Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7435 PLAZA & STREETSCAPE IMPROVEMENTS FOR POUDRE RIVER PUBLIC LIBRARY DISTRICT MAIN LIBRARY (2)CHANGE ORDER NO. 2 PROJECT TITLE: Library Streetscape Improvements CONTRACTOR: Hoff Construction PROJECT NUMBER: 7435 PURCHASE ORDER NO.: 9125895 DESCRIPTION: (See below) 1. Reason for change: The reason for this contract change includes modifications to both contract value and time based upon work change directives issued during the construction contract. Additionally, the contract time is being extended to compensate for additional work added to the base bid contract and weather delay. 2. Description of Change The description of the contract changes can be found in the attached work change directives which are incorporated into this change order by reference. Work Change Directives included in this change order are: Work Change Directive No. 1, 2, 3, 4, 5 The work change directives are summarized on the attached pending issues log. Substantial completion is being extended for weather delays and additional work. Final completion is being redefined to include changed work/installabon items. 3. Change in Contract Cost: $9,105.89 4. Change in Contract Time: calendar days for substantial completion Change in Contract Time: 9 calendar days for final completion ORIGINAL CONTRACT COST $191,120.00 TOTAL APPROVED CHANGE ORDER $0.00 TOTAL PENDING CHANGE ORDER $0.00 TOTAL THIS CHANGE ORDER $ 9,105.89 TOTAL % OF ORIGINAL CONTRACT, THIS C.O. 4.76% TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S 4.76% ADJUSTED CONTRACT COST $200,226.89 all change orders ACCEPTED BY: Contractor's Rec ACCEPTED BY: Library Representative O REVIEWED BY: Project Manager / v APPROVED BY: Purchasing Agent over $60,000 cc: Purchasing Architect Contractor Project File DATE: (Q- -q ` 13 / I DATE: DATE: DATE: dmilesco Project and Construction Services CHANGE ORDER NO. 2 SUPPORTING DOCUMENTATION Project: Library Streetscape Improvements Project No. 7435 Date: June 3, 2013 Description of Change: 1315 Oakridge Drive - Suite 120 Fort Collins, CO 80525 970.204.1673 fax ditescoservices.com This change order adds light pole foundations, landscape island, change in concrete finishes, manhole repair, and a mindhive sculpture foundation. This work was authorized through Work change directive (WCD) 001, 002, 003, 004, and 005. WCD 001, 002, 003, 004, and 005 are hereby incorporated by reference and included as attached. Change in Contract Value: The contract value is being increased by $9,105.89. Please see attached pending issues log summary and work change directive(s) as summarized in the table(s) below. Work Change Directives Item Number Description Contract Value WCD001 Light Pole Foundation $1,458'55 WCDO02 Landscape Island -$600.00 WCDO03 Concrete Finishes $4,245.00 WCDO04 Manhole Repair $2,482.72 WCDO05 Mindhive Sculpture Foundation $1,519.62 Total Work Change Directives: $9,105.89 Total Contract Change - this change order Total Change Order: $9,105.89 Change in Contract Time: Contract time changes associated with this change order are summarized below. All days shown are calendar days. Contract Time Summary Original Substantial Completion Date: May 29, 2013 Original Final Completion Date: June 13, 2013 WCDO01 - Light Pole Foundation 1 calendar day(s) WCDO02 - Landscape Island 0 calendar day(s WCDO03 - Concrete Finishes 0 calendar day(s) WCDO04 - Manhole Repair 1 calendar day(s) WCDO05 - Mindhive Sculpture Foundation 2 calendar day(s) Weather Days 5 calendar day(s) Revised Substantial Completion Date: June 7, 2013 Revised Final Completion Date: June 22, 2013 Page 1 of 1 Pending Issues Log ditesco Project and Construction Services Project: Library Streetscape Improvements Contractor: G.L. Hoff Construction Project No. #7435 Date: June 3, 2013 Ref. No. Spec Section Reference Item Description Date Requested Amount Status 1 WCD 001 Light Pole Foundation 426/2013 $1.458.55 2 WCD 002 Landscape Island 5/2/2013 $600.00 3 WCD 003 Concrete Finishes. 5/8/2013 $4,245.00 Material change from strictly a change in etch to a change in concrete color 4 WCD 004 : Olive/Peterson Manhole Repair 5/23/2013 $2482.72 5 WCD 005 Mindhive Sculpture Foundation 5/272013 $1.519.62 Job Totals: $9,105.69 COM $0.00 CO#2 $9,105.89 Remaining: $0.00 Total Contract Amount $191,120.00 Pentling Issues as a % of Contract Amount 4.76 Pending ' Change Order No. 1 Change Order No. 2