HomeMy WebLinkAboutADOLFSON & PETERSON CONSTRUCTION - CONTRACT - RFP - 7491 BLOCK 32 CM/GC IMPROVEMENTSPROFESSIONAL SERVICES AGREEMENT WORK ORDER TYPE THIS AGREEMENT made and entered into the day and year set forth below by and between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred to as the "City" and AP Mountain States, LLC dba ADOLFSON & PETERSON CONSTRUCTION, hereinafter referred to as "Professional'. WITNESSETH: In consideration of the mutual covenants and obligations herein expressed, it is agreed by and between the parties hereto as follows: 1. Scope of Services. The Professional agrees to provide services in accordance with any project Work Orders for 7491 Block 32 CM/GC Improvements, issued by the City. A blank sample of a work order and overall scope of services is attached hereto as Exhibit "A", consisting of three (3) pages and is incorporated herein by this reference. Irrespective of references in Exhibit A to certain named third parties, Professional shall be solely responsible for performance of all duties hereunder. The City reserves the right to independently bid any project rather than issuing a Work Order to the Professional for the same pursuant to this Agreement. 2. The Work Schedule. The services to be performed pursuant to this Agreement shall be performed in accordance with the Work Schedule stated on each Work Order. 3. Time of Commencement and Completion of Services. The services to be performed pursuant to this Agreement shall be initiated as specified on each Work Order. Time is of the essence. Any extensions of any time limit must be agreed upon in writing by the parties hereto. 4. Contract Period. This Agreement shall commence July 1, 2013, and shall continue in full force and effect until June 30, 2014, unless sooner terminated as herein provided. In addition, at the option of the City, the Agreement may be extended for additional Professional Services Agreement - Work Order Type Page 1 of 18 7491 Block 321 CM/GC Improvements OVERALL SCOPE OF SERVICES The Construction Manager/General Contractor (CM/GC) will collaborate with all consultants and the design team to work as an integrated design team and help maintain the focus and commitment to the integrated energy/high performance goals of the project. Commitment to continuous refinement and design optimization is essential to achieving these goals. The CM/GC team members will be encouraged to participate in evaluating innovative high efficiency design ideas in a cooperative, creative atmosphere. The impacts of changes in any one system shall be evaluated in relation to the whole building capital cost, operating cost, and effect on the objectives and targets of the project. Use of computer modeling as part of the whole building design optimization process, will be used along with BIM to valuate impacts of any changes. The (CM/GC) will assist the project team with cost estimating, construction methods and approach evaluations, construction sequencing and scheduling and other constructability considerations during planning and design, then facilitate and manage each construction project in the field from start through close-out and warranty as noted by each Work Order. The CM/GC will be compensated for their participation based on approved subcontractor or supplier proposals along labor and equipment rates submitted and approved with a cost not to exceed as listed in the Fee proposal. General condition charges will be allowed as per Exhibit C of the RFP along with the approved rates. Each invoice which shall have detailed itemization of each item submitted be within the not to exceed amount as listed for each item in the Fee proposal. Phase I The City of Fort Collins will be performing space planning of the existing Utility Service Center (USC) at 700 Wood Street, space planning for new Customer Service Building (CSB) for block 32 and conceptual/master planning for entire Block 32 in downtown Fort Collins. Phase II Phase II, which is the design and construction of the new CSB on Block 32 and design and renovation of the existing USC building at 700 Wood Street. Phase III Phase III will be the design and construction of other municipal buildings on Block 32. Following the preparation of final design drawings and construction specifications, the City expects to negotiate a guaranteed maximum price (GMP) contract(s) with the CM/GC for construction of the designed improvements. The final price negotiation(s) may be subject to outside review and auditing. The CM/GC will be required to enter into an agreement and sign the City's standard Construction Contract. If negotiation's cannot be successfully completed with a CM/GC for a GMP, then the City of Fort Collins reserves the right to hard bid the work. The CM/GC is required to commit key staff members to assist the project team by attending regularly scheduled project meetings and preparing information or responses to issues in advance of meetings. Normally, attendance will be required by the CM/GC's project cost estimator, project manager and project superintendent. In the event key technical functions are subcontracted or done by a consultant, the subcontractor or consultant shall assist the CM/GC firm in fulfilling its responsibilities under the agreement during the design phase(s), including participation in design discussions. (Note: Key personnel must be committed to this project for its duration, unless approved in writing by the Owner. This requirement is non-negotiable.) Key Personnel Required for this agreement: Eric Dimmick — Preconstruction Manager Professional services Agreement - Work Order Type Page 10 of 18 7491 Block 321 CWGC Improvements Eric Kimmelshue — Project Manager Brandon Hill — Project Superintendent Brooke Brookshire — MEP Manager Kelly Hertneky — Sustainability Manager The CM/GC firm will provide the following services for the various phases mentioned earlier. A. Pre -Construction Services ♦ Provide input on construction cost impacts for various master planning layouts. ♦ Provide input on existing building structural, mechanical and electrical components and options for modifications. ♦ Review of site layout and how it will work with existing elevations and contours. ♦ Estimating cost of the various options, alternatives and components. ♦ Review of designs for constructability and phasing to maintain operations. ♦ Providing opinions and recommendations on suitable methods and approaches to accomplish the work and minimize impact to operations. ♦ Offer value engineering suggestions to accomplish the desired objectives in the most cost effective manner possible. ♦ Provide the team with up to date on -going cost status of the current project design. ♦ Provide information on material availability and other resources as it relates to construction for LEED certification. B. Construction Services ♦ Full time site supervision when trades are working ♦ Stormwater management for the project site ♦ Site protection and security during construction ♦ Open competitive procurement of all subcontractors and suppliers to complete construction of projects. ♦ Project sequencing and scheduling of all manpower, materials and equipment. ♦ Manage all construction activities associated with the level of LEED certification the City requires. ♦ Manage Project Safety to ensure all personnel conduct their work per OSHA, state and local regulations and all personnel are safe from project activities. ♦ Manage Project Quality Control to ensure each item of work meets or exceeds the City's standards and goals of the RFP. ♦ Manage Record Documents to ensure all changes during construction are on the final documents turned over to the Owner. ♦ Manage Project Close-out to ensure timeliness of events to meet required dates. ♦ Manage Project Warranty to ensure prompt response and closure to items. Professional Services Agreement - Work Order Type Page 11 of 18 7491 Block 321 CM/GC Improvements EXHIBIT B COMPENSATION CHAPTER 6 — PROPOSED FEE SCHEDULE PROJECT: CITY OF FORT COLLINS NEW UTILITIES ADMINISTRATIVE SERVICES BUILDING - BLOCK 32 UTILITLIES ADMINISTRATIVE RENOVATION — 700 WOOD STREET FORT COLLINS, CO. Bid of Adoiison & Peterson Construction existing.under the laws of the state of Colorado M hereinafter called the bidder. TO OWNER: City of Fort Collins RFP 7491 Fort Collins Wood Street a corporation organized and or a partnership consisting of partners; or an individual Utilities Improvements for Block 32 & 700 Attn: John D Stephen, CPPO, LEED AP Interim Director of Purchasing & Risk Management (2Rd Floor) PO Box 580, 215 N. Mason Street Fort Collins, CO. 80522-0580 Acknowledgments A. The undersigned acknowledges that he has received and familiarized himself with the Request for Proposals dated April 19, 2013. B. The undersigned further acknowledges that he has visited the sites and familiarized himself with the local conditions affecting the cost of the work at the places work is to be performed. C. In submitting the Proposal and Bid the undersigned agrees: To enter into and execute a contract, if awarded on the basis of this bid,. and to furnish a Performance Bond and Labor and Material Payment Bond in accordance with the requirements of the contract. 2. CM/GC Conceptual/Master & Space planning CM Services Phase I Lump Sum Charges A. For compensation of the Master & space planning services noted as phase I in the Request for Proposal to include a labor, materials and equipment along with overhead and profit, the undersigned hereby proposes and agrees to the following Lump Sum cost not to exceed of: D.,,e i ve Thousand Six .unci-ed Dollars ($ 12, 600 ) (Amount shall be shown in both words and figures. In case of discrepancy, the amount in words will govern). RFP 7491 For: Collins Utilities Improvements for Block 32 & 700 Wood Street Page 24 of 41 Professional services Agreement - Work Order Type 7491 Block 321 Moo Improvements Page 12 of 18 3. CM/GC Pre -construction CM Services Phase If Lump Sum Charges A. For compensation of the Pre -construction services noted in the Request for Proposal to include a labor, materials and equipment along with overhead and profit, the undersigned hereby proposes and agrees to the following Lump Sum cost not to exceed of: Thirty Three Thousand Six Hundred Dollars ($ 33, 600 ) (Amount shall be shown in both words and figures. In case of discrepancy, the amount in words will govern). 4. CM/GC Construction Phase II CM Services Fee A. For compensation for the CM/GC's Fee for overhead and profit, the undersigned hereby agrees to the following percentage of the Cost of the Work: One Point Seven Five Percent( 1. 75 o ° ) �. (Amount shall be shown in both words and figures. In case of discrepancy, the amount in words will govern). 5. CM/GC Construction Phase II Lump Sum General Conditions A. For the General Conditions of the project during the construction phase 11 for the items noted in Exhibit C — General Conditions Checklist, the undersigned hereby proposes and agrees to the following Lump Sum cost not to exceed of: B. 1. General Conditions - Utility Service Center (USC) 700 Wood Street One Hundred Forty Two Thousand Three Hundred Thirty Four Dollars ($ 142, 334 ) (Amount shall be shown in both words and figures. In case of discrepancy, the amount in words will govern). 2. General Conditions - Customer Service Building (CSB) Block 32 Two Hundred Thousand Nine Hundred Forty Three Dollars ($ 200, 943 (Amount shall be shown in both words and figures. In case of discrepancy, the amount in words will govern). 6. CM/GC Construction Phase II General Conditions Cost Factors A. The Salary/Hourly Rates for the Project Team. Attach a list of each team member and their compensation along with labor burden. Position/Title Salary/Hourly Rate X Burden(%) = Total Cost B. The General Conditions Equipment Rental Rates (Fuel Included). Attached a list of all the equipment you have planned for or feel may be needed for this project. Equipment Type Hourly/Daily/Weekly/Monthly Rental Rates RFP 7491 Fort Collins Utilities Improvements for Block 32 & 700 Wood Street Page 25 of 41 Professional services Agreement - Work Order Type 7491 Block 321 CM/GC Improvements Page 13 of 18 C. Provide explanation of how you cover cost for small tools, misc. supplies and equipment. D. Weather Protection Allowance Budgeted in General Conditions above. USC:$ Not Included CSB:$ Not Included 7. Right of Owner In submitting this Bid, it is understood that the right to reject any and all Bids and to waive irregularities in the bidding has been reserved by the Owner. Dated this 3rd day of June 2013 Adolfson & Peterson,Construction Name of Bidder: 797 Ventura Street, Aurora, Colorado 60011 Address of Bidder 303-363-7101 djohnson@a-p.com Te Ml Doug Johnson Printed Name Vice President Title RFP 7491 Fort Collins Utilities Improvements for Block 32 & 700 Wood Street Professional Services Agreement - Work Order Type 7491 Block 321 CM/GC Improvements Page 26 of 41 Page 14 of 18 c � �067 O E M U Oi b O 1mr Qa �SUaww c O O U c W O � W F— W O IL z a U W 7 O w m m W z m w w w w w w w w w w w w 2 m o a s e �0 T o 0eeee m le, m �n e�nmommtnm !tom 1O m r ui rrnnrrrnc� � ui�r IO mi �c is vi �cO n 10 N Cf R (7 t7 [7 m f7 N m m 2 `m 3 c c m � m c c 0 m � m m � o cu> .- h ma c 0 c > y p m v W m m i� m c m c Ti U G Ta c m E o_ �� O w 0 N EXHIBIT C GENERAL CONDITIONS CHECKLIST (These items are not considered part of the CM/GC Fee) PROJECT COORDINATION A. Site Supervision and Administration 1. Project Field Superintendent 2. Project Field Engineers 3. Project General Superintendent 4. Project Managers B. Postage C. Holiday D. Vacation E. Subcontractor Coordination F. Oil and Fuel (Mileage to and from project or office) G. Travel Expenses (Motel, meals, etc.) 2. FIELD ENGINEERING A. Surveying B. Project Layout C. Layout Equipment & Supplies 3. REGULATORY REQUIREMENTS A. Special Inspections B. Stormwater Management C. Plan Review & Building Permit (Paid by Owner) D. Use or Special Taxes (Paid by Owner) 4. INSURANCE AND BONDS A. Performance Bond B. Payment Bond C. Liability Insurance D. Auto Insurance E. Equipment Insurance 5. CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS A. Mobilization & Demobilization B. Field Offices & Storage Trailers C. Temporary Utilities (Tap, Hookup, Service) 1. Electricity & Lighting 2. Heating & Ventilation 3. Telephone 4. Internet & Computer 5. Water 6. Sanitary Facilities 7. Fire Protection D. Construction Aids 1. Elevators, Hoist, Lifts, Etc. 2. Scaffold and Platforms 3. Stairways & Ladders for work access 4. Weather Protection Professional Services Agreement - Work Order Type 7491 Block 321 CM/GC Improvements Page 16 of 18 E. Barriers & Enclosures 1. Temporary Enclosures 2. Safety & Security Enclosures 3. Tree & Plant Protection 4. Cold Weather Protection F. Access Roads & Temporary Parking 1. Gates & Barriers 2. Tracking from site 3. Snow Removal G. Temporary Controls 1. Jobsite Cleanup 2. Recycling 3. Trash Removal 4. Dump Fees 5. Dust, Erosion & Noise Control 6. Protection of Finished Work 6. MATERIAL AND EQUIPMENT A. Transportation & Handling B. Storage & Protection C. Small Tools D. Equipment Rental E. Fuel for Equipment F. Vehicles SAFETY AND SECURITY A. Safety Supplies B. Fire Protection (Fire Extinguishers) C. First Aid Supplies D. Required Safety Equipment E. Safety Officer F. Drug Testing 8. CONTRACT CLOSE OUT A. Final Cleaning B. Commissioning C. Systems Training D. Project Record Documents E. Operation & Maintenance Data F. Project Warranty Management. Professional Services Agreement - Work Order Type 7491 Block 321 CWGC Improvements Page 17 of 18 EXHIBIT D CONFIDENTIALITY IN CONNECTION WITH SERVICES provided to the City of Fort Collins (the "City") pursuant to this Agreement (the "Agreement"), the Professional hereby acknowledges that it has been informed that the City has established policies and procedures with regard to the handling of confidential information and other sensitive materials. In consideration of access to certain information, data and material (hereinafter individually and collectively, regardless of nature, referred to as "information") that are the property of and/or relate to the City or its employees, customers or suppliers, which access is related to the performance of services that the Professional has agreed to perform, the Professional hereby acknowledges and agrees as follows: That information that has or will come into its possession or knowledge in connection with the performance of services for the City may be confidential and/or proprietary. The Professional agrees to treat as confidential (a) all information that is owned by the City, or that relates to the business of the City, or that is used by the City in carrying on business, and (b) all information that is proprietary to a third party (including but not limited to customers and suppliers of the City) . The Professional shall not disclose any such information to any person not having a legitimate need -to -know for purposes authorized by the City. Further, the Professional shall not use such information to obtain any economic or other benefit for itself, or any third party, except as specifically authorized by the City. The foregoing to the contrary notwithstanding, the Professional understands that it shall have no obligation under this Agreement with respect to information and material that (a) becomes generally known to the public by publication or some means other than a breach of duty of this Agreement, or (b) is required by law, regulation or court order to be disclosed, provided that the request for such disclosure is proper and the disclosure does not exceed that which is required. In the event of any disclosure under (b) above, the Professional shall furnish a copy of this Agreement to anyone to whom it is required to make such disclosure and shall promptly advise the City in writing of each such disclosure. In the event that the Professional ceases to perform services for the City, or the City so requests for any reason, the Professional shall promptly return to the City any and all information described hereinabove, including all copies, notes and/or summaries (handwritten or mechanically produced) thereof, in its possession or control or as to which it otherwise has access. The Professional understands and agrees that the City's remedies at law for a breach of the Professional's obligations under this Confidentiality Agreement may be inadequate and that the City shall, in the event of any such breach, be entitled to seek equitable relief (including without limitation preliminary and permanent injunctive relief and specific performance) in addition to all other remedies provided hereunder or available at law. Professional services Agreement - Work Order Type 7491 Block 321 CM/GC Improvements Page 18 of 18 one year periods not to exceed four (4) additional one year periods. Renewals and pricing changes shall be negotiated by and agreed to by both parties. The Denver Boulder Greeley CPIU published by the Colorado State Planning and Budget Office will be used as a guide. Written notice of renewal shall be provided to the Professional and mailed no later than ninety (90) days prior to contract end. 5. Early Termination by City/Notice. Notwithstanding the time periods contained herein, the City may terminate this Agreement at any time without cause by providing written notice of termination to the Professional. Such notice shall be delivered at least fifteen (15) days prior to the termination date contained in said notice unless otherwise agreed in writing by the parties. All notices provided under this agreement shall be effective when mailed, postage prepaid and sent to the following address: Professional: City: With Copy to: Adolfson & Peterson Construction City of Fort Collins City of Fort Collins Attn: Eric Kimmelshue Attn: Brian Hergott Attn: Purchasing 797 Venutra Street PO Box 580 PO Box 580 Aurora, CO 80011 Fort Collins, CO 80522 Fort Collins, CO 80522 In the event of any such early termination by the City, the Professional shall be paid for services rendered prior to the date of termination subject only to the satisfactory performance of the Professional's obligations under this Agreement. Such payment shall be the Professional's sole right and remedy for such termination. 6. Design, Proiect Insurance and Insurance Responsibility. The Professional shall be responsible for the professional quality, technical accuracy, timely completion and the coordination of all services rendered by the Professional, including but not limited to designs, plans, reports, specifications, and drawings and shall, without additional compensation, promptly remedy and correct any errors, omissions, or other deficiencies. The Professional shall indemnify, save and hold harmless the City its officers and employees, in accordance with Colorado law, from all damages whatsoever claimed by third parties against the City and for the Professional services Agreement - Work Order Type Page 2 of 18 7491 Block 321 CM/GC Improvements City's costs and reasonable attorney's fees arising directly or indirectly out of the Professional's negligent performance of any of the services furnished under this Agreement. The Professional shall maintain commercial general liability insurance in the amount of $500,000 combined single limits and errors and omissions insurance in the amount of $1,000,000. 7. Compensation. In consideration of services to be performed pursuant to this Agreement, the City agrees to pay Professional on a time and reimbursable direct cost basis designated in Exhibit "B", consisting of four (4) page(s), attached hereto and incorporated herein by this reference. At the election of the City, each Work Order may contain a maximum fee, which shall be negotiated by the parties hereto for each such Work Order. Monthly partial payments based upon the Professional's billings and itemized statements are permissible. The amounts of all such partial payments shall be based upon the Professional's City -verified progress in completing the services to be performed pursuant to the Work Order and upon approval of the Professional's direct reimbursable expenses. Final payment shall be made following acceptance of the work by the City. Upon final payment, all designs, plans, reports, specifications, drawings, and other services rendered by the Professional shall become the sole property of the City. 8. City Representative. The City will designate, prior to commencement of work, its project representative who shall make, within the scope of his or her authority, all necessary and proper decisions with reference to the project. All requests for contract interpretations, change orders, and other clarification or instruction shall be directed to the City Representative. 9. Project Drawings. Upon conclusion of the project and before final payment, the Professional shall provide the City with reproducible drawings of the project containing accurate information on the project as constructed. Drawings shall be of archival, prepared on stable mylar base material using a non -fading process to provide for long storage and high quality reproduction. "CD" disc of the as -built drawings shall also be submitted to the owner in and AutoCAD version no older then the established city standard. Professional Services Agreement - Work Order Type Page 3 of 18 7491 Block 321 CWGC Improvements 10. Monthly Report. Commencing thirty (30) days after Notice to Proceed is given on any Work Order and every thirty days thereafter, Professional is required to provide the City Representative with a written report of the status of the work with respect to the Work Order, Work Schedule and other material information. Failure to provide any required monthly report may, at the option of the City, suspend the processing of any partial payment request. 11. Independent Contractor. The services to be performed by Professional are those of an independent contractor and not of an employee of the City of Fort Collins. The City shall not be responsible for withholding any portion of Professional's compensation hereunder for the payment of FICA, Workers' Compensation, other taxes or benefits or for any other purpose. 12. Subcontractors. Contractor may not subcontract any of the Work set forth in the Exhibit A, Statement of Work without the prior written consent of the city, which shall not be unreasonably withheld. Contractor may, however, subcontract the work or other portions of the Work by providing notice to the City of its intent to do so. If any of the Work is subcontracted hereunder (with the consent of the City), then the following provisions shall apply: (a) the subcontractor must be a reputable, qualified firm with an established record of successful performance in its respective trade performing identical or substantially similar work, (b) the subcontractor will be required to comply with all applicable terms of this Agreement, (c) the subcontract will not create any contractual relationship between any such subcontractor and the City, nor will it obligate the City to pay or see to the payment of any subcontractor, and (d) the work of the subcontractor will be subject to inspection by the City to the same extent as the work of the Contractor. 13. Personal Services. It is understood that the City enters into this Agreement based on the special abilities of the Professional and that this Agreement shall be considered as an agreement for personal services. Accordingly, the Professional shall neither assign any responsibilities nor delegate any duties arising under this Agreement without the prior written consent of the City. Professional services Agreement - Work Order Type Page 4 of 18 7491 Block 321 CM/GC Improvements 14. Acceptance Not Waiver. The Citys approval of drawings, designs, plans, specifications, reports, and incidental work or materials furnished hereunder shall not in any way relieve the Professional of responsibility for the quality or technical accuracy of the work. The Citys approval or acceptance of, or payment for, any of the services shall not be construed to operate as a waiver of any rights or benefits provided to the City under this Agreement. 15. Default. Each and every term and condition hereof shall be deemed to be a material element of this Agreement. In the event either party should fail or refuse to perform according to the terms of this agreement, such party may be declared in default. 16. Remedies. In the event a party has been declared in default, such defaulting party shall be allowed a period of ten (10) days within which to cure said default. In the event the default remains uncorrected, the party declaring default may elect to (a) terminate the Agreement and seek damages; (b) treat the Agreement as continuing and require specific performance; or (c) avail himself of any other remedy at law or equity. If the non -defaulting party commences legal or equitable actions against the defaulting party, the defaulting party shall be liable to the non -defaulting party for the non -defaulting party's reasonable attorney fees and costs incurred because of the default. 17. Binding Effect. This writing, together with the exhibits hereto, constitutes the entire agreement between the parties and shall be binding upon said parties, their officers, employees, agents and assigns and shall inure to the benefit of the respective survivors, heirs, personal representatives, successors and assigns of said parties. 18. Law/Severability. The laws of the State of Colorado shall govern the construction, interpretation, execution and enforcement of this Agreement. In the event any provision of this Agreement shall be held invalid or unenforceable by any court of competent jurisdiction, such holding shall not invalidate or render unenforceable any other provision of this Agreement. 19. Prohibition Against Employing Illegal Aliens. Pursuant to Section 8-17.5-101, Professional Services Agreement - Work Order Type Page 5 of 18 7491 Block 321 CWGC Improvements C.R.S., et. seq., Professional represents and agrees that: a. As of the date of this Agreement: 1. Professional does not knowingly employ or contract with an illegal alien who will perform work under this Agreement; and 2. Professional will participate in either the a -Verify program created in Public Law 208, 104th Congress, as amended, and expanded in Public Law 156, 108th Congress, as amended, administered by the United States Department of Homeland Security (the "e-Verify Program") or the Department Program (the "Department Program"), an employment verification program established pursuant to Section 8-17.5-102(5)(c) C.R.S. in order to confirm the employment eligibility of all newly hired employees to perform work under this Agreement- b. Professional shall not knowingly employ or contract with an illegal alien to perform work under this Agreement or knowingly enter into a contract with a subcontractor that knowingly employs or contracts with an illegal alien to perform work under this Agreement. C. Professional is prohibited from using the e-Verify Program or Department Program procedures to undertake pre -employment screening of job applicants while this Agreement is being performed. d. If Professional obtains actual knowledge that a subcontractor performing work under this Agreement knowingly employs or contracts with an illegal alien, Professional shall: Notify such subcontractor and the City within three days that Professional has actual knowledge that the subcontractor is employing or contracting with an illegal alien; and 2. Terminate the subcontract with the subcontractor if within three days of receiving the notice required pursuant to this section the subcontractor does not Professional Services Agreement - Work Order Type Page 6 of 18 7491 Block 321 CM/GC Improvements cease employing or contracting with the illegal alien; except that Professional shall not terminate the contract with the subcontractor if during such three days the subcontractor provides information to establish that the subcontractor has not knowingly employed or contracted with an illegal alien. e. Professional shall comply with any reasonable request by the Colorado Department of Labor and Employment (the "Department") made in the course of an investigation that the Department undertakes or is undertaking pursuant to the authority established in Subsection 8-17.5-102 (5), C.R.S. f. If Professional violates any provision of this Agreement pertaining to the duties imposed by Subsection 8-17.5-102, C.R.S. the City may terminate this Agreement. If this Agreement is so terminated, Professional shall be liable for actual and consequential damages to the City arising out of Professional's violation of Subsection 8-17.5-102, C.R.S. g. The City will notify the Office of the Secretary of State if Professional violates this provision of this Agreement and the City terminates the Agreement for such breach. 20. Special Provisions. Special provisions or conditions relating to the services to be performed pursuant to this Agreement are set forth in Exhibit "C", consisting of two (2) page(s), and Exhibit "D", consisting of one (1) page, attached hereto and incorporated herein by this reference. Professional Services Agreement - Work Order Type Page 7 of 18 7491 Block 321 CWGC Improvements THE CITY O j OLLINS, O ORADO By: G Paul Director of Purchasing & Risk Management Date: If/ L? I t , AP Mountain States, LIB dba 0 CORPORATE PRESIDENT OR VICE PRESIDENT Date: ATTEST: (Corporate Seal) Corporate Secretary Professional services Agreement - Work Order Type 7491 Block 321 CM/GC Improvements Page 8 of 18 EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND ADOLFSON & PETERSON CONSTRUCTION DATED: Work Order Number: Purchase Order Number: Project Title: 7491 Block 32 CM/GC Improvements Commencement Date: Completion Date: Maximum Fee: (time and reimbursable direct costs): Project Description: Scope of Services: Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of _ L) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Project Manager Project Manager City of Fort Collins By: Gerry Paul Director of Purchasing and Risk Management (over $60,000.00) Date: Professional Services Agreement - Work Order Type 7491 Block 321 CM/GC Improvements Page 9 of 18