HomeMy WebLinkAboutBID - 7519 LEMAY AVENUE BRIDGE EXPANSION JOINT REPLACEMENTINVITATION TO BID 7519 LEMAY AVENUE BRIDGE EXPANSION JOINT REPLACEMENT BID OPENING: 3:00 P.M. (our clock), JUNE 20, 2013 The City of Fort Collins is requesting bids from firms for the replacement of the bridge expansion joints on the Lemay Avenue bridge where it crosses the Poudre River. Sealed bids will be received and publicly opened at the office of the Director of Purchasing and Risk Management, PO Box 580, 215 North Mason St., 2nd floor, Fort Collins, Colorado 80522, at the time and date noted on the bid proposal and/or contract documents. If delivered, they are to be sent to 215 North Mason Street, 2nd Floor, Fort Collins, Colorado 80524. If mailed, the address is P.O. Box 580, Fort Collins, 80522- 0580. Bids must be received at the Purchasing Office prior to 3:00 p.m. (our clock), June 20, 2013. The City encourages all disadvantaged business enterprises to submit bid in response to all invitations and will not be discriminated against on the grounds of race, color, national origin. Questions concerning the scope of the bid should be directed to Project Manager, Jin Wang at (970) 416-2292 or jwang@fcgov.com. Questions regarding bid submittal or process should be directed to John Stephen, CPPO, LEED AP, Senior Buyer at (970) 221-6777 or jstephen@fcgov.com. A copy of the Bid may be obtained as follows: 1. Download the Bid from the Purchasing Webpage, Current Bids page, at: http://fcgov.com/eprocurement Special Instructions All bids must be properly signed by an authorized representative of the company with the legal capacity to bind the company to the agreement. Bids may be withdrawn up to the date and hour set for closing. Once bids have been accepted by the City and closing has occurred, failure to enter into contract or honor the purchase order will be cause for removal of supplier's name from the City of Fort Collins' bidders list for a period of twelve months from the date of the opening. The City may also pursue any remedies available at law or in equity. Bid prices must be held firm for a period of forty- five (45) days after bid openings. Submission of a bid is deemed as acceptance of all terms, conditions and specifications Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 1 of 36 contained in the City's specifications initially provided to the bidder. Any proposed modification must be accepted in writing by the City prior to award of the bid. Only bids properly received by the Purchasing Office will be accepted. All bids should be clearly identified by the bid number and bid name contained in the bid proposal. No proposal will be accepted from, or any purchase order awarded, to any person, firm or corporation in default on any obligation to the City. Bids must be furnished exclusive of any federal excise tax, wherever applicable. Bidders must be properly licensed and secure necessary permits wherever applicable. Bidders not responding to this bid will be removed from our automated vendor listing for the subject commodities. The City may elect where applicable, to award bids on an individual item/group basis or on a total bid basis, whichever is most beneficial to the City. The City reserves the right to accept or reject any and all bids, and to waive any irregularities or informalities. Sales prohibited/conflict of interest: no officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision-making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity, favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited. Freight terms: unless otherwise noted, all freight is F.O.B. Destination, Freight Prepaid. All freight charges must be included in prices submitted on proposal. Discounts: any discounts allowed for prompt payment, etc., must be reflected in bid figures and not entered as separate pricing on the proposal form. Purchasing restrictions: your authorized signature of this bid assures your firm's compliance with the City's purchasing restrictions. A copy of the resolutions is available for review in the Purchasing Office or the City Clerk's Office. Request Resolution 91- 121 for cement restrictions. Collusive or sham bids: any bid deemed to be collusive or a sham bid will be rejected and reported to authorities as such. Your authorized signature of this bid assures that such bid is genuine and is not a collusive or sham bid. Bid results: for information regarding results for individual bids send a self-addressed, self-stamped envelope and a bid tally will be mailed to you. Bid results will be posted in our office 7 days after the bid opening. Gerry S. Paul Director of Purchasing and Risk Management BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 2 of 36 7519 LEMAY AVENUE BRIDGE EXPANSION JOINT REPLACEMENT BID OPENING: 3:00 P.M. (our clock), JUNE 20, 2013 WE HEREBY ENTER OUR BID FOR THE CITY OF FORT COLLINS' REQUIREMENTS FOR 7519 LEMAY AVENUE BRIDGE EXPANSION JOINT REPLACEMENT PER THE BID INVITATION AND ANY REFERENCED SPECIFICATIONS: PLEASE NOTE: Awarded service provider must enter into a service agreement (sample attached for your review) and provide the required insurance (Exhibit B). ABUTMENT 1ABUTMENT 4 202‐00220 REMOVAL OF ASPHALT MAT SY 18 18 36 202‐00504 REMOVAL OF EXPANSION DEVICE LF 67 67 134 515‐00120 WATERPROOFING (MEMBRANE) SY 9 9 18 518‐01004 BRIDGE EXPANSION DEVICE (0‐4 INCH) LF 67 67 134 518‐02010 ELASTOMERIC CONCRETE END DAM CF 40 40 80 626‐00000 MOBILIZATION LS 1 700‐70380 EROSION CONTROL LS 1 IN WORDS SIGNATURE PRINTED COMPANY ADDRESS CITY STATE ZIP PHONE EMAIL UNIT PRICE TOTAL PRICE TOTAL BASE BID ITEM DESCRIPTION UNIT SUPERSTRUCTURE QUANTITIES BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 3 of 36 SERVICES AGREEMENT THIS AGREEMENT made and entered into the day and year set forth below by and between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred to as the "City" and , hereinafter referred to as "Service Provider". WITNESSETH: In consideration of the mutual covenants and obligations herein expressed, it is agreed by and between the parties hereto as follows: 1. Scope of Services. The Service Provider agrees to provide services in accordance with the scope of services attached hereto as Exhibit "A", consisting of ( ) page and incorporated herein by this reference. 2. The Work Schedule. [Optional] The services to be performed pursuant to this Agreement shall be performed in accordance with the Work Schedule attached hereto as Exhibit "B", consisting of ( ) page , and incorporated herein by this reference. 3. Time of Commencement and Completion of Services. The services to be performed pursuant to this Agreement shall be initiated within ( ) days following execution of this Agreement. Services shall be completed no later than . Time is of the essence. Any extensions of the time limit set forth above must be agreed upon in a writing signed by the parties. 4. Contract Period. [Option 1] This Agreement shall commence upon the date of execution shown on the signature page of this Agreement and shall continue in full force and effect for one (1) year, unless sooner terminated as herein provided. In addition, at the option of the City, the Agreement may be extended for an additional period of one (1) year at the rates provided with written notice to the Professional mailed no later than ninety (90) days prior to contract end. 5. Contract Period. [Option 2] This Agreement shall commence , 200 , and shall continue in full force and effect until , 200 , unless sooner terminated as BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 4 of 36 herein provided. In addition, at the option of the City, the Agreement may be extended for additional one year periods not to exceed ( ) additional one year periods. Renewals and pricing changes shall be negotiated by and agreed to by both parties. The Denver Boulder Greeley CPIU published by the Colorado State Planning and Budget Office will be used as a guide. Written notice of renewal shall be provided to the Service Provider and mailed no later than ninety (90) days prior to contract end. 6. Delay. If either party is prevented in whole or in part from performing its obligations by unforeseeable causes beyond its reasonable control and without its fault or negligence, then the party so prevented shall be excused from whatever performance is prevented by such cause. To the extent that the performance is actually prevented, the Service Provider must provide written notice to the City of such condition within fifteen (15) days from the onset of such condition. [Early Termination clause here as an option 7. Early Termination by City/Notice. Notwithstanding the time periods contained herein, the City may terminate this Agreement at any time without cause by providing written notice of termination to the Service Provider. Such notice shall be delivered at least fifteen (15) days prior to the termination date contained in said notice unless otherwise agreed in writing by the parties. All notices provided under this Agreement shall be effective when mailed, postage prepaid and sent to the following addresses: City: City of Fort Collins Attn: Purchasing PO Box 580 Fort Collins, CO 80522 Copy to: City of Fort Collins Attn: PO Box 580 Fort Collins, CO 80522 Service Provider: Attn: In the event of early termination by the City, the Service Provider shall be paid for services rendered to the date of termination, subject only to the satisfactory performance of the Service Provider's obligations under this Agreement. Such payment shall be the Service Provider's sole right and remedy for such termination. 8. Contract Sum. The City shall pay the Service Provider for the performance of this BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 5 of 36 Contract, subject to additions and deletions provided herein, ($ ) as per the attached Exhibit " ", consisting of page , and incorporated herein by this reference. 9. City Representative. The City will designate, prior to commencement of the work, its representative who shall make, within the scope of his or her authority, all necessary and proper decisions with reference to the services provided under this agreement. All requests concerning this agreement shall be directed to the City Representative. 10. Independent Service provider. The services to be performed by Service Provider are those of an independent service provider and not of an employee of the City of Fort Collins. The City shall not be responsible for withholding any portion of Service Provider's compensation hereunder for the payment of FICA, Workmen's Compensation or other taxes or benefits or for any other purpose. 11. Personal Services. It is understood that the City enters into the Agreement based on the special abilities of the Service Provider and that this Agreement shall be considered as an agreement for personal services. Accordingly, the Service Provider shall neither assign any responsibilities nor delegate any duties arising under the Agreement without the prior written consent of the City. 12. Acceptance Not Waiver. The City's approval or acceptance of, or payment for any of the services shall not be construed to operate as a waiver of any rights or benefits provided to the City under this Agreement or cause of action arising out of performance of this Agreement. 13. Warranty. a. Service Provider warrants that all work performed hereunder shall be performed with the highest degree of competence and care in accordance with accepted standards for work of a similar nature. b. Unless otherwise provided in the Agreement, all materials and equipment BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 6 of 36 incorporated into any work shall be new and, where not specified, of the most suitable grade of their respective kinds for their intended use, and all workmanship shall be acceptable to City. c. Service Provider warrants all equipment, materials, labor and other work, provided under this Agreement, except City-furnished materials, equipment and labor, against defects and nonconformances in design, materials and workmanship/workwomanship for a period beginning with the start of the work and ending twelve (12) months from and after final acceptance under the Agreement, regardless whether the same were furnished or performed by Service Provider or by any of its subcontractors of any tier. Upon receipt of written notice from City of any such defect or nonconformances, the affected item or part thereof shall be redesigned, repaired or replaced by Service Provider in a manner and at a time acceptable to City. 14. Default. Each and every term and condition hereof shall be deemed to be a material element of this Agreement. In the event either party should fail or refuse to perform according to the terms of this agreement, such party may be declared in default thereof. 15. Remedies. In the event a party has been declared in default, such defaulting party shall be allowed a period of ten (10) days within which to cure said default. In the event the default remains uncorrected, the party declaring default may elect to (a) terminate the Agreement and seek damages; (b) treat the Agreement as continuing and require specific performance; or (c) avail himself of any other remedy at law or equity. If the non-defaulting party commences legal or equitable actions against the defaulting party, the defaulting party shall be liable to the non-defaulting party for the non-defaulting party's reasonable attorney fees and costs incurred because of the default. 16. Binding Effect. This writing, together with the exhibits hereto, constitutes the entire agreement between the parties and shall be binding upon said parties, their officers, employees, agents and assigns and shall inure to the benefit of the respective survivors, heirs, personal representatives, successors and assigns of said parties. BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 7 of 36 17. Indemnity/Insurance. a. The Service Provider agrees to indemnify and save harmless the City, its officers, agents and employees against and from any and all actions, suits, claims, demands or liability of any character whatsoever brought or asserted for injuries to or death of any person or persons, or damages to property arising out of, result from or occurring in connection with the performance of any service hereunder. b. The Service Provider shall take all necessary precautions in performing the work hereunder to prevent injury to persons and property. c. Without limiting any of the Service Provider's obligations hereunder, the Service Provider shall provide and maintain insurance coverage naming the City as an additional insured under this Agreement of the type and with the limits specified within Exhibit , consisting of one (1) page, attached hereto and incorporated herein by this reference. The Service Provider before commencing services hereunder, shall deliver to the City's Director of Purchasing and Risk Management, P. O. Box 580 Fort Collins, Colorado 80522 one copy of a certificate evidencing the insurance coverage required from an insurance company acceptable to the City. 18. Entire Agreement. This Agreement, along with all Exhibits and other documents incorporated herein, shall constitute the entire Agreement of the parties. Covenants or representations not contained in this Agreement shall not be binding on the parties. 19. Law/Severability. The laws of the State of Colorado shall govern the construction interpretation, execution and enforcement of this Agreement. In the event any provision of this Agreement shall be held invalid or unenforceable by any court of competent jurisdiction, such holding shall not invalidate or render unenforceable any other provision of this Agreement. 20. Prohibition Against Employing Illegal Aliens. Pursuant to Section 8-17.5-101, C.R.S., et. seq., Service Provider represents and agrees that: a. As of the date of this Agreement: BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 8 of 36 1. Service Provider does not knowingly employ or contract with an illegal alien who will perform work under this Agreement; and 2. Service Provider will participate in either the e-Verify program created in Public Law 208, 104th Congress, as amended, and expanded in Public Law 156, 108th Congress, as amended, administered by the United States Department of Homeland Security (the “e-Verify Program”) or the Department Program (the “Department Program”), an employment verification program established pursuant to Section 8-17.5-102(5)(c) C.R.S. in order to confirm the employment eligibility of all newly hired employees to perform work under this Agreement. b. Service Provider shall not knowingly employ or contract with an illegal alien to perform work under this Agreement or knowingly enter into a contract with a subcontractor that knowingly employs or contracts with an illegal alien to perform work under this Agreement. c. Service Provider is prohibited from using the e-Verify Program or Department Program procedures to undertake pre-employment screening of job applicants while this Agreement is being performed. d. If Service Provider obtains actual knowledge that a subcontractor performing work under this Agreement knowingly employs or contracts with an illegal alien, Service Provider shall: 1. Notify such subcontractor and the City within three days that Service Provider has actual knowledge that the subcontractor is employing or contracting with an illegal alien; and 2. Terminate the subcontract with the subcontractor if within three days of receiving the notice required pursuant to this section the subcontractor does not cease employing or contracting with the illegal alien; except that Service Provider shall not terminate the contract with the subcontractor if during such three days the subcontractor provides BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 9 of 36 information to establish that the subcontractor has not knowingly employed or contracted with an illegal alien. e. Service Provider shall comply with any reasonable request by the Colorado Department of Labor and Employment (the “Department”) made in the course of an investigation that the Department undertakes or is undertaking pursuant to the authority established in Subsection 8-17.5-102 (5), C.R.S. f. If Service Provider violates any provision of this Agreement pertaining to the duties imposed by Subsection 8-17.5-102, C.R.S. the City may terminate this Agreement. If this Agreement is so terminated, Service Provider shall be liable for actual and consequential damages to the City arising out of Service Provider’s violation of Subsection 8-17.5-102, C.R.S. g. The City will notify the Office of the Secretary of State if Service Provider violates this provision of this Agreement and the City terminates the Agreement for such breach. 21. Special Provisions. [Optional] Special provisions or conditions relating to the services to be performed pursuant to this Agreement are set forth in Exhibit " ", consisting of ( ) pages, attached hereto and incorporated herein by this reference. BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 10 of 36 CITY OF FORT COLLINS, COLORADO a municipal corporation By:_______________________________ Gerry S. Paul Director of Purchasing and Risk Management Date:_____________________________ ATTEST: _________________________________ City Clerk APPROVED AS TO FORM: ________________________________ Assistant City Attorney By:_______________________________ __________________________________ PRINT NAME __________________________________ CORPORATE PRESIDENT OR VICE PRESIDENT Date:_____________________________ ATTEST: (Corporate Seal) _____________________________ CORPORATE SECRETARY BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 11 of 36 EXHIBIT INSURANCE REQUIREMENTS 1. The Service Provider will provide, from insurance companies acceptable to the City, the insurance coverage designated hereinafter and pay all costs. Before commencing work under this bid, the Service Provider shall furnish the City with certificates of insurance showing the type, amount, class of operations covered, effective dates and date of expiration of policies, and containing substantially the following statement: "The insurance evidenced by this Certificate will not be cancelled or materially altered, except after ten (10) days written notice has been received by the City of Fort Collins." In case of the breach of any provision of the Insurance Requirements, the City, at its option, may take out and maintain, at the expense of the Service Provider, such insurance as the City may deem proper and may deduct the cost of such insurance from any monies which may be due or become due the Service Provider under this Agreement. The City, its officers, agents and employees shall be named as additional insureds on the Service Provider's general liability and automobile liability insurance policies for any claims arising out of work performed under this Agreement. 2. Insurance coverages shall be as follows: A. Workers' Compensation & Employer's Liability. The Service Provider shall maintain during the life of this Agreement for all of the Service Provider's employees engaged in work performed under this agreement: 1. Workers' Compensation insurance with statutory limits as required by Colorado law. 2. Employer's Liability insurance with limits of $100,000 per accident, $500,000 disease aggregate, and $100,000 disease each employee. B. Commercial General & Vehicle Liability. The Service Provider shall maintain during the life of this Agreement such commercial general liability and automobile liability insurance as will provide coverage for damage claims of personal injury, including accidental death, as well as for claims for property damage, which may arise directly or indirectly from the performance of work under this Agreement. Coverage for property damage shall be on a "broad form" basis. The amount of insurance for each coverage, Commercial General and Vehicle, shall not be less than $500,000 combined single limits for bodily injury and property damage. In the event any work is performed by a subcontractor, the Service Provider shall be responsible for any liability directly or indirectly arising out of the work performed under this Agreement by a subcontractor, which liability is not covered by the subcontractor's insurance. BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 12 of 36 PROJECT AREA REVISIONS: DATE: DRAWN BY: SCALE: DATE: DESIGNED BY: OF STRUCTURE NUMBER: SHEET SHEET SUBSET: SUBSET SHEETS: LEMAY AVENUE OVER POUDRE RIVER ENGINEERING DEPT. - CAPITAL PROJECTS CITY OF FORT COLLINS, COLORADO City of Engineering fcgov.com/engineering Justin.Spanier 4:53:02 PM R:\City of Fort Collins Bridge Services On-Call\W ork Order 9 (135236) - Lem ay Bridge Exp Jt Replacem ent\08_Sheet_Files\06_Structures\DGN\01-Cover Sheet.dgn CITY OF FORT COLLINS PUBLIC IMPROVEMENT CONSTRUCTION PLANS FOR: LEMAY AVENUE OVER POUDRE RIVER EXPANSION JOINT REPLACEMENT INDEX OF SHEETS: R I V E R S I D E A V E N U E E . M U L B E RR Y S T R EET LEMAY AVENUE E. LINCOLN AVENUE P O U D R E R I V E R SECTION OR DETAIL IDENTIFICATION CROSS REFERENCE DRAWING NUMBER GENERAL NOTES: (IF "-", REFERENCE IS TO SAME SHEET) 13 JFJ JBS 05/29/2013 2 N/A BRIDGE B2 GENERAL INFORMATION FCLMY-0.1-RVSDE REMOVAL OF EXPANSION JOINT: DETERMINATION OF RESPONSIBILITIES: PLACEMENT OF NEW EXPANSION JOINTS: BE MEASURED SEPARATELY BUT WILL BE INCLUDED IN THE WORK. PREPARATION REQUIREMENTS PER THE MANUFACTURER'S SPECIFICATIONS WILL NOT CUTTING OR CHIPPING FOR CONCRETE REMOVAL AND ANY OTHER INSTALLATION ALL WORK ASSOCIATED WITH REMOVAL OF THE EXPANSION JOINTS, INCLUDING SAW PAYMENT SHALL BE MADE UNDER ITEM 202, REMOVAL OF EXPANSION DEVICE. BETWEEN FACES OF BRIDGE RAILS AND PARALLEL TO THE EXPANSION JOINT. EXPANSION DEVICES REMOVED SHALL BE MEASURED BY THE LINEAR FOOT RECOMMENDATIONS. IN ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS AND EXPOSED CONCRETE SURFACES WITHIN THE REMOVAL LIMITS SHALL BE PREPARED CONTRACTOR'S EXPENSE WITH NO ALLOWANCE FOR CONTRACT TIME EXTENSION. SHALL BE REPAIRED OR REPLACED AT APPROVAL OF THE ENGINEER AND AT THE THE LIMITS OF CONSTRUCTION THAT IS DAMAGED BY THE CONTRACTOR'S OPERATION DESIGNATED TO REMAIN IN-PLACE. ANY CONCRETE OR REINFORCING STEEL OUTSIDE TO AVOID DAMAGE TO EXISTING CONCRETE AND REINFORCING STEEL THAT IS APPROVED BY THE ENGINEER. THE CONTRACTOR SHALL TAKE ALL STEPS NECESSARY THE METHODS AND EQUIPMENT USED FOR THE CONCRETE REMOVAL SHALL BE REMOVAL OPERATIONS SHALL BE COORDINATED WITH THE CITY AS APPROPRIATE. OR AS DIRECTED BY THE ENGINEER. PORTIONS OF SECTION 202 OF THE STANDARD SPECIFICATIONS, BY THE PLANS, THIS WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE APPLICABLE EXPANSION DEVICES, TO THE LIMITS AND DIMENSIONS AS SHOWN IN THE PLANS. THE CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL OF BOTH EXISTING WITH NO ALLOWANCE FOR CONTRACT TIME EXTENSION. REPLACED AT APPROVAL OF THE ENGINEER AND AT THE CONTRACTOR'S EXPENSE THAT IS DAMAGED BY THE CONTRACTOR'S OPERATION SHALL BE REPAIRED OR ANY CONCRETE OR REINFORCING STEEL OUTSIDE THE LIMITS OF CONSTRUCTION DEVICE (0-4 INCH) AND ITEM 518, ELASTOMERIC CONCRETE END DAM. TO MAKE THE INSTALLATIONS, SHALL BE PAID UNDER ITEM 518, BRIDGE EXPANSION SIDEWALK COVER PLATES AND ALL OTHER REQUIRED LABOR AND MATERIALS THE COST FOR INSTALLING THE BRIDGE EXPANSION JOINT DEVICES, INCLUDING TESTING REQUIREMENTS. SEE SECTION 518 OF THE STANDARD SPECIFICATION FOR WATER TIGHT INTEGRITY THE NEOPRENE GLAND SHALL BE INSTALLED IN ONE PIECE. DO NOT PAINT STEEL SURFACES IN CONTACT WITH EITHER CONCRETE OR SEAL. THE SLOPE AND GRADE OF THE DECK AND SIDEWALK, AS SHOWN IN THE PLANS. THE EXPANSION JOINT DEVICE SHALL BE INSTALLED ON GRADE, PARALLEL TO EXPANSION ANCHORS. MANUFACTURER'S SPECIFICATIONS AND RECOMMENDATIONS, EXCEPT FOR THE EXPANSION JOINT SHALL BE PLACED IN ACCORDANCE WITH THE WITHOUT THE EXPANSION ANCHORS. CONCRETE/STRIP SEAL EXPANSION JOINT SYSTEM MANUFACTURED BY D.S. BROWN, THE EXPANSION JOINT USED SHALL BE THE DELCRETE ELASTOMERIC OR AS DIRECTED BY THE ENGINEER. PORTIONS OF SECTION 518 OF THE STANDARD SPECIFICATIONS, BY THE PLANS, THIS WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE APPLICABLE EXPANSION DEVICES, TO THE LIMITS AND DIMES IONS AS SHOWN IN THE PLANS. THE CONTRACTOR IS RESPONSIBLE FOR THE INSTALLATION OF BOTH EXISTING SUMMARY OF QUANTITIES: 13 JFJ JBS 05/29/2013 BRIDGE B3 SUMMARY OF QUANTITIES FCLMY-0.1-RVSDE 3 NOTES: For Information Only Quantity = 105.7 Tons (Total). as defined by these plans. 3. The City is responsible for determination of HMA type and placement of HMA (membrane) necessary as a result of the Removal of Asphalt Mat (Planing) operations. 2. The City is responsible for determination of limits and placement of waterproofing For Information Only Quantity = 728 SY (Total). 1. The City is responsible for Removal of Asphalt Mat (Planing) as defined by these plans. N/A ITEM DESCRIPTION UNIT SUPERSTRUCTURE TOTALS ABUTMENT 1 ABUTMENT 4 202-00220 REMOVAL OF ASPHALT MAT SY 18 18 36 202-00504 REMOVAL OF EXPANSION DEVICE LF 67 67 134 515-00120 WATERPROOFING (MEMBRANE) SY 9 9 18 518-01004 BRIDGE EXPANSION DEVICE (0-4 INCH) LF 67 67 134 518-02010 ELASTOMERIC CONCRETE END DAM CF 40 40 80 626-00000 MOBILIZATION LS 1 700-70380 EROSION CONTROL LS 1 REVISIONS: DATE: DRAWN BY: SCALE: DATE: DESIGNED BY: OF STRUCTURE NUMBER: SHEET SHEET SUBSET: SUBSET SHEETS: LEMAY AVENUE OVER POUDRE RIVER ENGINEERING DEPT. - CAPITAL PROJECTS CITY OF FORT COLLINS, COLORADO City of Engineering fcgov.com/engineering Justin.Spanier 4:54:31 PM R:\City of Fort Collins Bridge Services On-Call\W ork Order 9 (135236) - Lem ay Bridge Exp Jt Replacem ent\08_Sheet_Files\06_Structures\DGN\03-Sum m ary of Quantities.dgn BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 15 of 36 & Ò BRIDGE Ò LEMAY AVENUE 66'-0" 33'-0" 33'-0" 1'-0" 6'-0" 6'-0" 1'-0" 7'-0" 7'-0" 2'-0" 33'-0" 33'-0" = 24'-0" 2 LANES @ 12'-0" = 24'-0" 2 LANES @ 12'-0" 2'-0" 66'-0" 266'-0" B.F. ABUTMENT 1 TO B.F. ABUTMENT 4 90° (TYP.) TO E. MULBERRY ST. TO RIVERSIDE AVE. B.F. ABUTMENT 1 B.F. ABUTMENT 4 (TO BE REPLACED) EXPANSION JOINT EDGE OF ASPHALT EDGE OF ASPHALT ELECTRIC OVERHEAD RECREATION PATH (TYP.) (TO REMAIN) STR. NO. FCLMY-0.1-RVSDE CONDUITS EXISTING UTILITY REPLACED) ABUTMENTS (TO BE EXPANSION JOINT AT EXISTING 1•" HMA EDGE OF ASPHALT EDGE OF ASPHALT (TO BE REPLACED) EXPANSION JOINT 1.5% 1.5% REVISIONS: DATE: DRAWN BY: SCALE: DATE: DESIGNED BY: OF STRUCTURE NUMBER: SHEET SHEET SUBSET: SUBSET SHEETS: LEMAY AVENUE OVER POUDRE RIVER ENGINEERING DEPT. - CAPITAL PROJECTS CITY OF FORT COLLINS, COLORADO City of Engineering fcgov.com/engineering Justin.Spanier 4:55:50 PM R:\City of Fort Collins Bridge Services On-Call\W ork Order 9 (135236) - Lem ay Bridge Exp Jt Replacem ent\08_Sheet_Files\06_Structures\DGN\04-General Layout.dgn PLAN TYPICAL SECTION Ò LEMAY AVENUE & Ò BRIDGE POUDRE RIVER NOTES: dimensions prior to ordering material. The contractor shall field verify actual SHLD. 1'-0" LANE 11'-0" 2'-0" LANE 11'-0" 2'-0" SHLD. CLEAR 2'-0" PHASE 1 CONSTRUCTION 27'-0" PHASE 1 TRAFFIC 31'-0" SHLD. 1'-0" LANE 11'-0" CLEAR 2'-0" PHASE 2 TRAFFIC 18'-0" PHASE 2 13'-0" SHLD. 1'-0" LANE 11'-0" 2'-0" SHLD. CLEAR 5'-0" PHASE 2 TRAFFIC 21'-0" SDWK. 6'-0" SDWK. 6'-0" SDWK. 6'-0" JOINT EXPANSION LIMITS OF NEW JOINT EXPANSION LIMITS OF NEW JOINT EXPANSION LIMITS OF NEW JOINT EXPANSION LIMITS OF NEW REMOVAL LIMITS OF REMOVAL LIMITS OF REMOVAL LIMITS OF REMOVAL LIMITS OF MEDIAN SHLD. 1'-0" LANE 11'-0" 2'-0" SHLD. CLEAR 5'-0" SDWK. 6'-0" 2'-0" LANE 11'-0" PHASE 3 CONSTRUCTION 24'-0" PHASE 3 TRAFFIC 34'-0" MEDIAN RAISED (SUGGESTED PEDESTRIAN DETOUR) RECREATION PATH (TYP.) MEDIAN RAISED MEDIAN RAISED MEDIAN RAISED REMOVAL LIMITS OF REMOVAL LIMITS OF JOINT EXPANSION LIMITS OF NEW JOINT EXPANSION LIMITS OF NEW PHASE 4 CONSTRUCTION (ROLLING TRAFFIC CONTROL) 64'-0" EXPANSION JOINT PREPARATION AND GLAND INSTALLATION INSTALLATION LIMITS OF GLAND INSTALLATION LIMITS OF GLAND ASPHALT TAPER (MEMBRANE), AND WATERPROOFING NEW EXPANSION JOINT, 2'-0" RECREATION PATH (TYP.) REVISIONS: DATE: DRAWN BY: SCALE: DATE: DESIGNED BY: OF STRUCTURE NUMBER: SHEET SHEET SUBSET: SUBSET SHEETS: LEMAY AVENUE OVER POUDRE RIVER ENGINEERING DEPT. - CAPITAL PROJECTS CITY OF FORT COLLINS, COLORADO City of Engineering fcgov.com/engineering OVERLAY ASPHALT MILL AND OVERLAY ASPHALT MILL AND MEDIAN RAISED (SUGGESTED PEDESTRIAN DETOUR) RECREATION PATH (TYP.) MEDIAN RAISED PHASE 5 CONSTRUCTION (ROLLING TRAFFIC CONTROL) 52'-0" MILL AND OVERLAY REVISIONS: DATE: DRAWN BY: SCALE: DATE: DESIGNED BY: OF STRUCTURE NUMBER: SHEET SHEET SUBSET: SUBSET SHEETS: LEMAY AVENUE OVER POUDRE RIVER ENGINEERING DEPT. - CAPITAL PROJECTS CITY OF FORT COLLINS, COLORADO City of Engineering fcgov.com/engineering Justin.Spanier 4:59:12 PM R:\City of Fort Collins Bridge Services On-Call\W ork Order 9 (135236) - Lem ay Bridge Exp Jt Replacem ent\08_Sheet_Files\06_Structures\DGN\07-Construction Phasing 3 of 3.dgn PLAN SECTION PHASE 5 13 JFJ JBS 05/29/2013 BRIDGE B7 CONSTRUCTION PHASING (3 OF 3) FCLMY-0.1-RVSDE 7 ACTIVITIES: (ALL BY CITY) 1 KEYNOTES: 1 Traffic control devices to be determined and provided by city. NTS PLACE ASPHALT 2"Î TO 3 •" AS SHOWN IN DETAILS. APPLY WATERPROOFING (MEMBRANE), IF NECESSARY AND WHERE APPLICABLE. MILL ASPHALT 2"Î TO LIMITS SHOWN IN DETAILS. RESET ROLLING TRAFFIC CONTROL (EST. 1 DAY, BY CITY). 1:80 BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 19 of 36 1'-6" 1'-0" 1'-0" 1'-6" 2 " 2 " 3 " " 2 1 1 REMOVAL SIDEWALK REMOVAL SIDEWALK " 2 1 1 3 " 1'-6" 1'-0" 1'-0" 1'-6" REMOVAL CONCRETE REMOVAL CONCRETE 1 ' - 0 " 1 ' - 6 " 1 ' - 6 " 1 ' - 0 " 3 " 3" 2 " 2 " 2" 3" 3" REMOVAL SIDEWALK REMOVAL CONCRETE 5'-11ƒ" 2 " 1 3 - 1.5 % ( S EE NO TE 1 ) - 1 . 3 9 % ( S EE NO TE 1 ) ELASTOMERIC 1'-0" HMA TAPER 1'-6" ELASTOMERIC 1'-0" HMA TAPER 1'-6" 2 " 1 3 3" ELASTOMERIC 1'-0" HMA TAPER 1'-6" ELASTOMERIC 1'-0" HMA TAPER 1'-6" (SYMM. ABOUT Ò BRIDGE) 26'-0‚" TO Ò BRIDGE 8 " 3 6 8 " 3 6 - A - A ELEVATION IN ROADWAY RECESS 4 " 1 GLAND RAIL (TYP.) EXPANSION JOINT ELASTOMERIC CONCRETE (TYP.) EXISTING BARRIER ELASTOMERIC CONCRETE (TYP.) GLAND RAIL (TYP.) EXPANSION JOINT RECESS 2 " 1 EXISTING SIDEWALK SPREADER BRACKET LEVELING BOLT (TYP.) NUT (TYP.) EXPANSION JOINT RAIL (TYP.) FORMING MATERIAL (TYP.) EXISTING CONCRETE (TYP.) EXISTING CONCRETE (TYP.) B9 DETAIL 1 B9 DETAIL 2 1 1 1 1 1 1 KEYNOTES: SUGGESTED INSTALLATION METHOD 2 2 NOTES: 10 13 JFJ JBS 05/29/2013 EXPANSION JOINT PLACEMENT DETAILS (2 OF 2) FCLMY-0.1-RVSDE BRIDGE B10 DECK SHOWN, SIDEWALK SIMILAR 1•:1 AT ROADWAY NOT SHOWN) (COVER PLATE SIDEWALK CURB AT recommendations. for determining specific details as necessary and in accordance with manufacturer 1. Details for the suggested installation method are general. The Contractor is responsible 1 bridge deck. No recess is required where cover plate will be present. 2 Expansion joint rail shall be recessed ‚" into elastomeric concrete end dam in the specifications. and any other item(s) required to install the expansion joint per manufacturer's 5'-11" 4 " 1 4 " 6 1 4 " 3 2 " 1 2 2 " 1 2 3" 2'-0" 2 ' - 0 " 1" RADIUS TYP.) SCREWS (COUNTERSUNK, AND •" FLAT HEAD CAP •" THREADED INSERTS 11 SPA. @ 6" = 5'-6" Œ"ß HOLES TYP.) SCREWS (COUNTERSUNK, AND •" FLAT HEAD CAP •" THREADED INSERTS APPROACH BRIDGE " 11 SPA. @ 6" = 5'-6" 2 1 2 2 " 1 2 •" REMOVEABLE COVER PLATE •" REMOVEABLE COVER PLATE 13 JFJ JBS 05/29/2013 BRIDGE B11 FCLMY-0.1-RVSDE ƒ:1 SIDEWALK COVER PLATE DETAILS 11 COVER PLATE PLAN COVER PLATE ELEVATION - A - A - A SECTION EXPANSION JOINT RAIL NOT SHOWN NOTES: shall not be paid separately but shall be included in item 518, Bridge Expansion Device (0-4 Inch). 3 All work and material associated with the fabrication and installation of sidewalk cover plates exposed corners to „" radius. 2. Cover plate shall be ASTM A36 steel. Galvanize cover plates after fabrication. Grind all 52'-0" 31'-6" 31'-6" 32'-6" 32'-6" 31'-6" 31'-6" 32'-6" 32'-6" 1'-0" 1'-0" 1'-0" 1'-0" END OF DECK END OF DECK (TYP.) SIDEW ALK (TYP.) BARRIER ABUTMENT 1 BACK FACE ABUTMENT 4 BACK FACE AND HMA OVERLAY (TYP.) LIMITS OF ASPHALT MAT (PLANING) PLAN 12 13 JFJ JBS 1:16 05/29/2013 BRIDGE B12 ASPHALT MILL AND OVERLAY (1 OF 2) FCLMY-0.1-RVSDE NOTES: 1. All work on this sheet is to be performed by the City. B13 A B13 A REVISIONS: DATE: DRAWN BY: SCALE: DATE: DESIGNED BY: OF STRUCTURE NUMBER: SHEET SHEET SUBSET: SUBSET SHEETS: LEMAY AVENUE OVER POUDRE RIVER ENGINEERING DEPT. - CAPITAL PROJECTS CITY OF FORT COLLINS, COLORADO City of Engineering fcgov.com/engineering Justin.Spanier 5:03:04 PM R:\City of Fort Collins Bridge Services On-Call\W ork Order 9 (135236) - Lem ay Bridge Exp Jt Replacem ent\08_Sheet_Files\06_Structures\DGN\12-Asphalt Mill and Overlay 1 of 2.dgn BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 24 of 36 30'-0" 1'-6" 1'-0" 32'-6" 1'-0" 1'-6" 30'-0" 32'-6" 32'-6" 32'-6" 2" 2 " 1 3 3" 2" 2" 3" 2 " 1 3 2" 31'-6" 1'-0" 1'-0" 31'-6" ABUTMENT BACK FACE EXISTING EXISTING GIRDER EXISTING BRIDGE DECK EXISTING END DIAPHRAGM EXISTING END DIAPHRAGM ABUTMENT BACK FACE EXISTING EXISTING GIRDER EXISTING BRIDGE DECK ASPHALT MAT (PLANING) ASPHALT MAT (PLANING) 2" HMA OVERLAY HMA OVERLAY 2 " 1 1 AS APPLICABLE ON DECK AS NECESSARY AND WATERPROOFING (MEMBRANE) NOTES: 13 13 JFJ JBS 05/29/2013 BRIDGE B13 ASPHALT MILL AND OVERLAY (2 OF 2) FCLMY-0.1-RVSDE …:1 HMA OVERLAY (PLANING) ASPHALT MAT 2. All work on this sheet is to be performed by the City. 1. Abutment 1 shown, abutment 4 similar by opposite hand. 1 KEYNOTES: 1 1 Dimensions shown are approximate and should be field verified. with a thickness of 1•" at the abutments and thicker near the center of the structure. 1 Existing asphalt overlay thickness is anticipated to vary along the length of the bridge B12 A SECTION BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 26 of 36 BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 27 of 36 BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 28 of 36 BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 29 of 36 BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 30 of 36 BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 31 of 36 BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 32 of 36 BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 33 of 36 BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 34 of 36 BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 35 of 36 BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 36 of 36 B12 A SECTION REVISIONS: DATE: DRAWN BY: SCALE: DATE: DESIGNED BY: OF STRUCTURE NUMBER: SHEET SHEET SUBSET: SUBSET SHEETS: LEMAY AVENUE OVER POUDRE RIVER ENGINEERING DEPT. - CAPITAL PROJECTS CITY OF FORT COLLINS, COLORADO City of Engineering fcgov.com/engineering Justin.Spanier 5:03:43 PM R:\City of Fort Collins Bridge Services On-Call\W ork Order 9 (135236) - Lem ay Bridge Exp Jt Replacem ent\08_Sheet_Files\06_Structures\DGN\13-Asphalt Mill and Overlay 2 of 2.dgn BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 25 of 36 1. Cover plate is intended to be placed flush with the top of sidewalk and face of sidewalk curb. REVISIONS: DATE: DRAWN BY: SCALE: DATE: DESIGNED BY: OF STRUCTURE NUMBER: SHEET SHEET SUBSET: SUBSET SHEETS: LEMAY AVENUE OVER POUDRE RIVER ENGINEERING DEPT. - CAPITAL PROJECTS CITY OF FORT COLLINS, COLORADO City of Engineering fcgov.com/engineering Rick.Koechley 7:14:25 AM R:\City of Fort Collins Bridge Services On-Call\W ork Order 9 (135236) - Lem ay Bridge Exp Jt Replacem ent\08_Sheet_Files\06_Structures\DGN\11-Sidewalk Cover Plate Details.dgn BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 23 of 36 expansion joint rails, leveling bolts, nuts, elastomeric concrete, gland, sidewalk cover plates, 1 D.S. Brown Delcrete Elastomeric Concrete/Strip Seal expansion joint system shall include REVISIONS: DATE: DRAWN BY: SCALE: DATE: DESIGNED BY: OF STRUCTURE NUMBER: SHEET SHEET SUBSET: SUBSET SHEETS: LEMAY AVENUE OVER POUDRE RIVER ENGINEERING DEPT. - CAPITAL PROJECTS CITY OF FORT COLLINS, COLORADO City of Engineering fcgov.com/engineering Justin.Spanier 5:01:46 PM R:\City of Fort Collins Bridge Services On-Call\W ork Order 9 (135236) - Lem ay Bridge Exp Jt Replacem ent\08_Sheet_Files\06_Structures\DGN\10-Joint Placem ent Details 2 of 2.dgn BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 22 of 36 - A SECTION ISOMETRIC VIEW GLAND 13 JFJ JBS 05/29/2013 BRIDGE B9 FCLMY-0.1-RVSDE 9 1 CONCRETE END DAM CONCRETE END DAM CONCRETE END DAM CONCRETE END DAM CONDUIT (IF PRESENT) EXISTING UTILITY OVERLAY EXISTING ASPHALT 1 1 1 JOINT RAIL TOP OF EXPANSION JOINT RAIL BOTTOM OF EXPANSION AFTER REMOVAL TOP OF CONCRETE RAIL (TYP.) EXPANSION JOINT 1 1 1 NOTES: KEYNOTES: 1 EXPANSION JOINT RAIL OVERLAY ASPHALT EXISTING DECK EXISTING BRIDGE ABUTMENT BACK FACE EXISTING BARRIER TOP OF EXISTING DECK BRIDGE EXISTING ABUTMENT BACK FACE EXISTING ASPHALT ROADWAY EXISTING SIDEWALK TOP OF EXISTING ASPHALT ROADWAY EXISTING BACKWALL ABUTMENT EXISTING BRIDGE DECK EXISTING (TO REMAIN UNDISTURBED) EXISTING BARRIER 2 AFTER NEW JOINT INSTALLATION 2 2 (MEMBRANE) WATERPROOFING ƒ:1 (BY CITY) (BY CITY) ELEVATION AT SIDEWALK CURB (BY CITY) (BY CITY) (BY CITY, TYP.) HMA TAPER DAM (TYP.) CONCRETE END ELASTOMERIC 2 1. Dimensions contained in these plans are calculated from the "as built plans" and may be adjusted to meet the existing structure. The contractor shall verify all dependent dimensions in the field before ordering or fabricating any material. 2. All dimensions shown are horizontal. CONDUITS (IF PRESENT) EXISTING UTILITY (MEMBRANE) WATERPROOFING (MEMBRANE) WATERPROOFING CONCRETE TOP OF ELASTOMERIC LEGEND: HMA (BY CITY) ELASTOMERIC CONCRETE END DAM 1 COVER PLATE SIDEWALK 3 3 3 3 3 3 ASPHALT ROADWAY EXISTING (TYP.) SIDEWALK EXISTING (IF PRESENT) CONDUITS UTILITY EXISTING SIDEWALK COVER PLATE 3 EXPANSION JOINT PLACEMENT DETAILS (1 OF 2) B10 1 B10 2 1 D.S. Brown Delcrete Elastomeric Concrete/Strip Seal expansion joint system shall include expansion joint rails, leveling bolts, nuts, elastomeric concrete, gland, sidewalk cover plates, and any other item(s) required to install the expansion joint per manufacturer's specifications. 2 Expansion joint rail shall be recessed ‚" into elastomeric concrete end dam in the bridge deck. No recess is required where cover plate will be present. 3 Minimum as shown. In the event that the dimension is larger than the minimum, the Contractor shall use elastomeric concrete at no additional cost to the project. Structural concrete will not be allowed. REVISIONS: DATE: DRAWN BY: SCALE: DATE: DESIGNED BY: OF STRUCTURE NUMBER: SHEET SHEET SUBSET: SUBSET SHEETS: LEMAY AVENUE OVER POUDRE RIVER ENGINEERING DEPT. - CAPITAL PROJECTS CITY OF FORT COLLINS, COLORADO City of Engineering fcgov.com/engineering Justin.Spanier 5:01:08 PM R:\City of Fort Collins Bridge Services On-Call\W ork Order 9 (135236) - Lem ay Bridge Exp Jt Replacem ent\08_Sheet_Files\06_Structures\DGN\09-Joint Placem ent Details 1 of 2.dgn BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 21 of 36 6'-0" CONDUIT (IF PRESENT) EXISTING UTILITY 2 " 1 1 OVERLAY EXISTING ASPHALT CONDUITS (IF PRESENT) EXISTING UTILITY EXISTING SIDEWALK BACKWALL ABUTMENT EXISTING ASPHALT ROADWAY EXISTING EXISTING BRIDGE DECK ASPHALT ROADWAY EXISTING ASPHALT ROADWAY EXISTING (TO REMAIN UNDISTURBED) EXISTING BARRIER SIDEWALK TOP OF EXISTING ABUTMENT BACK FACE EXISTING ABUTMENT BACK FACE EXISTING BARRIER TOP OF EXISTING REMOVAL ASPHALT MAT REMOVAL ASPHALT MAT REMOVAL ASPHALT MAT REMOVAL ASPHALT MAT EXISTING BARRIER SIDEWALK TOP OF EXISTING END DAM TOP OF EXISTING DECK (BEYOND) TOP OF EXISTING BRIDGE DECK EXISTING OVERLAY ASPHALT EXISTING (IF PRESENT) CONDUITS UTILITY EXISTING DECK BRIDGE EXISTING OVERLAY ASPHALT EXISTING (TYP.) 3" (TYP.) 2 " 1 EXISTING ANCHOR (TYP.) EXISTING ANCHOR (TYP.) (TYP.) 3" (TYP.) 3" ABUTMENT DECK 13 JFJ JBS 05/29/2013 ISOMETRIC VIEW AFTER ALL REMOVALS 1 1 1 1 - A - A ELEVATION IN ROADWAY - A SECTION BRIDGE B8 8 EXPANSION JOINT REMOVAL DETAILS FCLMY-0.1-RVSDE LEGEND: NOTES: CONCRETE REMOVAL SIDEWALK REMOVAL ƒ:1 ELEVATION AT SIDEWALK CURB ASPHALT MAT REMOVAL in the field before ordering or fabricating any material. structure. The contractor shall verify all dependent dimensions "as built plans" and may be adjusted to meet the existing 1. Dimensions contained in these plans are calculated from the ANCHOR REMOVAL ELEVATION ANCHOR REMOVAL PLAN 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 KEYNOTES: placement. sheet B9 for more information regarding concrete to vary depending on removal methods. Refer to 1 Minimum as shown. Actual dimension is anticipated 1 1 1 1 REVISIONS: DATE: DRAWN BY: SCALE: DATE: DESIGNED BY: OF STRUCTURE NUMBER: SHEET SHEET SUBSET: SUBSET SHEETS: LEMAY AVENUE OVER POUDRE RIVER ENGINEERING DEPT. - CAPITAL PROJECTS CITY OF FORT COLLINS, COLORADO City of Engineering fcgov.com/engineering Rick.Koechley 7:14:21 AM R:\City of Fort Collins Bridge Services On-Call\W ork Order 9 (135236) - Lem ay Bridge Exp Jt Replacem ent\08_Sheet_Files\06_Structures\DGN\08-Joint Rem oval Details.dgn BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 20 of 36 Justin.Spanier 4:58:12 PM R:\City of Fort Collins Bridge Services On-Call\W ork Order 9 (135236) - Lem ay Bridge Exp Jt Replacem ent\08_Sheet_Files\06_Structures\DGN\06-Construction Phasing 2 of 3.dgn PLAN PLAN SECTION SECTION PHASE 3 PHASE 4 ACTIVITIES: ACTIVITIES: 13 JFJ JBS 1:80 05/29/2013 BRIDGE B6 CONSTRUCTION PHASING (2 OF 3) FCLMY-0.1-RVSDE 6 NTS NTS KEYNOTES: 1 Traffic control devices to be determined and provided by city. 1 1 1 PLACE ASPHALT INCLUDING TEMPORARY TAPERS (BY CITY). APPLY WATERPROOFING (MEMBRANE). PLACE NEW EXPANSION JOINT (EXCEPT GLAND, TEMPORARY GAP FILLER TO REMAIN IN PLACE). REMOVE EXPANSION JOINT AND PORTIONS OF DECK AND ABUTMENT BACKWALL. REMOVE ASPHALT AND WATERPROOFING (MEMBRANE) 1'-6" BOTH SIDES OF JOINT. SHIFT TRAFFIC AND PEDESTRIANS (BY CITY). ONE END TO THE OTHER. INSTALLED AS A SINGLE CONTINUOUS PIECE, PLACED FROM INSTALL EXPANSION JOINT GLAND. EACH GLAND IS TO BE PREPARE EXPANSION JOINT FOR GLAND INSTALLATION. REMOVE TEMPORARY GAP FILLER. SET UP ROLLING TRAFFIC CONTROL (EST. 1 DAY, BY CITY). BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 18 of 36 RAISED MEDIAN RAISED (SUGGESTED PEDESTRIAN DETOUR) RECREATION PATH (TYP.) 2'-0" SHLD. 2'-0" 2'-0" 2'-0" ASPHALT TAPER (MEMBRANE), AND WATERPROOFING NEW EXPANSION JOINT, ASPHALT TAPER (MEMBRANE), AND WATERPROOFING NEW EXPANSION JOINT, MEDIAN RAISED MEDIAN RAISED RECREATION PATH (TYP.) REVISIONS: DATE: DRAWN BY: SCALE: DATE: DESIGNED BY: OF STRUCTURE NUMBER: SHEET SHEET SUBSET: SUBSET SHEETS: LEMAY AVENUE OVER POUDRE RIVER ENGINEERING DEPT. - CAPITAL PROJECTS CITY OF FORT COLLINS, COLORADO City of Engineering fcgov.com/engineering Justin.Spanier 4:57:01 PM R:\City of Fort Collins Bridge Services On-Call\W ork Order 9 (135236) - Lem ay Bridge Exp Jt Replacem ent\08_Sheet_Files\06_Structures\DGN\05-Construction Phasing 1 of 3.dgn PLAN PLAN SECTION CONSTRUCTION SECTION PHASE 1 PHASE 2 ACTIVITIES: ACTIVITIES: 13 JFJ JBS 1:80 05/29/2013 BRIDGE B5 CONSTRUCTION PHASING (1 OF 3) FCLMY-0.1-RVSDE 5 NTS NTS 1 1 1 KEYNOTES: 1 Traffic control devices to be determined and provided by city. 1 PLACE ASPHALT INCLUDING TEMPORARY TAPERS (BY CITY). APPLY WATERPROOFING (MEMBRANE). PLACE NEW EXPANSION JOINT (EXCEPT GLAND, TEMPORARY GAP FILLER TO REMAIN IN PLACE). REMOVE EXPANSION JOINT AND PORTIONS OF DECK AND ABUTMENT BACKWALL. REMOVE ASPHALT AND WATERPROOFING (MEMBRANE) 1'-6" BOTH SIDES OF JOINT. SHIFT TRAFFIC AND PEDESTRIANS (BY CITY). PLACE ASPHALT INCLUDING TEMPORARY TAPERS (BY CITY). APPLY WATERPROOFING (MEMBRANE). PLACE NEW EXPANSION JOINT (EXCEPT GLAND, TEMPORARY GAP FILLER TO REMAIN IN PLACE). REMOVE EXPANSION JOINT AND PORTIONS OF DECK AND ABUTMENT BACKWALL. REMOVE ASPHALT AND WATERPROOFING (MEMBRANE) 1'-6" BOTH SIDES OF JOINT. SHIFT TRAFFIC AND PEDESTRIANS (BY CITY). BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 17 of 36 2. All dimensions are horizontal and approximate. as detailed in these plans. joints and asphalt which shall be modified 1. Existing bridge to remain, except expansion 13 JFJ JBS 1:30 05/29/2013 BRIDGE B4 GENERAL LAYOUT FCLMY-0.1-RVSDE 4 LOOKING NORTH SCALE: 1:15 BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 16 of 36 BXX XX FIRST TRAFFIC CLOSURE ACTIVITY. THE CONTRACTOR SHALL COMPLETE ALL WORK WITHIN 30 CALENDAR DAYS OF THE QUALITY STANDARDS AND CDOT REQUIREMENTS FOR EROSION CONTROL. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE CITY'S MS4 WATER EXCAVATION OR OTHER EARTHWORK. AT LEAST 3 DAYS (NOT INCLUDING THE DAY OF NOTIFICATION) PRIOR TO ANY SHALL CONTACT THE UTILITY NOTIFICATION CENTER OF COLORADO AT 1-800-922-1987 ANY UTILITIES AS MAY BE NECESSARY TO AVOID DAMAGE THERETO. THE CONTRACTOR CONTRACTOR IS RESPONSIBLE FOR DETERMINING AS TO THE TYPE AND LOCATION OF OF UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR ALL INCLUSIVE. THE THE INFORMATION SHOWN ON THESE PLANS CONCERNING THE TYPE AND PLACEMENT MATERIAL. ALL DEPENDENT DIMENSIONS IN THE FIELD BEFORE ORDERING OR FABRICATING ANY MAY BE ADJUSTED TO MEET THE EXISTING STRUCTURE. THE CONTRACTOR SHALL VERIFY FROM THE "AS CONSTRUCTED PLANS." THESE STATIONS, ELEVATIONS, AND DIMENSIONS STATIONS, ELEVATIONS, AND DIMENSIONS CONTAINED IN THESE PLANS ARE CALCULATED DURING CONSTRUCTION SHALL BE REMOVED AT THE CONTRACTOR'S EXPENSE. BRIDGE DURING CONSTRUCTION. ANY MATERIAL THAT FALLS BELOW THE BRIDGE THE CONTRACTOR SHALL ENSURE THAT NO CONSTRUCTION MATERIAL FALLS BELOW THE SPECIFICATIONS. THE CONTRACTOR SHALL ADHERE TO SECTION 107.24 AND 107.25 OF THE STANDARD EXCEPT AS DIRECTED BY THE ENGINEER. THE COMPLETED SECTIONS OF EXPANSION DEVICE SHALL NOT BE OPENED TO TRAFFIC THE CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN DRAINAGE DURING THE WORK. BRIDGES DOWN TO BARE CONCRETE, WATERPROOFING (MEMBRANE) IS TO BE REPLACED. A NEAT LINE USING A SAWCUT 2" DEEP. WHEN REMOVING ASPHALT PAVEMENT FROM PRIOR TO ASPHALT REMOVAL FROM BRIDGE DECKS, ASPHALT SHALL BE CUT TO CONSTRUCTION, AS AMENDED IN THESE PLANS. TRANSPORTATION (CDOT) STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE ALL WORK SHALL BE IN ACCORDANCE WITH 2011 COLORADO DEPARTMENT OF WORK TO BE PERFORMED BY CITY IS LABELED "(BY CITY)." THE CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF ALL ACTIVITIES. -PLACEMENT OF HMA OVERLAY -PLACEMENT OF HMA TAPERS NECESSARY AND WHERE APPLICABLE -APPLICATION OF WATERPROOFING MEMBRANE ON THE BRIDGE DECK, IF -REMOVAL OF ASPHALT MAT (PLANING) 32'-6" EITHER SIDE OF EXPANSION JOINT - TRAFFIC CONTROL THE FOLLOWING WORK ACTIVITIES SHALL BE PERFORMED BY THE CITY OF FORT COLLINS: DECK SIDE OF THE EXPANSION JOINT -PLACEMENT OF NEW WATERPROOFING MEMBRANE 1'-6" ON THE BRIDGE COVER PLATES -PLACEMENT OF NEW EXPANSION JOINT, ELASTOMERIC CONCRETE, AND SIDEWALK -REMOVAL OF EXISTING EXPANSION JOINT AND CONCRETE SIDE OF EXPANSION JOINT - REMOVAL OF ASPHALT MAT AND WATERPROOFING (MEMBRANE) 1'-6" EITHER THE FOLLOWING WORK ACTIVITIES SHALL BE PERFORMED BY THE CONTRACTOR: REVISIONS: DATE: DRAWN BY: SCALE: DATE: DESIGNED BY: OF STRUCTURE NUMBER: SHEET SHEET SUBSET: SUBSET SHEETS: LEMAY AVENUE OVER POUDRE RIVER ENGINEERING DEPT. - CAPITAL PROJECTS CITY OF FORT COLLINS, COLORADO City of Engineering fcgov.com/engineering Justin.Spanier 4:53:59 PM R:\City of Fort Collins Bridge Services On-Call\W ork Order 9 (135236) - Lem ay Bridge Exp Jt Replacem ent\08_Sheet_Files\06_Structures\DGN\02-General Inform ation.dgn BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 14 of 36 (970) 221-6605 FORT COLLINS, COLORADO 281 N. COLLEGE AVE JIN WANG, P.E. CITY OF FORT COLLINS (720) 514-1100 LAKEWOOD, COLORADO 165 S. UNION BLVD. DAVID NEMOVITZ, P.E. MICHAEL BAKER JR., INC. TITLE SHEET 13 JFJ JBS 1:2000 BRIDGE B1 1 05/29/2013 FCLMY-0.1-RVSDE --ORIGINAL AS-BUILT PLANS (FOR REFERENCE ONLY) 13 ASPHALT MILL AND OVERLAY (2 OF 2) 12 ASPHALT MILL AND OVERLAY (1 OF 2) 11 SIDEWALK COVER PLATE DETAILS 10 EXPANSION JOINT PLACEMENT DETAILS (2 OF 2) 9 EXPANSION JOINT PLACEMENT DETAILS (1 OF 2) 8 EXPANSION JOINT REMOVAL DETAILS 7 CONSTRUCTION PHASING (3 OF 3) 6 CONSTRUCTION PHASING (2 OF 3) 5 CONSTRUCTION PHASING (1 OF 3) 4 GENERAL LAYOUT 3 SUMMARY OF QUANTITIES 2 GENERAL INFORMATION 1 TITLE SHEET BID 7519 Lemay Avenue Bridge Expansion Joint Replacement Page 13 of 36