Your firm has been selected to advance to Step II in the selection process for the 7455 Fort
Collins Senior Center Expansion
The other firms selected to advance in the selection process are:
Dohn Construction
Sink Combs Dethlefs / Adofson & Peterson Construction
The Neenan Company
You are scheduled for a Mini-Charrette on February 5, 2013 from 1:30-4:30 PM in the Training
Room located on the second floor of the Operation Services building, 300 Laporte Ave. Please
provide your team's charrette agenda to John Stephen, Istephen(oD_fcgov.com, by February 4,
2013 at noon.
Following is the proposed schedule for the STEP II selection process:
STEPII DATE
Submit Information to Four Design/Build Teams
Week of January 28, 2013
Pre -Proposal Meeting/Mini Design Charrette
(1/2 Day) with Four Design/Build Teams
February 5 and/or 6; 2013
Interviews with Four Design/Build Teams
March 28, 2013
Select Final Design/Build Team
Week of April 1, 2013
Notice to Proceed D/B Team
Week of April 8, 2013
• Include with the proposal the Construction cost factors.
o Establish in detail the factors which will be used in determining the final prices of
work on time and material projects OR on negotiated guaranteed maximum price
construction contracts. These factors shall be comprehensive in establishing all
costs to be applied to direct project labor and materials in determining the
construction cost. Commitments shall include:
Overhead and profit (combined) margin for general office activities on the
base bid cost.
• Overhead and profit (combined) margin for field office activities on the
base bid cost.
• Markup on subcontractor work by the General Contractor.
• Markup on materials and equipment on the base bid cost.
• Markup on project labor or materials to determine the final contract price.
• Change order markup, including supervision allowance, labor and
material markups, and overhead and profit percentages, as a percent of
labor and materials cost for any changes in the work following contract
award.
• You MUST submit the above requested information. The selection team
will consider other methods of contract negotiations that the firm may
have experience with. Firms are encouraged to submit basis for contract
negotiation.
• Your firm is expected and required to have a completely open book policy
on all pricing of work.
Your firm must follow Chapter 6, Proposal Evaluation Criteria, #3, Step II instructions
from the original proposal.
Included in the body of the email to which this letter was attached is a link to the secure
download of the files noted below. Please note that this file is approximately 150 MB.
a. Conceptual Site Plan (CSP1), prepared by Aller-Lingle Architects, P.C., dated
8/10/08. This plan provides pertinent information concerning the site, including:
Possible expansion and parking lot locations, but other options would be
appreciated and considered.
b. Existing Senior Center Auto Cad Drawings for Civil, Architectural, Mechanical,
Electrical to provide layout and utilities.
C. Existing Senior Center project specifications volume one and volume two.
d. Information on the security system that is to be installed for existing building
which will need to be included with the new expansion project.
e. Information on Hearing loop which is to be incorporated into this expansion
project for both existing and new addition.
We appreciate the time you expended in preparing your proposal presentation and look forward
to your oral presentation.
Sincerely,
me O'NeiII 11, CP NIGP
re or of Purchasing and Risk Management
F6rt
Cityof
Collins
Purchasing
January 30, 2013
Dohn Construction Inc
Attn: Doug Dohn
2642 Midpoint Drive
Fort Collins. CO 80525
RE: 7455 Fort Collins Senior Center Expansion
Dear Mr. Dohn:
Financial Services
Purchasing Division
215 N. Mason St. 2n" Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707- fax
fcgov. com/purchasing
Your firm has been selected to advance to Step II in the selection process for the 7455 Fort
Collins Senior Center Expansion
The other firms selected to advance in the selection process are:
Aller Lingle Massey Architects / Saunders
Sink Combs Dethlefs / Adofson & Peterson Construction
The Neenan Company
You are scheduled for a Mini-Charrette on February 5, 2013 from 8:00-11:00 AM in the Training
Room located on the second floor of the Operation Services building, 300 Laporte Ave. Please
provide your team's charrette agenda to John Stephen, istephen(a),fcgov.com, by February 4,
2013 at noon.
Following is the proposed schedule for the STEP II selection process:
STEPII DATE
Submit Information to Four Design/Build Teams
Week of January 28, 2013
Pre -Proposal Meeting/Mini Design Charrette
(112 Day) with Four Design/Build Teams
February 5 and/or 6, 2013
Interviews with Four Design/Build Teams
March 28, 2013
Select Final Design/Build Team
Week of April 1, 2013
Notice to Proceed D/B Team
Week of April 8, 2013
• Include with the proposal the Construction cost factors.
o Establish in detail the factors which will be used in determining the final prices of
work on time and material projects OR on negotiated guaranteed maximum price
construction contracts. These factors shall be comprehensive in establishing all
costs to be applied to direct project labor and materials in determining the
construction cost. Commitments shall include:
• Overhead and profit (combined) margin for general office activities on the
base bid cost.
• Overhead and profit (combined) margin for field office activities on the
base bid cost.
• Markup on subcontractor work by the General Contractor.
• Markup on materials and equipment on the base bid cost.
• Markup on project labor or materials to determine the final contract price.
• Change order markup, including supervision allowance, labor and
material markups, and overhead and profit percentages, as a percent of
labor and materials cost for any changes in the work following contract
award.
• You MUST submit the above requested information. The selection team
will consider other methods of contract negotiations that the firm may
have experience with. Firms are encouraged to submit basis for contract
negotiation.
• Your firm is expected and required to have a completely open book policy
on all pricing of work.
• Your firm must follow Chapter 6, Proposal Evaluation Criteria, #3, Step II instructions
from the original proposal.
Included in the body of the email to which this letter was attached is a link to the secure
download of the files noted below. Please note that this file is approximately 150 MB.
a. Conceptual Site Plan (CSP1), prepared by Aller-Lingle Architects, P.C., dated
8/10/08. This plan provides pertinent information concerning the site, including:
Possible expansion and parking lot locations, but other options would be
appreciated and considered.
b. Existing Senior Center Auto Cad Drawings for Civil, Architectural, Mechanical,
Electrical to provide layout and utilities.
C. Existing Senior Center project specifications volume one and volume two.
d. Information on the security system that is to be installed for existing building
which will need to be included with the new expansion project.
e. Information on Hearing loop which is to be incorporated into this expansion
project for both existing and new addition.
We appreciate the time you expended in preparing your proposal presentation and look forward
to your oral presentation.
Sincerely,
VsAB. ONeill IICPPO, FNIGP
r of Purchasing and Risk Management
:• ••
City of
F6rt Coltins
Purchasing
January 30, 2013
Sink Combs Dethlefs Architects
Atnn: Christopher Kastelic
475 Lincoln Street, Suite 100
Denver, CO 80203
RE: 7455 Fort Collins Senior Center Expansion
Dear Mr. Kastelic:
Financial Services
Purchasing Division
215 N. Mason St. 2n° Floor
Po Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707- fax
/cgov. corn/purchasing
Your firm has been selected to advance to Step II in the selection process for the 7455 Fort
Collins Senior Center Expansion
The other firms selected to advance in the selection process are:
Aller Lingle Massey Architects / Saunders
Dohn Construction
The Neenan Company
You are scheduled for a Mini-Charrette on February 6, 2013 from 1:00-4:00 PM in the Training
Room located on the second floor of the Operation Services building, 300 Laporte Ave. Please
provide your team's charrette agenda to John Stephen, istephenCa.fcgov.com, by February 4,
2013 at noon.
Following is the proposed schedule for the STEP II selection process:
STEPII DATE
Submit Information to Four Design/Build Teams
Week of January 28, 2013
Pre -Proposal Meeting/Mini Design Charrette
(112 Day) with Four Design/Build Teams
February 5 and/or 6, 2013
Interviews with Four Design/Build Teams
March 28, 2013
Select Final Design/Build Team
Week of April 1, 2013
Notice to Proceed D/B Team
Week of April 8, 2013
• Include with the proposal the Construction cost factors.
Establish in detail the factors which will be used in determining the final prices of
work on time and material projects OR on negotiated guaranteed maximum price
construction contracts. These factors shall be comprehensive in establishing all
costs to be applied to direct project labor and materials in determining the
construction cost. Commitments shall include:
• Overhead and profit (combined) margin for general office activities on the
base bid cost.
• Overhead and profit (combined) margin for field office activities on the
base bid cost.
• Markup on subcontractor work by the General Contractor.
• Markup on materials and equipment on the base bid cost.
• Markup on project labor or materials to determine the final contract price.
• Change order markup, including supervision allowance, labor and
material markups, and overhead and profit percentages, as a percent of
labor and materials cost for any changes in the work following contract
award.
• You MUST submit the above requested information. The selection team
will consider other methods of contract negotiations that the firm may
have experience with. Firms are encouraged to submit basis for contract
negotiation.
• Your firm is expected and required to have a completely open book policy
on all pricing of work.
• Your firm must follow Chapter 6, Proposal Evaluation Criteria, #3, Step II instructions
from the original proposal.
Included in the body of the email to which this letter was attached is a link to the secure
download of the files noted below. Please note that this file folder is approximately 150 MB.
a. Conceptual Site Plan (CSP1), prepared by Aller-Lingle Architects, P.C., dated
8/10/08. This plan provides pertinent information concerning the site, including:
Possible expansion and parking lot locations, but other options would be
appreciated and considered.
b. Existing Senior Center Auto Cad Drawings for Civil, Architectural, Mechanical,
Electrical to provide layout and utilities.
C. Existing Senior Center project specifications volume one and volume two.
d. Information on the security system that is to be installed for existing building
which will need to be included with the new expansion project.
e. Information on Hearing loop which is to be incorporated into this expansion
project for both existing and new addition.
We appreciate the time you expended in preparing your proposal presentation and look forward
to your oral presentation.
Sincerely, p`f,[,�//�
C)(6 _-j
J me B. O'Neill II, CPPO, FNIGP
D or of Purchasino and Risk Manaoement
F6rt
City of
Collins
Purchasing
January 30, 2013
The Neenan Company
Attn: Ms. Donna Smith
2620 E. Prospect Road, Suite 100
Fort Collins, CO 80525
RE: 7455 Fort Collins Senior Center Expansion
Dear Ms. Smith:
Financial Services
Purchasing Division
216 N. Mason St. 2nO Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707- fax
rcgov. com/purchasing
Your firm has been selected to advance to Step II in the selection process for the 7455 Fort
Collins Senior Center Expansion
The other firms selected to advance in the selection process are:
Aller Lingle Massey Architects / Saunders
Sink Combs Dethlefs / Adofson & Peterson Construction
Dohn Construction
You are scheduled for a Mini-Charrette on February 6, 2013 from 9:00 AM to 12:00 PM in the
Training Room located on the second floor of the Operation Services building, 300 Laporte Ave.
Please provide your team's charrette agenda to John Stephen, jstephen(c),fcpov.com, by
February 4, 2013 at noon.
Following is the proposed schedule for the STEP II selection process:
STEPII DATE
Submit Information to Four Design/Build Teams
Week of January 28, 2013
Pre -Proposal Meeting/Mini Design Charrette
(1/2 Day) with Four Design/Build Teams
February 5 and/or 6, 2013
Interviews with Four Design/Build Teams
March 28, 2013
Select Final Design/Build Team
Week of April 1, 2013
Notice to Proceed D/B Team
Week of April 8, 2013
• Include with the proposal the Construction cost factors.
o Establish in detail the factors which will be used in determining the final prices of
work on time and material projects OR on negotiated guaranteed maximum price
construction contracts. These factors shall be comprehensive in establishing all
costs to be applied to direct project labor and materials in determining the
construction cost. Commitments shall include:
• Overhead and profit (combined) margin for general office activities on the
base bid cost.
• Overhead and profit (combined) margin for field office activities on the
base bid cost.
• Markup on subcontractor work by the General Contractor.
• Markup on materials and equipment on the base bid cost.
• Markup on project labor or materials to determine the final contract price.
• Change order markup, including supervision allowance, labor and
material markups, and overhead and profit percentages, as a percent of
labor and materials cost for any changes in the work following contract
award.
• You MUST submit the above requested information. The selection team
will consider other methods of contract negotiations that the firm may
have experience with. Firms are encouraged to submit basis for contract
negotiation.
• Your firm is expected and required to have a completely open book policy
on all pricing of work.
• Your firm must follow Chapter 6, Proposal Evaluation Criteria, #3, Step II instructions
from the original proposal.
Included in the body of the email to which this letter was attached is a link to the secure
download of the files noted below. Please note that this file is approximately 150 MB.
a. Conceptual Site Plan (CSP1), prepared by Aller-Lingle Architects, P.C., dated
8/10/08. This plan provides pertinent information concerning the site, including:
Possible expansion and parking lot locations, but other options would be
appreciated and considered.
b. Existing Senior Center Auto Cad Drawings for Civil, Architectural, Mechanical,
Electrical to provide layout and utilities.
C. Existing Senior Center project specifications volume one and volume two.
d. Information on the security system that is to be installed for existing building
which will need to be included with the new expansion project.
e. Information on Hearing loop which is to be incorporated into this expansion
project for both existing and new addition.
We appreciate the time you expended in preparing your proposal presentation and look forward