HomeMy WebLinkAboutCHANGE ORDER - RFP - P1074 CITY ARCHITECTURAL AND ENGINEERING WORK ORDER CONTRACT (4)CHANGE ORDER NO. 2
PROJECT TITLE: Nix Farm -New Office Building
CONTRACTOR: Ailer-Ungie-Massey Architects
PROJECT NUMBER: Op-44g315
DESCRIPTION: New Office Building
In preparing change orders show in order as separate numbered paragraphs the following:
1. Reason for change: Added d Win work to provide photovoltaic system drawing:
o mr u a On IhIs fob.
2. Description of chan
3. Change in contract
8
This change is to provide design services for photovoltaic solar panel design.
Yes, this will increase the contract amount by $6,700
4. Change in contract time: No. It will be no different then change order #1.
(Attach additional sheets as required)
to
1
ORIGINAL CONTRACT COST
$70,715.00
$49,000.00
TOTAL APPROVED CHANGE ORDERS
$0.00
TOTAL PENDING CHANGE ORDERS
$6.700.00
TOTAL THIS CHANGE ORDER
9.47%
TOTAL % OF THIS CHANGE ORDER
Total C.O. % of Original Contract 76.77%
$126,415.00
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
ACCEPTED BY:
ACCEPTED BY:
REVIEWED BY
Contractors Representative
Project Manager"to'L,'fR1
APPROVED BY:
Print Name
cc: City Clerk Project File
Contractor Purchasing
Engineer
Date
79
Date
Alve
Date
Date
ALLER • LINGLE • MASSEY
ARCHITECTS V µ
-s
P.C.
July 1, 2013
Mr. Mark Sears
City of Fort Collins Natural Areas Director . Natural Resources Dept.
P.O. Box 580
Fort Collins, CO 80522
RE: Proposal for PV Design Services
Nix Farm Natural Areas
Fort Collins, Colorado
Dear Mark:
Per our meetings and conversations to 'date, this
Photovoltaic solar.panel design, including performance specification, inverter sizing, single line diagram,
panel layout, .including bid documents and performance
proposal includes professional services to. provide
available roof space at the existing maintenance building ngIng review for the proposed office building and
PV Design for Nix Farm Office Building and existing Maintenance Building
a Electrical Engineering
• Archit ctural $5,500.00
Total Fee 1 200.00
$6,700.00
Please feel free to contact me if you have any questions or comments regarding this proposal.
Sincerely,
ALLER•LINGLE•MASSEYARCHITECTS P.C.
Ian D. Shuff, AIA, LEED AP
IDS:I(S
712 WHALERS LVAY • BLDG. B, SUITE 1o0 • FORT COLLINS COLORADO • apgg
(970) 223-1820 phone • (970) 223_7833 fax o officegaller-lingie•massey,com www,aller•Itngle•masseycom
June 19, 2013
Mr. Ian Shufi
Alter Lingle Massey Architects
712 Whalers Way, Building B, Suite 100
Fort Collins, Colorado 80525
Service Scope Change Request—PV Design
Nix Farm Natural Area Office Building
BGANZE oz UDIN��
consulting englnrers, inc,
We've been asked to provide additional design services to incorporate photovoltaic arrays on
both the new Nix Farms Office Building and the existing. Maintenance Shop. With your
approval, the following scope will be added to BGCE's proposal contract (dated July 30, 2012):
1. PV Design
a. Provide string sizing calculations for PV arrays.
b. Provide inverter sizing and specification.
c. Provide single line diagram for PV arrays with c
distribution system. onnection into building power
d. Provide racking specification.
e. Site visit to Maintenance Building to verify existing conditions.
f Provide biddable drawings for both systems (requires complete
setup for Maintenance building) ly new drawing
9. Provide performance specifications for system installation.
h. Shop drawing review of systems..
The additional fee for this work will be billed hourly not to exceed S5,500.
Based on the current schedule it is anticipated that this work will be provided as an addendum to
the 7/8/13 permit set.
If you have any questions, please call.
Unan G. Robertson 11, P.E.
Senior Associate