Change Order Form
PROJECT TITLE: Turnberry Rd. Improvements
PROJECT NUMBER: 400901718 (Bid #7405)
CONTRACTOR: Connell Resouces, Inc. (PO #9124395)
CHANGE ORDER NUMBER: 8
npreparing change orders show in -order as separate numbered paragraphs the touowing
1. Reason for change. 2. Description of change.
3. Change in contract cost. 4. Change in contract time.
1&2. See attached sheet for detail.
3. The contract cost will not change. $85.160.70
There will be no change in contract time.
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
ACCEPTED BY: _ JIMC
(Contra(
APPROVED BY:
(Project
APPROVED BY:
3.66%
6,45%
$2,329,248.20
$65,152.63
$0.00
$85,160.70
$2,479,561.53
DATE: � 611�3
DATE: lU� Z lo/ 13
DATE: �' / r
APPROVED BY: DATE:
(Purchasing Agent over $60,000)
cc: Contractor
Purchasing
Project File
CHANGE ORDSRA5,,;-.,.
Turnbarry Road Improvement Projoct
rSUMNIARYOFWORK'
n'.Miw 11.11 S111'* TnIqI
I
Unclassified Excavation
12431
CY
5.3
$ 65,884.30
2
Embankment
1199
CY
$ 2.20
$ 2.637.80
3
Haul Material
9849
CY
$ 8.05
$ 79,284.45
203-02
Unclassified Excavation
-7,250
CY
$5.30,
-$38,425.0
203-03
Embankment
-9,469
CY
$2.201
-$20,831.80
203-04
Haul Material
-421
CY
$8.051
-$3.389,05
1114111 F.-YUR
$85,160.70
+'V.-REASON FOR CHANGE.-`
Additional earthwork (unclassified excavation, embankment, and haul) was identified as missing from the plans. Work was
1,2,3
directed to proceed and contractor kept track of time and materials. Upon completion, City and contractor re-estiamted the
dirt work on the project and came to agreement on the re -estimated quantifies.
Contractor was paid original plan quantity at time of earthwork. This credits the revised quantity for the amount the
)2, 203-03, 2(
contractor has already been paid for.
tv
:':.WHEN POSTED
Posted to Pay APP its
Revised Earthwork Summary
He -Estimated
Contractor
Agreed
Location
As -Bid Quantity
Quantity
Unit
South of Country Club
Unclassified Excavation:
0
1108
CY '
Embankment
-2000
-1696
CY
Country Club to Richard's Lake
Unclassified Excavation
10093
13094
CY
Embankment
-7469
-20
CY
Richard's Lake to Brightwater
Unclassified Excavation
1050
2122
CY
Embankment
0
-182
CY
Total Unclassified Excavation
11143
16324
CY
Total Embankement
-9469
-1898
CY
Topsoil Haul from under Roadway
-3324
CY
Structure Excavation
4000
4000
CY
Structure Backfill (Class 2)
-1360
-1360
CY
TOTAL:
1 43141
13742
CY
Project Revised Quantities
Unclassified Excavation
3893
CY
$ 1.50
$5,839.50
Unclassified Excavation
12431
CY
$ 5.30
$65,884.30
Embankment
'1199
CY
$ 2.20
$2,637.80
Haul Material
9849
CY
$ 8.05
$79,284.45
Haul Material
3893
CY
$ 6.35
$24,720.55
SUBTOTAL: $178,366.60