Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7440 SENIOR CENTER RE-ROOF OF WEST WINGPOW FCity of lirt dins Operafi Services Change Order Form Issued:6128/2013 OPERATION SERVICES Protect hlanaq:rrenl Plcanring 3 Dc&ign 30L' LJ1o'tc Avur m G.n ci ❑c n P.p Gr>x r'80 For, Co m. Co 8f15?7 048C 970.221.GG10 970.22LG534 -'ax PROJECT TITLE: Fort Collins Senior Center Re -roof of West Wing PROJECT NUMBER: 7440 CONTRACTOR: Gem City Roofing Inc., 1311 S. list Street, Laramie, WY. 82070 CHANGE ORDER NUMBER: 7440 - 001 P(0' q/2- ` I ,7,)-- In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change 2. Description of change 3. Change in contract cost 4. Change in contract time. 1&2 Reducing the scope of work and Additional owner expense due to contractor performance A. Crediting back for Alternate #2 for not replacing gutters & downspouts =-$6,568.00 B. Crediting the cost of added facility expenses for draging out roof over pool =-$2,090.76 C. Credit for concrete ramp damaged by fork lift weight traffic. = -$500 3 The contract will be reduced by $9,158.76 4 Project extension of 16 additional days - Substantial Completion date is now May 15, 2013. ORIGINAL CONTRACT AMOUNT TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT AMOUNT (Assuming all change orders approved) ACCEPTED BY: $149,968.00 $0.00 $0.00 ($9,158.76) -6.11 % -6.11 $140,809.24 DATE: G a/3 REVIEWED BY: / �C `� >V I DATE: CP '0 v (City IrFt. Collins) APPROVED BY: DATE: (Purchasing Agent over $60,000) cc:' Contractor Purchasing Project File ., Re 8. BID SCHEDULE (Base Bid) LUMP SUM BASE BID $ YS,�OD .oa 1N WORDS: Qn� ("d`r°� d 'torij�--(weeUuS��I `FtiUr �w..alree( ALTERNATE #1 1. Deductive Alternate: To remove the 2x framing for vented system and apply OSB sheathing directly over the polylso Insulation: $ 7, O00 � Deduct 2. Unit Price: Price per Square Foot to Increase additional roof scope or decrease roof scope. Includes removal, insulation, sheathing, membrane, (lashings, fasteners, vents, shingles, etc. for complete system. A. Vented Roof System $ 8. 60 /SF B. Unvented Roof System $ 8 . �� /SF ALTERNATE #2 1. Provide a lump sum price to replace the existing gutters C::505on west wing to be added to the base bid price. ADD 2. Provide a unit price to replace of the gutters for west wing to m color of the existing. / $ b • 33 /LF ADD 3. Provide a unit price to replace the downspouts for west wing to match the profile and color of the existing. $ S• C)D /LFADD ALTERNATE #3 Provide a lump sum price to complete rooting scope using 518" OSB FlameBlock Sheathing In lieu of the %" OSB Sheathing designed. 3cl OD Deduct $ Addendum 1- 7440 Senior Center Re -Roof of West Wing Page 3 of 14 Brian Hergott Oubject: FW: Senior Center - Lost revenues for pool closure From: Brian Hergott Sent: Saturday, February 02, 2013 10:43 AM To: Derek Olson Subject: FW: Senior Center - Lost revenues for pool closure Derek, Here is what I have received for the closure January 14-20 a total of $2,620 divided by 5 = $524 per day. If the City of Fort Collins takes care of the 2 days it agreed to it leaves you with a cost of $1,572 for Wednesday, Thursday and Friday. Instructor: 5 Days X 80 - $400 Pool Manager: 5 Days x $225 - $1125 Refunds given to patrons for classes not met: 5 Days x $184 = $920 S -7 2 Krista's time to process refunds: 7 Hours x $25 = $175 x 33 ors +froIP.� Thanks, S i 8 , i (o Orian Hergott, CDT, LEED AP BD+C Facilities Project Manager Operation Services FCof ort Collins ow��um, sus o: 970.221.6804 F: 970.221.6534 C: 970.237.1213 E: bhereottCaDfceov.com W: www.fcgov.com From: Peggy Bowers Sent: Friday, February 01, 2013 9:29 AM To: Brian Hergott Subject: FW: Lost revenues for closure �:5 7to = �� 070 Here are the cost of not having the pool open for a week. I see that Suzy included the whole week. I could try and get it forjust the three days if you want. This does not reflect revenue we lost from drop -in use. C °eggy From: Suzy Danford Sent: Thursday, January 31, 2013 5:06 PM i To: Peggy Bowers Subject: RE: Lost revenues for closure 0ere is what I have for the closure January 14-20: Instructor: $400 Pool Manager: $1125 Refunds given to patrons for classes not met: $920 Krista's time to process refunds: $175 Sury Danford Aquatics Supervisor City of Fort Collins sdonford@fcgov.com 970.221.6202 From: Peggy Bowers Sent: Thursday, January 31, 2013 4:37 PM To: Krista Hobbs; Suzy Danford; Mike McDonnell Subject: RE: Lost revenues for closure_ Suzy — do you just want to include all costs and send only one document? From: Krista Hobbs .sent: Wednesday, January 30, 2013 5:14 PM To: Peggy Bowers; Suzy Danford; Mike McDonnell Subject: RE: Lost revenues for closure Ok, doing refunds (136) has taken a lot of time(7.0 hrs.) for me to process. Instructor: $400 Pool Manager: $1125 Refunds given to patrons for classes not met: $920 Suzy will figure out my time and then send it onto Brian. Krista L. Hobbs Recreation Coordinator/Aquatics City of Fort Collins P: 970.221.6335 F: 970.221.6237 EN 2 No Text