Loading...
HomeMy WebLinkAboutWORK ORDER - BID - 7107 CARPENTRY CONTRACTOR 2010 (9)EXHIBIT "A" WOHK OHDEH FOHM PURSUANT TO A.1\! AGREEMENT BETWEEN THE CITY OF FOHT COLLINS ~~ DATED: __ ~~3_ Work Order Number:_~ l"'3 -l fa Purchase Order Number: k~!<...\ .•••.. Project Tille: __~ -!AA.A:J'.lJ...:..\\)=-~",,-"=~=----_--,~~===-- _ Commencement Dale: ~ .\.-•. "Co"-\t,..=\~3~ _ Completion Dale: -------8~ Maximum Fee: (time and reimbursable direct costs): 1h Co 1q~8L -= --: _ _Project *_ _Description: b._ b~ _~ .kt&_11+~M}~'?''l.\~_.--_ ef ~l~_.:. .t}.,.~..>:.. ~~~s~ o~_I-- _ _ Scope or Services: -~-- ~foqO?ItL Jo-~d sL:;~ Acceptance _~_~ User Scrvi~ Provider agrees to perform the services identified above and on the auachcd forms in accordance with the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conllict between or ambiguity in the terms or the Services Agreement and this work order (including the attached 10n115) the Services Agreement shall control. CiLYof For! Collins By: ' _ Date: _ Director or Purchasing and Risk Management Over $30,000 CC: Purchasing The attached forms consisting or CJ pages arc hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given. 4/2001 ....__ ..._._n .. .__ I Finishing Touch PO Box 1303 Phone: 970-834-1764 Ault CO 80610 Fax: 970-834-2734 Email: George@Finishingtouchnoco.com Date: 6/31/13 PROPOSAL TO: Eileen Scholl Re: Martinez Park shed Extension Thank you for the opportunity to bid this project: Below you will find our labor and material scope. Inclusions: 1. Excavate and haul off for concrete slab. 2. Pour new slab with thickened slab and 1 #4 rebar at perimeter. 3. Frame new walls using 2 x 4’s. 4. Frame new roof and sheath with 5/8 Osb 5. Install one 6’ X 6’ 8” double door with hardware. Doors and frame to be Hollow metal. 6. Install Cottage lap siding on nexterior. 7. Install roofing to match existing. 8. Exterior trim. 9. Painting of exterior. 10.Permit. Exclusions: 1. Painting of interior 2. Landscape repair 3. After hour work. Excavate and pour concrete: $2,800.00 Doors, frame and hardware: $1,281.00 Framing, trim and paint material: $1,300.00 7% on subs and material: $377.00 Labor $1200.00 Estimated Permit fees: $250.00 Total price: $7,208.00 Thank You George Moore