Loading...
HomeMy WebLinkAboutCORRESPONDENCE - BID - 7426 TRANSFORT MAINTENANCE FACILITY EXPANSION (5)System for Award Management Page 1 of 1 R. C. HEATH CONSTRUCTION CO. DUNS: 086341062 CAGE Code: 4LGA6 Status: Active Entity Information Entity Overview Name: R. C. HEATH CONSTRUCTION CO. Doing Business As: HEATH CONSTRUCTION CO Business Type: Business or Organization POC Name: None Specified Registration Status: Active Expiration Date:03/28/2014 Exclusions Active Exclusion Records? No SAM I System for Award Management 1.0 Note to all Users: This is a Federal Government computer system. Use of this system constitutes consent to monitoring at all times. 141 RACQUETTE DR FORT COLLINS, CO, 80524-3244, UNITED STATES IBM v1.1108.20130719-0907 WWW2 https://www. sam.gov/portal/public/SAM/?portal: componentld=fb67166e-75 d6-44cc-b77f-... 7/25/2013 DATA 'r�'ra�'�' SERVIEES,Nr DATA b VOICf CABLING •PHONE SYSTEMS J 1310 Webster Ave. FL Collins, Co.80524 Tel: 970.482-6064 Fax: 970-484-3262 PROPOSALTO: HEATH CONSTRUCTORS JOB NAME: TRANSFORT FACILrrY EXPANSION PROPOSAL M 13020t8 REVISION 7-23-13 07/23/13 PROVIDE MATERIALS AND LABOR TO INSTALL, TEST AND DOCUMENT ACERTIFIED CATEGORY 6 STRUCTURED CABLING SYSTEM PER OESCRIPTION BELOW: `THIS QUOTE IS BASED ON PREVAILING WAGES. 'EXCLUDES CROSS -CONNECTS TO SERVICES AND CUSTOMER EQUIPMENT. 'EXCLUDES ALL CONDUIT RACEWAYS, AND J- BOXES IN WALLS THROUGHWALLS AND OR ABOVE CEILINGS AND SLEEVES BETWEEN FLOORS. 'EXCLUDES UNDERGROUND CONDUITS AND VAULTS. 1 LOT WA NIA J-HOOKS, TAPE, JETLINE, CABLE TES, CONSUMABLES 50" WA NIA #0 THHN GREEN WIRE, GROUNDING 5EA ILSCO CLND-6-14-58 GROUNDING -SURE CRIMP 3 EA CPI 10822-012 GROUNDING KITS $529.41 534.00 $21.25 $332.20 1 EA RINO-TAPE IW3 LABELINGTAPE $14.86 1 EA NIA WA SCISSOR LIFT RENTAL $1.500.00 1 LOT N/A WA TESTING- EXCLUDES PRINTED TEST REPORTS - SO.00 1 LOT NIA WA AS-GUILTS-AUTOCAD $0.00 Proposal Accepted By: Printed Name: Date: 4H&H proposal number shall be an all Job related documents. Note: This quote Is valid for 30 days. 100% of materials will be billed upon contract signing. MATERIAL S42,720,93 LABOR 528,728.00 TAX(0%) $0.00 TOTAL $71,446.93 Title: Transfort Maintenance Facility Expansion change ordler ,6S Date: 7-25-13 CONTRACT CHECKLIST FOR NON-COMPETITIVE PROPOSALS (SOLE SOURCE) Checklist Item Contract File Comments Location 7) Independent Cost Estimate The City made and documented an YES independent cost estimate before receipt of proposals. 10) Unnecessary Experience and Excessive Bonding Unnecessary experience and excessive NO bonding requirements were not included in this solicitation or contract documents. 11) Organizational Conflict of Interest (OCI) If there is an apparent or potential OCI the solicitation contains provisions to eliminate or mitigate the conflict (e.g. by inserting a clause NO that prohibits the contractor from competing for the follow-on contract to the current design or research contact) and OCI Certification is submitted by the contractor. 12) Arbitrary Action There was no arbitrary action in the procurement process. (An example of arbitrary action is when award is made to NO other than the contractor who most satisfied all the City requirements as specified in the solicitation and as evaluated by staff. 13) Brand Name Restrictions Brand Name or Equal. When it is impractical or uneconomical to provide a clear and accurate description of the technical requirements of the property to be acquired, a "brand name or equal" description may be used to define the performance or other salient characteristics of a specific type of property. The City must identify the salient characteristics of the named brand that NO offerors must provide. When using a "brand name" specification, the City does not need to reverse -engineer a complicated part to identify precise measurements or specifications in order to describe its salient characteristics. FT A's "Best Practices Procurement Manual," (BPPM) contains additional information on preparation of specifications including examples with specific language. 14) Geographic Preferences The solicitation contains no in -State or local NO geographic preference except where Federal statutes mandate or'encoura a them. 15) Contract Term Limitation The contract period of performance for rolling stock and replacement parts does not exceed five (5) years inclusive of options without prior NA written FTA approval. For all other types of contracts, the procurement file contains evidence that the contract term is based on sound business judgment. 18) Award to Responsible Contractor The City made a determination that it was awarding to a responsible contractor considering such matters as contractor integrity, compliance with public policy, record of past performance, and financial and 1. Y technical resources. 2. Y 1. Appropriate Financial, equipment, facility 3. Y and personnel. (Y/N) 4. Y 2. Ability to meet delivery schedule. (Y/N) 5. Y 3. Satisfactory period of performance. (Y/N) 4. Satisfactory record of integrity, not on declined or suspended listings. (Y/N) 5. Receipt of all necessary data from vendor. (Y/N) 19) Sound and Complete Agreement This contract is a sound and complete agreement. In addition, it includes remedies YES CHANGE ORDER for breach of contract and provisions covering termination for cause and convenience. 24) Clear, Accurate, and Complete Specification A complete, adequate, and realistic specification or purchased description was YES available and included any specifications and pertinent attachments which define the items or services sought in order for the bidder to properly respond. 38) Sole Source if other Award is Infeasible The contract file contains documentation that award of a contract was infeasible under small purchase procedures, sealed bids, or competitive proposals and at least one of the following circumstances applies: (1) The item was available only from a single source. (Verify prices are no higher than price CHANGE ORDER for such item by likely customers.) (2) Public exigency for the requirement did CONTRACTOR IS Heath not permit a delay resulting from a Construction competitive solicitation. (3) An emergency for the requirement did not permit a delay resulting from a competitive solicitation. (4) The FT A authorized noncompetitive negotiations. (5) Competition was determined inadequate after solicitation of a number of sources. 39) Cost Analysis Required Cost analysis and profit negations were performed (initial award and modifications) And documented for price reasonableness YES was established on the basis of a catalog or market price of a commercial product sold in substantial quantities to the general public or on the basis of prices set by law or regulation. 40) Evaluation of Options The option quantities or periods contained in the contractor's bid or offer were evaluated in order to determine contract award. (To be NA eligible for Federal funding, options must be evaluated as part of the price evaluation of offers, or must be treated as sole source awards. 42) Written Record of Procurement History The file contains records detailing the history of this procurement. At a minimum, these YES ORIGINALLY SELECTED records include: BY BID PROCESS (1) the rationale for the method of CONTRACTOR HAS BEEN procurement, (2) Selection of contract type, RESPONSIVE (3) reasons for contractor selection or rejection, and 4 the basis for the contract price. 43) Exercise of Options The grantee exercised an option on this contract adhering to the terms and conditions of the option stated in the contract and determined that the option price was better NO than prices available in the market or that the option was a more advantageous offer at the time the option was exercised. If an option was not exercised under this contract, check NA. 44) Out of Scope Changes The grantee amended this contract outside the scope of the original contract. The YES, THE WORK IS OUTSIDE amendment was treated as a sole source THE ORIGINAL AGREEMENT procurement (complying with the FTA requirements for a justification, cost analysis and profit negotiation). 45) Advance Payment Provisions The contractor did not receive an advance payment utilizing FTA funds and the contract NO does not contain advance payment provisions or, if it did, prior written concurrence was obtained from FTA. 46) Progress Payment Provisions The contract contains progress payments based on costs incurred (as opposed to percent of completion) and the contract contains a provision giving the grantee title to YES property (materials, work in progress, and finished goods) for which progress payments are made. The contract may contain other security in lieu of obtaining title. 47) Time and Materials Contracts This is a time and materials contract; the grantee determined that no other type of NO contract is suitable; and the contract specifies a ceiling rice. 48) Cost Plus Percentage of Cost This is not a cost plus a percentage of cost NO type contract. 49) Liquidated Damages Provisions This contract contains liquidated damages provisions and the assessment for damages NO is specified in the contract at a specific rate per day for each day of overrun in contract time. 50) Piggybacking 1) The file contains: Assignability provisions. NO 2) The procurement file contains: Price reasonableness determination. 56) Clauses This contract contains the appropriate FTA YES required clauses. Excluded Parties Search SAM YES EPS run and include in the file. Change Order No. 5 PROJECT TITLE: TranW Malniemce Facility Expansion CONTRACTOR: Heath Construction BID NUMBER: 7426 DESCRIPTION: 1. Reason for change: Incorporation of Pricing Change Request (PCR) #10Into the Contract. 2. Description of change: PCR#10 -Provide Structured Cabling for the Transforl Maintenance FaciltyAddiBon. 3. Change In contract costs: $75,735.87 4. Change In contract time: 0 Days ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST $2,158,000.00 $59.418.24 $6,72125 $75 735.87 3.51% 6.58% REVIEWED BY: - - :t GATE: Facifflift Project Manager ACCEPTED REVIEWED APPROVED BY: cc: Contractor Purchasing Project File s2,297,a78.38 7• L& r 13 1-�U-13 TE: I cltyof FortCollins Independent Cost Estimate Date of Estimate: 15-May-13 Contract Type: Fixed Price Exisfing Contract or PO (Y/N): Yes Description Services (B): Provide all labor, materials and equipment to install structured cabling for the Transfort Maintenance Facility Addition. I have obtained the following estimate from: Engineering or Techincal Estimate (performed by) - Ron Kechter/Kryste Korf-Bartsch B Transfort Maintenance Facility Expansion Change Order #5 - PCR #10 Description Quantity I Unit Price Total Fiber Infrastructure Costs - Materials 1000 ft $2,094.12 Fiber Infrastructure Costs - Labor $4.515,00 Fiber Termination Costs 72 $38.00 $2,736.00 ADC Fiber Patch Panel - FL2-CB80024AN-2C50 - 24 3 $535.36 $1.606.08 CSC CEX-I2F-LCULCU-SM-7M 3 $191.06 $573.18 ADC 6PAK Plug -In Multimode Adapter - FL26MMST 3 60.3 $180.90 Fibertron LC/LC Sin lemode 91125 micron, I Fiber 12 $17.86 $214.32 Fibertron LC/LC Sin lemode 91125 micron. 2M Fiber 8 18.47 $147.76 Copper Infrastructure Costs Siemons Cable CAT6, Plenum 700 $0.43 $301.00 Slemons Cable CAT6, OSP, 4Pair 2.500 $0.62 $1550.00 Labor $1.568.00 Siemon Copper Patch Panel. CAT6, 48- ort 3 $313.06 $939.18 Siemon Horizontal Wire Manager. 1U 6 $63.29 $379.74 Siemon CAT6, 3' Patch Cord with Boot 30 $8.00 $240.00 Siemon CAT6. 5' Patch Cord with Boot 20 $8.30 $166.00 CPI Cabinet WallMount Cube4T 24"H x 30"D 12U 2 $517.55 $1.035.10 CPI Cabinet WallMount Cube -IT 24" H x 30" D 18U 1 $575:60 $575.60 CPI Power Strip, Horiz, 15 AMP, Rack Mount 3 $88.24 $264.72 CPI Cube IT Fan Kit 3 $211.65 $634.95 MSI Tec. Inc - Data Cabinet 1 $5.894.68 $5.894.6& Cisco VolP 7942 set 2 $203.50 $407.00 APC SMART -UPS RT 3000VA 1 $2,162.40 $2,162.40 APC SMART -UPS RT 2200 VA 3 $1.338.50 $4.015.50 American Power Network Management Card 4 $253.00 $1,012.00 Cisco Catalyst 2960S 24 Gi E poE 370W, 4 x SFP LAN 2 $3.995.00 $7.990.00 Cisco Smartnet 8x5xNBD Catalyst 2960S Stack 2 $325.00 $650.00 Cisco GE SFP, LC connector LX/LH transceiver 9 $995.00 $8.955.00 Cisco 802.1la/g/n Fixed Unified AP 1142N; Int Ant: A Reg Domain 1 $995.00 $995.00 SMARTNET 8X5XNBD 802.1la/ n Fixed Untried AP: Int Ant 1 $80.00 $80.00 Structural Cabling Vendor Labor Costs $15,060.00 Subtotal $66.883.23 Confingency @20% $13,376.65 (\/�'�j�� '��Q/y� Ioral l$BO,Z59.88I Signature of Preparer. �\ ap/ A ,a MAX Field Construction Office 3000 South College Ave., Suite 201 Fort Collins, CO 80526 fcgov.com/maxconstruction Delivery by hand July 26, 2013 Ms. Erika Keeton, PE MAX Project Manager City of Fort Collins — Engineering Dept 281 N. College Ave. Fort Collins, CO 80624 RE: MAX Bus Rapid Transit Project — Transfort Maintenance Facility Expansion 7426 Independent Cost Analysis — Change Order No. 5 Heath Construction Pricing Change Request #10 Heath Construction was requested to provide Proposed Change Request #10 in order to provide structured cabling that provides data connectivity for the addition, chassis wash, new entry gate, CNG fueling facility and camera coverage for the complex. The structured cabling package was designed by the City's Information Technology (IT) group and it was placed in a form were it could be delivered to the contractor on May 17, 2013. Subsequent to that a number of iterations of the proposal were provided by the contractor, then reviewed by IT and returned to the contractor with comments concerning the scope of work that needed to be included. The contractor was finally able to provide a proposal that was acceptable to IT this week and Pricing Change Request (PCR) #10 was provided to me at the OAC Meeting yesterday. This PCR now provides all of the components necessary for a complete structured cabling system for the Transfort Maintenance Facility Expansion. The labor, materials and equipment costs proposed by Heath Construction were evaluated against an Independent Cost Estimate prepared by IT and are consistent with pricing for similar work. As such, I find the cost of this Proposed Change Request #10 from Heath Construction converted into Change Order No. 5 in the amount of $75,735.87 to be reasonable for the required increase in scope. As such, I recommend acceptance of this additional cost to the contract. Ron Kechter Project Engineer City of Fort Collins Operational Services - Facilities Cc: job file Change Management Checklist .. Date Reviewed Reviewed for compliance with 7/26113 NIA RK Environmental Assessment Reviewed for construction/safety impacts 7126113 This work will follow all standard RK construction and safety practices Costs were determined to be in Independent cost estimate prepared 7126113 keeping with recent costs on RK similar work Reviewed for PCGA grant compliance 7/26113 Part of Build Alternative Scope RK included in SCC 20.04 Installation of the structured Reviewed for real estate impacts/needs 7/26/13 cabling is inside of the City owned RK facility and not in the right-of-way Reviewed for compliance with design criteria/ADA hilo://www.access-board.aov/ada-abalada- 7/26/13 NIA RK standards-dot.cfm _i Death construction Job: Project No. 1250531 Title: sVuchnedCabling Project: Transfod To: Attn: Ron Kechter Pricing Change Request No. 10 Back UP hdomutlnn City of Fort Collins - Facilities Management Originating Document: owrwr Rrgvar 201 N. CollegeAve. Originating Document Date:, 7/23/2013 Fort Collins, CO 80524 PCO Date: 7/23/2013 DESCRIPTION OF PROPOSAL - provlde Struetred cabana as Identified on sulmntreclonr gouts, nr.•. .,.... Item DescriptionIt Unit Snit Labor Material E ul subcontractor Other Total I H 6 H Data Service 1.00 LS 0.00 0.00 0,00 71 448.93 0.00 $ 71 448.93 2 1.00 Ea 0.00 0.06 0.00 MOO 0.00 $ - 3 1.00, LF - 0.00 0.00 0.00 0.00 - 0.00 $ . 4 1.00 EA 0.00 0.00 0.00 0.00 ` - 0.00 $ -. 5 1.00 Ea 0.00 0.00 0.00 0.00 0.00 $ a 7 0.00 0.00 0.00 O.DO - - 0.00 $ 8 0.00 0.00 0.00 0.00 - 0.00 $ - 9 0.00 0.00 0.00 0.00 0.00 $ 10 0.00 0.00 0.00 0.00 - 0.00 $ 11 0.00 0.00 0,00 - 0.00 - 0.00 $ 12 _ _ 0.00 0.00 - 0.00 0.D0 0.00 $ - 13 - 0.00 0.00 0.00 0.00 - -.. 0.00 $-. -- 14 0.00 0.00 - 0.00 0.00 0.00 $ is Additional General Cond 0.00 Da 0.00 0.00 0.00 0.00 0.00 $ 16 GC Carpenter LaborRorAddition 0.00 hr 68.00 0.00 0.00 0.00 0,00 0.00 $ 17 GC lor 0.00 hr 68.00 0.00 0.00 0.00 0.00 0.00 $ 18 GC en 0.00 hr 0.00 0.00 0.00 - - 0.00 0.DO 0.00 $ 19 0.00 0.00 0.00 - 0.00 $ 21 Sub 0.00 0.00 0.00 71 448.93 0.00 $ 71 40.93 23 Sal M NA % 0,00% 0.00 $ 24 Bon 0 71 448.93 %. 1,00% $ 714.49 25 Uab O 71448.93 % 0.83% $ 26 Buil 1 O 1 71 448.93 % 1 $ 29 Subtotal 0.00 S 714.49 30 Labor Burden O 0.00% 0.00 32 Subtotal 0.00 S 34 Overhead 0 71448.93 3.00% 2,143,47 $ 2143.47 Profit O 1 71 448.93 2.00% _ 1,420.98 S 1,428.98 35 36 Subtotal 0.00 0.00 0.00 0.00 0.00 $ 3,57245 Nee: 0 Addalerml dnye o1 time are requested as a remA of this chanpa. Total COSt $ 75,735.07 Issued By: Reviewed By: Approved By: Paul L Ehrlich Jr., Project Manager Ron Koehler Project Architect Heath Construction City of Fort Collins Alter Ungle Massey Data 1 a DATA SERVItESIN� DAU b VCHCE CABLING •PHONE SYSTEMS J PROPOSAL TO: HEATH CONSTRUCTORS JOB NAME TRANSFORT FACILITY EXPANSION 131 O Wsbate. Ave. FL Collins, Co.80524 Tel: B70482.6064 Fax: 970.484-3252 PROPOSALS. 1302018 REVISION 1-23.13 07/23/13 PROVIDE MATERIALS AND LABOR TO INSTALL, TEST AND DOCUMENT ACERTIFIED CATEGORY 6 STRUCTURED CABLING SYSTEM PER DESCRIPTION BELOW: 'THIS QUOTE IS BASED ON PREVAILING WAGES. 'EXCLUDES CROSS -CONNECTS TO SERVICES AND CUSTOMER EQUIPMENT. *EXCLUDES ALL CONDUIT RACEWAYS, AND J- BOXES IN WALLS THROUGHWALLS AND OR ABOVE CEILINGS AND SLEEVES BETWEEN FLOORS. 'EXCLUDES UNDERGROUND CONDUITS AND VAULTS. HORIZONTAL COPPER AND FIBER DROPS: -INSTALL (16) FIFTEEN SINGLE CATS CABLES TO PTZ CAMERA LOCATIONS. . 'EACH CATS CABLE WILL BE ROUTED FROM THE PTZ CAMERA LOCATION TO THE NEAREST IDF. 'CAMERAS WILL BE TERMINATED WITH RJ-45'S OR ON BISCUITS GET WITH CAMERA CONTRACTOR TO DECIDE. -INSTALL (2) TWO SINGLE CATS CABLES FOR TELECO DROPS IN THE NEW GARAGE EXPANSION. 'INSTALL (2) TWO SINGLE CATS CABLES FOR DATA DROPS IN THE NEW GARAGE EXPANSION IN CEILING FOR WAPS. -INSTALL (2) TWO SINGLE CATS CABLES FOR EXTERNAL RINGERS IN THE NEW GARAGE EXPANSION. 'INSTALL (1) NEW 12ST SM FIBER TO THE COTTAGE.TREASURY BLDG. MAINTENANCE SHOP IDPS. 'INSTALL (2) TWO SINGLE CATS CABLES TO THE NEW GATE LOCATIONS. 'INSTALL (1) ONE DUAL DROP TO SOUTH SIDE OFMAINT SHOP ONE FOR PHONE AND ONE FOR FUTURE WORK STATION. 'TRACER WIRE WILL BE INSTALLED IN ALL UNDERGROUD CONDUIT RUNSI MDF: .W THE MDF THERE WILL BE (3) THREE 12 STRAND SINGLE MODE FIBERS TERMINATED INTO AN ADC FIBER CONNECTOR HOUSING. 'ONLY THE BLUE BUFFER TUBE WILL BE SPLICED AT THIS T94E FROM EACH OF THE (3) THREE IDFS. 'SPLICING WILL BE AS DESIGNED BY CFC SPLICING DIAGRAM. -(EXCLUDED) INSTALL NEW ST MM BULKHEADS FOR EXISTING MM FIBER TO REMAIN OPERATIONAL AT THIS TIME. 'INSTALL ONE APC SMART UPS RT30WVA RM IN BOTTOM OF TELECOM CABINET. 'INSTALL ONE APC NETWORK MANA GEMENT CARD INTO UPS. 'EXCLUDES THE REMOVAL OF THE EXISTING MULTI MODE FIBER AND CONNECTOR HOUSING AT THIS TIME, THE EXISTING MM FIBER AND CONNECTOR HOUSING WILL BE REMOVED WHEN THE 13RT SOUTH SIDE FIBER (FORTNER SUBSTATION TO TRANSFORT MAINTENANCE FACILITY) S INSTALLED. 'EXCLUDES NEMA LS 30R THIS NEEDS TO BE INSTALLED BY ELECTRICAL. CONTRACTOR. -IN THE MAINTENANCE SHOP THERE IS AN EXISTING 24X24X24 CUBE -TT CABINET, THIS CABINET WILL BE REMOVED AND REPLACED WITH A NEW 36X24X30 CUBIT. -INSTALLED ONE NEW ADC 24 POSITION FIBER PANEL AT TOP OF CUBIT WITH 1U WIRE MANAGER WM143-5 BELOW. 'SPLICE THE BLUE BUFFER TUBE COMING FROM THE MDF. 'RE -INSTALL THE EXISTING MULTIMODE FIBER INTO THE NEW ADC PANEL. 'RE -INSTALL THE EXISTING CABLES IN THE NEW CUBE -TT CABINET. 'THE EXISTING DATA CABLES ARE NOW TERMINATED ON A CT PATCH PANEL. 'THE EXISTING VOICE CABLES ARE NOW TERMINATED ON A 19' 110 STYLE PATCH PANEL. 'THE EXISTING 25 PAIR CATS CABLE IS ALSO TERMINATED ON THE 1 t0 STYLE 19'PATCH PANEL. -(EXCLUDES) IN THE NEW CUBE -FT CABINET INSTALL (1) NEW 24 PORT CAT5E PATCH PANEL AND RE -TERMINATE THE 25 PAIR CATS CABLE ONE PAIR PER PORT. 'INSTALL (1) ONE NEW CATO 48 PORT PATCH PANEL INTO THE NEW CUBE-fT CABINET.. 'TERMINATE THE EXISTING CAT5E CABLES ONTO THE NEW CATS PATCH PANEL, TERMINATE THE NEW CATS CABLES THAT WILL BE ROUTED IN THE AREA OF THIS OF ONTO THE NEW 48 PORT CATS PATCH PANEL AS WELL. 'RE4NSTALL THE HORIZONTAL WIRE MANAGERS THAT WERE REMOVED FROM THE 24' CUBE -IT INTO THE NEW 36' CUBE-R. 'THE 25 PR WILL BE TERMINATED ON THE LAST (8) EIGHT PORTS OF THE NEW PATCH PANEL ONE PAIR PER PORT. 'TELECOM CONTRACTOR WILL REMOVE THE EXISTING EQUIPMENT FROM THE 24"CUBE-FT AND REINSTALL INTO THE NEW 38' CUBE -IT. 'RE4NSTALL THE EXISTING MULTIMODE FIBER INTO THE NEW ADC PANEL ON BST MM BULK HEAD THIS WILL REMAIN IN USE AT THIS TIME 'INSTALL ONE APC SMART UPS RT2200VA RM IN BOTTOM OF TELECOM CABINET. *INSTALL ONE APC NETWORK MANAGEMENT CARD INTO UPS. 'ALL FINAL CONNECTIONS WILL BE VERIFIED BY CFC MIS DEPT. a oaTa SERVI�ES,N�. DATA b VOICE CABIRJG •PHONE SYSTEMS J PROPOSALTO: HEATH CONSTRUCTORS JOB NAME: TRANSFORT FACILITY EXPANSION 1310 WebeterAve. Ft Collins, Co,80524 Tel: 970482-6064 Fac 970484-3252 PROPOSAL /. 1302018 REVISION 7-23-13 _ 07/23/13 PROVIDE MATERIALS AND LABOR TO INSTALL, TEST AND DOCUMENT A CERTIFIED . CATEGORY 6 STRUCTURED CABLING SYSTEM PER DESCRIPTION BELOW: 'THIS QUOTE IS BASED ON PREVAILING WAGES. 'EXCLUDES CROSS -CONNECTS TO SERVICES AND CUSTOMER EQUIPMENT. 'EXCLUDES ALL CONDUIT RACEWAYS, AND J- BOXES IN WALLS THROUGHWALLS AND OR ABOVE CEILINGS AND SLEEVES BETWEEN FLOORS. 'EXCLUDES UNDERGROUND CONDUITS AND VAULTS. TREASURYBLOG. IDF: 'IN THE TREASURY BLDG THERE IS AN EXISTING 24X24X24 CUBE -IT CABINET. THIS CABINET WILL BE REMOVED AND REPLACED WITH A NEW 24X24X30 WALL MOUNT CUBIT _ INSTALL (1) ONE NEW ADC 24 POSITION FIBER CONNECTOR HOUSING INTO THE NEW CUBEfT TO ACCOMIDATE THE NEW 24 STD. SINGLE MODE _ FIBER COMING IN FROM THE MDF. - - 'SPLICE THE NEW 12 STD. SINGLE MODE FIBER COMING FROM THE MDF. TERMINATE THE BLUE BUFFER TUBE COMING FROM THE MDF. 'THE EXISTING MULTIMODE FIBER WILL LAND ON A GIST MM BULK HEAD IN THE NEW ADC PANEL AND REMAIN IN USE AT THIS TIME - INSTALL (1) ONE NEW SIEMON HD6.48 CAT B 48 PORT PATCH PANEL INTO NEW CUBIT, RETERMINATE ALL EXISTING CABLES. 'THE 25 PAIR WILL BE TERMINATED ON THE LAST (8) EIGHTPORTS OF THE NEW PATCH PANEL ONE PAIR PER PORT. -TERMINATE THE (2) TWO NEW CATE COPPER CABLES FROM THE NEW CAMERA LOCATIONS ONTO NEW PATCH PANEL 'INSTALL ONE APC SMART UPS RT2200VA RM IN BOTTOM OF TELECOM CABINET, 'INSTALL ONE APC NETWORK MANAGEMENT CARD INTO UPS. 'TELECOM CONTRACTOR WILL REMOVE THE EXISTING EQUIPMENT FROM THE 24" CUBE -IT AND RE -INSTALL INTO THE NEW CUSE4T. MODULAR BLDG. IDF: 'IN MODULAR BLDG THERE IS AN EXISTING 24X24X24 CUBE -IT CABINET. THIS CABINET WILL BE REMOVED AND REPLACED WITH A NEW 24X24)QO WALL MOUNTCUSIT. INSTALL (1) ONE NEW ADC 24 POSITION FIBER CONNECTOR HOUSING IN NEW CUBIT, 'SPLICE THE BLUE SUFFER TUBE COMING FROM THE MDF. `THE EXISTING MULTI MODE FIBER WILL BE PLACED ON NEW BST MM BULK HESD AND REMAIN IN USE AT THIS TIME. - *ALL EXSISTING EQUIPMENT AND CABLES WILL BE REMOVED FROM OLD CUBIT AND REINSTALLED INTO NEW CUBIT. INSTALL (1) ONE NEW SIEMONS HD6-48 CAT B 48 PORT PATCH PANEL INTO NEW CUBIT. qHE 25 PR WILL BE TERMINATED ON THE LAST(B) EIGHT PORTS OF THE NEW PATCH PANEL ON PAIR PER PORT. `TERMINATE THE NEW CATS DROPS IN THIS AREA ONTO NEW PATCH PANEL INSTALL ONE APC SMART UPS RT2200VA RM IN BOTTOM OF TELECOM CABINET. INSTALL ONE APC NETWORK MANAGEMENT CARD INTO UPS. 'TELECOM CONTRACTOR WILL REMOVE THE EXISTING EQUIPMENT FROM THE 24" CUBE -IT AND RE -INSTALL INTO THE NEW CUBE4T. CNG BLDG: INSTALL NEW CUSTOM BUILT CABINET TO INCLUDE ALL PARTS BY MSI TECH THIS WILL REPLACE THE EXISTING ONE. -REMOVE ALL CABLES AND OTHER PARTS FROM OLD CABINET AND REPLACE INTO NEW CABINET, 'ALL NEW CABLES CLOSE TO THIS AREA WILL LAND ON SIEMON DIN -RAIL PATCH PANEL 12 STRAND SINGLE MODE BACKBONE FIBER: -INSTALL (1) ONE 12 STRAND SINGLE MODE FIBER FROM THE MDF TO THE MODULAR UNIT IOF. -INSTALL (1) ONE 12 STRAND SINGLE MODE FIBER FROM THE MDF TO THE MAINTENANCE SHOP IDF, 'INSTALL (1) ONE 12 STRAND SINGLE MODE FIBER FROM THE MDF TO THE TREASURY BLGG,IDF. 'ALL FIBER WILL BE PIGTAIL SPLICED W NEW ADC FIBER PANELS IN ALL MDFS AND IOFS. TESTING AND DOCURENTATION.' INCLUDES LABELING WITH MACHINE GENERATED WHITE LABELS WITH BLACK LETTERING PER CUSTOMER SPECIFICATIONS. 'LABELING SCHEME: PER CITY STANDARDS. - INCLUDES TESTING OF COPPER AND FIBER WITH LEVEL III TESTERS. INCLUDES (1) ONE COPY OF TEST REPORTS ON CD. 'INCLUDES (1) ONE COPY OF AUTOCAD AS -BUILT ON CO. CAD DRAWINGS MUST BE ISSUED TO H&H DATA BY OTHERS: a DATA S�RVI�ES�RT. DATA b VpICE CA9LWG •PHONE SYSTEMS J 1310 Webster Ave. Ft Collins, Co.80524 Tel: 970482-6064 Fax: 970494-3252 PROPOSALTO: HEATH CONSTRUCTORS JOB NAME: TRANSFORT FACILITY EXPANSION PROPOSALS: 1302018 REVISION 7-23-13 07/23/13 PROVIDE MATERIALS AND LABOR TO INSTALL, TEST AND DOCUMENT A CERTIFIED 'THIS QUOTE IS BASED ON PREVAILING WAGES. 'EXCLUDES CROSS -CONNECTS TO SERVICES AND CUSTOMER EQUIPMENT. 'EXCLUDES ALL CONDUIT RACEWAYS, AND J- BOXES IN WALLS THROUGHWALLS AND OR ABOVE CEILINGS AND SLEEVES BETWEEN FLOORS. 'EXCLUDES UNDERGROUND CONDUITS AND VAULTS. - GENERAL: 'INSTALLATION WILL BE PERFORMED BY H&H EMPLOYEE TECHNICIANS ONLY. (SUBCONTRACTORS OR TEMPORARY LABOR WILL NOT BE USED,) H&H TECHNICIANS ARE INDUSTRY AND MANUFACTURER CERTIFIED. 'H&H DATA SERVICES RCOD AND A PROJECT MANAGER WILL OVERSEE THE INSTALLATION. 'INSTALLATION WILL BE PER ANSVEIARIA STANDARDS AND LOCAL CODES AND ORDINANCES. 'INSTALLATION TO BE DONE DURING STANDARD BUSINESS HOURS. 'INCLUDES MANUFACTURER'S WARRANTY ON MATERIALS AND ONE-YEAR WARRANTY ON WORKMANSHIP. 'EXCLUDES TAX 'LIFT WILL BE PROVIDED BY H&H DATA SERVICES PER CITY DIRECTION. gnMH mm PART DESCRIPTION EXTENSION 1,409F1 CORNING 012EIIF-31131-29 12-STRAND, SM, INDOOR/OUTDOOR RISER S1,270.59 1.200 FT NIA NIA TRACER WIRE $84.71 3 u ADC FL2.CB80024AN•2C50 FL2000 PreconOgured TeradSpllce Panel -24-posidon )2441bere), SM, LC Duplex $1.506.09 3EA ADC FL2-6PMMST BPAKPLUGIN MULTIMODE ADAPTER LOADED $180.68 5 EA ADC FL2-ACCO07 FL2000 Cable Clamp $18029 3 EA CSC CEX•12F.LCULCU•SM-7M 12 STRAND SINGLE MODE 7 METER PIGTALEI BOTH ENDS $573.18 12 EA FIBERTRON FSPDAII.01M FIBER JUMPER, SM, tCILC, 1M, DUPLEX S244,94 8 EA CSC F-PVSKLCLC-02 LCILC Single mode 91125miwn 2Meter Fiber $168.00 2,700 ET SIEMON PCeP4•E3-08-RXA CABLE, CATS, PLENUM $1,168.94 2 EA CPI 11908.724 CUBE IT, 24'Hx24N*30'D SOLID METAL DOOR 31,141.18 1 EA CPI 11998-736 CUBE IT. 36'Hx24'Wx30'D SOLID METAL DOOR $639.41 3 EA CPI 12804-701 CUBE.rr, FAN KIT $317.47 25 EA SIEMON MXBF-02 CAT 6 COMMUNICATIONS OUTLET, WHITE,ANGLED $166.18 3 EA SIEMON MX-FPS-01-02 FACEPLATE, 1-PORT, WHITE $5.05 3 EA SIEMON HDe48 PATCH PANEL, CATS, 48-PORT $930.18 17 EA SIEMON SMI-02 SURFACE MOUNT BOX, I -PORT CAT5E, WHITE $0.00 17 EA TYCO RJ45 RJ45 MODULAR PLUG $10.00 30 EA SIEMON MCB-5-T-03-02 CATS, T PATCH CORD WITH BOOT, TELECO EQUIPMENT $231.18 20 EA SIEMON MC841-T-05-02 CATS, S PATCH CORD, WITH BOOT, TELECOM EQUIPMENT $165.88 50 EA SIEMON MCS-5-T40-02 CATS, 10' PATCH CORD, WITH BOOT $0.00 1 EA APC SURTA3000RMXL3U APC SMART -UPS RT 30DOVA RACK TOWER 120V $2,429.41 3 EA APC SURTA2200RMXL2U APC SMART -UPS RT 22GOVA RM 12DV $4,510.59 4 EA APC AP9630 SMARTSLOT UPS NTWK MGMT CARD 2 $1.152.94 2 EA CISCO WS-C2880S-24PS-L CATALYST 29805 24 GIGE POE 370W, 4xSFP LAN BASE $4.680.94 2 EA CISCO CON-SNT-2960S2PS CATALYST 2960S 24 GIGE POE 370W, 41SFP LAN BASE $370.45 12 EA CIS00 GLC-LHSM GE SFP, LC CONNECTOR LXA.H TRANSCEIVER $8,709.18 1 EA CISCO AIR4AP1142N-A-K9 802.11 AIBIN FIXED UNIFIED AP; INT ANT: A REG DOMAIN $725.78 1 EA CISCO CONSNT-1142NAK SMARTNET8x5xNBD 802.11 AIGM FIXED UNIFIED AP INTANT $77.18 1 EA MSI TEC 09-1203.001 MSI TEC DATA ENCLOSURE $8,934.92 1 EA CPI 12818.701 POWER STRIP, HORIZ, 15AMP, RACKMOUNT $88.24 2 ROLL SIEMON VCM 25-08-01 HOOK AND LOOP CABLE MANAGEMENT, 25IROLL, B' LENGTH EA $32.94 2 EA SIEMON WM143S HORIZONTAL WIRE MANAGER, 1U $63-29 4 FA SIEMON WM144-5 HORIZONTAL WIRE MANAGER, 2U $152.24 3 LOT WA NIA REMOVE 8 RE -INSTALL (1) ONE 24X24X24 CUBE -IT $176.47 2 EA WHEELOCK UTA-VPS EXTERNAL BELL IRINGER. STROBE 31,058.82