Loading...
HomeMy WebLinkAboutWORK ORDER - BID - 7391 MISCELLANEOUS CONCRETE ANNUAL (28)Fort Collins EXHIBIT "A" WORK ORDER FORM AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND VOGEL CONCRETE, INC. BID NO: 7391 DATE: 5-27-2013 REQUESTED BY: Rob Mosbev Email work orders to mail(o)vogelconcrete.com WORK ORDER NO: 09-VOG-254903300-13 PHONE NUMBER: 970-221-6659 (office) BILL TO (name, address, zip): Rob Mosbev, 281 N. College Avenue, Fort Collins, CO 80522 EMAIL ADDRESS: rmosbey(cDfcgov.com DEPARTMENT: Engineering PROJECT TITLE/DESCRIPTION: East side of Stanford (MTP sidewalk) SCOPE OF SERVICES: Remove and replace COST: W0�r damaged sidewalk, C&G, and ADA accessible / ramps. COMMENCEMENT DATE: 6/3/2013 COMPLETION DATE: 6/12/2013 CITY OF FORT COLLINS: (42 BY: Rob Mosbev _ DATE: 5-27-2013 3S- Vogel Concrete, Inc. agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms), the Services Agreement shall control. VOGEL CONCRETE, INC: DATE: 5-27-2013 BY: CC: Purchasing; the attached form(s) consisting of - page(s) are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given. Miscellaneous Concrete Annual - Page 1 of 1 Li UOOEL C®i1C ET z 6330 S. College Ave. FORT COLLINS COLORADO P Port Collins. CO 80525 Bill To City of Fort Collins Engineering Department Attn: Rob Mosbey 1'.0. Box 580 Fort Collins, Co. 80522 Please Remit To: 6330 S. College Ave. Fort Collins, CO 80525-4044 Project Location East Side ofS(anford (MTP sidewalk) P.O./ Work Order #. 09-VOG-254903300-13 Invoice Date Invoice # 6/11/2013 6884 Terms Net 30 Descriprion of Work and Materials Quantity Unit Cost Amount Sawcul Asphalt 4" - 6" 255 LF ✓ 3.10 790.50 Remove Monolithic curb gutter and sidewalk 1.713 SF 2.45 4,196.85 Drive over curb gutter and walk 42 LF 23.00 ✓ 966.00 Vertical curb gutter and walk 221 LF 24.50 ✓ 5,414.50 Additional I" concrete (2" on all curb and Gutter) 1,316 SF 0.85 ✓ 1.1 18.60 Aggregate Base 31.31 TN 30.00 ✓ 939.30 Traffic Control Supervisor 58.5 FIRS 34.70 -�'2,029,95 Flagging 46.5 FIRS 22.00 ✓ 1.023.00 Vertical panels 145 PEPD 0.75 ✓ 10&75 Panel A sign 30 PEPD 1.65 ✓ 49.50 Reflective Cones 182 PEPD 0.70 127.40 Channelizing Barrels 40 PEPD 0.75 ✓ 30.00 Type I Barricade 10 0.55 ✓ 5.50 S16.799.85 Thank you for your business. Total PI PASL PAY FROM THIS INVOICE Phone # Fax # E-mail 970-484-3880 970-226-2657 mailryvogelconcrete.com [-Balance Due S16.799.85