fort Collins Engineering 281 North College Avenue Fort Collins, CO 80521 Subject: Proposal for Additional Services Fees — Change Order 1 Prospect Road Bridge Replacement Dear Jin: As discussed over the last year, there have been three additions to our scope of work that have required additional work hours. The additions are the replacement. of the existing colored concrete strip for all of the northern sidewalk and part of the southern sidewalk, tho replacement of the landscape timber retaining wall adjacent to the south sidewalk with an urban designed reinforced concrete "L shape wall, and the addition of an 18" high "curb wall" adjacent to the parking lot'and sidewalk at the end of the timber retaining wall. The attached Exhibit A has the fee proposal. Please review my fee proposal and scope of services to verify that they are acceptable to you. If you have questions or need additional information, please contact me at 720-420-9069 or 6-mail me at skobayashi64@msn.com. Sincerely, Stan Kobayashi, PE Project Manager Attached: Exhibit A, Engineer's Estimate of Fees ® KDG Engineering LLC 3500 S. Wadsworth Blvd Suite 400 Lakewood, CO 80235 Ph.: 720-42P9069 skcbayashl®kdgengineering.mm EXHIBIT A - FEE SCHEDULE - CHANGE ORDER 1 ENGINEER'S ESTIMATE OF FEES FOR DESIGN CHANGE ORDER 1 -SIDEWALK, URBAN DESIGN WALL & CURB WALL PROSPECT ROAD BRIDGE 712612013 LABOR HOURS KDG Engineering BHA Design Sr. Bridge Bridge CAD Tech Princ. Designer Scope Item Subs Expenses Total En r 11 Designer Tot. Hrs. Labor Billing Rates: $120.00 $100.00 $65.00 $135.00 $75.00 1 .'ADDITIONAL'SERVICESi- ,6:0, 7l N:802„:.!„i._420L'!x„290jx'-2%a85__�i:•"915i�': ..-+58�650:00 i` �:-_50:00-''SBi650i00 1.1 Replace existing exposed aggregate colored concrete strip for the entire north 2.0 2.0 16.0 5.0 1.0 26.0 $2,230.0 $2,230.00 sidewalk and a portion of the south sidewalk with an urban designed, ADA compliant strip. 1.2 Replace existing landscape timber wall adjacent to the south sidewalk west of the bridge with an urban designed reinforced 2.0 4.0 16.0 15.0 3.0 40.0 $3,930.00 $3,930.00 concrete "L" shape wall compatible with the urban design of the bridge pedestrian wall. 1.3 Add vertical 18" concrete curb wall adjacent to the south sidewalk along the 2 0 2.0 10.0 14.0 $1,090.00 $1,090.00 nearby apartment building's parking lot for traffic control. 1.4 Adjustment for Urban Designer re- coordination and scheduling efforts due to 9.0 2.5 11.5 $1,400.00 $1,400.00 delay of Mulberry Street Bridge. Total Addendum Not to Exceed Hours and Fees 6.0 8.0 42.0 29.0 6.5 91.5 $8,650.00 $8,650.00 Fees $720.00 $800.00 $2730.00 $3915.00 $485.00 Total Fees Per Firml $4,250.00 $4,400.00