Loading...
HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 9132197EXIIIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS and InterweA Consulting Group Inc. DATED: May 2, 2013 Work Order Number: V-400901800-13 Project Title: 7392 Civil Engineering, Design, Drafting & Surveying Services On -Call S. Lemay Avenue Southbound Left Turn Lane Analysis Commencement Date: May 1, 2013 Completion Date: August 31, 2013. Maximum Fee: (time and reimbursable directs costs): not to exceed $9,500.00 Project Description: See Attached. Scope of Services: See attached scope of service. Service Provider agrees'to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of 'the Services Agreement and this work order (including ,the attached forms), the Services Agreement shall control. Service Provider Date: May 2; 2013 Approved By: Purchasing Agent over $60,000 The attached forms consisting of three (3) pages (including the work order form) are: hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given. City, f Fo C`olli By: ti\`t7� Date: May 2, 2013, jrF7 INTERWEST I CONSULTING GROUP April 25, 2013 Mr. Rick Richter City of Fort Collins 281 College Avenue Fort Collins CO 80522 RE: S. Lemay Avenue Southbound Left Turn Lane Analysis Civil Site Engineering and Design Services Dear Rick, Attached is the project scope and fee estimates based on our discussions for the project. Description Interwest Consulting Group (Interwest) will provide civil engineering services for the conceptual design of a second southbound left turn lane on S. Lemay Ave. approaching E. Mulberry Street. Scope of Services Conceptual Roadway Design - Prepare conceptual level plans for the following arterial improvements to support the addition of a second southbound left turn lane: 1. Establish preliminary curb, gutter and sidewalk horizontal and vertical alignments along the west side of Lemay between Magnolia and Mulberry. This information will be used by PRPA, City Traffic and City Light and Power to design facilities along the future commercial site frontage. 2. Identify required median modifications between Magnolia and Mulberry 3. Prepare alternative context plans that will evaluate the impacts associated with the future third westbound through lane along Mulberry and the lane geometry required to.tie Lemay Ave. back to the north side of the Poudre River Bridge. This task does not include vertical alignment considerations beyond a conceptual design level. 4. Prepare conceptual Striping Plans 5. Meetings and coordination with city staff and the affected utility providers Estimated Fee: $8,000 Floodplain Coordination — This task includes coordination and meeting time with Anderson Consulting Group and the City Floodplain Manager to discuss alternatives to minimize or eliminate the current floodplain spill condition over Lemay Ave. This does not include hydraulic modeling of the proposed alternatives. Two meetings, approximately one hour each, are anticipated. Estimated Fee: $1,250 Reimbursable Items — Including prints, mileage, and deliveries, etc. Estimated Fee: $250 1218 W. ASH, STE. C, WINDSOR, COLORADO80550 TEL. 970.674.3300 - FAX 970.674.3303 Assumptions 1. The city Traffic Department and FC Light and Power will provide the necessary design input to facilitate the conceptual design 2. No public outreach or hearings are anticipated 3. The southern limit of the analysis area is the existing Poudre River Bridge 4. Meetings, coordination and/or document submittals to CDOT are not anticipated Schedule We would anticipate approximately 2 weeks from authorization to proceed for the initial document preparation, followed by meetings and coordination and subsequent revisions to the alternative plans. Please call me at 970-460-8487 if you have any questions or need any additional information. Sincerely, Robert Almirall, PE Senior Project Manager