Loading...
HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9116546 (3)June 26, 2013 Brian Ainsley CRISP Project Manager 2221 S Timberline Road Fort Collins, CO 80525 Subject: Change Proposal (CP) — 019: Add 4 new workstation at FCPS and LCSO locations Reference: EP-1272 UNIX to Windows Migration agreement between the City of Fort Collins and Larimer County and Tiburon, Inc., dated October 29, 2011. Dear Mr. Ainsley: Tiburon, Inc. is pleased to present the City of Fort Collins (hereinafter, "Client") with this Change Proposal to procure 4 new workstations at FCPS and LCSO locations (hereinafter, referred to as the "Proposal"). Scope Description and Responsibilities The attached Exhibit 1, Statement of Work ("SOW") describes the project tasks, responsibilities of each party and defined completion criteria. Price Description 1) Firm fixed price: $10,276 2) Upon achievement of the completion criteria set forth in the SOW the Tiburon Annual Maintenance Fee will not increase. 3) This Proposal does not include: • Warranty • Documentation • Travel and on -site time • Any taxes levied by a government agency. Taxes, if applicable are the sole responsibility of the Client. Effective Date and Pavment Schedule 1) The work described herein will be scheduled to commence at a mutually agreeable date after Client's acceptance of this Proposal. Tiburon, Inc. 3000 Executive Parkway, Suite 500, San Ramon, CA 94583 t: 925-621-2700 f: 925-621-2799 Brian Ainsley CRISP Project Manager CP-019: Add 4 new servers at FCPS and LCSO locations Page 2 of 5 2) Payment Schedule: • 50% Upon Tiburon receipt of the signed acceptance of this Proposal. • 50% Upon achievement of the completion criteria set forth in the SOW. Note: No scheduling of resources will occur until after the first payment milestone is paid. This Proposal may be cancelled at Tiburon's discretion upon written notice to Client if the first payment milestone is not paid when due. 3) Client's acceptance of this Proposal in the signature block provided below, authorizes Tiburon to proceed with the work described herein and confirms funding will be obligated. Any requisite contractual documents required by Client's purchasing procedures are the responsibility of the Client. 4) The terms and conditions of the above referenced Agreement, and this Proposal prevail regardless of any conflicting or additional terms and conditions on any Purchase Order or other correspondence. Any contingencies or additional terms obtained on any Purchase Order are not binding upon Tiburon. All Purchase Orders are subject to approval and acceptance by Tiburon. 5) This fixed price Proposal is valid through September 21, 2013. Upon review and acceptance of this Proposal, please have a duly authorized person sign below and return the signed copy of the Proposal to Judy Basnett by email at: Judy.Basnett@tiburoninc.com or fax 510- 217-6466. If you have any questions or require further information, please contact Judy Basnett at 650- 245-6702, at your convenience. Sincerely, Carol Mosconi Vice President, Operations Attachment: Exhibit 1 f�tatement of Work By tTre,:ntcepts this Proposal CP-019: Signature Dat GeeAP ') 5C�) c2�Sl.,f Printed Name / Title Tiburon, Inc. 3000 Executive Parkway, Suite 500, San Ramon, CA 94583 t: 925-621-2700 f: 925-621-2799 Brian Ainsley CRISP Project Manager CP-019: Add 4 new servers at FCPS and LCSO locations Page 3 of 5 Exhibit 1 Statement of Work Scope Description Tiburon will procure 4 new Dell T3600 computers, ship the computers and all accessories to the client's Fort Collins Police Building. Crisp receiving personnel will divide the shipment so each client's site, LCSO and FCPS receives two computers and accessories from the shipment of four. Crisp personnel will receive, un-box, cable, install / setup OS, join to CRISP Domain and make computers remotely available, by installing RealVNC Server software on each computer. Tiburon's technical staff, via the client's VPN, will remotely finish configuring each computer to work optimally with the Tiburon application. CRISP personnel will then install the Tiburon application on the staged hardware. Computers and Components to be procured by Tiburon for CRISP 4 — Dell T3600 Computers Dell Precision T3600,MT,425W Base Unit: Dell Precision T3600,MT,425W (225-2089) Processor: Four Core XEON E5-1603, 2.8GHz, 10M, Dell Precision T3600 (317-8699) Memory: 8GB DDR3 UDIMM 1600,NECC,4x2GB,Dell Precision (317-9076) Keyboard: Dell USB Entry Keyboard,No Hot Keys,English,Precision Desktop (331-1965) Monitor: Monitor Option -None (320-3316) Video Card: 512 MB AMD FirePro 2270, Two Monitor, Dell Precision TX600 (320-2884) Hard Drive: 250GB,SATA,3.5",7200,NCQ,8M,DelI Precision Tx600 (342-3434) Hard Drive Controller: CI SATA 3.5 Inch, 1-2 Hard Drive,Dell Precision T3600 (331-4815) Operating System: Windows 7 Ultimate,No Media, 64-bit, Fixed Precision, English (421-5652) Operating System: Windows 7 Label, OptiPlex, Fixed Precision, Vostro Desktop (330-6228) Operating System: Dell Client System Update (Updates latest Dell Recommended BIOS, Drivers, Firmware and Apps),Precision Desktop (421-5335) Operating System: Dell Data Protection Access, Precision Tx600 (421-7814) Mouse: Dell MS I I I USB Optical Mouse,OptiPlex and Fixed Precision (330-9458) TBU: Integrated Intel controller, SATA 3Gb/s RAID 0/1/5/10 (4 ports), Dell Precision T3600 (342-5613) CD-ROM or DVD-ROM Drive: 8X DVD-ROM SATA,Data Only,Dell Precision T3600,T5600 and T7600(318-1323) CD-ROM or DVD-ROM Drive: Screw for Slim Opticals,Dell Precision T3600 and T5600 (310-4279) CD-ROM or DVD-ROM Drive: Speakers: No Speaker option (313-2663) Power supply: Precision T3600,425W 90 Percent Efficiency Power Supply (331-4098) Cable: Enable Low Power Mode for EUP Compliance,Del1 Precision Desktop (342- 2635) Cable: Regulatory Label,Dell Precision T3600 (331-4090) Cable: Power Cord, I25V,2M,CI3,Dell Precision (330-3157) Tiburon, Inc. 3000 Executive Parkway, Suite 500, San Ramon, CA 94583 t: 925-621-2700 f: 925-621-2799 Brian Ainsley CRISP Project Manager CP-019: Add 4 new servers at FCPS and LCSO locations Page 4 of 5 Documentation: Documentation,English and French,Dell Precision (331-2477) Bundled Software: Microsoft Office Trial, MUI, OptiPlex, Precision, Latitude (630-AABP) Controller Option: RAID,CNTRL,INTEL,PAYG,A,T3600 (331-4107) Factory Installed Software: Energy Star Not Selected, Dell Precision Desktop (330-3201) Software Disk Two: No Out -of -Band Systems MGMT,Dell Precision T3600 (331-4113) Feature No Resource CD for Dell Precision Desktop (330-4024) Feature: NO RAID,Dell Precison Tx600 (331-4816) Service: Basic Hardware Service: Next Business Day Onsite Service After Remote Diagnosis 2 Year Extended (994-2312) Service: Basic Hardware Service: Next Business Day Onsite Service After Remote Diagnosis Initial Year (994-8030) Service: Dell Limited Hardware Warranty Plus Service Extended Year(s) (938-3738) Service: Dell Limited Hardware Warranty Plus Service Initial Year (934-7307) Installation: Standard On -Site Installation Declined (900-9987) Misc: Quick Reference Guide,English,Dell Precision T3600,T5600 and T7600 (331 A094) Misc: Shipping Material for System,Dell Precision T3600 (331-4091) DMS-59 to Dual DVI Adapter, Dell Precision Desktop (331-2473) Special Pricing Applied (463-0742) Additional Components 2 Part # 330-4685 Video Cable,Display Port,VGA Dual,Dell Precision,Customer Install (330-4685) Tiburon Responsibilities 1) Procure Computer components and ship to Clients location 2) Complete configuration of hardware per the Scope Description. 3) Notify Client when configuration of hardware is complete. Client Responsibilities 1) Received, inventory, and install new Dell Computers. 2) Send Tiburon copies of received packing slips. 3) Upon notification of completed hardware configuration by Tiburon, install Tiburon application software. 4) Complete any required File Maintenance or workstation.ini modifications. Tiburon, Inc. 3000 Executive Parkway, Suite 500, San Ramon, CA 94583 t 925-621-2700 f: 925-621-2799 Brian Ainsley CRISP Project Manager CP-019: Add 4 new servers at FCPS and LCSO locations Page 5 of 5 5) Designate a person to be the principal point of contact for all technical questions and administrative arrangements relating to this Proposal. 6) Provide VPN access to Tiburon. 7) As required, coordinate the participation of non -Tiburon provided third parties and outside agencies. 8) Test the workstations for conformance with the Scope Description within ten (10) business days from receipt of Tiburon's notification the code is ready for testing. Completion Criteria This work will be considered complete upon delivery of hardware to Client's facility. Final invoice will be issued upon receipt of hardware by client. Tiburon, Inc. 3000 Executive Parkway, Suite 500, San Ramon, CA 94583 t: 925-621-2700 f: 925-621-2799