HomeMy WebLinkAboutWORK ORDER - RFP - P1117 CONSULTING ENGINEERING SERVICES FUTURE WATER WW SW FACILITIES CAPITAL IMPROVEMENTS (40)PROFESSIONAL SERVICE AGREEMENT WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND STANTEC CONSULTING SERVICES INC. DATED: JULY 15, 2008 Work Order Number: Purchase Order Number: 33 Project Title: CATHODIC PROTECTION SERVICES — PHASE 4 (YEAR 2013) Commencement Date: June 2013 Completion Date: December 2013 Maximum Fee: (time and reimbursable direct costs): Not to exceed $117,182.00 (See attached EXHIBIT B). Project Description: (See attached Scope of Work — EXHIBIT A). Scope of Services: (See attached Scope of Work — EXHIBIT A). Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of four (4) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Professional: CO SERV C ES INC. By: Donald Silar Title: Senior Assoc Date: City of Fort Collins Submitted By: Sue Paquette, Sp Projects Manager Date: Reviewed By: Owen Ra dall, Chief Engineer Date: G/7�/-T Approved By: Jon Haukaas, Water Engineering and Field Services Operations Manager Date: 4/' F11 3 Approved By: Brian Janonis, Utilities xecutive Dire or (over 00 00) Approved By: Gerry aul Director of Purchasing and Risk Management (over $60,000.00) Date: ��l EXHIBIT A City of Fort Collins CATHODIC PROTECTION SERVICES — PHASE 4 Year 2013 SCOPE OF SERVICES The City of Fort Collins (City) wishes to continue monitoring, design and installation of cathodic protection measures on their water transmission systems and the yard piping at the Water Treatment Facility (WTF) using standard established corrosion control techniques In the year 2013, work in general will focus on: 1) installation of deep anode groundbeds at the WTF; 2) completion of the design and preparation of drawings for the Anheuser Busch (AB) pipeline; and 3) continuing interpretation of yearly readings from the existing test stations on the transmission system and the yard piping at the WTF. The work completed in 2013 will assist in preparation of work to be completed in 2014; which in general will focus on continual monitoring and installation of impressed current cathodic protection stations (rectifiers and deep anode groundbeds) on the Anheuser Busch pipeline. Stantec will continue to employ the services of RUSTNOT Corrosion Control Services, Inc. to assist with these tasks and work with Hydro Construction for installation of recommended improvements with a specialized prequalified cathodic protection subcontractor. GENERAL The remainder of this document describes our understanding of the scope of work. Several assumptions were made in developing the scope: The City of Fort Collins team will include: • Owen Randall as Chief Engineer, orandalICcDfcgov.com ; and • Sue Paquette as Special Projects Manager, spaguetteta'�.fcgov.com . The Stantec team will include: • Don Silar as Project Manager, dsilar(a)stantec.com ; and • Arielle Winans as Design Engineer, arielle.winans(a)stantec.com ; The Hydro Construction team will include: • Jim Eurich as Project Manager, iim(a-)hydroconstruction.com ; and • Tom Noble as Project Superintendent, tom(aa-)hydroconstruction.com . The RUSTNOT team will include: • Bill Spickelmire as Project Manager, bspickelmire(a)rustnotconsulting.com ; and • Jerry Hihath as Cathodic Protection Engineer, mail. com . V.-52873%/active/187310262/management/contract/FINAL-Exhibit A-Scope-06142013.doc Page 1 EXHIBIT A All project deliverables will be made available to the City in electronic as well as hard copy format (i.e. reproducible Mylars and paper copies). Electronic files will be prepared and formatted in current industry standard software including AutoCAD (DWG) and Adobe (PDF) formats. TASKS It should be noted that the following tasks or priorities are based on work completed in previous years and were determined in coordination with the City of Fort Collins. This scope of services is for the work to be accomplished in the year 2013. The current identified Tasks and their relative scope of work and timeframe are: TIMEFRAME: Year 2013 Water Treatment Plant (WTP) A. RUSTNOT will monitor all readings taken in 2013 and prepare a brief report with an overview of what was found and any areas that indicate issues or need for further investigation. This report will be sent to the City for review and comment(s) and the content will be reviewed with City staff. B. A rectifier system has been recommended to address pipes that are out of acceptable ranges and protect other areas from degradation. RUSTNOT has designed the rectifier system to protect all possible areas and including the installation of two (2) deep anode groundbeds that will occur and be observed by the project team. Drawings will be prepared for Hydro to utilize in a manner so that a prequalified specialized cathodic protection subcontractor can install the deep anode groundbeds and Record Drawings will be prepared based on information obtained from City, Hydro and RUSTNOT staff. Once the groundbeds are installed the system will be energized and adjusted with interference testing, an interrupted polarized potential survey will be performed, and client training will be done. Anheuser Busch Transmission Line: A. Under the 2012 contract, it was recommended the AB pipeline be electrically isolated and five (5) separate impressed current cathodic protection stations be installed to provide protection to the pretensioned concrete cylinder pipeline. The actual location and size of the rectifiers and groundbeds have been determined. The design of fill materials, surface improvements, the size of the rectifiers and the supporting equipment (i.e. cabinet, supports, electrical meter, site security/safety measures, etc.), and cross V.52873f/active/187310262/management/contract/FINAL-Exhibit A-Scope-06142013.doc Page 2 EXHIBIT A connections to foreign pipelines will be completed and final construction drawings prepared for Hydro Construction's use. B. Work will also include preparation of permanent utility easements for three (3) City owned properties (Soft Gold Park, Evergreen East Pond, and Crump Pond). Yearly Transmission Line Reads A. RUSTNOT/Stantec have been reviewing City obtained CP readings on an annual basis for a number of years. This task involves continuing this work throughout this year (2013). Readings will be taken by City staff on all CP test stations on the water transmission lines throughout the City. Once these are compiled this information will be sent on to RUSTNOT and Stantec. Once received, RUSTNOT will review the results against readings from prior years and determine if any changes have occurred in the test voltages (potentials and anode current outputs) that would indicate accelerated corrosion, loss of continuity along the pipelines, damage to test wiring, and/or loss of protection from spent anodes. Upon completion of the review, RUSTNOT will prepare a letter report summarizing their findings. The draft report will be forwarded to City's Project Manager (PM) for review and comment(s), and then finalized and delivered to the PM. END OF EXHIBIT A V..,52873j/active/187310262/management/contract/FINAL-Exhibit A-Scope-06142013.doc . Page 3 EXHIBIT B CATHODIC PROTECTION - 2013 PROJECTS (PHASE 4)1 Labor Category or Sub -consultant Proj Mgr/QC Proj Engr Dsgn Engr Individual Don Arielle Rate/hour $177 $104 $95 Subconsultant RUSTNOT Expenses TASK TOTAL TOTAL Task 1 1.1 Coordination, Site Assistance, and Easement and Drawing Preparation 1 Monitor all reads taken in Spring 203 and prepare brief findings report g4 ! $ 9,535 $ 57 $ 10,300 12 Prepare Deep Anode Groundbed Bid Set RUSTNOT design and field assistance at WrP - $ 16 _ RUSTNOT design for AB Install two 2 rectifiers at the WTP I) � 16 8 Finalize AB Drawings $ -- ------ ------ ----- - - Prepare Easements for City properties — $ 30 Subtotal:) 52 54 Administration Office Administration 24 - 32 $ 356 $ 4,812 $ 54,519 $ 29,294 1.3 1.4 $ 51,193 29,294 $ 246 $ - 1.5 1.6 _ 32 _$_ — __ $ 293 $_ 356 --._._.- $ 3,957 $ 4,812 1.7 Task 2 2.1 _ _ 64 90,022 $ 363 $ 4, 899 --- 1 $ 1,672 $ 340 Task 1 subtotal: $ : 112,594 $ 4,588 ------ _ _ subtotal:) 24 0 0 340 Task 2 subtotal: $" 4,588 level of effort per labor category (hours): 76 54 64 ----- ------- 194 I <<TotalManhours total costs per labor category, sub -consult. 8 expenses: $ 13,452 1 $ 5,616 $ 6,080 $ 90,022 $ 2,012 Total Costs>> $ 117,182 staff -weeks: 1.90 1 1.35 1.60 Total Man -weeks: 4.85 V:/52873f/active/187310262/management/FINAL-2013-stantec-fee estimate-06142013.x/s dated: 061142013, dfs. 1