Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 7337 ELECTRICAL CONTRACTOR 2012 (4)Exhibit A: Work Order WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN the CITY OF FORT COLLINS and (contractor name)��era c DATED: April 30, 2013 Work Order Number: b i ` q � Z (O12- Purchase Order Number: R 1 3 2-1 9-2 Project Title: Commencement Date: 3 - 2(-, - 13 Completion Date: S- /D - Maximum Fee: (time and reimbursable direct costs): Project Description: !A� I( 2 M etiu to p5�.. e �S fn Q " Inl ,.; Aede- �i ram, f3 t It ;ems Scope of Services: Service Provider agrees to perform the above services and those set forth on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Services Agreement shall control. The attached forms consisting of consisting of lam) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Service Provid6r: y Date: City of Fort Collins: Submitted By: Mana6er Date: Approved by: Director of Purchasing Risk Management (if over $60,000.) Date: S ' - 13 7337 Electrical Contractor Agreement 2012 Page 7 of 23 CONSTRUCTION SERVICES March 29, 2013 Attn: Bryan Garrett Re: City Museum Lighting Project Interstates Construction Services, Inc. is pleased to present pricing for the above referenced project. All direction for this project has been taken from the job walk between yourself and Josh Barber on 3/26/2013 Proiect Scope Includes the Following: - Purchase and install QTY (2) 100 amp distribution panel next to the existing 400 amp panel in the server room. o Purchase and install QTY (2) 100 amp branch breakers and install into the existing 400 amp distribution panels. These will be used to feed the two new distribution panels. - Purchase and install electrical provisions for the following: o QTY (32) quadplex receptacles in the dispatch center. (2 per work space) (total of 8 per section) o QTY (4) quadplex receptacles in the dispatch supervisors office for the hard drives. (to be located under the workspace counter top) Clarifications: - This pricing is good for 30 Days from date of issue. - A one year warranty applies for all installation and materials except where manufacturer warranties apply. - Pricing does not include cost for environmental monitoring while underground work is being conducted. This will be provided by the owner per discussion during the job walk. - Pricing does not include any cost for the lighting poles, heads, caisson bolts, ect. These will be provided by the City per discussion during the job walk. It is assumed that this project can be executed during normal business hours Monday through Friday. If this project is to be executed during other than normal business hours then it will be at additional cost. (we plan to coordinate the work with the facility to minimize the impact to the dispatch area) Our Total Lump Sum Price for this Project is: $15,280.00 If you have any questions or I can be of further service please feel free to contact me at your convenience. Sincerely, Josh Barber Service Manager Interstates Construction Services, Inc. 2636 Midpoint Drive Fort Collins, CO 80525 Phone: 970.221.1776 x113 Cell: 970.988.8329 Fax: 712.722.7987 Josh. Barber@interstates.com UNDERSTANDING NEEDS ► DELIVERING RESULTS From: Bryan Garrett To: Doua Clapp Subject: FW: Police Station UPS Power Pricing Date: Monday, April 29, 2013 8:04:51 AM Attachments: City of Fort Collins Police Services UPS Power.odf Doug, Rosanne asked me to forward this to you. This is the estimate for the work that we have started for Mary Moore. Let me know if you have any questions. Bryan From: Joshua Barber[mailto:Joshua.Barber@interstates.com] Sent: Friday, March 29, 2013 9:00 AM To: Bryan Garrett Cc: Doug Coltharp Subject: Police Station UPS Power Pricing Bryan, Here is the pricing for the UPS Power project that we walked earlier this week. This price came out considerably higher than the price we discussed with Mary during the job walk. The reason for the difference is the fact that we are now purchasing two 100 amp breakers for the existing panels and installing two new panels full of breakers instead of the one we planned before. Also due to the complexity and sensitivity of working with this UPS system live I have priced this work to be executed by two service technicians instead of the normal service tech. and apprentice. Hopefully this price is not out of reach for their budget. Let me know if you have any questions. Thanks, Josh Barber Service Manager Interstates Construction Services. Inc. 2636 Midpoint Drive Fort Collins, CO 80525 Phone: 970.221.1776 x113 Cell: 970.988.8329 Fax: 712.722.7987 Joshua. BarberlcD interstates.com UNDERSTANDING NEEDS ► DELIVERING RESULTS 1Ati BC 2011 r-r<p DIAMOND 16 AWARD£•�hgka hxm Associated Builders and Contractors STEP Diamond Participant EC&M Top 50 Electrical Contractor ENR Top 600 Specialty Contractor This e-mail is confidential and for the use of the intended recipient(s) only. If you are not the intended recipient or you have received this e-mail in error, please notify the sender immediately and then delete this e-mail with all attachment(s). You must not use, disclose or distribute this e-mail or the information contained in or attached to this e-mail without the author's prior permission. We have taken precautions to minimize the risk of transmitting software viruses, but we advise you to carry out your own virus checks on any attachment to this message. We cannot accept liability for any loss or damage caused by software viruses. From: Bryan Garrett To: Doua Clapp Subject: FW: Police Station UPS Power Pricing Date: Monday, April 29, 2013 8:04:51 AM Attachments: City of Fort Collins Police Services UPS Power.ndf Doug, Rosanne asked me to forward this to you. This is the estimate for the work that we have started for Mary Moore. Let me know if you have any questions. Bryan From: Joshua Barber [mailto:Joshua.Barber@interstates.com] Sent: Friday, March 29, 2013 9:00 AM To: Bryan Garrett Cc: Doug Coltharp Subject: Police Station UPS Power Pricing Bryan, Here is the pricing for the UPS Power project that we walked earlier this week. This price came out considerably higher than the price we discussed with Mary during the job walk. The reason for the difference is the fact that we are now purchasing two 100 amp breakers for the existing panels and installing two new panels full of breakers instead of the one we planned before. Also due to the complexity and sensitivity of working with this UPS system live I have priced this work to be executed by two service technicians instead of the normal service tech. and apprentice. Hopefully this price is not out of reach for their budget. Let me know if you have any questions. Thanks, Josh Barber Service Manager Interstates Construction Services. Inc. 2636 Midpoint Drive Fort Collins, CO 80525 Phone: 970.221.1776 x113 Cell: 970.988.8329 Fax: 712.722.7987 Joshua. Barber(a)interstates.com UNDERSTANDING NEEDS ► DELIVERING RESULTS _00IBC 2011 IMP DIAMOND 'SWARD fti.1.Mk. rnn.. Associated Builders and Contractors STEP Diamond Participant EC&M Top 50 Electrical Contractor ENR Top 600 Specialty Contractor This e-mail is confidential and for the use of the intended recipient(s) only. If you are not the intended recipient or you have received this e-mail in error, please notify the sender immediately and then delete this e-mail with all attachment(s). You must not use, disclose or distribute this e-mail or the information contained in or attached to this e-mail without the author's prior permission. We have taken precautions to minimize the risk of transmitting software viruses, but we advise you to carry out your own virus checks on any attachment to this message. We cannot accept liability for any loss or damage caused by software viruses. CONSTRUCTION SERVICES March 29, 2013 Attn: Bryan Garrett Interstates Construction Services, Inc. is pleased to present pricing for the above referenced project. All direction for this project has been taken from the job walk between yourself and Josh Barber on 3/26/2013 Project Scope Includes the Following: Purchase and install QTY (2) 100 amp distribution panel next to the existing 400 amp panel in the server room. o Purchase and install QTY (2) 100 amp branch breakers and install into the existing 400 amp distribution panels. These will be used to feed the two new distribution panels. - Purchase and install electrical provisions for the following: o QTY (32) quadplex receptacles in the dispatch center. (2 per work space) (total of 8 per section) o QTY (4) quad plex receptacles in the dispatch supervisors office for the hard drives. (to be located under the workspace counter top) Clarifications: - This pricing is good for 30 Days from date of issue. - A one year warranty applies for all installation and materials except where manufacturer warranties apply. - Pricing does not include cost for environmental monitoring while underground work is being conducted. This will be provided by the owner per discussion during the job walk. - Pricing does not include any cost for the lighting poles, heads, caisson bolts, ect. These will be provided by the City per discussion during the job walk. - It is assumed that this project can be executed during normal business hours Monday through Friday. If this project is to be executed during other than normal business hours then it will be at additional cost. (we plan to coordinate the work with the facility to minimize the impact to the dispatch area) Our Total Lump Sum Price for this Project is: $15,280.00 If you have any questions or I can be of further service please feel free to contact me at your convenience. Sincerely, Josh Barber Service Manager Interstates Construction Services, Inc. 2636 Midpoint Drive Fort Collins, CO 80525 Phone: 970.221.1776 x113 Cell: 970.988.8329 Fax: 712.722.7987 Josh.Barber@interstates.com UNDERSTANDING NEEDS ► DELIVERING RESULTS