Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7405 TURNBERRY ROAD IMPROVEMENTS PROJECT (6)City of ort /F�Collins �� Engineering Planning, Development &Transportation Engineering 281 North College Avenue P.O. Box 580. Fort Collins, CO 80522 0580 970.221.6605 970.221.6378 - fax Change Order Form PROJECT TITLE: Turnberry Rd. Improvements PROJECT NUMBER: 400901718 (Bid #7405), CONTRACTOR: Connell Resouces, Inc. (PO ##9924395) CHANGE ORDER NUMBER: 7 )reparing cnange oraers snow In oraer as separate numoe 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 1&2. See attached sheet for detail. 3. The contract cost will not change. $0.00 4. There will be no change in contract time. ORIGINAL CONTRACT COST $2,329,248.20' TOTAL APPROVED CHANGE ORDERS $65,152.63 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $0.00 TOTAL % OF THIS CHANGE ORDER 0.00% TOTAL C.O. % OF ORIGINAL CONTRACT 2.80% ADJUSTED CONTRACT COST $2,394,400.83 (Assuming all change orders approved) ACCEPTED BY: • NIA DATE: (Contractor's Representative) APPROVED BY: (Project Engineer- Engineering) DATE: APPROVED BY: DATE: (Project Manager - Parks) APPROVED BY: DATE: (Department Head) APPROVED BY: (Purchasing Agent over $60,000) cc: Contractor $97,795.53 Street Oversizing Purchasing ($97,795.53) Parks Project File .. .......... . CHANGE ORDER T., Turnberry Road Improvement Project SUMMARY OFWORK -:1 Rpm A uem r)..nmtitV I Wit C I I ire T-1.1 I Street Oversizing 1 LS $ 97,795.53 $ 97,795.5.3 2 Park Planning BCC Regional Trails 1 LS $ (97,795.53) $ (97,795.53) TOTAL $0.00 ±REASCN FOR CHANGE This change order transfers$97795.53 that was over appropriated in the park planning budget for costs that are Street 1,2 Oversizing costs. WHEN POSTED Posted May 28, 2013