Pre-Bid Meeting Agenda
Phase II Concrete Annual
Bid No. 7509
Friday May 10, 2013 10:00 a.m.
1. CITY OF FORT COLLINS Email Cell
Tom Knostman –Pavement Engineer tknostman@fcgov.com 221-6576
Rhoda Henson – Project Manager rhenson@fcgov.com 402-5575
Darren Moritz- Pavement Manager dmoritz@fcgov.com 556-1495
Mike Knox - Public Outreach mknox@fcgov.com 221-2091
4. PROJECT SUMMARY AND SCHEDULE
This work shall consist of the removal and/or installation of concrete curbs, gutters, sidewalks, crosspans, aprons, drive
approaches, inlets, concrete pavement, and pedestrian access ramps and placement of temporary asphalt patching
adjacent to new concrete on designated streets in the City of Fort Collins. Specific locations are described in Section
3500, Project Map.
Engineer’s Estimate $1.25 million
140 Working days
5. CONTRACT CHANGES/UPDATES
202 Saw cutting – is incidental items designated as Remove and items in 604, 608 & 609; used for
incidental items, typically control joints
304 Aggregate Base Course – per Ton
601 Exposed Sand Finish – New line item paid by the SF; gives the surface appearance of older concrete
604 Standard inlet depth = 5.0 Ft – No additional depth or additional width line items
608/609 Contract specifies concrete shall be 48 hour high early – Standard mix designs will be submitted for
approval 48 hr, 24 hr, 12 hr.
608.46 Dump Fees – Only paid when concrete has existing wire/rebar (not accepted at Hoffman Mill Pit)
Page 2 of 2
Pre-Bid Meeting Agenda
Phase II Concrete Annual
Bid No. 7509
Friday May 10, 2013 10:00 a.m.
6. MISCELLANEOUS
Concrete Batch Weights on all concrete tickets
Expansion – vertical, full-depth
Notifications
Questions
7. CONTRACT DOCUMENTS AND LINE ITEM PRICES
Fill out provided Xcel Spread Sheet
Added Work: Traffic Control based on Traffic Control Ratio