HomeMy WebLinkAboutCHANGE ORDER - BID - 7332 MAX BRT PROJECT (10)PROJECT TITLE: CONTRACTOR: PROJECT NUMBER: PURCHASE ORDER NO.: DESCRIPTION: 1. Reason for change: CHANGE ORDER NO. 05 Mason Corridor - MAX BRT Concrete Express, Inc. 7332 (CEI project no. 12-009) 9124039 Mason Grade Separation at NRRC See attached Exhibit A to this change order. 2. Description of Change: See attached Exhibit A and B to. this change order. c Please reference Exhibit A for changes to contract time and definitions of Milestones 1 and 2 related to the Mason Grade Separation portion of the project. 3. Change in Contract Cost: $1,779,894.43 4. Change in Contract Time: 0 calendar days for substantial completion (MAX Project) 0 calendar days for final completion (MAX Project) ORIGINAL CONTRACT COST $31,886,878.94 TOTAL APPROVED CHANGE ORDERS $394,402.40 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $ 1,779,894.43 TOTAL % OF ORIGINAL CONTRACT, THIS C.O. 5.58% TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S 6.82% ADJUSTED CONTRACT COST $34,061,175.77 ACCEPTED BY: Contractor's Represen REVIEWED BY: Construction Manager APPROVED BY: C City Project Manager( APPROVED BY: \ City Engineer APPROVED BY: Purchasing Agent over all change orders n cc: City Clerk Architect Contractor Engineer Project File Purchasing DATE: 15 t13 DATE: DATE:S DATE�6^J3 "I5 DATE: G-, I7-t) Page 1 of 4 ma -ft CHANGE ORDER NO. 5 Exhibit A Project: Mason Corridor — MAX BRT Project No. 7332 (CEI project #12-009) Date: May 9, 2013 Description of Change: MAX Field Construction Office 3000 South College Ave., Suite 201 Fort Collins, CO 80526 fcgov.com/maxconstruction This change order adds the Mason Grade Separation at NRRC Overpass Ramps and substructure to the MAX BRT construction contract. This work includes design, procurement, installation and construction of the NRRC (aka Spring Creek) Overpass as is shown in the attached Mason Grade Separation at NRRC. Change Order 4-12-13 plans and Mason Grade Separation at NRRC-Change Order No 5 specification special provisions. Elements of construction not specifically outlined in the Mason Grade Separation at NRRC-Change Order No 5 specifications and special provisions shall be specified, constructed and warranted according to the Specifications and Contract Documents for the MAX Project — Bid #7332 as amended herein. Specifically, the work consists of excavation, embankment, caisson installation, reinforcing steel, structural concrete, sitework, railing, traffic control, wall construction, lighting, site furnishings, mobilization and general conditions. Through Work Change Directive (WCD) 051, MAX Proiect — Bid #7332 contract specifications and construction plans have been formally amended to include the following additions. Snecifications: Revision of Section 504 Concrete Block Facing MSE Wall Revision of Section 514 Pedestrian Railing (Steel) Revision of Section 601 Structural Concrete Revision of Section 613 Lighting and Power Equipment Revision of Section 715 Lighting Materials Revision of Section 622 Pedestrian Ramp Structure Revision of Section 622 Rest Area and Building (Site Furnishings) Revision of Section 630 Construction Traffic Control Construction Plans: Contract Drawing Sheets 1-46 Change in Contract Value: The contract value is being increased by $1,779,894.43. Please see attached quantity and unit price cost schedule attached hereto and incorporated by reference as Exhibit B. .. g : _ °ripe order;`. Total Contract Chan a -this cha WCD051 — Mason Grade Separation $1,779,894.43 Total Change Order: $1,779,894.43 Page 2 of 4 Change in Contract Time: The MAX Project Bid #7332 contract documents; Section 00520 — Agreement, Article 3; Part 3.2 Liquidated Damages is hereby modified as follows. 1) Substantial Completion: Add after the first paragraph: Eight Hundred Dollars ($800) for each calendar day or fraction thereof that expires after July 31, 2013 for Substantial Completion Milestone 1 of the East and West Plaza Piers as shown on the Mason Grade Separation at NRRC. Change Order4-12-13; Sheets 16 through 32. Substantial Completion Milestone 1 shall be defined as completion of the East and West Plaza Piers, ready for inspection, concrete initially cured, forms stripped and available for conformational measurements of bearing for steel bridge fabrication. Two Thousand Dollars ($2,000) for each calendar day or fraction thereof that expires after October 31, 2013 for Substantial Completion Milestone 2 of the Mason Grade Separation as shown on the Mason Grade Separation at NRRC, Change Order 4-12-13 plans and as defined in the Mason Grade Separation at NRRC-Change Order No 5 specifications and the MAX Project — Bid #7332 contract documents. Substantial Completion Milestone 2 shall be defined as completion of the Mason Grade Separation project as defined in the plans and specifications referenced above. This portion of the contract (WCD051/Change Order No. 5) shall be ready for final acceptance. 2) Final Acceptance: Add after first paragraph: After Substantial Completion of Milestone 2, Five Hundred Dollars ($500) for each calendar day or fraction thereof that expires after a 15 calendar day period for Final Payment and Acceptance. Final Acceptance of the Mason Grade Separation shall be defined as all work complete, including soil preparation, seeding and construction punch list(s) ready for final acceptance and beneficial use of the site and facility. The contract times for the MAX Project are outlined below. �h�P` 1.bu x-rtxnvxcc`C d t t y1� ^••.. x^� :; Ir 4:w' •. Contract Time Summ#ry Revised Substantial Completion Date January 8, 2014 (BRT Project through CO #4): Revised Final Acceptance Date February 7, 2014 (BRT Project through CO #4): Substantial Completion Milestone 1: July 31, 2013 (Mason Grade Separation CO#5) Substantial Completion Milestone 2: October 31, 2013 (Mason Grade Separation CO#5) Final Acceptance: November 15, 2013 (Mason Grade Separation CO#5) Page 3 of 4 Exhibit B to Change Order No. 5 (WCD051) -GE CHANGE;ORpER1BIDR#G OQNSTRUCTIONCOFMASONiGRADESEPARATION'ATNRR'C1_ _ - _, {eY IRON(GREEN; CEI,MDAJE%4,19 - -- 2013_. _ _ - y ITEM NO. ITEM DESCRIPTION UNIT UNIT COST QUANTITY ITEM COST~ 201 CLEARING AND GRUBBING L S $8,900.00 1 $8,900.00 202 REMOVAL OF ASPHALT MAT SY $4.80 478 $2,294.40 203 BLADING HR $118.00 8 $944.00 206 STRUCTURE EXCAVATION CY $13.50 372 $5,022.00 206 STRUCTURE BACKFILL (CLASS 1) CY $20.25 100 $2,025.00 206 STRUCTURE BACKFILL (CLASS 2) CY $16.00 303 $4,848.00 206 MECHANICAL REINFORCEMENT OF. SOIL CY $34.00 60 $2,040.00 206 ISHORING (AREA 1) LS $6,800.00 1 $6,800.00 206 FILTER MATERIAL (CLASS B) CY $40.00 62 $2,480.00 208 EROSION LOG (12 INCH) LF $5.00 55 $275.00 208 SILT FENCE LF $1.50 100 $150.00 208 CONCRETE WASHOUT STRUCTURE EA $1,080.00 1 $1,080.00 208 REMOVAL AND DISPOSAL OF SEDIMENT (EQUIPMENT) HR $138.00 20 $2,760.00 208 REMOVAL AND DISPOSAL OF SEDIMENT (LABOR) . HR $145.00 40 $5,800.00 208 EROSION CONTROL SUPERVISOR HR $64.38 40 $2,575.20 210 ADJUST MANHOLE EA $524.00 1 $524.00 212 SEEDING (NATIVE) ACRE $9,275.00 0.14 $1,298.50 212 SOIL PREPARATION (SPECIAL) ACRE S17,815.00 0.05 $890.75 213 MULCHING (WEED FREE STRAW) ACRE $1,500.00 0.14 $210.00 213 MULCH TACKIFIER LB $3.00 21 $63.00 403 HOT MIX ASPHALT (PATCHING) (ASPHALT) SY $48.50 35 $1,697.50 412 CONCRETE PAVEMENT (6INCH) SY $39.10 456 $17,829.60 412 CONCRETE PAVEMENT (6 INCH)(SPECIAL) SY $87.25 69 $6,020.25 412 CONCRETE PAVEMENT (8 INCH)(SPECIAL) SY $165.00 59 $9,735.00 420 GEOTEXTILE (EROSION CONTROL)(CLASS 1) SY $2.40 140 $336.00 420 GEOMEMBRANE SY 1 $9.00 99 $891.00 503 DRILLED CAISSON (42 INCH) LF $346.00 99 $34,254.00 504 BLOCK FACING SF $18.00 251 $4,518.00 506 RIPRAP (12 INCH) CY $136.45 17 $2,319.65 514 PEDESTRIAN RAILING (STEEL) LF $186.00 333 $61,938.00 601 CONCRETE CLASS D (MISCELLANEOUS) CY $500.00 34 517,000.00 601 CONCRETE CLASS D (BRIDGE) CY $448.30 62 $27,794.60 601 STRUCTURAL CONCRETE COATING SY $9.80 159 $1,558.20 602 REINFORCING STEEL LB $1.00 17063 $17,063.00 602 REINFORCING STEEL (EPDXY COATED) LB $1.06 10008 $10,608.48 609 CURB AND GUTTER TYPE 2 (SECTION II-B) LF $12.90 187 $2,412.30 613 LIGHTING AND POWER EQUIPMENT LS S42,000.00 1 $42,000.00 620 SANITARY FACILITY EA $1,500.00 1 $1,500.00 622 PEDESTRIAN RAMP STRUCTURE LS $1,207,806.00 1 $1,207,806.00 622 STRUCTURAL ENGINEERING SERVICES FOR RAMP LS S42,900.00 1 $42,900.00 622 BICYCLE RACK EA $1,200.00 3 $3,600.00 622 TRASH RECEPTACLE EA $1,610.00 2 $3,220.00 625 SITE SURVEY & STAKING LS S4,845.00 1 $4,845.00 626 fMOBILIZATION LS $130,000.00 1 $130,000.00 630 CONSTRUCTION TRAFFIC CONTROL LS S13,900.00 1 $13,900.00 700 F/A MINOR CONTRACT REVISIONS FA S50,000.00 1 $50,000.00 700 AA EROSION CONTROL FA $2,000.00 i $2,000.00 715 2 INCH ELECTRICAL CONDUIT LF $69.20 100 $6,920.00 715 2 INCH CONDUIT (PLASTIC) LF $23.60 180 $4,248.00 TOTAL = $1,779,894.43 Page 4 of 4 ditesco Date of Estimate: 6-Mar-13 Contract Type: Mason Corridor BRT (Hard Bid) Existing Contract or PO (YIN): Y Independent Cost Estimate Description of Goods (A) or Services (B): A The scope is to provide temporary shoring in order to construct wall #3. The shoring was not identified in the plans or the bid tabulation, but is requried in order to comply with the BNSF requirements for excavations in their ROW. It is anticipated that this shoring will be required for a minimum of 3.4 months. I have obtained the following estimate from; Published Price List / Past Pricing (date) Quotes Engineering or Technical Estimate (performed by) Independent Third Party Estimate (performed by) Beau Javemick Other (specify) Cost Estimate Details and explanation of justification: (Estimale calculated ln'US Dollars) Cnst of Standard Itome Product. Cost ($/unit) Unit Quantity Notes TOTAL Delivered Data Source $ SubTotal $. Cost of Services, Repairs, or Non -Standard Items ItemJiask: Materials or Work Description Unit Unit QTY Notes ' Price TOTAL "Unit price for shoring was checked against a local contractor using the Monthly rental for Shoring SF/Month. $ 20.00 3400 same subcontractor as CEI. $ 68 000.00 r'-ro f�Assumed,Pesfsirvovn:za.l Encygx mvpe:.ye,r.>i.:me fo+rtr40- 'h:rs..,- at $ 100/hr t I t}" De L'u $4,0 . 4:. 000.0'0+.a„Shodn Site Survey—, LS s�4 $42;200.001 t%-+>=F�AssumedIwo daysV survey crewat$1'100 perda-t,� 2;200.0V -. ,: ,...! -r'" • a' -^ "7' +^ t "'" - „ 1' F-� fi%py*' •m y;; 4- -This has'been changed;because'.markup'allo ,don subcontractorj', -.,._ .,�..�, y ,> 5 /o Subcontractor Marku^�, LS •+'Z $ 3710' .00'�� .�.-�5'• 1 t'.ft? .. w,'cr}:Md'4,•'�.e_r -work,is5^/om >�r,: nx+.y ..* �" - 00 "Supervision of safety labor to install safety material. Estimated to be a Additional supervision and labor DAYyi $ 110.00 21 foreman - $55/hr for two hours per day. $ 2,310.00 "rr ]� Zi-H4 I\+I ram` +}}YSEztra m- matenals fogsa(ety used CElrpmposed number,$692 per Site SafetMalenals.f "`'- '� x ^". LS`"'""a'-'=c4'""o,. g�4", $ 2,076.74 a,. 1 month rs a reasonable amount for thrs,wark swpe ^- - u 'fir+-�*,.'+^.-��. x - - ..0 • ae - $•2,076.741 15%:.Markup on Labor ands t - r'•�.}r4r nx. '1*"qr >4 .' .a t• ;-.�1 P''4;+ 2it„ `�, :y -,. o .. ; �, ' ThlsAthe.15/,markup alloNed�for labor andymaleryalsi 1 t ;• .,.,� Materials' - •-• LS bsy $- 658.01 .+ $s^. .1 . �.�F', '-"�+ - •,658:01 SubTotal $ 82,954.75 Signature of Preparer.-- 'ae6g, Ge,eml antl MMristro,iw Ememea TOTAL $ 82,954.75 One time cost: $ 12,644.75 Estimated month) cost: $ 68.770.00