Loading...
HomeMy WebLinkAboutPrebid - BID - 7509 CONCRETE MAINTENANCE PROJECT PHASE IIPage 1 of 2 Pre-Bid Meeting Agenda Phase II Concrete Annual Bid No. 7509 Friday May 10, 2013 10:00 a.m. 1. CITY OF FORT COLLINS Email Cell Tom Knostman –Pavement Engineer tknostman@fcgov.com 221-6576 Rhoda Henson – Project Manager rhenson@fcgov.com 402-5575 Darren Moritz- Pavement Manager dmoritz@fcgov.com 556-1495 Mike Knox - Public Outreach mknox@fcgov.com 221-2091 4. PROJECT SUMMARY AND SCHEDULE This work shall consist of the removal and/or installation of concrete curbs, gutters, sidewalks, crosspans, aprons, drive approaches, inlets, concrete pavement, and pedestrian access ramps and placement of temporary asphalt patching adjacent to new concrete on designated streets in the City of Fort Collins. Specific locations are described in Section 3500, Project Map. Engineer’s Estimate $1.25 million 140 Working days 5. CONTRACT CHANGES/UPDATES 202 Saw cutting – is incidental items designated as Remove and items in 604, 608 & 609; used for incidental items, typically control joints 304 Aggregate Base Course – per Ton 601 Exposed Sand Finish – New line item paid by the SF; gives the surface appearance of older concrete 604 Standard inlet depth = 5.0 Ft – No additional depth or additional width line items 608/609 Contract specifies concrete shall be 48 hour high early – Standard mix designs will be submitted for approval 48 hr, 24 hr, 12 hr. 608.46 Dump Fees – Only paid when concrete has existing wire/rebar (not accepted at Hoffman Mill Pit) Page 2 of 2 Pre-Bid Meeting Agenda Phase II Concrete Annual Bid No. 7509 Friday May 10, 2013 10:00 a.m. 6. MISCELLANEOUS Concrete Batch Weights on all concrete tickets Expansion – vertical, full-depth Notifications Questions 7. CONTRACT DOCUMENTS AND LINE ITEM PRICES Fill out provided Xcel Spread Sheet Added Work: Traffic Control based on Traffic Control Ratio