Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 7368 PROFESSIONAL NETWORK ENGINEERING & IMPLEMENTATION/tfj�), y11-736 % 7-68 J°i2.GGSS,a�ry N/Tr✓�RIc d L,"/ a*,rr✓i�ry>>anl WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND GTRI DATED: 6121 /2013 Work Order Number OPP-54676 PSTN Transfer Purchase Order Number: q!3 3289 Project Title: Nortel PSTN Trunk Transfer Commencement Date: 6/21/2013 Completion Date: 7/3112013 Maximum Fee: (time and reimbursable direct costs): $6411 Project Description: Move PSTN trunks from Nortel 81C to Cisco gateways. Scope of of Services: Minimum discount of 48% on purchase order = $100 K or 45% < $100K list price. Each site specific project requires a work order authorized by the project manager and Purchasing agent for release of funds. Invoices to reflect specific work order number and PO number. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Work Order Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Work Order Services Agreement and this work order (including the attached forms) the Work Order Services Agreement shall control. The attached forms consisting of OPP-54676 PSTN Transfer are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Se ce Provider: By: Date:_ Submitted By: Bob Singleton Network Administration Manager (Project Manager) Date: 6/21/2013 Approved by: Dan Coldiron IT Infrastructure Director Date: 6/21/2013 Approved by: Director of Purchasing & Risk Management (if over $60,000.) Date: PSTN Transfer • Extend/Move location of PRI/Router and cabling from Norte] PBX to Cisco VOIP Routers • Coordinate Time of cutover and time requirements with Client and Nortel PBX team • Modify and document changes to Route Plans and requirements for Nortel PBX • Modify and document changes to planned steps for configuration. • Run planned test procedures, document results, verify with Client. 3.2.2 Deployment Deliverables Below are the deliverables GTRI will provide as part of the deployment. • GTRI will provide remote Day 2 support as necessary to assist after the change. • GTRI will implement the solution as identified in the statement of work • GTRI will provide documentation as defined in the deployment tasks • GTRI will update as appropriate any maintained documentation related to location of PRI's in final as -built documentation of the implemented solution • GTRI will provide information regarding the verification tests run on the installed components that are a part of the project and the results of those tests 01'P-54676 PS"IN Transfer SOWI e"Ui R<v M6i2013 5/14/2013 Page 6 of 9 PSTN Transfer 4 Assumptions This section of the statement of work covers the assumptions that are made as part of this project. These assumptions include tasks that the Client will agree to perform as part of this project. These assumptions will also include what items are in scope and out of scope for this project. General Assumptions • Client will provide GTRI with a single point of contact or key staff necessary for completion of the project. • All communications for project details including scheduling, planning and work changes must be communicated from the client point of contact to the GTRI primary point of contact. • Client will provide GTRI with information about their currently deployed IT infrastructure as applicable to this project. The Client will provide information to GTRI about sites of operation, WAN circuits, Network topology, UP Telephony system information, and all IT computing systems. • Client will work with GTRI to gather all data necessary for the work to begin on the first day of the project. • Client will ensure all appropriate power/environmental requirements are provided to the specific project needs and environmental standards are being met prior to start date. This includes rack space, power and cooling. • Client will verify all cabling requirements are completed prior to the beginning of the project. Project Assumptions OPP-54676 PS7N Transfer Client will provide cables, cross connections, run and connect cables during switch from Service Provider connections to be moved to Cisco Routers. 20% of planned engineering will be off -hours due to the nature of this work. GTRI needs 3-4 weeks to schedule engineer for this project once the SOW is signed and delivered. SOW Tem Ia, Rev 2/26/2013 5/14/2013 Page 7 of 9 PSTN Transfer 5 Project Pricing This pricing is for GTRI to complete the work previously defined in this document. This is a firm fixed priced engagement based on the information that has been collected and the assumptions defined above. If any changes are required then the client will follow GTRI's Change Order Process to make any necessary adjustments. Below is a breakdown of milestones and phases that will be performed as part of this project. Project Milestone ' Services Cost per ; Milestone Project Milestone (1): $1,444 Project Initiation Project Milestone (2): $4,332 Project Close and Acceptance • Total Services Cost: $5,776 • Estimated Travel Costs (If $635 Applicable): All project pricing is quoted to occur during normal business hours, Monday through Friday, 8am - 5pm, excluding holidays, unless otherwise defined in this statement of work. Engineering time used outside of nonnal business hours may require a change order detailing the work to be completed and any associated costs for work to be completed outside of normal business hours. All prices are quoted in U.S dollars. Prices do not include tax, freight, or customs charges. The services pricing for this agreement is good for 90 days from the date it is issued. If the proposed start date for the project is greater than 90 days from the creation of this document then this document may potentially need to be revised. OPT-54676 PSTN Transfer SOW Template Rev 2/26R013 5/14/2013 Page 8 of 9 PSTN Transfer 6 Signature Page GTRI and Client agree that we have read this Statement of Work, its associated Master Sales Agreement, understand them, and agree to be bound by their terms and conditions. BY SIGNING BELOW, YOU ARE AGREEING TO THE MSA WHICH IS INCORPORATED HEREIN BY REFERENCE. Additionally, GTRI and Client mutually agree that a photocopy of this document shall be treated as if it were an original. Requested Project Start Date: Agreed to: City of Fort Collins Signature Title Printed Name Date OPP-54676 PSTN Transfer SOW Tenalale Rev M62013 5/14/2013 Page 9 of 9 PSTN Transfer 6 Signature Page GTRI and Client agree that we have read this Statement of Work, its associated Master Sales Agreement, understand them, and agree to be bound by their terms and conditions. BY SIGNING BELOW, YOU ARE AGREEING TO THE MSA WHICH IS INCORPORATED HEREIN BY REFERENCE. Additionally, GTRI and Client mutually agree that a photocopy of this document shall be treated as if it were an original. Requested Project Start Date: Agreed to: City of Fort Collins Signature Printed Name OPP-54676 PSTN Transfer / v L✓ d i?.4,Z- / ` V "" l — , S f-¢�(d Title Date SOWT=phm Rc M6CO13 5/ 14/2013 , Page 9 of 9 0 PSTN Transfer Nortel to Cisco Trunks FFP Prepared for: City of Fort Collins 215 N. Mason, 3rd Floor Fort Collins, CO 80524-4408 Bob Singleton bsingletonWcgov. com (970) 221-6789 Prepared by: Global Technology Resources, Inc. 990 S. Broadway, Suite 400 Denver CO 80209-4010 GTRI- RELENTLESS COMMITMENT PSTN Transfer Table of Contents 1 PROJECT OVERVIEW.............................................................................................. 1 1.1 Current\Proposed High Level Design...............:......................................................... 1 1.2 Project Requirements................................................................................................... 2 2 PROJECT MANAGEMENT....................................................................................... 3 2.1 Project Initiation........................................................................................................... 3 2.1.1 Project Kick-off:......................................................................................................... 3 2.2 Project Planning............................................................................................................ 3 2.2.1 Schedule: ..................................................................................................................... 3 2.3 Project Execution..........................................................................................................3 2.3.1 Resource Management: ............................................................................................... 3 2.4 Project Control.............................................................................................................. 3 2.4.1 Project Status: ............................................................................................................. 3 2.4.2 Change Management: ................................................................................................. 3 2.5 Project Close-out........................................................................................................... 4 3 DESIGN AND DEPLOYMENT SERVICES............................................................. 5 3.1 Planning & Design......................................................................................................... 5 3.1.1 Planning Tasks............................................................................................................ 5 3.1.2 Planning & Design Deliverables................................................................................. 5 3.2 Deployment....................................................................................................................5 3.2.1 Deployment Tasks....................................................................................................... 5 3.2.2 Deployment Deliverables............................................................................................ 6 4 ASSUMPTIONS............................................................................................................7 5 PROJECT PRICING 6 SIGNATURE PAGE OPP-54676 PSTN Transfer 5/14/2013 .................................... 8 9 SOWTem Wl Rev 2/26QO13 Page i of i PSTN Transfer 1 Project Overview This Statement of Work (SOW) is for a project at City of Fort Collins to move 4 PRI trunks from Nortel PBX to Cisco 2821 Routers. This will be a coordinated effort with team and 3`d Party vendor supporting Norte] PBX to re -configure calling path and test. This Statement of Work serves as written documentation and the basis of understanding for technical integration services to be performed by Global Technology Resources, Inc. (hereinafter GTRI) for City of Fort Collins (hereinafter Client). Unless otherwise negotiated, the terms and conditions outlined in the Master Sales Agreement (MSA) govern the work contained herein excluding Federal and some State and Local agencies. The MSA, located online at www.gtri.com/MSA, is the most current version and may be updated from time to time. 1.1 Current\Proposed High Level Design Currently there are 4 PRI's in the Cisco environment connecting to Nortel PBX and the system is at times overloaded. The Client has requested the 4 PRI trunks in the Norte] PBX be moved to the Cisco 2821 Router and reconfigured to handle PSTN trunk. There will be some Nortel re-routing performed by PBX team and this will need to be coordinated off -hours. GTRI team has verified the Cisco 2821 routers will not need any additional hardware including PVDM nor PRI interface modules. There are 3 V WIC2-2MFT-TI/El with I PVDM2-32 and 2 PVDM2-64 in each router. Only 2 of the V WIC2-2MFT-T I/E I are used today. The plan is to put 2 PRIs in the first router (CHWGATEI_rtr) and 2 PRIs into the second router (CHWGATE2 rtr) Gateways to be used are already configured as MGCP gateway and this config will not change mgcp mgcp call -agent 10.150.3.34 2427 service -type mgcp version 0.1 mgcp dhnf-relay voip codec all mode out -of -band mgcp rtp unreachable timeout 1000 action notify mgcp modem passthrough voip mode use mgcp package -capability rtp-package mgcp package -capability sst-package mgcp package -capability pre-package mgcp default -package fxr-package no mgcp package -capability res-package no mgcp timer receive-rtcp mgcp sdp simple mgcp rtp payload -type g726r16 static mgcp bind control source -interface Loopback0 mgcp bind media source -interface Loopback0 mgcp profile default OPP-54676 PSTN Transfer SO W Template Rev 2262013 5/14/2013 Page 1 of 9 PSTN Transfer 1.2 Project Requirements Based on discussions and documentation provided by City of Fort Collins, the following requirements were outlined to GTRI. Move PRI Trunks from Nortel into Cisco 2821 Routers Configure for Cisco Router Configure Cisco Call Manager Coordinate with Nortel PBX team Test Changes and validate with Client OPP-54676 PSTN Transfer Requirements from Client: This will leverage the 2821 gateways for all incoming PSTN traffic instead of the Nortel 81 C and minimize the traffic on the QSIG trunks. We have had issues on occasion with traffic loading the QSIG trunks given most of our voice now reside on the Cisco network. SOWTeWk,,Rev 2R6W3 5/14/2013 Page 2 of 9 PSTN Transfer 2 Project Management 2.1 Project Initiation 2.1.4 Project Kick-off- GTRI will conduct a project kick-off meeting prior to work commencing to review the project scope, project requirements and objectives, technical approach, communication plan and project schedule. This meeting will be led by the GTRI Project Manager or BU Practice Leader, and include the Client, Project Team, and other stakeholders. 2.2 Project Planning 2.2.1 Schedule: GTRI Project Management will provide a project schedule to outline the tasks and timelines required to accomplish the scope. This can be included on the format of MS Project, MS Word, MS Excel or simplified email format. 2.3 Project Execution 2.3.1 Resource Management: GTRI Project Management will be responsible for coordinating and directing the project team and resources. 2.4 Project Control 2.4.1 Project Status: GTRI Project Manager will provide a project status to the project team and stakeholders during the duration of the project. Depending on the type and duration of the project, this can be conducted at milestone points or regular intervals during the duration of the project (per the project communications plan). This will be in the format of an audio call or physical site meeting and/or a status report. 2.4.2 Change Management: GTRI Project Management will control any required changes to the project scope in the format of a Change Agreement. If such requirement is identified, a Change Agreement form will be created to outline the changes in scope and cost prior to commencement of work and approved by client. OPP-54676 PSTN Transfer SOW TeWlale Rev L36Q013 5/ 14/2013 Page 3 of 9 PSTN Transfer 2.5 Project Close-out GTRI will conduct a project closure to review all completed tasks and components of the project scope. This will include reviewing any project checklists and or punch lists, testing results and deliverance and review of any included project deliverable documentation as per this SOW. Upon completion of the close-out. GTRI will present the project close and acceptance form to the client for acceptance and hand off the project to GTRI Managed Services if purchased. This meeting will be led by the GTRI Project Manager or 13U Practice Leader, and include the Client POC, Project Team, and other stakeholders. OPP-54676 PS'IN'rransfer SOW Terz I.e Rev M62013 5/14/2013 Page 4 of 9 PSTN Transfer 3 Design and Deployment Services This section identifies the work that will be performed as part of this project. The project will follow the order of the activities as they are shown below. 3.1 Planning & Design This portion of the project is a detailed planning and design phase that incorporates both a discovery and a design component. During this process all elements that potentially impact project success are examined. Once complete, detailed design recommendations and a project implementation schedule are created that will ensure the proposed solution meets the Client's requirements. 3.1.1 Planning Tasks • Verify Route Plan • Verify location of PRI/Router and cabling requirements • Verify Time of cutover and time requirements • Document Existing Route Plans and requirements for Nortel PBX • Document planned steps for configuration • Document planned test procedures 3.1.2 Planning & Design Deliverables Below are the deliverables GTRI will provide as part of the planning & design. • GTRI will provide list of steps necessary to move PRI trunks from Nortel PBX • GTRI will coordinate with Client team and provide sample high level test plan to verify PRI trunks are properly configured. • GTRI will provide documentation as defined in the planning and design tasks • GTRI will create a list of the final project assumptions • GTRI will detail all the final project costs • GTRI will submit a firm -fixed price statement of work for the project deployment • GTRI will create a project schedule and any associated change management approvals for project deployment 3.2 Deployment This section of the Statement of Work covers the work that will be performed during the deployment phase of this project. This covers all phases of the deployment of the solution. 3.2.1 Deployment Tasks • Modify Route Plan OIT-54676 sow TeWlmexe. 2rz6W3 PS"IN Transfer 5/14/2013 Page 5 of 9