HomeMy WebLinkAboutCHANGE ORDER - RFP - P1074 CITY ARCHITECTURAL AND ENGINEERING WORK ORDER CONTRACT (4)CHANGE ORDER NO. 2 PROJECT TITLE: Nix Farm -New Office Building CONTRACTOR: Ailer-Ungie-Massey Architects PROJECT NUMBER: Op-44g315 DESCRIPTION: New Office Building In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change: Added d Win work to provide photovoltaic system drawing: o mr u a On IhIs fob. 2. Description of chan 3. Change in contract 8 This change is to provide design services for photovoltaic solar panel design. Yes, this will increase the contract amount by $6,700 4. Change in contract time: No. It will be no different then change order #1. (Attach additional sheets as required) to 1 ORIGINAL CONTRACT COST $70,715.00 $49,000.00 TOTAL APPROVED CHANGE ORDERS $0.00 TOTAL PENDING CHANGE ORDERS $6.700.00 TOTAL THIS CHANGE ORDER 9.47% TOTAL % OF THIS CHANGE ORDER Total C.O. % of Original Contract 76.77% $126,415.00 ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED BY: ACCEPTED BY: REVIEWED BY Contractors Representative Project Manager"to'L,'fR1 APPROVED BY: Print Name cc: City Clerk Project File Contractor Purchasing Engineer Date 79 Date Alve Date Date ALLER • LINGLE • MASSEY ARCHITECTS V µ -s P.C. July 1, 2013 Mr. Mark Sears City of Fort Collins Natural Areas Director . Natural Resources Dept. P.O. Box 580 Fort Collins, CO 80522 RE: Proposal for PV Design Services Nix Farm Natural Areas Fort Collins, Colorado Dear Mark: Per our meetings and conversations to 'date, this Photovoltaic solar.panel design, including performance specification, inverter sizing, single line diagram, panel layout, .including bid documents and performance proposal includes professional services to. provide available roof space at the existing maintenance building ngIng review for the proposed office building and PV Design for Nix Farm Office Building and existing Maintenance Building a Electrical Engineering • Archit ctural $5,500.00 Total Fee 1 200.00 $6,700.00 Please feel free to contact me if you have any questions or comments regarding this proposal. Sincerely, ALLER•LINGLE•MASSEYARCHITECTS P.C. Ian D. Shuff, AIA, LEED AP IDS:I(S 712 WHALERS LVAY • BLDG. B, SUITE 1o0 • FORT COLLINS COLORADO • apgg (970) 223-1820 phone • (970) 223_7833 fax o officegaller-lingie•massey,com www,aller•Itngle•masseycom June 19, 2013 Mr. Ian Shufi Alter Lingle Massey Architects 712 Whalers Way, Building B, Suite 100 Fort Collins, Colorado 80525 Service Scope Change Request—PV Design Nix Farm Natural Area Office Building BGANZE oz UDIN�� consulting englnrers, inc, We've been asked to provide additional design services to incorporate photovoltaic arrays on both the new Nix Farms Office Building and the existing. Maintenance Shop. With your approval, the following scope will be added to BGCE's proposal contract (dated July 30, 2012): 1. PV Design a. Provide string sizing calculations for PV arrays. b. Provide inverter sizing and specification. c. Provide single line diagram for PV arrays with c distribution system. onnection into building power d. Provide racking specification. e. Site visit to Maintenance Building to verify existing conditions. f Provide biddable drawings for both systems (requires complete setup for Maintenance building) ly new drawing 9. Provide performance specifications for system installation. h. Shop drawing review of systems.. The additional fee for this work will be billed hourly not to exceed S5,500. Based on the current schedule it is anticipated that this work will be provided as an addendum to the 7/8/13 permit set. If you have any questions, please call. Unan G. Robertson 11, P.E. Senior Associate 251 Linden Sneel, Su4a 200 Fort CCAim, Co 8052.1 •:p 970 221 $091 FORTCOLLINS ALBUUUEROUE UEM'ER FORTCOLLINS %,,%IL WI d b(om CWn