HomeMy WebLinkAboutWORK ORDER - BID - 7391 MISCELLANEOUS CONCRETE ANNUAL (28)Fort Collins
EXHIBIT "A"
WORK ORDER FORM
AGREEMENT BETWEEN THE CITY OF FORT COLLINS
AND VOGEL CONCRETE, INC.
BID NO: 7391
DATE: 5-27-2013
REQUESTED BY: Rob Mosbev
Email work orders to mail(o)vogelconcrete.com
WORK ORDER NO: 09-VOG-254903300-13
PHONE NUMBER: 970-221-6659 (office)
BILL TO (name, address, zip): Rob Mosbev, 281 N. College Avenue, Fort Collins, CO 80522
EMAIL ADDRESS: rmosbey(cDfcgov.com DEPARTMENT: Engineering
PROJECT TITLE/DESCRIPTION: East side of Stanford (MTP sidewalk)
SCOPE OF SERVICES: Remove and replace COST: W0�r
damaged sidewalk, C&G, and ADA accessible /
ramps.
COMMENCEMENT DATE: 6/3/2013 COMPLETION DATE: 6/12/2013
CITY OF FORT COLLINS: (42
BY: Rob Mosbev _ DATE: 5-27-2013
3S-
Vogel Concrete, Inc. agrees to perform the services identified above and on the attached forms in accordance with
the terms and conditions contained herein and in the Services Agreement between parties. In the event of a conflict
between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms), the
Services Agreement shall control.
VOGEL CONCRETE, INC:
DATE: 5-27-2013
BY:
CC: Purchasing; the attached form(s) consisting of - page(s) are hereby accepted and incorporated herein by this reference,
and Notice to Proceed is hereby given.
Miscellaneous Concrete Annual - Page 1 of 1
Li
UOOEL C®i1C ET z 6330 S. College Ave.
FORT COLLINS COLORADO P Port Collins. CO 80525
Bill To
City of Fort Collins
Engineering Department
Attn: Rob Mosbey
1'.0. Box 580
Fort Collins, Co. 80522
Please Remit To:
6330 S. College Ave.
Fort Collins, CO 80525-4044
Project Location
East Side ofS(anford
(MTP sidewalk)
P.O./ Work Order #.
09-VOG-254903300-13
Invoice
Date
Invoice #
6/11/2013
6884
Terms
Net 30
Descriprion of Work and Materials
Quantity
Unit
Cost
Amount
Sawcul Asphalt 4" - 6"
255
LF ✓
3.10
790.50
Remove Monolithic curb gutter and sidewalk
1.713
SF
2.45
4,196.85
Drive over curb gutter and walk
42
LF
23.00
✓ 966.00
Vertical curb gutter and walk
221
LF
24.50
✓ 5,414.50
Additional I" concrete (2" on all curb and Gutter)
1,316
SF
0.85
✓ 1.1 18.60
Aggregate Base
31.31
TN
30.00
✓ 939.30
Traffic Control Supervisor
58.5
FIRS
34.70
-�'2,029,95
Flagging
46.5
FIRS
22.00
✓ 1.023.00
Vertical panels
145
PEPD
0.75
✓ 10&75
Panel A sign
30
PEPD
1.65
✓ 49.50
Reflective Cones
182
PEPD
0.70
127.40
Channelizing Barrels
40
PEPD
0.75
✓ 30.00
Type I Barricade
10
0.55
✓ 5.50
S16.799.85
Thank you for your business.
Total
PI PASL PAY FROM THIS INVOICE
Phone #
Fax #
E-mail
970-484-3880
970-226-2657
mailryvogelconcrete.com
[-Balance Due S16.799.85